Project: Gul Ahmed wind power Project#: 1161 Area: GAWPP


SITE General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer
Date: 11-02-2016 Supervisor: Muhammad Ali (Mech. Engineer)

Job Description: Work In Night Shift


Equipment & Severity
Item Detail of Activity Risk Involved Preventive Measure Responsible Person
Tools used Rating
 Suitable Lighting Must Be Arranged
 Safety Task Must Be Conducted Before
Stating Activity.
Personal Injury
1    Competent Supervision
(Hand, Body Parts)
 Mandatory & Required PEEs Must Be
Wearing.
 Proper Handling of material.
 Equipment Inspection should be carried
out as per schedule.
2 Property Damage  
 Tag line must be used while lifting of
material.
 Full body harness must be worn while
working above 1.8 meter height.
3 Personal Fall    100 % tie off should be ensured.
 Safety precaution must be taken while
work at height.

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
© Copyrights Ordinance 2002, All Rights Reserved
 Objects should be secured with manila
4 Fall Objects  
ropes while
 Not Allowed in Restricted Area (Such as
out of boundaries)
 Adequate & Suitable Lighting Must Be
Arranged
 Maintain Area Clean And Tidy At All
5 Biological Hazards  
Time.
 Proper Stacking Of Materials.
 Unnecessary Materials Should Be
removed.
 First Aid Kit Must Be Available At Site.
6   

Severity Rating: (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident

Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?

_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
© Copyrights Ordinance 2002, All Rights Reserved

You might also like