Assessors Name: Assessors signature: Location of Date of Review date:

Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

Skin HIGH YES YES YES Prior to the  Ensure that Project
35 irritation and commencement operatives are made Manager
Skin of the activity aware of the
diseases potential health Construction
DUST effects of Dust Manager
exposure.
Site Manager
 Provide good
Occupational HIGH YES YES YES housekeeping to Project
Asthma and ensure that excessive Engineer Medium
Rhinitis amounts of dust do
not accumulate in the HSE Manager
working area as this
can cause fire or
explosion hazards.

Chronic HIGH YES YES YES  Ensure effective and


Obstructive adequate ventilation
lung disease systems at the work
area. Dusty
processes should be
segregated.

 Where reasonably
practicable, control
Exposure to HIGH YES YES YES the dust level to
microorganis within safe
m occupational limits.

 Use water hose to


wet dust down at the
point of dust

RISK RATING MATRIX 1 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

generation. Water
Eye irritation HIGH YES YES can be used through
non-electric cutting
or grinding tools to
reduce the dust in
the air.

 Medical monitoring
Fire and HIGH YES YES should be available to
Explosion those workers where
they may be
exposed.

 Suitable type of
Personal protective
Reduce HIGH YES YES equipment should be
visibility used and workers
must be trained in
their proper use and
maintenance.

 Provision for
DUST Emergency Rescue
Plan shall be in place.
All operatives shall
Slippery HIGH YES YES understand what to Low
surface do in case of any
condition incidents happened.

 Arrangement of
Welfare facilities
should be provided in
case of any accident.

RISK RATING MATRIX 2 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

RISK RATING MATRIX 3 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09