You are on page 1of 57

DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

TO Carry out an activity Safely


Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)

Additional Final Risk


Existing control
Risk Rating control Rating
Measures with
Measures with
Legal requirements mechanism
Hazard Person(s) at mechanism
HAZARDS To be complied from hierarchy

Likelihood

Likelihood

Final Risk
Effect risk from hierarchy

Severity

Severity
Number

Number
(Yes/No) of control for

Risk
of control for
each identified
each identified
hazard
hazard

Shifting of Plant,  Fatality  Drivers  Ministerial Order  Approved 2 1 5 10  MSRA shall be 2 5 0. 5


Equipment and  Production  Supervisor No. 32 / 1982 MSRA has been 0 0 communicated 5
Materials loss  Other Article-19 followed and to all crew prior
 Property operatives DEWA SP06 sequence work to the
 Falling of material Damage  Helpers CCSP 22 observed commencemen
while traveling or  Serious  Visitors CCSP 21.1  Work permit has t of the task
at the offloading injury CCSP 7.1 been obtained  All person shall
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

point.  Material  CCSP 4.2 prior to the be inducted by


-Loose loads/ damage beginning of the main contractor
Entrapments/ task  Exclusion zone
Inadequate  Assigned site shall be
training. Engineer has established at
been notifying work area.
the  Rigger shall be
commencement in direct contact
of delivery and with
offloading operator/Effecti
material at site ve
at least 2days communication
prior shall be
 Preparation of established
traffic diversion inclusive of
is in place by Walkie-Talkie
main contractor  Daily Safety
 Separate Task briefing
pedestrian and shall be done
vehicle access by the
are provided supervisor
 Safe Working /foreman and
Load (SWL) of record shall be
the trailer is maintained at
observed work location
 Use only Vision  Height and
width ratio shall
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

approved plant be ensured


and equipment while doing
with DM third material
party approved stacking
load test
certificate.
 Centre of
gravity of load
ensured during
the time of
loading and
unloading
 Load has been
evenly
distributed on
the trailer deck
 Appropriate and
adequate
dunnage’s has
been provided
 Appropriate
lashing belt are
used for load
securing
 Sleeves or
rubber packing
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

are given at
sharp contact
points
 All
trailer/pickups
are following
site speed limit,
 Experienced
/licensed driver
is engaged for
the transferring
material
 Trained persons
records are
available with
MSRA and
PTW
 Lifting plan is in
place for critical
lifting
 Lifting checklist
has been
prepared as per
Vision lifting
PTW system
 Certified lifting
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

supervisor is
engaged for
lifting Operation
 3rd party
certified
flagman is
engaged for the
safe
manoeuvring/m
arching of
loaded trailer at
site.
 Visual
inspection has
been carried out
at the time
loading
&unloading
steel material
on to the trailer
Erection/Use of Fatality  Operatives  Yes  Certified 2 1 5 10  Exclusion zone 2 5 1 1
False work Major/minor  Workers  Ministerial order No lifting 0 0 shall be 0
 Collapse of False work
injury  Staffs 32/1982 supervisor established at
Property  Pedestrian  DEWA SP06 Appointed the lifting zone
damage  CCSP 11.2 for lifting and below the
Material  CCSP 20.3 Operation work at height
 Injury of operatives  DM activity
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

during erections/striking damage  CCSP 21.1 approved  MSRA shall be


  CCSP 22 third party communicated
certified to all crew prior
lifting to the
 Falls of operatives accessories commencemen
during erection/striking are used. t of the task
 Monthly  Daily Safety
Color code Task briefing
system are shall be done
Falls of Materials followed as by the
per the site supervisor
Color coding /foreman and
and record record shall be
are maintained at
maintained work location
 SWL of  All lifting
lifting gears accessories
is observed including Tirfor
 In case of and Chain
more blocks must be
persons are DM approved
involved in third party
rigging only certified.
one  Thoroughly
permitted examine the
person give lifting
proper equipment and
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

signals to accessories, if
the crane any defects are
operator, found replace
inclusive of it.
Walkie-
Talkie
 Competent
Rigger has
been
permanently
in
communicati
on with
Crane
Operator.
Use of  Fatality  Drivers Ministerial order 32 of  Approved 2 1 5 10  MSRA shall be 2 2 1 4
Scaffolds  Production  Supervisor 1982 Article 19 and 20 method 0 communicated
 Manual Handling – loss  Other DM code of statement in to all crew prior
Back injury/ Strain/  Property operatives Construction Safety place prior to
to the
Sprain Damage  Helpers practice chapter 8 start activity
 Scaffolds are commencemen
 Serious Visitors DEWA Covid19
 Collapse/Collision - precautionary erected to t of the task
injury
Injury to persons  Material requirements manufacturer’s
https://www.dewa.gov. instructions.  All person shall
damage
ae/en/covid19  Only certified be inducted by
 Falls from Height - CCSP-8 erectors erect main contractor
scaffolds as
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Injury to Operative CCSP-7 per training  Exclusion zone


CCSP-03,01 guidance and shall be
Instructions. established at
Falling of Materials -  Scaffolds
work area.
Injury to erected on firm
level surface.
 Min 3.5:1  Daily Safety
Height to Base Task briefing
Ratio (Internal) shall be done
 Min 3:1 Height by the
to Base Ratio supervisor
(External). /foreman and
Double
record shall be
handrail with
the 3top hand maintained at
rail erected to work location
n4o less than
910mm with  Warning signs
the gap shall be
between the displayed to
toe board and warn of the
mid guard rail
possible
and the mid
and top guard hazards.
rail to not
exceed  Compliance of
470mm. approved PPE
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Toe boards are shall be


no less than ensured.
150mm,
 Access
provided from
inside by way
of secured
ladder.
 For mobile
scaffolds,
brakes are
applied when
stationary.
 No riding of
tower
scaffolds.
 No persons
allowed to be
on scaffold
during
movement.

Delivery and  Fatality  Drivers  Ministerial Order  Work permit has 2 1 2 10  Area shall be 2 5 1 1
offloading of  Production  Supervisor No. 32 / 1982 been obtained 0 0 inspected/surve 0
materials from trailers loss  Other Article-19 prior to material yed prior to the
 Property operatives DEWA SP06 delivery at site positioning of
CCSP 22  Assigned site the crane for
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

using mobile crane Damage  Helpers CCSP 21.1 Engineer has any
 Serious  Visitors CCSP 7.1 been notified underground
Poor site logistic injury  CCSP 4.2 commencement utilities or
arrangement  Material of any delivery overhead
damage at site at least obstructions
2days prior  Barricade the
 Logistic plan is area, display
in place for steel cautionary
material delivery board.
and offloading  All cladding
 Preparation of materials used
traffic diversion will be
by main delivered to site
contractor shall be
 Site trained inspected
installation before
crew only accepting
engaged to /receiving
work  Delivery of
 Use only Vision material shall
approved plant be
and equipment appropriately
with DM third scheduled
party approved  Material shall
valid load test be stored in
certificate. permitted
location
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Third party  Hose keeping


certified shall be done
equipment and daily basis
lifting  Daily Safety
accessories are Task briefing
available shall be done
 Ensure the by the
compact supervisor
condition of the /foreman and
soil. record shall be
 All lifting and maintained at
work height work location
activities are
suspended
during adverse
weather wind
speed more
than 38km/h
and visibility is
>5m
Movement of plant  Fatality/  Drivers  Ministerial Order  All plant 2 1 5 10  All operatives 2 5 1 1
and equipment and major  Operatives No. 32 / 1982 arriving at the 0 0 must wear 0
positioning of lifting injury  Pedestrian  CCSP ,22 project has appropriate
areas on site  Property /  Workers and  CCSP 21.1 been PPE’S
 Overturning/ material Staffs  CCSP.20.3 undergone for  Load must be
mechanical failure damage a pre-start properly
of vehicle-Use of inspection at
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

substandard or  Material outside the secured &


defective plant & damage gate by evenly loaded
Equipment contractor during
engineer transportation.
 Initial  All safety
inspection of device of the
equipment has equipment shall
been be checked to
completed by ensure they are
TSE engineer fully functional
prior to  Operatives and
contractor helpers shall
inspection attend the site
 All equipment’s induction prior
(crane. MEWP, to start any
etc.) having activities ate
DM approved site
third party  All audible
certificates / alarm shall be
checked and operational
confirmed  Plant and
 Defective plant equipment’s
and equipment shall be parked
are repaired or in designated
replaced areas only
 Site speed limit  Good
is followed
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Driver and housekeeping


passenger has shall be
worn seat maintained
belts at all  All the
times operatives shall
 Plants& be experienced
Equipment’s trained and
are unloaded certified
using safe
means as
recommended
by manufacture
 All vehicle
movements are
controlled by
flagman’
 Plat and
equipment
movement
have been
planned and
executed
Working in and  Fatality/  Drivers  Ministerial Order  Site 2 1 5 10  All safety 2 5 1 1
around underground major  Operatives No. 32 / 1982 established 0 0 device of the 0
and overhead injury  Pedestrian  CCSP ,22 work permit equipment shall
utilities/strength;  Property /  Workers and  CCSP 21.1 system has be checked to
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 failing to take material Staffs  CCSP.20.3 been followed ensure they are
necessary damage  Plant and fully functional
precautions and  Material equipment  Plan and
ground failure due to damage positioning equipment
severe points has movement shall
rain/landslides/wash been surveyed be planned and
out and inspected executed
jointly by  All audible
engineer and alarm shall be
operator prior operational
to the task  Plant and
 Necessary equipment’s
control shall be parked
measures have in designated
been areas only
undertaken  Good
after the survey housekeeping
and inspection shall be
 Site speed limit maintained
is followed  Experienced
 All vehicle operators shall
movements are be engaged
controlled by
flagman’
 Flagman
identified by
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

safety jacket
and helmet
 Safe distance
is observed
when moving
or working
near power line
depending on
the line voltage
Storage and use Property  Ministerial Order  Placing of 2 5 5 50 2 2 1 4
of construction damage,  MSRA shall
 Operatives No. 32 / 1982 more than
material.  CCSP ,22 two bundles be
 Workers and
material Staffs  CCSP 21.1 in a stack is communicate
Fall of stacked damage  CCSP.20.3 not permitted d to all crew
materials/collapse  CCSP.7.1  Weight and  Daily Safety
of stacked Serious width ratios Task Risk
bundles/Slip, trip Injury are observed Reduction
and fall/Sharp  Designated
edges Talk shall be
area is only
used for given prior to
storage the task
 Firm and commencem
even floor ent
are used for  Effective
store supervision
 Keep panels
shall be
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

bundles
ensured
slightly
inclined to
allow the
Moisture to
run off
 Barricade
the area and
display
storage sign
boards
 Observe the
housekeepin
g and avoid
slip and trip
 Protect
sharp edges
with
rubber/sleev
es

Working at height  Fatality Operatives Yes  Work at 2 1 5 10 2 5 1 1


Foreman 0 0  Location shall 0
 Poor erection of  Personal Ministerial order 32 of Height
scaffold, collapse of injury Inspectors 1982 permit has be inspected
scaffold, Poor  Property Surveyor CCSP-8 been by a
scaffold, Fall of damage CCSP-11.7 obtained for competent
material/persons  Back CCSP 19.3 elevated Engineer prior
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

injury CCSP 4.2 level


to the
 Strain activities
 Stair case commenceme
tower nt of the
scaffold installation
access has task
been  Appropriate
installed at PPE’s shall be
required worn by the
points with execution
adequate team. And
intermediate ensured.
landing with  Scaffold shall
standard be inspected
guardrails daily and after
 Scaffold is bad weather
constructed conditions
as per the  MEWP
design operator’s
calculation operation shall
and only be
contractor permitted from
approval. the basket.
 Contractor Operating the
approved equipment
third party form remote or
certified
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

scaffolders ground
are only to permitted only
erect, alter in an
and emergency
dismantle case allowed.
scaffold  Safety Task
 Certified Risk Reduction
inspector is Talk shall be
only given to the
permitted to crew members
do scaffold prior to the task
inspection begins\
 Approved  Drop zone area
scaffold shall be
components provided with
are only barriers and
used for signs
construction  Double lanyard
 Scaffold is Safety Harness
built on with shock
stable absorber shall
surface be worn by
 All faces of surveyor and
scaffold are helper and
adequately clipped on at
braced designated
location while
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Height width on slab edge at


ratio is all the time
maintained
 No
excavation is
allowed near
scaffold
 Excavation
supervisor
has to get
permit from
main
contractor or
otherwise
alternative
method need
to be applied
to secure the
structure.
 All scaffold
installers are
provided
with double
lanyard full
body
harness and
hundred
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

percentage
tie off has
been
ensured
 Adequate
supervision
is in place.
 Installation
operatives
who are in
M.E.W.P
anchor their
double
lanyard full
body
harness
hook with
shock
absorber at
the
designated
point
 All people
have been
undergone
for safety
induction
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

and possess
ID card with
them.
Fall of persons from Fatality Operatives Yes Work at height 2 1 5 10 Life line load 2 5 1 1
height & leading Major/minor Helpers Ministerial order permit has been 0 0 withstanding 0
edges/ Deck openings injury  Other 32/1982 Article 19 and obtained for capacity shall be
at Mezzanine floor & Material workers 20 elevated level as per DM lifting
slap damage nearby CCSP-11.7 activities procedure*
CCSP 4.2 Leading edge DM lifting safety
 CCSP 19.3 protection close procedure shall
to work location be followed*
has been Scaffold access or
adequately MEWP ‘shall be
provided used for
All floor opening installation of life
has been line& wire rope
identified and edge protection.
closed and Medically fit
marked or hard employees only
barricaded * allowed to work at
Site safety height*
procedure is Job rotation shall
been followed for be adopted to
the avoid employees
opening/closing ‘continuous
of roof* exposure to WAH
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Life line design activity*


has been Experience
submitted for workers shall be
approval and engaged for this
third party tested task.
life line.* Competent
10mm/12mm wire supervision
rope has been throughout the
used for lifeline activity.
and 3 bull dog Appropriate PPE’s
grips/clamps at for workers shall
anchoring including safety
directly to the harness, helmets
steel frame of the with chin straps
building with etc. provided
intermediate post Walking on beam
Lifelines are been strictly prohibited
inspected and Work at height
color and Rescue third
coded/tagged party trained
before being employees shall
used/handing be engaged and
over to erection integrate with
team in place ESC rescue team
Life lines are Work at Height
inspected by rescue procedure
competent
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

person by using shall be submitted


HSE checklist
Number of
personal hooked
on life line has
been defined*
All fall protection
devices/systems
are visually
inspected and
colour
Coded.
Height phobia
people are
permitted to work
at height.
Usage of Full
Body Harness
(FBH) with
double lanyard
for 100% tie off
has been
ensured.
Lifting. Fatality,  Operators  Vision permit 2 1 5 10  Mobile crane 2 5 1 1
 Failure or topple personal  Workers  Ministerial order to work 0 0 boom should 0
down of injury,  Supervisor 32/1982 Article 19 system and be retracted
Property
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

equipment damage,  visitors and 20 approved during break


(mobile crane) material  CCSP-11.7 MSRA has hours to avoid
/Inappropriate/Inc damage  CCSP 4.2 been probable
ompetent rigging. Production CCSP followed hydraulic
loss 19.3,11.2,22,21,1  Lifting plan cylinder
Fines, has been failure*
penalty, followed for  Preventive
Lose of critical lift maintenance
reputation loads, shall be in
 Appointed place
Person (AP)  Periodic
for lifting has inspection
been in place shall be
 DM approved carried out for
3rd party crane
certified  Trained
cranes are flagman shall
used provide
 3rd party appropriate
trained and signal.
certified  Tool Box
operators and Talks shall be
riggers are given to the
engaged crew
 Safe distance members
are  Daily
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

maintained inspection
away from shall be done
overhead for crane by
power operator
lines/obstructi using HSE
ons checklist
 Overhead  MSRA shall
/Underground be
utilities and communicate
ground soil d to all
stability have employees
been taken in  Mandatory
to P.P.E`s (Hard
consideration hat, safety
during Mobile shoes,
crane reflective vest)
operation and and full body
load placing* safety
 Limit switches harness with
are in lanyard &
operational shock
condition absorber shall
 Exclusion be worn by all
zone has operatives
been working at
established height.
around lifting
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

area.
 Hazard
warning signs
are displayed
 spotter is in
place to
restrict
unauthorized
entry
 operators
training
certificates/ID
cards are
available at
work
location /with
operators at
all the times

 Production  Drivers  Ministerial Order  DM 2 1 5 10  MSRA shall be 2 5 1 1


Failure of Lifting loss  Supervisor No. 32 / 1982 approved 0 0 communicated 0
Gears/Lifting beam  Property  Other Article-19 third party to all crew prior
Damage operatives DEWA SP06 certified to the
 Fatality  Helpers CCSP 22 Lifting gears commencement
 Serious  Visitors CCSP 21.1 and lifting of the task
injury CCSP 7.1 beams are  Visual
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Material CCSP 4.2 only used inspection


damage  Experienced should be done
and DM for all lifting
approved 3rd gears before
party every use and
certified colour coding
lifting shall be
supervisor ensured.
has been  Daily Safety
engaged for Task briefing
the task shall be done
 Approved by the
lifting plan is supervisor
in place for /foreman and
critical lifting record shall be
 Lifting maintained at
checklist has work location
been
prepared as
per Vision
Construction
lifting PTW
system
 S.W.L. of the
lifting gears
has been
observed
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

while lifting
 competent
man power
has engaged
for the task
 Competent
Banks men are
available
 Production  Drivers  Ministerial Order  Use of 2 5 5 50  Load 2 2 1 4
Striking of the Steel loss  Supervisor No. 32 / 1982 Tagline is transferring
Columns and sheet  Property  Other Article-19 mandatory path shall be
bundles against men Damage operatives DEWA SP06  Long inspected/
 Serious  Helpers CCSP 22 taglines surveyed by the
or adjacent structure
injury  Visitors CCSP 21.1 have rigger prior to
 Material CCSP 7.1 provided to the positioning
damage CCSP 4.2 keep the overhead
handlers obstructions
body parts  Exclusion zone
away from shall be
harm established at
considering the lifting zone
the size of and below the
the load work at height
 Tag line activity
body is free  Tagline hazards
from knot or shall be
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

on tail end communicated


 Two sets of to all crew prior
tagline have to the
been used at commencement
both ends of the task
where lifting  Daily Safety
required on Task briefing
to high shall be done
structures to by the
establish supervisor
transfer load /foreman and
from picking record shall be
point and at maintained at
receiving work location
point
 No load
handler
stand on the
loop of tag
line and
avoid tagline
snagging/ent
anglement
 Effective
communicati
on has
established
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

by hand
signal and
Walkie-
Talkie
 Keep away
all
machineries
and
personnel
from the
swinging
area as far
as possible.
 Competent
Banks men
has been
engaged for
the task
Fall from height Fatality Scaffolder Work permit 2 1 5 10 Ensure the ladder 2 5 1 1
(leading edges, Property Workers Ministerial order 32 of obtained for 0 0 is long enough to 0
missing handrails, damage Staffs 1982 elevated level reach the access
/Over reaching Material Pedestrian CCSP-8 activities point, without
/Unstable ladder) damage Other workers CCSP-11.7 Access to over-reaching.
Major/Minor near by CCSP 19.3 elevated level are Ladders shall be
injury CCSP 4.2 restricted until the at least one meter
completion of higher from the
handrail point of the work
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

standard and place to ease


approved access to it.
material used for Unnecessary
scaffold erection materials shall be
Scaffolds are not kept away from
erected /used the scaffold.
closer than 3 Work at height
meter near activities shall be
energized power terminated in
line case of strong
All the work at winds (38km/h),
height activities rain or dense fog.
has been planned For restarting the
and supervised work scaffold
by competent shall be inspected
person. by the competent
Scaffolds are Scaffold
erected/ Inspector.
dismantled by Safe Working
competent Load (SWL) of
persons the scaffold must
Inspected by be complied with
competent according to the
Scaffold scaffold
Inspector construction.
GREEN TAG’ Stability of the
ground shall be
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

ensured before ensured by


use. competent
Unauthorized Engineer.
entry to work All personal
area prohibited. involved in activity
Erected on firm & shall be trained in
level ground. WAH training
Appropriate Medically fit
bracing, workers are only
outriggers or ties employed and
will be used as Height phobia
required. people not
Ladders placed allowed for wok at
on stable and height
even ground Usage of Full
/surfaces. Body Harness
Ladders are (FBH) with double
secured /tied to lanyard for 100%
prevent slipping tie off shall
outward or be ensured
sideways. during work at
The height activities.
supporting
angle of the
ladders with
the ground
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

must be
approximatel
y 75 degrees
(ratio 4:1).
Use of Major/Minor Electricians Ministerial Order No. All extension 2 5 5 50  Inspected 2 2 1 4
Portable injury Operatives 32 / 1982 leads are and colour
Electric Appliances managed to coded tools
Property Staffs Article 10,11,13
 Loose damage prevent tipping shall be used
Pedestrians DMTG 9,10
connection Material hazards.  Safety Task
other workers DNTG 16,21
of Power cables are Analysis Risk
damage CCSP 16
cables/Enta placed on Reduction
nglement/C Local order 61
nonconductive Talk shall be
ontact with stands/hooks/hol conducted
sharp edges ders prior to task
 Electricity -
Temporary cables begins
Electric
Shock have been
Electrocution removed from
site when not in
 Fire - Injury to use.
Persons, Power tools have
Property the correct guard,
Damage shield or other
attachment that
the manufacturer
 Manual recommends
Handling -
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Back injury
Strain/ Sprain

Hot work Major/Minor Welders Ministerial Order No. Competent 2 5 5 50 Ensure that the 2 2 1 4
 Flying injury Operatives 32 / 1982 persons with power tool shall
particles/sp Property Staffs Article 10,11,13 training have the correct
arks damage Pedestrians DMTG 9,10 certificates are guard, shield or
 Electricity - Material other workers DNTG 16,21 engaged for the other attachment
Electric damage CCSP 16 task as per the
Shock, Double eye manufacturer
 Fire/ Visitors - protection recommends
Explosion – Injury to (Goggle and MSRA shall be
 Burn from eyes/ Flying Face shield ) communicated
fumes objects, Cuts usage has been
Noise -
established
Tinnitus/Nois
e Induced Trained
Hearing employees have
Loss. been engaged for
Inhalation of the task
Dust/ Fumes Mandatory PPEs
– Injury to has been
Respiratory provided inclusive
Tract/ of goggle
diseases/can
cer acute
and chronic
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Storage & Use of Nausea Welders  Ministerial  Approved 5 4 5 20 3 4 1 4


Hazardous Vomiting Operatives order 32 of method  All workers
Substances Stomach/skin Staffs 1982 Article statement in aware of
(Oils, Paints, Liquefied irritation Pedestrians 19 and 20 place prior to hazards from
Petroleum, lubricants, Visual other workers  DM code of start the work COSHH
sealants, impairment Construction activity assessment.
solvents, welding, Fire Safety  Job safety  Ensure
wood grinder dusts) Damage of practice analysis (JSA) adequate
clothing  DEWA SP06 or similar ventilation to
 Inhalationof Dust  CCSP-11 system is move or extract
Soil
Fumes Vapors,  CCSP-01 completed. fumes, and
contaminatio
metals - Lung  CCSP-0 7  All substances respiratory
n
Cancers & disease  CCSP-0 4 must have equipment is
Environment
leading to death,  CCSP-02 accompanied worn
al nuisance
asthma, sore eyes,  CCSP-08 Material Safety  Storage of
Death CCSP-09 Data Sheet
vomiting.  substances
 CCSP-13 from must be secure
 Contact with skin -  CCSP-15 Manufacturer and of good
Dermatitis,  MSDS storage construction
sensitization, skin requirements with ventilation,
diseases leading to strictly placed in cool
cancer followed. and shaded
 Available area and out of
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Contact with eyes – COSHH direct sunlight.


Visual Impairment Assessment is  Ensure
acute and chronic, satisfactory substance and
burns. Conjunctivitis  Suitable protective
firefighting equipment is
 Fallsof materials - equipment disposed of in
Death, or serious suitably accordance
injury, fractures, located and with Material
bruises, cuts, and marked at site. safety data
possible all of above  Proper Hazard Sheet.
warning  Always clean
Storage and handling signages are hands and face
of chemicals displayed. thoroughly
throughout the project  First Aider on before eating,
on soil and near water site with drinking or
sources- serious adequate first smoking.
contamination of aid facilities.  Use Barrier
water sources and  Approved PPE creams and
soil. worn as per moisturizers
recommended
on label of
tin/drum.

 Fire Fatality Electricians Ministerial Order No. Distribution 2 1 5 10  Do not use 2 5 1 1


Major/Minor Operatives 32 / 1982 boards are 0 0 power tools 0
injury Staffs Article 10,11,13 equipped with near
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Property Pedestrians DMTG 9,10 ELCB and flammable


damage other workers DNTG 16,21 emergency materials.
Material CCSP 16 switch  Adequate
damage Local order 61 Tested and test maintenance
UAE Fire & Life safety passed of the
code of Practice machines are equipment
chapter 1&12 2018 used shall be
Edition Fire extinguisher, ensured.
fire blanket are  Project
available at close approved Hot
vicinity wok safety
Third party procedure
trained and shall be
certified fire followed with
watchers are all control
engaged measures for
PPEs have been the hot work
provided inclusive activity
of goggle, gloves.
Small demolition Major/Minor Operatives Ministerial Order No. Tested and test 2 5 5 50  MSRA shall 2 2 1 4
works injury Staffs 32 / 1982 passed be
 Noise Property Pedestrians Article 10,11,13 machines are communicate
 Vibration damage Visitors DMTG 9,10 used d to crew
 Dust emission Material other workers DNTG 16,21 Adequate  Damaged
 Premature collapse damage CCSP 16 maintenance of hand tools
of structures Local order 61 the equipment must be
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Movement of has been return to the


vehicles ensured. store for
 Contact with live Job rotation for discarding/rep
overheads repeated and airing.
 Contact with buried monotonous  Noise
services tasks. assessment
Limit the time when deemed
spent by worker necessary.
on a vibrating  Visual
equipment/ inspection of
surface/tool the
Task has been equipment/
planned cables and
supervised by a electrical
competent panels,
person. lighting and
Appropriate site facilities
PPE’s -Hand shall be
gloves and carried out
goggles/face  Ensure
shields) has been competent
provided apart persons are
from mandatory engaged for
PPE’s the task.
Ear protection is
used by operator
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Use of Disc Major/Minor Operators Ministerial Order No. Power tool has 2 5 5 50  MSRA 2 2 1 4
Cutters and injury Operatives 32 / 1982 the correct guard, communicate
Abrasive shield or other d
Property Staffs Article 10,11,13
Wheels
damage Pedestrians DMTG 9,10 attachment as  Competent
 Bursting of abrasive
Material By-standers DNTG 16,21 per the supervision
wheel or disc
damage other workers CCSP 16 manufacturer  Trained
 Contact with wheel or Local order 61 recommends employees
disc
Double eye shall only be
protection engaged for
 Clothing entanglement (Goggle and the task
with moving parts Face shield )
usage has been
established
 Eye injury from flying Mandatory PPEs
particles has been
provided inclusive
of goggle
 Inhalation of Dust

 Exposure to hazardous
noise levels

Fire
Excavation &  Property  Workers DM CoCSP  DEWA 1 5 5 2  STARRT Card 1 5 1 5
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Backfilling damage  Operators Chapter 9 Existing Plant 5 and TBT shall


 Hit by Moving  Personal  Supervisor rules and be conducted
equipment injury regulatioNS prior to start
 Collision of  Fracture shall be strictly works.
equipment  Respirator followed. Crew  Work should
 Dust emission y disease are be avoided in
 Noise  Fatigue communicated. windy
 Continuous work  Daily condition and
inspection of sandstorm
 Collapse of soil
equipment  Regular
 Equipment falls
confirmed prior maintenance of
into excavation
to use. equipment’s to
 Personal fall into
 Certified maintain the
excavation
and trained noise level to
operator low levels.
with valid  Proper
3rd party informative and
certificate. reflective
 Certified warning
flagman is signage’s
available.  Rest area and
 Exclusion zone potable water
ensured around must be
moving available.
equipment.  Full job
 Restricted supervision and
movement of HSE monitoring
heavy
 Spray water
equipment
near the edge regularly to
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

of excavation keep the dust in


 Provided edge control.
protection to
prevent fall of
personnel and
materials.
 1-meter distance
from the edge of
excavation
maintained.
 Area barricaded
and
unauthorized
entry restricted
 Adequate access
and egress
provided.
 Dust
suppression
ensured by
spraying water.
Covid19  Sprea  Operati  Ministerial order 32 1)Based on the 2 5 5 5  Impleme 2 5 1 1
 Movement of d of ves of 1982 Article 19 number of 0 ntation of 0
Covid and 20
staff and 19.Vu  Staffs workers and the hand
visitors on site lnera  Pedest  DM code of
numbers of wash
 Use of ble rians Construction Safety people, who stations
common use group  Visitors practice come into the at all
s
facilities such such  other  DEWA SP06 work site, entrance
as wash as worker decide: how s, this
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

rooms & perso s  CCSP-01 many washing will


ns
launch rooms  CCSP-08 facilities you comply
with
 Neglect of existi need (you may of a hand
social ng already have sanitizer,
distancing under enough); where Provision
lying
and wearing washing facilities of latex
health
of masks condit need to be gloves
ions located. for use in
risk 2)Provide hand the
contr
sanitizers for the kitchen
acting
coron occasions when area.
a people can’t Toilets
virus. wash their hands and
 Fata There’s a legal sinks to
lity duty to provide have
 Deat welfare facilities soap and
h and washing warm
facilities for water
visiting drivers available
at all
You should talk times.
to managers at Kitchen
any sites your area,
drivers are toilets
visiting to ensure and
they are sinks to
provided with be
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

washing cleaned
facilities. after
each use
and deep
cleaned
once per
day
using
spray
bleach,
this will
include
all work
surfaces
and door
handles.
Bins to
be
cleared
once a
day by
the store
man
using a
face
mask
and latex
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

or site
gloves.
Stores to
be
managed
to keep a
high
stock of
soap,
hand
sanitizer
and
paper
towels
Hands
are to be
washed
with
soap and
hot water
for at
least 20
seconds
Manual Handling Musculoskel Material Yes  DM 1 2 5 10  No persons 1 2 1 2
 Pinch points etal handlers Ministerial Order 32 approved shall be
 Poor disorders. Fabricators, of 1982 Article 19 and third party allowed to lift
Physical capacity, /Prolapsed Store keepers 20
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

•Awkward posture, disc/ Hernia other CCSP 19.1 certified or carry any
•Too heavy /unknown Personal operatives CCSP 7.4 lifting gears heavy/outsiz
load injuries are used for e item
•Poor ergonomics Back pain
manual without
•Slippery objects Material
•High frequency of Damage installation seeking help.
lifting/action  On-site TBT  Access
• Heat stress training on routes
manual unobstructed
handling .
provided.  Environment
 Manual al factors like
lifting / humidity;
handling heat etc. will
procedure be taken
are care
available.  Proper
 Comfortable communicati
clothing and on between
non- slip the
Safety shoes operatives
are provided shall be
 Good house- followed in
keeping case of
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Person is not multiple


allowed to person are
carry any engaged in
materials single
blocking his activity.
vision.  Manual
 Pinch points handling
has been activities
identified must be
and control properly
measures planned and
taken executed
 Ensure  All materials
adequate shall be
illumination. stored in
 Manual designated
handling areas.
postures and
sign are
displayed.
 Job rotation
is followed in
case of
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

continues
work
 Manual
handling
activities
shall be
minimized
with the use
of
mechanical
means.
 .Appropriate
PPE has
been worn
by all
operatives
involved in
the task
Aluminum Glazing work Major/Minor Operatives  Ministerial order  Approved 2 5 5 50  Ensure Job 2 2 1 4
 Falls from Height - Back injury Staffs 32 of 1982 method safety analysis
Injury, Fractures, Cuts, Property Pedestrians Article 19 and statement must (JSA) or similar
Bruises, Death damage Visitors 20 in place prior to system is
Material other workers start the work completed
damage  DM code of  Harnesses
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Fall of Materials – Head Construction activity should be


Injury, Death, Safety practice  Planned work to inspected & worn
Fractures, Cuts,  DEWA SP06 ensure safe where protection
Bruises. Or property  CCSP-11 access, working is not possible
damage.  CCSP-01 platform and secured to fixed
 CCSP-0 7 system of work. structure capable
 CCSP-0 4  Suitable signs of sustaining the
 CCSP-02 and barriers weight.
 CCSP-08 below work to  PPE including
 CCSP-09 inform others of hard hats with
 CCSP-13 work above. chin straps must
 CCSP-15  Working be worn by all.
Platforms to be  Manual lifting
erected and technique must
used by be followed.
Competent  Area should be
Persons. surveyed in
 Edge protection plans prior to
above 1.2m with work
double handrail commencing,
and toe boards, with routes for
or brick safe walking.
guards/fans to
prevent Tools should be
materials falling. suitably secured to
prevent the fall of
tools
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

Housekeeping and Personal Worker  Ministerial order No  Proper 1 2 5 10 Hazardous 1 2 1 2


removal of waste injury Supervisor 32/1982 Article -19 housekeeping materials shall be
 CCSP 3.17 is maintained disposed in the
 Trip slip and fall  CCSP 7.1  Lifting gears Hazardous
 CCSP 3.2 and tools has material skip
been properly provide in the
kept on ground site(main
at work contractor)
locations. Training shall be
 All FOD needs provided through
to be disposed TBT
in provided Approved Project
containers. CEMP shall be
 Clear/dispose followed precisely
waste in waste for waste
skips provided generation and
and do not disposal
allow building
up of.
Clear debris end
of each shift.
Heat Stress and  Heat Workers DM CoCSP  Work 2 5 5 5  Toilets to have 2 5 1 1
Adverse Weather Stress Operators Chapters 3 and other suspension 0 urine color 0
Conditions  Sunburn technical guidelines under adverse charts posted to
Supervisor
 Thermal Radiation  Skin weather aid self-
 UV Radiation ageing conditions. assessment of
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

 Heat Stress  Eye Strain Weather dehydration


 Poor Visibility  Premature forecasting has levels
 Dust Storm and Cancer been done. Post  Monitoring of
Rainy weather, fog  Skin rain inspections operatives by
ageing performed by supervisors for
 Premature the work signs of heat
canskin supervisor to stress and sweat
Eye strain assess the field rash.
 Dust hazards.  Adherence to
Allergy  Provision of Summer working
drinking water hours’
for all work  Regulations
locations  Planning of
 Provided critical tasks in
shaded/Air- cooler conditions
conditioned  Job rotation
rest areas for  Provision of
all work suitable PPE
locations  Availability and
 HSE training awareness of
department -
First Aiders
Heat stress
 Training &
awareness
Supervision
campaign.
 Poster
campaigns
 Pre-Work
briefings /
Tool box talks
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

ref: heat stress


 Rest cycles are
followed as per
TWL
 Adequate
cooled water
stations are to
be provided.
 ORS solutions
are distributed
on self-
contained water
bottle with
every worker.
 Mid-day break
rules followed.
Work Related stress  High Workers  Ministerial order No  Proper 2 5 5 50  Cautionary 2 2 1 4
 Fatigue absente Supervisors 32/1982 Article -19 arrange boards will
Inspectors ments be displayed
eism. are in to warn the
 Ministerial
 High place to people about
resolution 410 /
labour 2006
ensure the work
turnove the related
followin stress.
r.  DMTG 7 g;  Workers
 Poor I. Organiza should speak
time tion
culture.
to the
keeping II. Bad
foreman and
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

. manage
ment
move
immediately
 Poor practices
. to the a/c
perform rest area in-
III. Job
ance content case feel
and and uncomfortabl
demand e.
product s.
ivity.  RA shall be
IV. Physical
work communicate
 Low environ d to the crew.
morale. ment.  Work related
 Poor V. Relation stress
ships at Management
motivat work.
plan shall be
ion. VI. Change
manage followed
 Increas ment. All welfare
ed VII. Lack of facilities shall be
employ support. extended to the
ee VIII. Role workers for the
conflict. project activities
complai
nts.
 Increas Provisio
ed ill- n of
health, cool
drinking
acciden water
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

ts and has
incident been
arrange
s d near
reports work
location
and
remind
them to
drink a
glass of
water
every
20
minutes
(Min.)
 First
Aider
with Kit
is
availabl
e at the
first aid
centre
 Emerg
ency
procedu
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

re shall
be
followe
d in the
event of
a work
related
stress.
 TBT
Training
s are
done on
Mental
and
psychol
ogical
health.
 Forema
n has
been
selecte
d only
physical
ly fit
employ
ees.
 Freque
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

nt rest
or job
rotation
has
been
observe
d.
 Continu
ous
supervi
sion to
monitor
situatio
ns of
work
related
stress.
 If
anybod
y found
feel
dizzy,
weak or
nauseo
us
immedi
ately
DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

take
him to
the rest
area.
Assessors Reviewed by: Approved by:

Assessors

Approved by

Name: Partuh Egoh & Aamer Raja Name: Sayed Arafa Name: Hazem Helmi

Designation: Project Safety & project Engineer Designation: Project Manager Designation: Project Director

Date: 02/1/2022 Date 02/1/2022 Date 03/1/2022

Signature: Signature: Signature:


DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form


Project Name.: Construction and Associated Civil & MEP works for Meriyal 33/11kV Substation - Assessment Date: 02-1-2022
Ref. No.: RFX # 2132100061VIS-R-MS-05
Activity/Area/Equipment: Construction works at LEHBAB FIRST, DUBAI ON PLOT # 7510105 Rev. 01-Jan-2022
Assessor(s): Partuh Egoh & Aamer Raja Next Rev. Dt.: 3rd-1-2023
Reviewed By: Sayed Arafa Rev. No:00
Approved: Hazem Helmi
Health and Safety Risk assessment

SP06: Annexure III A

No .of people affected Severity of injury Likelihood of occurrence


1-5 Persons 1 Negligible 1 Improbable 0.5
6-50 Persons 2 Minor 2 Remote 1

50+ persons 3 Major 5 Possible 5


Public/ Vulnerable persons affected
3 Fatal 10 Likely 10
(Ref. Annexure IIID)

Risk rating score Action To Be Taken


Up to 20 Risk is low
21-50 Risk is medium & additional control measures required to control the risk
51-100 Risk is high & unacceptable
100+ Risk is totally unaccepted