ACCOMPLISHMENT REPORT

I, SANTOS A. PASIONA JR, have accomplished the following targets for the period September 11-22, 2020

GASS/MFO Success Indicators Actual Accomplishments Remarks


1.0 Road Widening/Primary Roads Tanza-Trece For the actual period
1. Timely update of Materials Logbook and
Martires City-Indang Rd. K0036+145 - September 11-22, 2020
monitoring of activities
K0038+982, Cavite Province 18-DO-0042
2.0 Construction of Flyover/Interchange
Underpasses/Long Span Bridges; Molino-Daang 2. Check fabrication and installation of rebars for
Hari, including RROW (PHASE II), Cavite 18-DO- Girder Type VI; Coping Beam; Column; RCBC
0059 Assisted the Materials Engineer in ensuring the quality controls of
3.0 Construction of Flyover at Molino-Daang materials in accordance with DPWH Standards, Procedures and 3. Check Formworks of structures, for Girder
Hari Road Intersection, Cavite 2nd LD Specification. Type VI; Coping Beam; Column; RCBC
(16-DO-0064) 4. Check Batching of Concrete at Plant
4.0 Construction of By Pass/Alternate/ 5. Slump Test
Diversion Roads Molino Boulevard to Aguinaldo 6. Sampling of Concrete
Highway (Bacoor-Imus), Cavite 7. Testing of Samples
(20-DO-0050) 8. Check Base Preparation
9. Witness Field Density Test

SANTOS A. PASIONA JR. VICENTE S. REYES


Engineer II Engineer III