S-HSE-1

ENVIRONMENT, HEALTH & SAFETY


Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu
1 Working activity description
Sr. Sequence of activity in chronological order
No.
01 The employee working for this job would be working in proposed factory construction

02 In case of any emergency


 Emergency siren will be sounded in wailing mode for 1 min.
 Take nearest exit / emergency exit and reach nearest assembly point with help of signage.
 Walk fast, don’t run in emergency.
 Wait for instruction at assembly point
Your nearest test assembly point
03 In case you observe any emergency
 Emergency. Dialing for mobile : 8883884294,8809776901
 Keep away from emergencies like fire and explosion

Sr. Sequence of activity in Hazard Associated Sequence of control Measure using Hierarchy
No. chronological order
PEB Material Loading & Unloading, Erection of PEB material , Roof sheet and Wall Cladding ,

1 Manually/ Mechanically  Personal Injury due to  Ensure work specific tool box training to
unloading PEB materials from slippage of material by all the workmen conducted by the
trailer. Shifting of the hand. contractor engineer & safety officer
materials from storage yard  Fall of stacking before start the work.
by the help of Farana ,Hydra. materials due to non-  Ensure the ground surface condition to be
 Positioning of vehicle at sequence materials levelled for materials stacking and vehicle
unloading point. removal. movement.
 The maximum height of  Slip & trip due to  Materials shifting route to be clearly
material stored will be 2.5 m uneven access. identified and any obstacle materials to be
ground level.
 Fall of man & materials remove from access area.
 Identified the materials from height.  Ensure the weight of materials before
stacking and store area.  Overturn of hydra due manually handling don’t handling by
 Clearly marked the access to over load and forcefully.
area and route for materials uneven ground.
 Work permit should be taken for activity.
shifting.  Breaking of slings due
 Shifting of column and to overload and use  Route survey must be carried out for
rafter , Purlin, Sag Angle, the wrong procedure. entering trailer
Gutter at required place By  Hit by suspended load.
Farana.  Hit to person and  Speed 10Kmph limit should be maintained
2  Placement of PEB other object by while entering the site.
Material at erection place crane/hydra during
for slinging & guide rope the materials shifting.  Vehicle must be checked before entering
fixing
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu
 Column, Rafter,  Fall of man & in the Unloading area.
purlin,crane beam and materials from
bracing Erection and fixing height.  Safety Helmet, Jacket, Shoe must be
of all structural members,  Swing of material. provide driver & helper.
3 sheets, manually with the  All the workers should be trained &
help of Farana, Hyadra &  Damage lifting tool
experienced.
Crane & tackles.
 Shifting of column& Rafter  Poor ground  Check the condition of incoming trailer.
at required place By condition or bad
Farana,Hyadra/mobile component  All lifting tools / equipment i.e. Crane/
crane. resulting in topple Lifting Sling, D-shackle must have valid test
of Farana,Hyadra & certificate (third party test certificate by
 Placement of rafter piece Crane. competent person) with good condition
on wooden batten for  Failure of and punched SWL and color code.
assembly with Farana equipment.  Experienced hydra operator with valid
 Failure of lifting tool license to be engaged for unloading,
 Assembly of rafter & &tackles. shifting work of materials.
column at ground with the  Falling Object.
 Materials storage area to be caution tape
help of bolting and final
tighten of bolts will be  Working at height. barricading.
done with the help of  Ensure the Hydra documents like RC book,
torque wrench.  Fall of rafter piece Insurance, PUC, driver license, Fitness
from wooden piece certificate (10 no form) to be valid and
 Placement of column & due to Improper submit before use.
Rafter at erection place for stacking or damaged  PPEs (Polka dotted type cotton Hand
slinging & guide rope wooden piece. Gloves , Safety Helmet, safety shoes, ,
fixing. Reflective jacket, Nose mask to be used)
 Improper hand  Don’t allow the work under height activity.
 Erection of column & rafter tools.  Safety harness to be used if working above
by crane/Farana /Hyadra  Stumble hazard 1.8 mtr height and test certificate to be
 Failure of submit.
 De-slinging of Column & equipment.  Lifted load should be guide by two guide
Rafter  Failure of lifting tool ropes to prevent toppling during shifting.
&tackles.  Ensure the lifting/erection area barricaded
 Fixing of pulley in the
by caution tape and displayed the signage
column top for manually  Poor housekeeping board.
girts lifting. at site.  Slinging must be done by experienced
 Then temporary wire ropes
person.
will be fixed with the turn  Heavy wind/loose
buckle for support of first materials.  SWL of the sling must be matched
two columns.  Falling object during according to the material weight.
lifting & fixing of  Only one trained signal man will give signal
 Erection of girts by Rope sheet.
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu
Pully or Farana,Haydra to the operator.
 Fixing of pulley in the  Fall of Hook
 Two guide ropes of minimum three meter
rafter for manually purlin  Tripping hazards
length must be use to guide the material
lifting at ground level by  Electric shock. during shifting.
the help of PP Rope  Serious injury of
 Erection of purlin by Rope suspend of eyes or  The position of person holding guide rope
Pully or Farana,Haydra body for the should be out of material & equipment
 Manual lifting &fixing of damage of cutting reach.
purlin. wheel.  Lifting tool & tackles must be checked
 After fixing of purlin, fixing  Fire hazard. before use.
of bracing members will be  Breaking of PP rope.
done in the same manner.  Personal Injury due  Only third party certified lifting tool &
 crane beam will be erected to slippage of tackles should be use.
with the help of Farana material by hand.  Check the capacity of tool & tackles
&Haydra before lifting.

wall cladding sheet, SSR Roof  Packing must be provided in between


4 sheet, insulation fixing , all material & sling to protect from sharp
sheeting members and SSR edges.
Sheet profiling .  Guide ropes must be fixed on ground
1. Shifting of wall sheet, only.
Roof liner sheet and
 Ground condition must be checked before
all sheeting members
at required place By placement of equipment it should be
manually. compacted and levelled properly.
 SWL of the crane must be checked before
 Placement of sheet piece lifting for particular material.
on wooden batten for fixing  Erection scheme should be followed for safe
with and manually. lifting.
 Equipment checklist must be filled.
 Placement of wall sheet,
roof sheet at sheet fixing  Only experienced person will operate the
place for slinging & guide vehicle.
rope fixing.  Only third party certified equipment will be
used at site.
 Manual lifting &fixing of
 There should be a proper lifeline for
sheet.
anchoring of full body harness during
working at height
 Lifting & Fixing of sheet
 During lifting no any person allowed to
with help of hook, pulley,
come near by the material or come under
PP Rope
the suspended load.
 All sheeting member will be  Condition of all lifting tool & tackles must
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu
fixed by manually and be checked before use.
Scaffolding.
 Use appropriate lifting tool
 Lifting & fixing of insulation
&tackles(match the capacity according to
with help of and manually.
material weight).
 SSR Sheet profile will be by
the help of Manually  Ensure the lifeline before lifting of Rafter.
 Laying of SSR Sheet on the  Safety harness will be anchor with pp
ground.
rope lifeline during the purlin fixing.
 After completion of work
housekeeping will be done  Remove all unwanted loose material from
on daily basis. working site.
 Lifting & fixing of sheets  Materials shifting route to be clearly
with help of hook identified and any obstacle materials to be
/Pulley/Manually remove from access area.
 Lifting of SSR sheet on the  Allow only authorize /Trained person for
roof by PP Rope power supply distribution for power tools.
 Fixing of roof sheet  Mobile don’t allow for use during the
work.
 Ensure the weight of materials before
manually handling don’t handling by
forcefully.
 Regular checking of power tools like cutter
machine, grinder machine and welding
machine and all rotating part to be
covered by safety cage and cutting wheel
RPM & expire date to be checked before
use and always wheel RPM to be higher
from machine RPM.
 Don’t allow the work under height activity.
 Power supply to be used through 30 mA
ELCB /RCCB & overhead double insulated
cable and with metallic extension board
male female weather proof socket and no
any joint in cable.
 All power tools to be in good condition
and double body earthing if it is not
double insulated and check before
 All hand tools should be good condition
with proper grip and damage free
 Ensure the fire extinguisher availability
near hot work.
 Ensure the lifeline before starting the roof
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu
sheeting.

 Ensure the anchoring point before start


the work.
 Ensure work specific tool box training to
all the workmen conducted by the
contractor engineer & safety officer
before start the work.
 All workmen planned for this work shall
be screened for medical fitness and deploy
only if found medically fit by qualified
doctor.
 PPE (Cotton Hand Gloves, Double Lanyard
Full body harness ( with306 pp rope
harness ISI 3521:1999/rope ISI PP rope ISI
5175/anchorage hook – CE certified as per
EN 362 opening 55 mm scaffolding hook
/Energy absorber Ce Certified as per EN
355), Safety Helmet, safety shoes,
 Hard hat, Reflective Jacket, safety Shoe &
goggles along with hand gloves to be used
during work.

 All the sheets must be secured on ground.


 Sharp edge of the sheets must be
protected.
 Access to working area must be clear.
 Ensure all workers/Supervisors must use
proper roof access.
 Area should be barricaded.
 Do not allow work in high wind pressure
 Area to be barricaded during lifting &
fixing of sheet.

 Person should wear full body harness &


shock absorber for height & must anchor
with lifelines.
 All lifting activity will be done on ground
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu
only.
 Full sleeves shirt. Should be worn during
sheet handling.
 Use hand gloves properly during handling
of sheets.
 Rope shall be free from any cut and
damages.
 Lifeline should be provided on roof before
start the roof sheet.
 SSR Sheet will be shifted on the roof with
help of PP Rope &PP Rope platform.
 Insulation bag will be shifted on the roof
with the help of PP Rope.
 Housekeeping must be everyday at site.

Safety Training

1 Think through the task


(Work scope, Safe working procedure, Required permit(s) to work obtained, You and co-workers are
suitably trained for the task, Correct safety equipment available, Correct PPE available
2 Observe the work area and surroundings
(Required physical isolations used (e.g. Lockout Tag out, stored energy), Work area clearly identified
(barriers, signs), Work area is safe (e.g. housekeeping, lighting, temperature etc), Equipment in work area
is in safe condition.
3 Check what else is happening in the work area today
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu

4 Identified any new hazards, that not on risk assessment

5 Satisfy yourself that it is safe to proceed

Clearly identify the Mandatory PPEs requirement

Helmet Safety Type of Hand Face mask / Safety Hearing Safety Any other
Shoes and gloves with face shield harness protection goggles Pls specify
gumboot description
Reflective
Jacket, Nose
mask
Apron
extinguisher
hand glows.

Yes Yes Yes Yes Yes YES Yes √


Cotton/lather
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu

Revisions History

Rev. No. Rev. Date Revision details

Type Does work require work permit Cold work, Material handling,
height work, sheeting work

Use of hazardous chemical / Material Please describe clearly


No

Does any activity requires emergency rescue especially for height work? Ladder

Main Emergency contact No. 8883884294


Contactor Superison Contact No. 8809776901
A 25.06.2019 Material unloading , Erection work & Sheeting of PEB material

Communication of method statement and signing off register:

Communicate to all relevant parties (via a toolbox talk) and ensure it is signed by all Personnel.
S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu
I undersigned have read, discussed and fully understand the above Standard work procedure (Erection
work &SSR sheeting work and Wall cladding) and will adhere to all method of work and condition set
down.

Time--------------------------- Training given by --------------------------------------------

Name Name of company Designation Date Signature


S-HSE-1
ENVIRONMENT, HEALTH & SAFETY
Job Safety Analysis

(JSA) Job no :- 395
Prepared By Checked by Approved by Date Revision
Mr. Ranjan Kumar Roy Mr. Sachin Aher Mr. Dhaval Patel 25/06/2019 A
Name of Project Simens Gamesa Work Location Rachaillapadu