Professional Documents
Culture Documents
Rotary Joints Status
Rotary Joints Status
Installation Component
Location Installation date Current status Detail
detail
Rotary joint leaked-New joint is 27/09/2021 old rotary joint is
1 intalled-Left rack 2nd column 2nd repaired-new carbon is
from top installed
rotary joint leaked-Carbon seal undergo wear 29/09/2021 repaired joint is installed
and tear and spring broke- 1st stack 1st
1 column 2nd from top
Two joints leak- one on the 2nd rack 2nd 2/10/2021 One new joint and other old
2 column top one and the 2nd from the top joint is repaired and installed
1
23/11/2021 repaired rotary
joint is installed
Repaired rotary joint is installed
- 2nd stack 1st column bottom
one- 2 new flexible pipes are
2 also installed
27/1/2022 repaired rotary
joint is installed
Soaper-1 2 rotary joints installed
on drying machine- 1st stack
2nd column 3rd from
top(counter threads) and 4th
3 one from top
4
Drying machine-1 Haroon Print (Rotary joints status report)
Date of checking status 2/2/2022
3
4