Job Safety Analysis Petrofac

JSA No:
Activity: Cable Laying and Testing
EF-1928-HSE - 002
Project Manifold Group Trunkline (MGT) System for GCs 29, 30
Project No: EF-1928
Title: and 31 - North Kuwait
Site/Facility: EF 1928_GreenField:
Work Area: Permit No:
GCs 29,30 & 31 Area
KOC Emergency Contact Number:160 Date:
Personal Protective Equipments: Hard Hat, Safety Shoes, Safety Goggles, Hand Gloves, Dust Mask, Coverall

RESIDUAL
JOB STEPS POTENTIAL HAZARDS RISK RATING MITIGATION MEASURES
RISK RATING

 Comply with KOC.SA.004 (Permit To Work system)


 All Vehicles / Equipments shall be inspected and
certified as per KOC.SA.013
4(C)  Excavation safety procedures shall be followed as
 Non-compliance of KOC 2(A)
per KOC.SA.026
 Conduct Tool Box Talk and discuss about the
Pre-Work
hazards.
 Use all necessary PPEs

 Ensure EOD clearance certificate for the area from


5(C) Company
 Presence of EOD 4(A)
 Any explosive ordinance findings, barricade the
area, inform Company and keep personnel away
 Only qualified person to operate the Crane and
other lifting equipments
 Ensure visual inspection of all lifting equipments
and vehicles
 Always maintain the Safe Working Load
 Cable Jack shall be placed on leveled and
compacted ground
 Overloading
 Cable Jack and Loading Shaft shall be with
sufficient capacity, duly inspected and color
Loading and  Lifting failure
coded
Unloading of Cable 4(C)  Proper manual handling techniques shall be
3(A)
Drums  Unstable support
followed
 Use appropriate PPEs
 Accident/Incident
 Area of work shall be barricade with Caution /
Warning Signage
 All activities shall be carried out as per TWI / CMS
 No lifting during heavy sand storm / poor visibility
 Keep the equipment away from the trench edge
 Only competent personal shall be used for the
activity
 Manual unrolling of cable shall be performed in a
slow and study manner
 Any return back movement due to slipping of cable
or tension shall be immediately stopped and such
provisions shall be made
 Any deviation on loading Cable Jack shall be
closely monitored
 Falling of Cable Drums  Personnel shall be suitably instructed in cable
pulling techniques including appropriate manual
Cable Laying and  Entrapment 4(C) handling techniques 3(A)
dressing  Assign sufficient personnel for manual unrolling of
 Manual Handling cable
 Proper hand protection and excess caution during
the cable pulling / laying
 Competent supervision
 Barricade the area with Caution / Warning
signage.
 Gas testing shall be carried out before entry into
confined space trench

Page 1 of 2 JSA No. EF 1928-HSE- Rev 0


 Provide suitable ladder, ramp or stair as access
and egress to the cable trench

 Stored energy shall discharged by using the


discharge stick
 Proper communication shall be maintained.
 Ensure all safe guards and controls are in place
 Competent supervision prior to proceed with the work.
& Personnel  Electrical caution signage shall be displayed at the
site and the c Megger Test on the system prior to
 Nonstandard tools and
energize
equipment
Testing of LV  Inspect all equipment and tools before using, and
Cable drums (  Faulty and Non- 4D ensure the insulation without damage. 2B
multi meter and approved equipment (High)  Ensure inspected and certified tools and (Low)
Megger) and tools equipment shall be used for the activities
 Ensure the earth connections as applicable and
 Cable/equipment adequate.
 Testing procedure shall be strictly followed.
 Ensure all personnel aware of the Company
emergency response procedure
 Unauthorized personnel entry shall be restricted.
 Area of activity shall be barricaded and placed
with signage

 All cable drums shall be stored provided with


stoppers and secured in a safe manner
 Ensure the drums are not blocked any ROW
movement
 Storing of Materials  All vehicles / equipments shall be parked on the
Housekeeping  Blockage of Traffic side of ROW 3(A)
4(C)
 Unrolled cables shall be secure and keep away
 Tripping Hazards from the personnel / Vehicle movement area

Additional
Hazards
(Other than
indicated above)
JSA Done by Name: Controlling Team:
Permit Applicant
KOC. No. Signature:

JSA Reviewed by Name: Controlling Team:


Permit Issuer
KOC. No. Signature:

Page 2 of 2 JSA No. EF 1928-HSE- Rev 0