You are on page 1of 3

JOB SAFETY ANALYSIS

Date :…………….., 2021 Location : A JSA Number : 04

Job / Task : Company name :


Concrete Work Royal-Technic JV

PPE Required: Basic PPE, Safety Goggles, Hand Gloves, Coverall, Safety Harness etc.

Supervisor name and signature: PTW no:

Basic Sequence of Risk


No Potential of Hazard Safety Control PIC
Job Steps Rating
1.Materials may fall Hold materials firmly
Transfer materials 2.Hit by various Look for loose item
and tools to work materials maintain safe distance
L
site. Prepare, 3.Slip, trip and fall Keep eyes on path
1 Supervisors
inspect the work 4. Pinch point Use PPE
site. 5. Biological Hazard
1.Swinging Rebar -maintain safe distance
may hit worker -use proper technique
2. Pinch point -keep eyes on task
3.Sharp edge -use appropriate gloves
4. electrocution (mechanical/
from cutting cotton)
machine -Hold tools & Materials
5.Tools &Materials firmly. Keep
2 Rebar Work may fall from eye on task and path. L
hand while passing -Ensure correct tying Supervisor
6. Body positioning material when
when manual lowering material with rope
lifting, standing or -Maintain proper
bending. communicate among
work team.
-Follow manual handling and
lifting technique.
-maintain safe distance
-keep eyes on task
1.Shutter may fall
-use hand gloves
on body/ ground
(mechanical/
2. pinch point
others)
Form work 3. Hit by swinging
-keep eyes on path Supervisor
(Shuttering and de- hammer
3 -maintain safe distance
shuttering) 4.Tools &Materials L
-Hold tools & Materials
may fall from
firmly. Keep
hand while passing
eye on task and path.
down.
-Ensure correct tying
material when
lowering material with rope
1. Welder to be certified
and experienced
1.1 Appropriate PPE for
1.Burn or body parts
welder must be worn.
specifically face
1.2 Full face shield with
caused by exposure
smoked glass and welding Supervisor and M
Welding, Cutting and to welding arc
4 gloves workers
Grinding work
2.Fire caused by
2. Fire extinguisher to be on
welding sparks
site
2.1 Ensure no flammable
materials at the work area

1.Wear Safety harness


when work above 1.8 meter
1.Fall from height
Working at height from ground Supervisor
and personnel M
5 2.Personnel injury
involved the team 2.Appropreate PPE for all
employees involved to the
Piling work

1.Inappropriate
PPE’s/ tools during
Concrete work 1. Insure Proper PPE
1.1. Skin Contact 2. maintain safe distance L
6 Concreting work Supervisor
with concrete or 3. Keep eyes on path while
others chemicals carrying concrete materials
2. pinch point
3. Slip, trip and fall
1. Team leader or site in
charge keep on eyes and
supervised and monitor the
team closely
Monitor 1.Lack of Project
7
Compliance communication manager L
1.2 The project managers or
the appointed person shall
on a weekly basis audit this
procedure
1.Be aware of the
surrounding area and work
surface you are standing
1.Slip, trips and fall
2. Use correct lifting
techniques when
8 Housekeeping 2.Manual handling Supervisors L
Housekeeping
3. Dropped objects
3. Ensure all tools and
equipment are secured or
properly tied off.

Reviewed by: