Page 1 JSA – GP 011

JOB DESCRIPTION
JOB SAFETY ANALYSIS
: INSTALL HABITAT FOR HOT WORK ACTIVITY
DATE OF ISSUED : SIGNATURE OF SUPERVISOR
JOB NO. :
AREA/TAG NO/EQUIPMENT DESCRIPTION : REVIEWED BY :
REFERENCES : - GP – HSE MANUAL
LAST REVIEWED DATE:
- C – HSMS – 00002 - COPI

SAFETY EQUIPMENT (PPE) REQUIRED DOING THIS JOB: STANDARD PPE., Safety Harness, Hand Glove.

Sequence of Basic Job Steps Machine/Equipment/Tool Involved Potential Accidents or Hazards Recommendations to Eliminate or Reduce
in each step Potential Hazards
Preparation.

Make sure all worker have given safety briefing about job and
PJSM how to minimize risk of accident at each step of work before start
to work

Report to Production operator on duty about job.


LOTO (Lock Out Tag Out )
( do not start to work before approved work permit by operator on
duty )
- make sure all tools and material safe for use
- Scratch by sharp object - Materials Pipe or board more than 2.5mtrs length must
Preparation Material and Tools. - Muscle injured during handling by two person
handling material - Materials more than 20kg weight must handle by crane
or two person or more
Use hand glove, wear safety harness during work at over height
Scratch by sharp object, fall from
area, materials with length
over height area, scaffolding
Rig up scaffolding Ratchet wrench, manila rope More than 2 mtrs handle by two persons and handle with care,
material hit others platform
secure working area and develop police line
components,
Use hand glove, wear safety harness during work at over height
Scratch by sharp object, fall from
area, materials with length
Ratchet wrench, manila rope, Fire over height area, scaffolding
Rig up habitat for hot work More than 2 mtrs handle by two persons and handle with care,
Blanket material hit others platform
secure working area and develop police line
components,

Finishing
Rig down habitat Use hand glove, wear safety harness during work at over height
Scratch by sharp object, fall from
area, materials with length
Ratchet wrench, manila rope, Fire over height area, scaffolding
More than 2 mtrs handle by two persons and handle with care,
Blanket material hit others platform
secure working area and develop police line
components,
Page 2 JSA – GP 011

Rig down Scaffolding Ratchet wrench, manila rope Scratch by sharp object, fall from Use hand glove, wear safety harness during work at over height
over height area, scaffolding area, materials with length
material hit others platform More than 2 mtrs handle by two persons and handle with care,
components, Slip and Trip secure working area and develop police line,
Watch Step, Stop work when bad weather

House Keeping area Slip and Trip Watch step

This sheet is to record that Personnel noted below have been made aware of the nature of the task to be carried out; any potential hazards associated with the completion of this task and
any additional work activities which could impact on safe completion of this task. It can be used as an aid by work leader.

Are you satisfied that:


Page 3 JSA – GP 011

 You have seen, briefed and understood all Work Permits, Work Procedure, and Job Safety Analysis?
 You understand your responsibilities for both the work activity and safe working practices?
 You have the correct tools and equipment for the job?
 You know how to access and exit the work site safely, the nearest emergency telephone or fire alarm point is?
 You are aware what action to take in an emergency?
 You have all the necessary and specified personnel protective equipment?
 You have received MSDS advice on any materials or substances you may come in contact with?
 You have considered the work environment?
 You understand how you will control waste?
 You have considered conflicting activities?
 You are PTW trained and competent to carry out the task?

WORK LEADER AND WORK TEAM TO CONFIRM PJSM, JSA REVIEW HAS BEEN HELD,
DISCUSSED AND UNDERSTOOD
Work Permit Duration – max 8 periods
Work Team Member Signature (1) Start Date 1 2 3 5 6 7 8