Key Team members: Document Title: JSEA for Dewatering Identification / Document No:
H H
Consequenc
Consequenc
POTENTIAL HAZARDS
Probability
Probability
REQUIRED HAZARD CONTROL
Checked
Against each task step list the potential Verifying
Procedure / Document / Measures
No hazards that could cause injury / damage M M Responsibility Document or
e
For each hazard identified list the control measures required to
when the task step is performed. recourses
eliminate or minimize the risk of injury and damage.
(scenario thinking) L L
Page: 1 of 3
DOCUMENT TITLE: JSEA for: “Dewatering” KNOWLEDGE AREA HSSE MANAGEMENT
Date: 22.05.15
DOCUMENT NO: 40014004-HSSE-JSA-008 PROCESS GROUP EXECUTION PHASE Rev.: 2
Project Title: Gamba Export Sealine Replacement Project JSEA Work Sheet
Key Team members: Document Title: JSEA for Dewatering Identification / Document No:
H H
Consequenc
Consequenc
POTENTIAL HAZARDS
Probability
Probability
REQUIRED HAZARD CONTROL
Checked
Against each task step list the potential Verifying
Procedure / Document / Measures
No hazards that could cause injury / damage M M Responsibility Document or
e
For each hazard identified list the control measures required to
when the task step is performed. recourses
eliminate or minimize the risk of injury and damage.
(scenario thinking) L L
Injuries: Due to noise, moving / rotating Use of the right PPE (coverall, helmet, gloves, safety shoes,
2.1 parts, high pressure equipment and B 3 M goggles, ear protection); B 2 M Foreman
vibration. Ensure that non-essential personnel are removed from site;
Jetting, pumping high pressure water down Right PPE, helmet, gloves, coverall, safety shoes;
2.3 into the riser. Hose collapsing, injuries: fall, B 2 M Ensure that non-essential personnel are removed from site; B 1 L Foreman
trip, slip. Supervisor on site;
Injuries: Due to noise, moving / rotating Use of the right PPE (coverall, helmet, gloves, safety shoes,
2.1 parts, high pressure equipment and B 3 M goggles, ear protection); B 2 M Foreman
vibration. Ensure that non-essential personnel are removed from site;
Page: 2 of 3
DOCUMENT TITLE: JSEA for: “Dewatering” KNOWLEDGE AREA HSSE MANAGEMENT
Date: 22.05.15
DOCUMENT NO: 40014004-HSSE-JSA-008 PROCESS GROUP EXECUTION PHASE Rev.: 2