TITLE OF THE ACTIVITY: Under Ground, Above Ground Drainage Works & Plumbing Works
ASSESSOR: Safety & Project Departments ASSESSED DATE: 28/09/2019 REVIEWED DATE:
RISK
RISK
EVALUATIO RESIDUAL RISK
LEVEL ACCEPT
SN ACTIVITY HAZARD CONSEQUENCES/ IMPACT N IMPLEMENTED CONTROL MEASURES
Y/N?
H/
L S H/M/L L S
M/L
Page 1 of 4
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Under Ground, Above Ground Drainage Works & Plumbing Works
ASSESSOR: Safety & Project Departments ASSESSED DATE: 28/09/2019 REVIEWED DATE:
6 Working at Inadequate Personnel injury 4 4 16 Use competent persons to erect and dismantle 1 4 4 Y
Height working Fracture scaffolding,
platform Fatality Proper scaffold with fully boarded, hand rails,
Fall of toe boards & access to be provided.
person/mate Personnel should wear full body harness.
rial. Other appropriate PPE to be used.
Close supervision
Persons in danger
Workers undertaking the work
Workers below the block work area.
Page 2 of 4
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Under Ground, Above Ground Drainage Works & Plumbing Works
ASSESSOR: Safety & Project Departments ASSESSED DATE: 28/09/2019 REVIEWED DATE:
Persons passing the site location, e.g. members of the public and persons in the Vehicles.
Personal protective equipment
Safety Helmet, Safety Shoes, Ear plugs, Face shield/Visor, Appropriate Gloves & Safety Goggles
Information, instruction and training
All personnel in the team are to be made aware of the safe systems of work.
Supervisors should ensure that all lifting gear used are in good condition and safe for use.
Workers and supervisors should be trained in the use of power tools and machinery to ensure that
equipment is maintained in good condition prior to and during use.
Ensure that good house keeping standard is maintained through out.
Emergency procedures
Site emergency procedures should make provision for the rescue of individuals from injuries.
First-aid facilities should be available to cope with any significant injuries that may arise from the
work.
Monitoring and review
Work should be monitored by Foreman and charge hand who are trained to ensure that any
additional precautions or equipment required are provided.
Prepared By
QAMERUDDIN
HSE ENGINEER
Page 3 of 4
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Under Ground, Above Ground Drainage Works & Plumbing Works
ASSESSOR: Safety & Project Departments ASSESSED DATE: 28/09/2019 REVIEWED DATE:
LIKELIHOOD
Likely
Rare Unlikely Possible Almost certain
Could happen often (on
Remote possibility (once Could happen but rare Could happen occasionally Could happen frequently
L average once a month or
every 3 years or more) (typically once in a year) (on average quarterly) (once a week or more)
SEVERITY more)
1 2 3 5
(IMPACT) S 4
Quick, easy controls should be implemented immediately and further action planned for when resources permit. Monitoring required
1-4
ensuring controls are maintained. Manage through routine procedures. Go for economic improvements where possible. Incident
Low
report must be completed.
Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and implement the
appropriate actions. Actions should have a timescale and should be monitored. Where the risk involves work in progress undertake
5-12 a risk assessment as soon as possible to ensure the safety of the situation or task. Work should not start until the risk is
Medium reduced to an acceptable level. Considerable resources may have to be allocated. Contact your Manager and Risk Manager by
telephone about the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added
to service risk register.
Do not commence the activity until a risk assessment has been completed to ensure the safety of the situation or task. If it is
15-25 not possible to reduce or eliminate the risk even with unlimited resources, work must remain prohibited. Inform your relevant
High Director, your Manager and the Risk Manager immediately by telephone. Incident report must be completed. Incident must be
added to service risk register.