DUBAI ELECTRICITY AND WATER AUTHORITY

Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

Task No.: 01- Transporting Loading & Unloading


Collision of Injury to Site Yes 1) Driver/Operator possess valid license 1 5 5 25 1) Training and Tool box talk to communicate 1 5 1 5
vehicle, Trap in personnel/ Workers, DM code of and visitor’s induction provided. site traffic regulations.
between, slip & Property Supervisor, construction 2) Unauthorized person are not allowed 2) Spill prevention / measures to prevent soil
trip, fall of damage Driver, safety in the lifting area and area has to be
contamination.
material due to Operator & practice Barricade.
poor stacking, Engineers chapter 3) Visitors are controlled by site 3) Banks man should be present to control the
sudden no:20-3, supervisor. vehicle movements.
breakdown of Site 4) Only authorized personnel are 4) Housekeeping must be maintained.
vehicle or tire Transportatio included in lifting activity. 5)Tyre conditions must be checked at security
burst n 5) Parked the vehicle only in designated check points.
area and stable area. 6) Materials shall be offloaded in designated
6) Don’t park the vehicle at the edge of
areas only.
excavation.
7) Carried out regular maintenance of the
vehicle.
8) Loaded materials are checked before
allowing inside the site.
9)Site speed limit is adhered. Banksman
available with moving vehicle and plant
equipment.
10) Drivers are wearing mandatory PPEs
while on site.
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

Task No.: 02- Manual Handling


Risk of cuts/ Site Yes 1) Suitable PPE's have been issued 1 5 5 25
Injury to 1) No employee shall be asked to carry loads 1 2 5 10
wounds/ from Workers, 2) Tool box talks has been conducted on
personnel/ above his capacity.
sharp edges of Supervisor DM code of risks / hazards on the job.
Property 2) Where possible, mechanical lifting equipment
materials, Slip / & construction 3) Ensure adequate supervision for the
damage
trip / fall while Engineers safety job. shall be used
carrying load practice 4) Wherever possible, sharp edges must 3) Housekeeping must be maintained.
chapter be protected with suitable padding.
no:7-4-1 5) Wooden planks timber or any has been
Manual available prior to unload the materials on
handling the ground to avoid pinch point between
ground and materials
6) Ensure that load carried is not
obstructing the vision.
7) Always try to form uniqueness of height
when load is carried by 2 or more
personnel.
8) Ensure Sufficient lighting is maintained.
9) Ensure that path is clear of obstruction.
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

Task No.: 03- Work at Height / Scaffolding


Falling Injury to Site Yes 1) Tool Box Talk shall be conducted prior 1 5 5 25 1) Work at height permit to be obtained. 1 2 5 10
materials from personnel/ Workers, Dubai code of to start work. 2) Certified scaffolders are to be employed for
scaffolding/ Property Scaffolders, construction While erecting or dismantling minimum 2 the installation of scaffold platform intending to
Fall of person/ damage Supervisor safety board secured properly has been used for work beyond 1.8 meter height.
Collapse of & practice the works. 3) Full body harness and 100% tie-off must be
scaffolding Engineers chapter no:8 2) Working platform has been erected, adopted.
Scaffolding checked and altered by only competent 4) Only work at height trained personnel are
safety person. allowed to access to work at height.
4) Ensure safe access, safe working 5) Work at height more than 1.8 meter require
platform and safe scaffolding with hand to wear full body harness and working platform.
rail and mid rail. 6) Scaffold system tag validation must be
5) Maintained to prevent slip, trip and fall weekly basis by certified scaffold inspector.
hazard. 7) Scaffold platform to have adequate anchor
6) Full body harness has to be clipped to points/bracings ensuring the stability.
the permanent anchoring point. 8) Hard barricade the area.
7) Don’t keep unwanted materials on the 9) Provide safety signs of falling object,
working platform. overhead work.
8) Only authorized persons has been 10) Don’t allow same level working, while
included in the activity. working overhead.
9) Working area shall be barricaded and 11) Housekeeping must be maintained.
proper signs shall be displayed. 12) Loose materials are to be kept metallic
10) Proper fall arrest system has been tray /leather bag.
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

followed.
11) Ensure that there is adequate lighting
arrangements.
12) Tool lanyard shall be used to prevent 13) Materials to be lowered using certified zin
falling of tools wherever practical bag using pulley and rope.
13) Remove all unwanted / wastages from
the work area.
14) While working at height all the small
lose materials shall be contained and
secured.
15) Provide catchment net.
16) Secure the materials kept at height.

Task No.: 04- Hot Work Activities( Power tools and welding )
Fire/ Flying Injury to Site Yes 1)Tool Box Talk has been conducted prior 1 5 5 25 1) Hot Work permit to be obtained. 1 2 5 10
objects/ Falling personnel/ Workers, to start work. 2) Only power tools trained /experienced
spark / Fire Property Supervisor Dubai code of 2) Ensure that all power tools are fitted personnel can be employed for grinding and
Explosive damage. & construction with safety guards cutting operation.
Engineers safety 3) All power tools must be inspected by ESC
practice 3) All power cables has been protected HSE, sticker and color code must be provided.
chapter from any damage. 3) Must use hard hat inbuilt with face shield,
no:14.3 4) Check the expiry date of grinder/cutting additionally goggles (Double protection) as key
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

Power tool wheels and remove all expired wheels PPE for power tool.
/cutting disk. 4) Never remove hard hat while grinding or
Dubai code of 5) Ensure the use of proper personal cutting.
construction protective equipment like hard hat, safety 5) Provide safety signs.
safety shoes, coverall, nose mask, ear plug, 6) Housekeeping must be maintained.
practice hand gloves, face shield and goggle etc. 7) All hot work areas, sparks/flux must be
chapter no:15 6) Ensure grinding / cutting disc rpm is controlled using fire blanket.
Welding and higher than the machine rpm.
cutting 7) Never use cutting disc to do grinding.
8) Once activity is completed the machine
shall be disconnect from power source.
9) Never remove any safety guards /
handle.
10) Dead man switch has been provided
for grinding machine
11) All the pipe of cuts has been
contained to prevent personnel
accidentally step on and fall.
12) A drip tray has been provided to
collect all the metal chips and the
(Threading oil)
13) Loose clothing, loose hand gloves,
jewelers etc. Shall not be used in a
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

rotating parts.
14) Cloths or bare hands has not be used
to clean the metal chips, brush may use.
15) Only trained competent person has
been assigned for the activity.
16) The machine has been fixed firmly on
a firm surface.
17) The machine has been unplugged
during cleaning or maintenance.
18) The switches (hand or foot pedal)
shall be of dead man switch.
Electrode holders has been of a capacity
capable of safely handling the maximum
rated current for the electrical circuit and
fully insulated to prevent electrical shocks
19) Welder has to make sure that
machine is properly earthed.
20) Remove all unwanted material from
work area.
21) Welding machine grounding has been
provided near to the welding joint.
22) Close supervision must be done.
23) Only trained / competent person has
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

been allowed to use the activity.


24) Provide leather hand gloves/leather
apron to welders/operators to avoid from
accidental contact with hot surface.
25) Clean the area after the work on daily
basis.
26) DCP Fire extinguisher has been
available at working area.
27) Fire Blanket shall be available at
working area
28) Combustibles materials has to be
removed

Task No.: 05- Construction Power Supply


Electrical shock / Personal Site Yes 1) Tool Box Talk has been conducted 1 5 5 25 1) Electrician responsible for routine inspection 1 2 5 25
Fire Explosive/ injury / Property Workers, Dubai code of prior to start work. of all DBs, his picture, contact number,
Flash/ Burn Damaged Supervisor construction 2) Ensure all temporary supply is taken inspection sticker to be displayed.
& safety through 30mA RCD. 2) All DBs are grounded, and it’s to be
Engineers practice 3) Check and ensure that all cables and meggered earth resistance value to be
chapter no:16 connections are in good condition and recorded.
color coded by a competent person. 3) Cable management and inspection.
4) Ensure sizes of cables are as per the 4) Housekeeping must be maintained.
load requirement of tools.
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

5) Ensure the tools and DBs are properly


inspected.
6) All the socket outlets has been fitted/
taken from 30mA RCD.
7) Welding operation has been performed
in dry areas.
8) Ensure cables and connectors are with
appropriate insulation.
9) Check the cable for any damaged or
worn out sign in the insulation.
10) Cable extensions has been done with
proper industrial sockets (IP 65 rated).
11) All electric cables has been routed
along wooden stands to prevent contact
with steel.
12) Ensure the availability of competent
electrician during the work activity.

Task No.: 06- Working under hot summer


Working in Hot Heat Stress Site Yes 1) Tool Box Talk has been conducted 1 5 5 25 1) Project heat stress management plan must 1 2 5 10
Environment Heat Stroke Workers, Dubai code of prior to start work. be followed during Ramadan and summer
heat stress Fatigue Scaffolders, construction 2) Ensure proper rest in each necessary break periods most specific adverse conditions
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

Dehydration Supervisor safety time interval. of high humidity and temperature based on
Collapse & practice 3) All to be aware of work overhead. Good TWL results.
Engineers chapter control of the work areas and ensure that 2) Project Emergency response plan is to be
no:2,3 the correct PPE is worn. followed for any kinds of emergency expected
4) Workers instructed to work under during the activities.
shaded area in case of emergency work 3) Periodic rest system breaks as outlined with
undertaken. TWL and Heat stress flag system.
5) Ensure cool drinking water has been 4) Ensure first aid facilities and oral rehydrates
made available. are available.
6) Schedule the work for cooler part of the
day.
7) Workers encouraged increasing their
fluid intake during hot weather.
8) Workers instructed to avoid heavy and
oily foods and acid contented drinks.
9) Rotate the personnel shift at regular
intervals
10) Assign two groups shift wise for a
particular job.
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)

Likelihood

Likelihood

Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control

Severity

Severity
Number

Number
at risk
complied for each identified hazard

Risk
(Yes/No)

Assessor Contractor Safety Officer Site Manager


(Reviewer)
Name: R.Aarone Name: Shiros Name: N.Balaji
Date: 10.05.2020 Date: 10.05.2020 Date: 10.05.2020
Signature: Signature: Signature:
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form

Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020

Rev.No.C
SP06: Annexure III B

No .of people affected Severity of injury Likelihood of occurrence


1-5 Persons 1 1 Negligible 1 Improbable 0.5

6-50 Persons 2 2 Minor 2 Remote 1

50+ persons 3 3 Major 5 Possible 5


Public/ Vulnerable
persons affected 3 3 Fatal 10 Likely 10
(Ref. Annexure IIID)