RISK RATING Dept./ Who might be at Sr. No. Hazard Risk Control Measures / References Activity Area risk? S P Significance Level Machinery / Vehicle Operators and 1.Barrication using cone tie with caution 2 2 4 low may hit Machinery tape & human marshal with traffic baton 1. Exp. personal will be deploy under Physical injury Electrical work crew 2 2 4 low supervisor. 2.Use Of Mandatory PPE's Personal may fall from Electrical work crew 4 2 8 Moderate 1.Trained personal will be deploy Transport Electrical work crew / 1.Exp. Rigger will be deputed. Material may get Loading & Machinery / other 2 2 4 Low 2.Proper stacking must be done. Damaged Unloading of hot parties work crew 3.TBT must be conducted 1 spot detection Electrical 1. Approved lifting sling will be used for equipment, pole , unloading, shifting etc. and its accessories Electrical work crew 2.Before lifting area In-Charge and HSE Breakage Sling 3 3 9 Low and operator team will check sling for damage. 3.sufficient illumination will be ensured before starting the job. 1. Unloading activity will be done on firm ground and load under the capacity of Operators and crane. Topple of crane 2 2 4 Low Machinery 2.sufficient illumination will be ensured before starting the job. 3.Exp. Rigger will be deputed on job. 1.No storage of Diesel/Petrol will be done on work site. 2.Fire Extinguisher need to be present Electrician /Technician near D.G Set. Fire / Explosion 3 2 6 Low /Eng./Sup. 3.Proper Connection from D.G will be taken through Plug, panel etc. D.G Power supply 4.Electrician/designated personal only be 2 Electrical for work operating D.G.
1. Company designated electrician will be
dealing with power connection, cable Electrocution Electrician 3 2 6 Low laying etc. for power supply. 2.Use of Mandatory and required PPE's
1.TBT will be done by site In-Charge
before starting the Job. 2. Use of site mandatory PPE's. 3.Safe manual handling practice's will be Physical injury (strain, Electrical work crew 3 3 9 Low ensured. cut etc.) 4.Proper Illumination will be ensured Excavation of pit before starting the Job. 3 and anchor bolt Electrical 5.Barrication of excavation pit. casting 6.use of access for pit. 1.Trained / Exp. Personal will be deploy Hit by equipment Electrical work crew 3 2 6 Low for the task. 2.Unauthorized entry will be restricted. Use of Nose Mask and site mandatory Inhalation of Dust Electrical work crew 2 2 4 Low PPE's 1. Exp. personal will be deploy under supervisor. Physical injury Electrical work crew 2 2 4 low 2.Use Of Mandatory PPE's. 3.TBT before starting the job Electrical work crew / 1.Exp. Rigger will be deputed. Material may get Machinery / other 2 2 4 Low 2.Proper stacking must be done. Damaged parties work crew 3.TBT must be conducted 1. Approved lifting sling will be used for unloading, shifting etc. 2.Before lifting area In-Charge and HSE Electrical work crew team will check sling for damage. Breakage Sling 3 3 9 Low 4 Erection of pole Electrical and operator 3.sufficient illumination will be ensured before starting the job. 4.Use of Tag line/Guy rope to control swing 4 Erection of pole Electrical
1. Unloading activity will be done on firm
ground and load under the capacity of crane. Operators and Topple of crane 2 2 4 Low 2.sufficient illumination will be ensured Machinery before starting the job. 3.Exp. Rigger will be deputed on job. 4.Unauthorized entry will be restricted .
1.Exp./Trained Personal will be deputed
on site. 2.Daily TBT Before starting the Job by concern area In-Charge. 3.Barrication of work area with cone. Man & Material May 4.Proper illumination will be arranged Electrical work crew 4 3 12 Moderate fell before starting the Job. 5.Use of Ladder and it is supported by one personal all time. Installation of Hot 6.Use of modified height platform truck if spot detection required. With proper railing around the equipment such 5 Electrical platform. as camera, wiring etc. and its 1.All personal should have site accessories Mandatory PPE's. Physical Injury Electrical Work crew 3 2 6 Medium 2. Exp./Trained personal will be deployed. 1.Desiginated Electrician will be providing all electric connection. 2.Use of job specific PPE's all time while Electrocution Electrical Work crew 3 2 6 Low working. 3.All connection will be taken through industrial plug. 4. Damage free tools will be use. 1.Exp./Trained Personal will be deputed on site. 2.Daily TBT Before starting the Job by concern Vehicle area In-Charge. Movement with 6 Electrical Personal may fall Electrical work crew 4 3 12 Moderate 3.Guard rail will be present on height personal on platform . height 4.While vehicle movement personal will be at sitting position and small marching at dead slow