Date: 2 November 2021 Will the work involve any of the activities below? (Circle that apply)
If ‘YES’ a Permit must be obtained
Prepared By: Rannie Hot work and / Work in Confined space entry, Excavation >/= 1.2
Hazardous areas >/= 1.5 meter meter
Company: HI TECH ENGINEERING SDN BHD Inerting or Gas Freeing Work on Flammable Live Electrical Work/
Gas Systems LOTOTO
Department / Address: NO. 10G, LEBUH BENDAHARA 4, Asbestos Work / Working Explosive Blasting/ Other (specify):
OFF JLN RAJA NONG, 41200 KLANG, SELANGOR at Height (1.8 Meter) Radiation Exposure
JHA Reference No.: HI Tech (S/B) 0032/2021 JHA Review No.: Hi Tech (S/B) 0031/2021
JHA Review Date: 2/11/21
Predetermined JHA shall be verified and reviewed on site every day before performing the work
Description of work: Electrical Installation from Sub-board Air-Dryer, Lighting, Exhaust Fan, Out Socket 13A at First Floor
Step Job Step Job Step Hazard Job Step Control Tick
No
1 Barricading work area Struck by equipment or material - Placement of warning signage (safety cone)
2 Moving materials manually to the work Body sprains and strains from - use correct lifting techniques
area lifting materials
- get assistance when lifting heavy
loads
3 Drilling holes in wall & ceiling Exposure to silica dust Wear respirator mask.
Wear safety googles.
Injuries from drilling - never carry power tools with the trigger depressed
- keep hands away from the immediate work area
- disconnect tools from the power source before
making adjustments or carrying out servicing
- wear hearing and eye protection correctly
- keep a firm grip while using tools
Step Job Step Job Step Hazard Job Step Control Tick
No
4 Using hand and power tools Injuries from drilling - never carry power tools with the trigger depressed
- keep hands away from the immediate work area
- disconnect tools from the power source before
making adjustments or carrying out servicing
- wear hearing and eye protection correctly
- keep a firm grip while using tools
5 To install GI conduct pipe and Body sprains and strains from - use correct lifting techniques
accessories lifting materials
- get assistance when lifting heavy loads
Fall from height - ensure that ladders are safely secured, and at a
4:1 pitch
- do not stand higher than the 3rd top rung
- only carry out light duties, using one hand, when
working from a ladder
- Inspect ladder before use
- Use buddy system.
- inspect ladder or scaffold before using.
- lock ladder or scaffold securely before using.
6 To install electrical cable and Electrical equipment & wiring - Ensure main switch is isolated.
accessories (outlet double socket, shock
- Ensure LOTO system is practiced.
isolator, industrial exhaust fan & LED
florescent light) - Ensure competent wireman is available to handle 3
phase system
Fall from height - ensure that ladders are safely secured, and at a
4:1 pitch
- do not stand higher than the 3rd top rung
- only carry out light duties, using one hand, when
working from a ladder
- Inspect ladder before use
- Use buddy system.
- inspect ladder or scaffold before using.
- lock ladder or scaffold securely before using.
Step Job Step Job Step Hazard Job Step Control Tick
No
7 To cut zinc plate at ceiling for industrial Body sprains and strains from - use correct lifting techniques
fan installation lifting materials
Fall from height - ensure that ladders are safely secured, and at a
4:1 pitch
- do not stand higher than the 3rd top rung
- only carry out light duties, using one hand, when
working from a ladder
- Inspect ladder before use
- Use buddy system.
- inspect ladder or scaffold before using.
Eye damage due to exposure to - Use safety shield when cutting using grinder
spark
- Use safety googles when cutting using grinder
Broken or loose cutting disc - All small tools shall be inspected prior to use and
found to be in good working order prior to use
- Confirm discs are not cracked or broken.
- Use the correct type of disc for cutting work
Personal Protective Equipment (PPE) appropriate to the task at hand shall be worn / used at all times.
Tick box any PPE that applies to this job.
/ / / /
List required equipment / tools (e.g. fire extinguisher, barricading / signs, hand tools, mechanical tools, plant etc.):
a) Drill Machine
b) Pipe range
c) Ladder
d) Fire Extinguisher
e) Safety Cone
f) Grinder Machine
The work crew acknowledges that they understand and will comply with the precautions listed above