LIGHTING SYSTEM
JOB HAZARD ANALYSIS ON ERECTION OF HIGH MAST LIGHTING SYSTEM
1. Engineer – in – Charge :
2. Manpower required for the job :
3. Tools and Tackles required : Hydra machine, Mobile crane,
D- shackles, slings, Anchoring hook,
4. PPE required : Helmet, shoes, Cotton Boiler suit,
Safety belt.
5. Authorization Required : Yes
2. Erection of pole a) Risk of falling 1. Personnel should have height passes for
by mobile crane from height. working at height.
2. Personnel should be experienced and
should use safety belt and helmet.
Safety belt should be properly clamped
tied to lifeline.
3. Personnel to be given rest at each stage
of work and blood pressure of personnel
to be checked regularly.
4. Stop working at night and during heavy
rains and wind.
3. Erection of line and Accident due to Fittings used should be free from any
stringing. falling of fittings. defect.
CHECK LIST FOR POLE ERECTION/ REMOVAL ACTIVITES