DATE: 18-08-2020
a) RISK ASSESMENT
Work Risk assessment about all work and possible risks at the site, is listed as follow:
(Minor (Major
injury Injury,
(FAC), Disabling
S
Minor illness, (Single (Multiple
(Delay Only)
damage, damage & Fatality) Fatalities)
Lost time multiple
injury, Recordable
illness) injuries)
P = Likelihood P 1 2 3 4 5
Very Likely = 5 5 L L L M H
Likely = 4 4 L L M H H
May Happen = 3 3 L M M H H
Unlikely = 2 2 L M M H H
Very Unlikely = 1 1 L M H H H
1
Risk
Risk Assessment
Project Name Assessment Prepared by Reviewed by Approved by Rev. No Date
for the activity of
Number
Likelihood
Likelihood
Residual
Severity
Severity
Sub activity Exposed Additional control
Activity Hazard Risk Existing controls
Risk
Risk
(task) groups methods
8
shackles/ Eye Damage Regular inspection. Competent rigger
bolts material and supervisor
Approved method statement and
Lifting plan
Heavy Lifting
& rigging
Activity by Workers Lift plan is in use, crane operator
Collapse of Injury or Trained Rigger and
Crane and 3 4 12 & must be aware of it and respect 1 4 4
Load serious injury rigging plan
Visitors while lifting.
9
Improper
Injury or Wear Proper PPE’s
handling of
serious
beam and Barricade and clear the area. Trained Supervisor
injury,Damage Workers 2 3 6 1 3 3
rigging plate and skilled Team
materials or Pre-task briefing brfore the
during
tools activity.
installation