Section / Dept: / civil Activity: Risk Assessment-Lifting
& Fixing of cross bracing
Additi
Sl Basic Job Potential Hazard Consequence Current control measure onal
Probability
Probability
N. Steps Risk rating Ini contro Risk rating
Residual
tial l
Ris measu
risk
P E A R k re P E A R
Use guide rope during shifting of
materials and always keep away
Get Injury/ from swing area.Daily tool box talk
Fall of materials
Fatality before starting of job by crew
supervisor.
Failure of wire rope Get Injury All the wire rope sling & D-shackle
sling/D-shackle must be visually checked . Tested
sling must be colour coaded by a
Skilled workmen shall be engaged
specific colour .aily tool box talk
for hooking of material.Hook of hydra
before starting of job by crew
must be provided with hook latchaily
Hooking of material Get injury supervisor.
tool box talk before starting of job by
crew supervisor.
1of2
Additi
Sl Basic Job Potential Hazard Consequence Current control measure onal
Probability
Probability
N. Steps Risk rating Ini contro Risk rating
Residual
tial l
Ris measu
risk
P E A R k re P E A R
Take Wah permit before starting the
activity
Leackage of hose Get Injury due to Proper hose clamp shall be provided
pipe fire at both cylinder side and torch side.
Binding wire shall never be used or
allowed inplace of hose clamp
Colour code for separate hose pipe
(Red for DA and blue for Oxygen)
Gas cutting shall be maintained and never be
7 mixed 2 1 0 0 2 4
activity
Only striking lighter shall be used to
light the torch and torch shall be
checked for any kind of damages
prio to start the job