Activity Cable laying, Cable tray erection

and Fabrication
Project SMP- 2 TO CRM -2

Document No. CE/MCE/HSE/JSA/01

JOB SAFETY ANALYSIS

pg. 1
JOB SAFETY ANALYSIS

Required Safety
Work Activity Hazards Present
Measures/PPE

1. Machine/ vehicle/
1. Injury due to 1. Check all machines
Equipment mobilization at defective/ unhealthy and vehicles before entry.
site equipment’s. 1.1 Ensure equipment’s
2. Entry of are certified by Reliance
unauthorized person at P&M dept. prior to
site. mobilization at site.
3. Vehicle may roll. 2. Ensure only authorized
operator/ drivers/ drive
machine/ vehicles.
2.1 check SDP of all
operators and
drivers
3. ensure apply the
parking brake while
in standing position.
3.1 Place blocks in front
and back of the wheel
diagonally opposite to the
flat.
2.Material handling at site 1. Injury/ property 1. Avoid manual handling,
(loading/ unloading, damage due to failure of use mechanical aid, if
shifting of steel,cable tray lifting equipment tools & required ensure use of
,cable,conduit, earthing tackles. proper technique and
strip) specific PPE’s.
1.1 Deploy trade validated
workman.
1.2 Ensure use of third
party certified lifting
tools

pg. 2
JOB SAFETY ANALYSIS

& tackles.
1.3 Selection of crane,
lifting tools & tackles
as per desire load.
1.4 Validated operators,
riggers and banks man
deployed for rigging.
1.5 Use tag line to control
swing of material.
1.6 Maintain good
housekeeping.
1.7 use of specific PPE.
(cut resistance hand
gloves)
3. Mobile Scaffolding 1. Fall of person. 1. Deploy competent
erection and dismantling. 2. Struck by falling person shall
scaffolding improper supervise the
erection, moving or
setup.
Dismantling of
3. Improper access. scaffolding.
4. Sleep & trip wizard. 2. Deploy competent
trade validation
scaffolder for the
scaffolding
erection.
3. Provide a safe
means of
access.
4. Inspect scaffolding
on regular basis
checklist.
4.1 Falling protection is
required if working
above 1.8 mtr
height.
4.2 Look before
you walk.
4.3 Good housekeeping.
4.4 Use all PPE’s
properly.
4.5 Suitable barricade
during erection
and dismantling.
4.6 Scaffolding status

pg. 3
JOB SAFETY ANALYSIS

tag attached to the


scaffolding
completed/ under
erection as
applicable.
4.7 All metal scaffolds
used in building or
other construction
work shall conform
to the approved
standards.
4.8 Ensure Wheels are
Locked when
Scaffolding is in
use
4.Work at height 1. Physical hazards due
1. Deploy competent trade
to improper access.
validation workman work
2. fall of person at height.
from height 2. Use full body harness
3. Improper working above 1.8 mtr height with
shock observer.
platform. 3. Safe convenient working
4. Falling from height platform and top rail, hand
and loose material. rail, toe guard provides.
4. Before use, check the
5. Falls using portable
status tag of ladder and
ladders straight of scaffolding.
extension. 5. Use all PPE’s properly.
6. Landing platform
6. Fall of ladder
provide at every 9
mtr height.
7. Don’t overextend when
working by reaching out to
far on the side of ladder.
8. life line (12mm)
provide at required
place work at height.

pg. 4
JOB SAFETY ANALYSIS

5. Cable laying 1. Injury due to 1. Ensure use of


handling of/placement validated/ certified
(LT Cable Having Different
of cable drums on the tools, Tackles for
Size as per Drg.)
jack. loading and unloading
2. Fall/slip hazard due of cable drums.
to pulling uncoiling 1.1 Follow safe
cable material handling
Procedures
1.2 Check the condition of
jack and shaft with respect
to cable drum weight.
1.3 Deploy trade
validated workmen.
2. Check the condition of
jack and shaft with respect
to cable drum weight.
2.1 Ensure cable drum set
on compacted ground/flat
hard surface.
2.2 Ensure proper access
for working.
Ensure proper
communication &
coordination of
worker under strict
supervision.

6. Cable tray & cable laying in 1. Physical injury due 1. Provide sufficient
trench. trench width in case of
to narrow trench.
person required to work
2.Fall of personal due
in a trench.
to walk in a narrow 2. Ensure proper
trench communication &
coordination of worker
under strict supervision
3. Avoid personal walkingin
a trench till possible.
4.Ensure good
housekeeping inside and
around work area

pg. 5
JOB SAFETY ANALYSIS

7. Hot work grinding. (Steel, 1. Physical injuries due 1. Deploy trade validated
Cable Tray will be grind) to unsafe grinding. workmen.
2. Electrocutions due to 2. Providing adequate
unsafe condition of space for grinding.
grinding or supply 3. Ensuring use of specific
cable. PPE. (leather gloves, apron,
3. Entanglements, contact face shield).
of body parts and ejection 4. Supervision required
of sparks &metal particles during the job.
during grinding work. 5. TBT must be
4. Physical injuries due to conducted on safe
grinding wheel break. Grinding techniques
5. Noise during grindingbefore start the job.
work. 6.Ensure and verify the
6. Fire due to short circuitvalidation of machine/
and grinding sparks. equipment installation.
7. Daily inspection of
electrical installation &
Grinding machine by safety
supervisor operator.
8.Earthing and 30 ma
ELCB for all electrical
installation.

pg. 6
JOB SAFETY ANALYSIS

8. Hot work welding


1. Burn injury due to hot 1. Ensure trade validated
(Welding of Steel, Cable spark & metal particles welder is deployed for the
Tray) during welding. job.
2. Electrocution due to 1.1 Ensuring use of specific
unsafe condition of PPE (face shield,
welding machine or supply protective clothing, leather
cable. hand gloves).
3. Fire due to short circuit 2. Ensure and verify the
and welding sparks. validation of machine/
4. Arc-eye due to UV equipment installation.
radiation. 2.1 Ensure trade validated
5. Effects on lungs and welder is deployed for the
health effect due to job.
welding fumes. 2.2 daily inspection of
6. Pinch to fingers while electrical installation &
insert arc welding rod in welding machine by safety
handle &hammer strikes supervisor & operator.
to remove excess slag. 2.3 Ensure proper earthing
7. Eye damage by flying is provided for the
debris from hammer machine and appropriate
strikes to remove excess tripping device (30 ma
slag. ELCB) is fitted with the
supply board & for all
electrical installation.
2.4 Avoid open cable joint
& use industrial plugs/
socket as per appropriate
current rating.
2.5 Ensure no water
logging at electrical
installation and work area.

pg. 7