Hazard Identification & Risk Assessment (HIRA) Register


Name of the Job Site: M/s. HIAL, Hyderabad
Activity/ Facility/ Equipment/ Substance*: MEWP (Boom Lift ) Activity Date ;02-07-2019 :
RefNo: HIRA/A/86 :
HIRA Team members Prepared by with the I have read and understood the
involvement of ---- Reviewed by (respective seniors) Approved by (only PD/ PM) Understood and agree to comply contents (communicated down the
(workmen representatives line)
Mr.Abdul-EHSO, Mr.Sunil Mane-EHSM L&T Mr.Manmadh kumar -PM Micron Mr.Laxminarayan- site in charge Micron
Mr.Wahid-EHSO, Mr.Jitin-L&T
Name & role: Mr.Laxamaiah-Site Engg Mr.Amer-EHSM Micron
Mr.Shankar-Site Engg

Signature

Indicate Critical control points (CCP) for this HIRA:

1- Safe to start Work permit obtain from L&T


2.Enclosed Supervision

Sl Possible Population Probabilit Severity Risk Additional Control Anticipate


Sub activity Hazard Hazardous Event Existing Control Measure* Action By
No Outcome at risk y Rating Rating Level Measures d Risk

OP. op.
Er. Er.
1. provide adequate illumination during 1.Delay start mechanical
night shift must be installed in MEWP
2- Make the entry area even and have
a firm base.
3-Make demarked area for proper
1.Transport hazard. access
1.Collision with other 4.Engaged banks man Site
2. Uneven ground. Co-
Transportation of vehicle/person/objects 5. Third party inspection to be carried Engineer/
1 3.poor illumination during First aid Injuries Workers , 3 3 9 6
MEWP(Boom Lift) . 2. Topling of out before entering the MEWP Project
night shift Operator
vehicles. 3.Hit- Manager
Ad. & PPE Ad. & PPE
to fixed oject/person.
1. Availability of all statutory document 1. Availability of emergency
such as (insurance, fitness, pollution equipment in MEWP ( fire
test, RC, driver license, road text) extinguisher, first aid box.).
2. wear necessary PPES ( reflective 2. take clearance of work
vest, safety shoes, helmet.) location before netring the
3. MEWP inspection must be carried MEWP.
out before entering the MEWP.
op.
op.
Er. Er.
1- Make sure the drive way is safe and 1.enssure that there is no
clear for truck to drive through. overhead power line
2- Deploy one person to guide the services.
traffic and driver of the vehicle with red 2.bicone light keep in on
1.Contact with flag condition.
moveing and rotating 3- Identify/demark the placed area
1. Mechanical hazard. part of MEWP. where MEWP has to be located.
2.Movement of 2.Hit to 4. segregation of vehicle path way and site
Lost time Operator,
2 mobilization of MEWP vehicle&pedestrian. pedestrian/vehicles. 4 3 12 pedestrian path way. 6 Engineer/
Accident Helper
3.Uneven ground. 3. Topling of MEWP. 5. proper illumination must be provide operator
4. Over-head power-line. 4.Electrocution due to during night shift
Ad. & PPE Ad. & PPE
contact with over-
1. trained and competent operator 1. PEP TALK must be
head power line
engaged for the job. conducted before started
2.enssure the area no overhead power the work.
lin. 2.Display Oprator name &
3. wear nessussury PPES ( reflective photo on MEWP
jucket.helmate, safety shoes.). 4.use 3.Job Specfic training
full body harness while working on should be conducted
boom lift with anchoring
op. op.
Er. Er.
1. Maintenance must be carried out
periodically.
1.Contact with 2. Ensure that the no overhead power
moveing and rotating line.
1. Mechanical hazard. part of MEWP. 3. make level the ground surface
2.Movement of 2.Hit to before poisoning the MEWP. site
Operator,
3 Positioning of MEWP vehicle&pedestrian. pedestrian/vehicles. LTI 4 3 12 4. barricade the area 6 Engineer/
co-worker
3.Uneven ground. 3. Topling of MEWP. Ad. & PPE Ad. & PPE operator
4. Over-head power-line. 4.Electrocution due to 1. display the sign board. 1. PEP TALK must be
contact with over- 2. operator must be trained and conducted before started
head power line competent. the work.
3. wear necessary PPES.
4.do not stand near moving MEWP
equipment.

op. op.
Er. Er. 1,
1. outrigger are extended and wheel ensure that there is no
are blocked and chocked. overhead power line
2. Working platform is fitted guard rail services
1.Contact with and toe board.
moveing and rotating 3. Ensure MEWP is situated on firm,
part of MEWP. stable and even ground.
1. Mechanical hazard. 4. Barricade the area
2.Hit to
2.Movement of
pedestrian/vehicles. site
vehicle&pedestrian. operator,
4 Operating of MEWP 3. Topling of MEWP. Severe Injuries 4 3 12 6 Engineer/
3.Uneven ground. Co- worker
4.Electrocution due to operator
4. Over-head power-line.
contact with over-
5. Work at height.
head power line.
5.Fall of
person/material.
1.Contact with
moveing and rotating
part of MEWP.
1. Mechanical hazard.
2.Hit to Ad. & PPE Ad. & PPE
2.Movement of
pedestrian/vehicles. 1. Display the sign board. 1. Display the operator site
vehicle&pedestrian. operator,
4 Operating of MEWP 3. Topling of MEWP. Severe Injuries 4 3 12 2. operator must be trained and details on MEWP. 6 Engineer/
3.Uneven ground. Co- worker
4.Electrocution due to competent. 2. PEP TALK must be operator
4. Over-head power-line.
contact with over- 3. do not allow the load beyond MEWP conducted before starting
5. Work at height.
head power line. SWL. the work. 2.
5.Fall of 4. do not keep loose material in Regular monitoring and
person/material. working platform . competent supervision has
5. do not over reaching while working to be done.
MEWP. .
6. wear nessuseury PPES ( full body
harness, reflective vest, safety shoes,
helmet).

OP. op.
Er. Er.
1. Injuries, mental
1. proper illumination must be provide. 1. separate team engaged
stress due to
2. barricade the MEWP area. for day and night shift, to
tiredness.
avoid stress.
2. Poor illumination /
lighting site
Operator, Ad. & PPE Ad. & PPE
5 work at night shift poor illumination 3. Poor access and Severe Injuries 4 4 16 6 Engineer/
co-worker 1. Display the sign board. 1. PEP TALK must be
egress operator
4. Snakes bite 2. operator must be trained and conduct during night shift.
5. Fire competent. 2.Regular monitoring and
6. Emergency competent supervision has
conditions to be done.

Project Manager/ Construction Manager / Section In-charge HSEO


* - Strike off what is not relevant

Op: Opportunity for Elimination & Substitution, Er – Engineering Control, Ad & PPE – Administrative control and Personal Protective Equipment