Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
followed.
11) Ensure that there is adequate lighting
arrangements.
12) Tool lanyard shall be used to prevent 13) Materials to be lowered using certified zin
falling of tools wherever practical bag using pulley and rope.
13) Remove all unwanted / wastages from
the work area.
14) While working at height all the small
lose materials shall be contained and
secured.
15) Provide catchment net.
16) Secure the materials kept at height.
Task No.: 04- Hot Work Activities( Power tools and welding )
Fire/ Flying Injury to Site Yes 1)Tool Box Talk has been conducted prior 1 5 5 25 1) Hot Work permit to be obtained. 1 2 5 10
objects/ Falling personnel/ Workers, to start work. 2) Only power tools trained /experienced
spark / Fire Property Supervisor Dubai code of 2) Ensure that all power tools are fitted personnel can be employed for grinding and
Explosive damage. & construction with safety guards cutting operation.
Engineers safety 3) All power tools must be inspected by ESC
practice 3) All power cables has been protected HSE, sticker and color code must be provided.
chapter from any damage. 3) Must use hard hat inbuilt with face shield,
no:14.3 4) Check the expiry date of grinder/cutting additionally goggles (Double protection) as key
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Power tool wheels and remove all expired wheels PPE for power tool.
/cutting disk. 4) Never remove hard hat while grinding or
Dubai code of 5) Ensure the use of proper personal cutting.
construction protective equipment like hard hat, safety 5) Provide safety signs.
safety shoes, coverall, nose mask, ear plug, 6) Housekeeping must be maintained.
practice hand gloves, face shield and goggle etc. 7) All hot work areas, sparks/flux must be
chapter no:15 6) Ensure grinding / cutting disc rpm is controlled using fire blanket.
Welding and higher than the machine rpm.
cutting 7) Never use cutting disc to do grinding.
8) Once activity is completed the machine
shall be disconnect from power source.
9) Never remove any safety guards /
handle.
10) Dead man switch has been provided
for grinding machine
11) All the pipe of cuts has been
contained to prevent personnel
accidentally step on and fall.
12) A drip tray has been provided to
collect all the metal chips and the
(Threading oil)
13) Loose clothing, loose hand gloves,
jewelers etc. Shall not be used in a
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
rotating parts.
14) Cloths or bare hands has not be used
to clean the metal chips, brush may use.
15) Only trained competent person has
been assigned for the activity.
16) The machine has been fixed firmly on
a firm surface.
17) The machine has been unplugged
during cleaning or maintenance.
18) The switches (hand or foot pedal)
shall be of dead man switch.
Electrode holders has been of a capacity
capable of safely handling the maximum
rated current for the electrical circuit and
fully insulated to prevent electrical shocks
19) Welder has to make sure that
machine is properly earthed.
20) Remove all unwanted material from
work area.
21) Welding machine grounding has been
provided near to the welding joint.
22) Close supervision must be done.
23) Only trained / competent person has
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Dehydration Supervisor safety time interval. of high humidity and temperature based on
Collapse & practice 3) All to be aware of work overhead. Good TWL results.
Engineers chapter control of the work areas and ensure that 2) Project Emergency response plan is to be
no:2,3 the correct PPE is worn. followed for any kinds of emergency expected
4) Workers instructed to work under during the activities.
shaded area in case of emergency work 3) Periodic rest system breaks as outlined with
undertaken. TWL and Heat stress flag system.
5) Ensure cool drinking water has been 4) Ensure first aid facilities and oral rehydrates
made available. are available.
6) Schedule the work for cooler part of the
day.
7) Workers encouraged increasing their
fluid intake during hot weather.
8) Workers instructed to avoid heavy and
oily foods and acid contented drinks.
9) Rotate the personnel shift at regular
intervals
10) Assign two groups shift wise for a
particular job.
DUBAI ELECTRICITY AND WATER AUTHORITY
Health and Safety Risk Assessment Form
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B
TO Carry out an activity Safely
Final Risk Rating should be reduced to 20 or below: Work Covered by Permit to Work (PTW)
Additional control Measures with
Final Risk
Risk Rating mechanism from hierarchy of control for
Legal Rating
each identified hazard
requirement Existing control Measures with
Person(s)
Likelihood
Likelihood
Final Risk
HAZARDS Hazard Effect s To be mechanism from hierarchy of control
Severity
Severity
Number
Number
at risk
complied for each identified hazard
Risk
(Yes/No)
Project Name.:Aweer Power Station "H" Phase IV Assessment Date: May 10, 2020
Activity/Area/Equipment: Installation of Sprinkler System/As per MS/As listed in MS Ref. No.: 3761800008-M-38-M-E-47698_C
Assessor(s): Shiros(HSE), R.Aarone (Engineer) Rev. No.: C Date: May 10, 2020
Reviewed By: N.Balaji (Site Manager) Next Rev. D Date: October 09, 2020
Rev.No.C
SP06: Annexure III B