Likelihood
Likelihood
Final Risk
Effect risk from hierarchy
Severity
Severity
Number
Number
(Yes/No) of control for
Risk
of control for
each identified
each identified
hazard
hazard
are given at
sharp contact
points
All
trailer/pickups
are following
site speed limit,
Experienced
/licensed driver
is engaged for
the transferring
material
Trained persons
records are
available with
MSRA and
PTW
Lifting plan is in
place for critical
lifting
Lifting checklist
has been
prepared as per
Vision lifting
PTW system
Certified lifting
DUBAI ELECTRICITY AND WATER AUTHORITY
supervisor is
engaged for
lifting Operation
3rd party
certified
flagman is
engaged for the
safe
manoeuvring/m
arching of
loaded trailer at
site.
Visual
inspection has
been carried out
at the time
loading
&unloading
steel material
on to the trailer
Erection/Use of Fatality Operatives Yes Certified 2 1 5 10 Exclusion zone 2 5 1 1
False work Major/minor Workers Ministerial order No lifting 0 0 shall be 0
Collapse of False work
injury Staffs 32/1982 supervisor established at
Property Pedestrian DEWA SP06 Appointed the lifting zone
damage CCSP 11.2 for lifting and below the
Material CCSP 20.3 Operation work at height
Injury of operatives DM activity
DUBAI ELECTRICITY AND WATER AUTHORITY
signals to accessories, if
the crane any defects are
operator, found replace
inclusive of it.
Walkie-
Talkie
Competent
Rigger has
been
permanently
in
communicati
on with
Crane
Operator.
Use of Fatality Drivers Ministerial order 32 of Approved 2 1 5 10 MSRA shall be 2 2 1 4
Scaffolds Production Supervisor 1982 Article 19 and 20 method 0 communicated
Manual Handling – loss Other DM code of statement in to all crew prior
Back injury/ Strain/ Property operatives Construction Safety place prior to
to the
Sprain Damage Helpers practice chapter 8 start activity
Scaffolds are commencemen
Serious Visitors DEWA Covid19
Collapse/Collision - precautionary erected to t of the task
injury
Injury to persons Material requirements manufacturer’s
https://www.dewa.gov. instructions. All person shall
damage
ae/en/covid19 Only certified be inducted by
Falls from Height - CCSP-8 erectors erect main contractor
scaffolds as
DUBAI ELECTRICITY AND WATER AUTHORITY
Delivery and Fatality Drivers Ministerial Order Work permit has 2 1 2 10 Area shall be 2 5 1 1
offloading of Production Supervisor No. 32 / 1982 been obtained 0 0 inspected/surve 0
materials from trailers loss Other Article-19 prior to material yed prior to the
Property operatives DEWA SP06 delivery at site positioning of
CCSP 22 Assigned site the crane for
DUBAI ELECTRICITY AND WATER AUTHORITY
using mobile crane Damage Helpers CCSP 21.1 Engineer has any
Serious Visitors CCSP 7.1 been notified underground
Poor site logistic injury CCSP 4.2 commencement utilities or
arrangement Material of any delivery overhead
damage at site at least obstructions
2days prior Barricade the
Logistic plan is area, display
in place for steel cautionary
material delivery board.
and offloading All cladding
Preparation of materials used
traffic diversion will be
by main delivered to site
contractor shall be
Site trained inspected
installation before
crew only accepting
engaged to /receiving
work Delivery of
Use only Vision material shall
approved plant be
and equipment appropriately
with DM third scheduled
party approved Material shall
valid load test be stored in
certificate. permitted
location
DUBAI ELECTRICITY AND WATER AUTHORITY
failing to take material Staffs CCSP.20.3 been followed ensure they are
necessary damage Plant and fully functional
precautions and Material equipment Plan and
ground failure due to damage positioning equipment
severe points has movement shall
rain/landslides/wash been surveyed be planned and
out and inspected executed
jointly by All audible
engineer and alarm shall be
operator prior operational
to the task Plant and
Necessary equipment’s
control shall be parked
measures have in designated
been areas only
undertaken Good
after the survey housekeeping
and inspection shall be
Site speed limit maintained
is followed Experienced
All vehicle operators shall
movements are be engaged
controlled by
flagman’
Flagman
identified by
DUBAI ELECTRICITY AND WATER AUTHORITY
safety jacket
and helmet
Safe distance
is observed
when moving
or working
near power line
depending on
the line voltage
Storage and use Property Ministerial Order Placing of 2 5 5 50 2 2 1 4
of construction damage, MSRA shall
Operatives No. 32 / 1982 more than
material. CCSP ,22 two bundles be
Workers and
material Staffs CCSP 21.1 in a stack is communicate
Fall of stacked damage CCSP.20.3 not permitted d to all crew
materials/collapse CCSP.7.1 Weight and Daily Safety
of stacked Serious width ratios Task Risk
bundles/Slip, trip Injury are observed Reduction
and fall/Sharp Designated
edges Talk shall be
area is only
used for given prior to
storage the task
Firm and commencem
even floor ent
are used for Effective
store supervision
Keep panels
shall be
DUBAI ELECTRICITY AND WATER AUTHORITY
bundles
ensured
slightly
inclined to
allow the
Moisture to
run off
Barricade
the area and
display
storage sign
boards
Observe the
housekeepin
g and avoid
slip and trip
Protect
sharp edges
with
rubber/sleev
es
scaffolders ground
are only to permitted only
erect, alter in an
and emergency
dismantle case allowed.
scaffold Safety Task
Certified Risk Reduction
inspector is Talk shall be
only given to the
permitted to crew members
do scaffold prior to the task
inspection begins\
Approved Drop zone area
scaffold shall be
components provided with
are only barriers and
used for signs
construction Double lanyard
Scaffold is Safety Harness
built on with shock
stable absorber shall
surface be worn by
All faces of surveyor and
scaffold are helper and
adequately clipped on at
braced designated
location while
DUBAI ELECTRICITY AND WATER AUTHORITY
percentage
tie off has
been
ensured
Adequate
supervision
is in place.
Installation
operatives
who are in
M.E.W.P
anchor their
double
lanyard full
body
harness
hook with
shock
absorber at
the
designated
point
All people
have been
undergone
for safety
induction
DUBAI ELECTRICITY AND WATER AUTHORITY
and possess
ID card with
them.
Fall of persons from Fatality Operatives Yes Work at height 2 1 5 10 Life line load 2 5 1 1
height & leading Major/minor Helpers Ministerial order permit has been 0 0 withstanding 0
edges/ Deck openings injury Other 32/1982 Article 19 and obtained for capacity shall be
at Mezzanine floor & Material workers 20 elevated level as per DM lifting
slap damage nearby CCSP-11.7 activities procedure*
CCSP 4.2 Leading edge DM lifting safety
CCSP 19.3 protection close procedure shall
to work location be followed*
has been Scaffold access or
adequately MEWP ‘shall be
provided used for
All floor opening installation of life
has been line& wire rope
identified and edge protection.
closed and Medically fit
marked or hard employees only
barricaded * allowed to work at
Site safety height*
procedure is Job rotation shall
been followed for be adopted to
the avoid employees
opening/closing ‘continuous
of roof* exposure to WAH
DUBAI ELECTRICITY AND WATER AUTHORITY
maintained inspection
away from shall be done
overhead for crane by
power operator
lines/obstructi using HSE
ons checklist
Overhead MSRA shall
/Underground be
utilities and communicate
ground soil d to all
stability have employees
been taken in Mandatory
to P.P.E`s (Hard
consideration hat, safety
during Mobile shoes,
crane reflective vest)
operation and and full body
load placing* safety
Limit switches harness with
are in lanyard &
operational shock
condition absorber shall
Exclusion be worn by all
zone has operatives
been working at
established height.
around lifting
DUBAI ELECTRICITY AND WATER AUTHORITY
area.
Hazard
warning signs
are displayed
spotter is in
place to
restrict
unauthorized
entry
operators
training
certificates/ID
cards are
available at
work
location /with
operators at
all the times
while lifting
competent
man power
has engaged
for the task
Competent
Banks men are
available
Production Drivers Ministerial Order Use of 2 5 5 50 Load 2 2 1 4
Striking of the Steel loss Supervisor No. 32 / 1982 Tagline is transferring
Columns and sheet Property Other Article-19 mandatory path shall be
bundles against men Damage operatives DEWA SP06 Long inspected/
Serious Helpers CCSP 22 taglines surveyed by the
or adjacent structure
injury Visitors CCSP 21.1 have rigger prior to
Material CCSP 7.1 provided to the positioning
damage CCSP 4.2 keep the overhead
handlers obstructions
body parts Exclusion zone
away from shall be
harm established at
considering the lifting zone
the size of and below the
the load work at height
Tag line activity
body is free Tagline hazards
from knot or shall be
DUBAI ELECTRICITY AND WATER AUTHORITY
by hand
signal and
Walkie-
Talkie
Keep away
all
machineries
and
personnel
from the
swinging
area as far
as possible.
Competent
Banks men
has been
engaged for
the task
Fall from height Fatality Scaffolder Work permit 2 1 5 10 Ensure the ladder 2 5 1 1
(leading edges, Property Workers Ministerial order 32 of obtained for 0 0 is long enough to 0
missing handrails, damage Staffs 1982 elevated level reach the access
/Over reaching Material Pedestrian CCSP-8 activities point, without
/Unstable ladder) damage Other workers CCSP-11.7 Access to over-reaching.
Major/Minor near by CCSP 19.3 elevated level are Ladders shall be
injury CCSP 4.2 restricted until the at least one meter
completion of higher from the
handrail point of the work
DUBAI ELECTRICITY AND WATER AUTHORITY
must be
approximatel
y 75 degrees
(ratio 4:1).
Use of Major/Minor Electricians Ministerial Order No. All extension 2 5 5 50 Inspected 2 2 1 4
Portable injury Operatives 32 / 1982 leads are and colour
Electric Appliances managed to coded tools
Property Staffs Article 10,11,13
Loose damage prevent tipping shall be used
Pedestrians DMTG 9,10
connection Material hazards. Safety Task
other workers DNTG 16,21
of Power cables are Analysis Risk
damage CCSP 16
cables/Enta placed on Reduction
nglement/C Local order 61
nonconductive Talk shall be
ontact with stands/hooks/hol conducted
sharp edges ders prior to task
Electricity -
Temporary cables begins
Electric
Shock have been
Electrocution removed from
site when not in
Fire - Injury to use.
Persons, Power tools have
Property the correct guard,
Damage shield or other
attachment that
the manufacturer
Manual recommends
Handling -
DUBAI ELECTRICITY AND WATER AUTHORITY
Back injury
Strain/ Sprain
Hot work Major/Minor Welders Ministerial Order No. Competent 2 5 5 50 Ensure that the 2 2 1 4
Flying injury Operatives 32 / 1982 persons with power tool shall
particles/sp Property Staffs Article 10,11,13 training have the correct
arks damage Pedestrians DMTG 9,10 certificates are guard, shield or
Electricity - Material other workers DNTG 16,21 engaged for the other attachment
Electric damage CCSP 16 task as per the
Shock, Double eye manufacturer
Fire/ Visitors - protection recommends
Explosion – Injury to (Goggle and MSRA shall be
Burn from eyes/ Flying Face shield ) communicated
fumes objects, Cuts usage has been
Noise -
established
Tinnitus/Nois
e Induced Trained
Hearing employees have
Loss. been engaged for
Inhalation of the task
Dust/ Fumes Mandatory PPEs
– Injury to has been
Respiratory provided inclusive
Tract/ of goggle
diseases/can
cer acute
and chronic
DUBAI ELECTRICITY AND WATER AUTHORITY
Use of Disc Major/Minor Operators Ministerial Order No. Power tool has 2 5 5 50 MSRA 2 2 1 4
Cutters and injury Operatives 32 / 1982 the correct guard, communicate
Abrasive shield or other d
Property Staffs Article 10,11,13
Wheels
damage Pedestrians DMTG 9,10 attachment as Competent
Bursting of abrasive
Material By-standers DNTG 16,21 per the supervision
wheel or disc
damage other workers CCSP 16 manufacturer Trained
Contact with wheel or Local order 61 recommends employees
disc
Double eye shall only be
protection engaged for
Clothing entanglement (Goggle and the task
with moving parts Face shield )
usage has been
established
Eye injury from flying Mandatory PPEs
particles has been
provided inclusive
of goggle
Inhalation of Dust
Exposure to hazardous
noise levels
Fire
Excavation & Property Workers DM CoCSP DEWA 1 5 5 2 STARRT Card 1 5 1 5
DUBAI ELECTRICITY AND WATER AUTHORITY
washing cleaned
facilities. after
each use
and deep
cleaned
once per
day
using
spray
bleach,
this will
include
all work
surfaces
and door
handles.
Bins to
be
cleared
once a
day by
the store
man
using a
face
mask
and latex
DUBAI ELECTRICITY AND WATER AUTHORITY
or site
gloves.
Stores to
be
managed
to keep a
high
stock of
soap,
hand
sanitizer
and
paper
towels
Hands
are to be
washed
with
soap and
hot water
for at
least 20
seconds
Manual Handling Musculoskel Material Yes DM 1 2 5 10 No persons 1 2 1 2
Pinch points etal handlers Ministerial Order 32 approved shall be
Poor disorders. Fabricators, of 1982 Article 19 and third party allowed to lift
Physical capacity, /Prolapsed Store keepers 20
DUBAI ELECTRICITY AND WATER AUTHORITY
•Awkward posture, disc/ Hernia other CCSP 19.1 certified or carry any
•Too heavy /unknown Personal operatives CCSP 7.4 lifting gears heavy/outsiz
load injuries are used for e item
•Poor ergonomics Back pain
manual without
•Slippery objects Material
•High frequency of Damage installation seeking help.
lifting/action On-site TBT Access
• Heat stress training on routes
manual unobstructed
handling .
provided. Environment
Manual al factors like
lifting / humidity;
handling heat etc. will
procedure be taken
are care
available. Proper
Comfortable communicati
clothing and on between
non- slip the
Safety shoes operatives
are provided shall be
Good house- followed in
keeping case of
DUBAI ELECTRICITY AND WATER AUTHORITY
continues
work
Manual
handling
activities
shall be
minimized
with the use
of
mechanical
means.
.Appropriate
PPE has
been worn
by all
operatives
involved in
the task
Aluminum Glazing work Major/Minor Operatives Ministerial order Approved 2 5 5 50 Ensure Job 2 2 1 4
Falls from Height - Back injury Staffs 32 of 1982 method safety analysis
Injury, Fractures, Cuts, Property Pedestrians Article 19 and statement must (JSA) or similar
Bruises, Death damage Visitors 20 in place prior to system is
Material other workers start the work completed
damage DM code of Harnesses
DUBAI ELECTRICITY AND WATER AUTHORITY
. manage
ment
move
immediately
Poor practices
. to the a/c
perform rest area in-
III. Job
ance content case feel
and and uncomfortabl
demand e.
product s.
ivity. RA shall be
IV. Physical
work communicate
Low environ d to the crew.
morale. ment. Work related
Poor V. Relation stress
ships at Management
motivat work.
plan shall be
ion. VI. Change
manage followed
Increas ment. All welfare
ed VII. Lack of facilities shall be
employ support. extended to the
ee VIII. Role workers for the
conflict. project activities
complai
nts.
Increas Provisio
ed ill- n of
health, cool
drinking
acciden water
DUBAI ELECTRICITY AND WATER AUTHORITY
ts and has
incident been
arrange
s d near
reports work
location
and
remind
them to
drink a
glass of
water
every
20
minutes
(Min.)
First
Aider
with Kit
is
availabl
e at the
first aid
centre
Emerg
ency
procedu
DUBAI ELECTRICITY AND WATER AUTHORITY
re shall
be
followe
d in the
event of
a work
related
stress.
TBT
Training
s are
done on
Mental
and
psychol
ogical
health.
Forema
n has
been
selecte
d only
physical
ly fit
employ
ees.
Freque
DUBAI ELECTRICITY AND WATER AUTHORITY
nt rest
or job
rotation
has
been
observe
d.
Continu
ous
supervi
sion to
monitor
situatio
ns of
work
related
stress.
If
anybod
y found
feel
dizzy,
weak or
nauseo
us
immedi
ately
DUBAI ELECTRICITY AND WATER AUTHORITY
take
him to
the rest
area.
Assessors Reviewed by: Approved by:
Assessors
Approved by
Name: Partuh Egoh & Aamer Raja Name: Sayed Arafa Name: Hazem Helmi
Designation: Project Safety & project Engineer Designation: Project Manager Designation: Project Director