Risk Assessment/Management Form

Ref:
Section / Dept: civil Risk Assessment-
Activity: Location:
Painting work
Addi
Sl Basic Job Potential Consequence Current control measure tion

Probability

Probability
N. Steps Hazard Risk rating In al Risk rating
iti cont

Residual
al rol
Ri mea

risk
P E A R sk sure P E A R

Use of Helmet with chin


strap,Rubber hand gloves
Use of safety goggles &Safety
Effects of skin Skin Irritation shoe 1 0 0 0 2 2
Painters shall be fully protected
The materials shal be isolated
from other materials
Deployment only skill workers
Proper storage shall be done on
designated place
Painting area shall be provided
proper ventilation
All electrical appliances installed
Painting Fire and Get
1 shall be flame proof through 2 0 0 0 2 4
Activity Explosion Injury/Fatality
proper ELCB,s connection

Painting work should not be done


near the Gas cutting, welding &
Grinding work

Deployment only authorised


person
Use of double rope full body
harness and anchored it above the
Working at Get head height 2 0 0 0 2 4
height Injury/Fatality
Use of Fall arrestor with the safety
belt hook for ascending and
descending to prevent from
accidental fall
Prepaired Approved by: Reviewed by
by:
Contractor Contractor
Date Date Date