GROUNDING CABLE
TANGIER BLOCK 4/5-MET-0802 2 19-August-2022
INSTALLATION
Cutting Cutting Wound in fingers by pliers 3 2 6 Medium Daily inspection of pliers 1 1 1 low
grounding cable by (before starting the task)
cable by cutting Hurting eyes by fling parts
Personal
cutting pliers of cables Use only the pliers who have
/
pliers environm the color coding
Cable ent
waste TBT to cutting team
Muscles aches
Provide a comfortable
workshop to execute the task
Breathers
Wearing PPE
Stumbles
Transpo Lifting Person Accident with fixed 3 2 6 Medium Just the qualified and 1 1 1 low
rtation and al objects authorized person can
off Circulati manipulate the forklift
cables on of forklift Accident with moving
section forklift objects Daily inspection to the
by forklift before starting the
forklift Accident with other task
vehicles Check all regulatory
documents of forklift and
Crushing of workers conductor
Hit the workers
Respect the maximal
Overturning of the load of the forklift
forklift
Use the compatible
Fall of load forklift to lift the charge
circulation
Parking forklift on a
stable and leveled
surface during the lifting
operation
Prohibition circulation of
forklift without competent
flagman
In a bad weather
condition, which affect
the visibility the forklift
will put the flashing light
and headlight into
service
A fire extinguisher
should be in forklift
cabinet
A supervisor will be
present in work area
3
Document Name Document No Revision Date
GROUNDING CABLE
TANGIER BLOCK 4/5-MET-0802 2 19-August-2022
INSTALLATION
4
Document Name Document No Revision Date
GROUNDING CABLE
TANGIER BLOCK 4/5-MET-0802 2 19-August-2022
INSTALLATION