Project Name: Installation Of Fence & Gate for Qassim Oasis Main Contractor: Al Naseer RA NO : 16
Risk factor
Risk factor
Likelihood
Likelihood
Who affected How affected Controls to be implemented
Severity
Severity
(check all that apply) Risk Risk
level level
Risk assessment Risk assessment
Risk factor
Risk factor
Likelihood
Likelihood
Who affected How affected Controls to be implemented
Severity
Severity
(check all that apply) Risk Risk
level level
Risk factor
Risk factor
Likelihood
Likelihood
Who affected How affected Controls to be implemented
Severity
Severity
(check all that apply) Risk Risk
level level
Risk factor
Risk factor
Likelihood
Likelihood
Who affected How affected Controls to be implemented
Severity
Severity
(check all that apply) Risk Risk
level level
Risk factor
Risk factor
Likelihood
Likelihood
Who affected How affected Controls to be implemented
Severity
Severity
(check all that apply) Risk Risk
level level
All personnel Improper handling , contact with sharp Use of proper PPE's , manual handling &
Woods Waste Disposal. hand/leg injury , working in or edges , obstruction on passageways , ergonomics orientation,waste
cuts/laceration,nail puncture/foot injury , adjacent to undenailed crates * hand/leg injury , 3 3 9 9 segregation.Wood waste to be 2 2 4 4
ENV: land pollution the working cuts/laceration,nail puncture/foot injury , segregated, properly labeled & barricaded
area ENV: land pollution , recycling of such woods recommended
Risk assessment Risk assessment
Risk factor
Risk factor
Likelihood
Likelihood
Who affected How affected Controls to be implemented
Severity
Severity
(check all that apply) Risk Risk
level level
Noise Pollution All personnel Hearing Sense could be damage Change in the level Adequate PPE's Shall
working in or be ensured wearing of hearing protection
adjacent to ear plug or ear muff, Arcuate breaks
the working during task, Site facilities shall be
area maintaine. All mobile equipment should
3 3 9 9 have reverse alarm, 2 1 2 2
Speed limit and trafic plan should be
followed, Pedestrain route to be clearly
defined
Dust All personnel Inhalation problems,lung problem TBT shall be conducted for dust hazards,
working in or Dust mask will be provided and
adjacent to monitored, Water curing shall be
the working 2 3 6 6 maintained. Provision of dust mask to all 2 1 2 2
area workers in the vicinity, Maintain safe
clearance at all time,
Spill & Equipment breakdown All personnel Contamination of land. In case of Only Third party certified operators and
working in or equipment damage can cause serious equipments will be allowed,
adjacent to injury and fatality, or damage to property Daily inspection checklist shall be
the working ensured, Before use of any equipment on
area 4 3 12 12 site, approval and inspection will also be 2 2 4 4
acquired from safety personnel