Part 1: Job Particulars Page 1 of _____

JOB TITLE / AIM: Relocation of Monkey Ladder of Fire Water Tank to Construct the Phase-I Transformer Bay.
JSA DATE: 02/03/2007 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Zahid Masood SCRIBE: Abdullah Khan
PARTICIPANTS: Murtaza, Muhammad Ali, Arshad Imam Farooqi
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps: 1- Mobilization of Tool, Equipment & workers.
2- Construction of Foundation at the new location of Monkey Ladder.
3- Dismantling of Monkey Ladder from supports by cutting with grinder
4- Lifting of Dismantled ladder with crane to new location.
5- Installation of Monkey ladder at New Location by welding.
6- Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of workers & Unauthorised equipment/tools brought to site Before mobilizing any equipment/tools make sure
equipment that the E &P Personnel got inspected the
equipment. Banks man must be provided and
adhering the speed limit
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site.
Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site.
Workers starting the job without JSA JSA must be in place prior to work. Ensure all the
persons take part in the tool box meeting
discussion. JSA was discussed to workers and
signed at the back.

Workers work start without permit Before start activity Hot work permit shall be
attached with JSA.
Workers starting the job unaware of work Ensure that permit recipient must conduct
plan, role, responsibilities toolbox meeting and people are aware of job
and hazards involved in the job they are
doing. Jsa was discussed in the TBM and
every one is required to sign at the back of
JSA.
Heat Exhaustion Persons involved in manual labour or grinding
activities shall be provided with Drinking water
supply all the time.
SIMOPS-With Operations All works to be under taken under PTW
system.
2. Construction of Foundation at the Hand Injury. Ensure proper handling of materials/ wear gloves
new location of Monkey Ladder. during performing all activities.
Back Injury. Ensure proper lifting of material get help from
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
others.
MSDS of Materials not present. Ensure that the MSDS of Materials being used is
available at site all the time and at least minium
requirement of PPE’s is fulfilled.
Trip/Fall of Persons and material Ensure good housekeeping to avoid any trip
hazard. All material should be placed at safe and
proper locations to avoid any trip/fall hazard.
Throwing of Materials Ensure that materials should not be pass on by
throwing.
PPE’s not present Ensure that all workers of any craft must ware full
PPE’s
3 Dismantling of Monkey Ladder from Uninspected Grinder brought on site Prior to work grinder must be inspected by
supports by cutting with grinder E&P .Positive locking system shall be in place.
Unwanted sound If sound is more than 85db use of double ear
muff protection is mandatory.
Grinder without safe guard Ensure the grinder must be installed with the
safe guard.
Position of Grinder Man Ensure the correct position of the grinder man
such that sparks should go towards safe
area.
Fire blanket shall be in place during the
activity.
Hand Injury Ensure proper hauling of materials/Wear hand
gloves.

4 Lifting of Dismantled ladder with Equipment failure Only certified operator should operate the
crane to new location. crane. A copy of the daily checklist should be
in the crane. All the rigging gears should be
certified. The operator must have his load
chart to confirm his allowable distance of load
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
to crane. Operator must not try to override any
of the crane safety alerts
Uncompacted soil/trench Equipment should be inspected by equipment
Ensure outrigger fully extended and in stable
condition secure
Poor Barricading Make sure swing zone was barricaded and
Workers will be oriented about the proper posture
and positioning during the execution of the job.
Improper Access of Ladder Ensure that workers have proper ladder/acces
during placement of sling and shackles
Violation of Work at Height Protocols Ensure that protocols for work at height should be
given due regards.
Miscommunication Ensure there is a traffic coordinator or banks
person during transferring the monkey ladder
to new location
Ensure that no one except riggers should
Unwanted Signals given any signals or instructions to crane
operator.
Installation of Monkey ladder at Uninspected Welding machine brought on Prior to work welding machines must be
New Location by welding. site inspected by E&P.
5  
Ensure that welder must wear welding
  Welding Helmet not present. Hamlet during welding.

 
Ensure proper housekeeping after the works Ensu
Trip/Fall of Persons each
4   Demobilization to avoid any fall or trip hazard.