You are on page 1of 3

IJM CORPORATION BERHAD

(104131-A)
HAZARD IDENTIFICATION AND RISK ASSESSMENT ANALYSIS

WORKPLACE : PJ 8 Development Project


ACTIVITY : Plastering (Block A,B and C)

SEQUENCE OF JOB HAZARD GROUP & POTENTIAL POTENTIAL LEGAL & OTHER RISK RATING CONTROL MEASURE/
HAZARD RISK REQUIREMENTS Prob. Sev. Total RECOMMENDATION
(P x S)
1.Mobilition / Delivery 1. Mechanical – Struck by / Hit by the 1. Fatality or serious Part II B.O.W.E.C. 2 4 8 1. All workers must be inducted before
of Materials vehicle. body injury. (High) commencing of work.
2. Ensure crane has current certificate as
1. Fatality or serious well as competent operator.
2. Physical / Gravitational – Hit by the body injury Part IV B.O.W.E.C 1 4 4 3. The un-loading area must be barricaded /
materials Low cordoned.
IJM Procedure. 4. To obtain Permit To Work from IJMC
authorized person for any lifting operation
using cranes (More 0.5 tan).
4. All workers must be briefing before
commencement and weekly toolbox talks to
explain the hazards and risk.
5. All workers must use proper P.P.E.
2.Mixing the Mortar 1.Physical / Gravitational 1. Minor or Serious FMA (BOWEC) 3 2 6 1. All workers must be inducted before
– Hit by material/falling body injury Part II Preliminary 5& 10 Low commencing of work
object. FMA (BOWEC) 2. The Activity shall be carried out by
2. Minor or Serious 3 2 6 competent/experienced personal and
2. Mechanical body injury Low supervised.
–Hit by the moving part of 3. To comply with the electrical Safety
the machine. procedure (All Electrical
SEQUENCE OF JOB HAZARD GROUP & POTENTIAL POTENTIAL LEGAL & OTHER RISK RATING CONTROL MEASURE/
HAZARD RISK REQUIREMENTS Prob. Sev. Total RECOMMENDATION
(P x S)
3.Chemical 3.Serious long-term USECHH Reg. 2000 3 2 6 equipment must be regularly
-Inhalation injury-irritant and BOWEC Part III Medium checked by competent person, live electric
minor skin burn.

HSEF-HRC-001 Rev.1 IJMC/PJ8/HIRARC/047-08 (Plastering)


IJM CORPORATION BERHAD
(104131-A)
HAZARD IDENTIFICATION AND RISK ASSESSMENT ANALYSIS

. -Absorption cable must be hangover head level).


4. Do not eat, drink or smoke when
handling chemical.
5. If contact with skin or eyes wash with
large amount of water immediately.
6. Wash hand before eating.
7. CSDS to be made available as reference.
8. All workers must use proper P.P.E.
4.Plastering 1.Physical / Gravitational 1. Serious Part III B.O.W.E.C 2 3 6 1. All workers must be inducted before
-Fall of person or hit by falling object. body injury. Medium commencing of work.
2.To provide proper working platform
2. Kinetic - Cut by sharp angle / 2 2 4 (working platform must be fully barricaded,
materials 2. Minor injury Regulation 1989 Part II Low secured, the plank
B.O.W.E.C. must be wide enough as per scaffolding
requirement and provide with proper access
and egress).All scaffolding erection ( more
then 3 m) must erected by competence
scaffolder.
3. The Activity shall be carried out by
competent/experienced personal and
supervised.
4. If contact with skin or eyes wash with
large amount of water immediately.
5. Wash hand before eating.
6. All workers must wear proper PPE.

Activity carried out by: Ah Soon Construction Sdn Bhd Prepared by: 1. Shaiful Izzuan (IJM) Approved by:
2. Norizal Sani (IJMC)
3. Faizal Riza (IJMC)
4. Tham Leong Yuen (IJMC) Name: Mr Beh Lai Seng
Location of activity: Block A, B & C 5. Billy Fu (Ah Soon) Date: January 31, 2008

HSEF-HRC-001 Rev.1 IJMC/PJ8/HIRARC/047-08 (Plastering)


IJM CORPORATION BERHAD
(104131-A)
HAZARD IDENTIFICATION AND RISK ASSESSMENT ANALYSIS

HSEF-HRC-001 Rev.1 IJMC/PJ8/HIRARC/047-08 (Plastering)

You might also like