Professional Documents
Culture Documents
FOR INFORMATION
PROJECT :
CONSULTANT :
CONTRACTOR :
D.S.MA 27-SEP-2021 - -
i
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
CONTENTS
1.1 PURPOSE........................................................................................................................................... 1
1.2 REQUIREMENTS TO BE MET BY THE IDENTIFICATION SYSTEM KKS.........................................................1
1.3 STRUCTURE AND APPLICATION OF THE POWER PLANT IDENTIFICATION SYSTEM KKS..............................2
1.4 BREAKDOWN, STRUCTURE AND CONTENTS OF THE IDENTIFICATION........................................................5
1.5 PLANT CODE KEY............................................................................................................................... 8
1.6 FUNCTION KEY................................................................................................................................... 9
1.7 EQUIPMENT UNIT KEY....................................................................................................................... 11
1.8 COMPONENT IDENTIFICATION............................................................................................................. 12
1.9 BREAKDOWNS, CONTENTS OF KKS DATA CHARACTER........................................................................13
ii
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
1.1 Purpose
The power plant identification system is applied to clearly identify plants, systems, parts
and components to their purpose, type and location.
The contents are based on the “Identification Systems for Power Plant (KKS)” published
by VGB - Technical Association of Large Power Plant Operators.
In order to perform the set tasks, the identification system must be capable of satisfying
the following requirements:
Subdivision with graded details and a fixed meaning for the data characters,
Variable identification length depending upon the detail requirements of the various
areas of application,
Ease of recognition ensured by clarity and an acceptable length for the identification,
1
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
1.3 Structure and application of the power plant identification system KKS
The location identification identifies the rooms and floors, or other installation sites, for
installations and equipment in building structures.
A uniform identification structure, with a maximum of four breakdown levels, was created
for all three types; the units referred to becoming smaller from left to right.
Serial Number of
0 1 2 3
Breakdown level
Name of
Total plant Function Equipment Component
Breakdown level
2
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
In this type of identification the entire system is subdivided according to the function or
process, since, whether for mechanical, electrical, control of civil engineering, the
equipment units and components must be identifiable in relation to the process.
In the electrical and instrumentation control engineering sectors, the equipment for
auxiliary services, power supply, open-loop-control, instrumentation, etc,. is treated as a
process engineering function. The same applies to structures in civil engineering work.
As with the Process-related Identification, the KKS is also used to identify locations,
principally of electrical and instrumentation and control equipment, but also of mechanical
equipment. Locations, for example, coordinates, racks and positions in cubicles etc. are
identified in the breakdown level EQUIPMENT UNIT.
The identification letters now used for the Point of installation identification in the
breakdown level FUNCTION are the same as those for the process-related identification.
This improves recognition of the identification in the overall system.
In order to clearly identify the position of plant, subsystems and equipment in the power
plant, the building structure and floor is entered at the breakdown level FUNCTION, and
the rooms on the various floors of the building structure at the breakdown level
EQUIPMENT UNIT. The breakdown level COMPONENT is omitted in such cases. Fire
protection sections are identified according to the room identification.
3
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Serial number of
0 1 2 3
breakdown level
Name of Total Equipment
Function Component
breakdown level plant unit
Designation of data
G F0 F1 F2 F3 FN A1 A2 AN A3 B1B2BN
character
Type of data
(A) or (N) (N) A A A N N A A N N N (A) AANN
character
A = Alphabetical symbols (letters, special symbols)
0 1 2 3
Breakdown levels
Total plant Function Equipment unit Component
Process-related Code
Total Equipment unit Component
System code
plant code code
Point of Installation
Unit Installation Installation
Unit code Space code
Unit Switchgear Tier/space
Electrical and C&I Unit Elec. equip. cab. Tier/space
Unit Control console Coordinate
4
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Location Code
The KKS is divided into different BREAKDOWN LEVELS and codes from right to left in
diminishing order of the units of a complete power plant.
0 1 2 3 (1)
Total plant Function Equipment unit Component (2)
G F0 F1F2F3 FN A1A2 AN A3 B1B2 BN (3)
NN NNN (A)
A or N (N) AAA AA AA NN
(4) (5) (6)
(Chapter 3.0)
Component code
(Chapter 5.0)
5
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
6
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
7
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Type of character (A or N)
Plant G
Code Identification
Code Identification
Common Facility to Unit 1 & Unit 2,
0
or Plant Overall
Applicable to Unit 1 only or simultaneous representative
1
for Unit 2
2 Applicable to Unit 2 only
8
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Code Identification
- Demineralization System
- Laboratory equipment
9
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Code Identification
- Fire fighting system
- HVAC system
- Auxiliary boiler
- Stack
- Workshop Equipment
stripping system
Boiler island
- Boiler
- Electrostatic precipitator
- Fuel system
- Condenser
- Intake facility
10
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Code Identification
- Aux. Cooling water system
Code Identification
A - Grid and distribution systems
11
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Y - Site
Main groups A1
Subgroups A1A2
12
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
B Mechanical equipment
G Electrical equipment
Main groups B1
Subgroups B1B2
X Signal origins
Y Signal applications
Z Gated signals
13
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
For complete components of the subgroups B1B2, see component code (Chapter 5.0).
14
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Identification of
power station units and
unit independent plants
System-classifying
Classifying sub-division of system
and plants of unit
System-counting
Counting sub-division of systems and plants
into system sections and sub-systems
Equipment-classifying
Classifying sub-division of mechanical
equipment, open loop-control
Equipment-counting
Counting of similar mechanical equipment, electrical and
control & instrumentation equipment
Component-classifying
15
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Component-counting
Counting of components or signals
The data character marked ( ) and the prefix sign can be omitted of the identification is
unequivocal.
0 1 2 3
Overall plant Function Equipment unit component
G F0 F1F2F3 FN A1A2 AN A3 B1B2 BN
A or N N AAA NN AA NNN A AA NN
Function code
(chapter 3)
component code
(chapter 5)
The limits of systems and sub-systems are part of the function code list.
16
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
If consumer system limits are not defined, the beginning of consumer system is at branch-off or
outlet of supply system or at a point where unequivocal allocation of a component to consumer
system is possible.
This designation is used for the point of installation identification in assembly units for
instrumentation and control system (for e.g. in cubicles, panels, consoles etc.) Not only is
this designation important for cabling but for the interconnection of electrical equipment
and equipment of the control technical as well.
The Point of Installation Code is divided into different breakdown levels with different
meanings, from right to left in diminishing order, starting from the Total Plant up to the
Installation Space Code.
The following example illustrates the structure of the Point of Installation Code:
0 1 2
G F0 F1F2F3 FN A1 A2 AN
where:
Designation of Entire
Plant Units
Systems classifying
System numbering
17
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
The alphabetical designation of installation point in the vertical direction (rows designation)
is done by data character A1A2. Data characters AN indicate counting in the horizontal
direction (columns numbering).
As alphabetical letters (without I and O) are used, on data characters A1 A2 for point of
installation identification in the assembly unit there occurs the combination of letters as for
the aggregate designation according to process. In order to discriminate it from other
types of designation there must be written “.” (period) in front of the breakdown level 2.
As a result to a fact that there are often used codes next to each other in the electric
therefore there is used “=” (sign of equality) in front of designation code according to
process and “+” (sign of plus) in front of designation code according to point of installation,
which in similar cases neither have to contain level 2 nor period for the discrimination of
prefix code, which can fall off in case that the specification stays unambiguous.
The following principles direct for the designation of installation point in assembly units:
- The counting direction and counting sequence derive from the initial position data(left
top corner) at the view to the front side.
- The counting direction at the view to the front side is from left to right and from top to
bottom.
- The vertical breakdown is axis Y (i.e. rows designation) is designated with Capital
letters.
Breakdown level 0 1 2
18
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Designation of data F F F F F F A A A A A A
G
character 0 1 2 3 N N 1 2 N N N 3
(A)
Type of data character + (N) A A A N N A A N N N (A)
(N)
Building Room
Civil engineering Total plant
Floor, Level Section
This identification block expects the prefix symbol “+”(Location) ; may be omitted if the
identification remains unambiguous.
19
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Piping & Instrument Diagrams (P&ID) and Single Line Diagrams (SLD) are the basic
documents (origins) for a project related KKS coding.
Single line diagrams are the basic documents (origins) for a project related KKS coding
in electrical engineering.
For other engineering activities (e.g. layout planning, component engineering), KKS
code must always be taken from the above mentioned basic documents.
In basic KKS documents (P & IDs and SLD), the breakdown level 3 (Component code)
shall not be applied.
It is not allowed to change allocated KKS numbers for a project, if these numbers have
been released for the project.
The original KKS number is still kept, even when another kind of equipment is used
providing that the function according to the KKS equipment unit code is not changed
(e.g. substitution of a gate valve by a globe valve).
20
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
2.3 General rules on other numbering code elements (Fn, An, Bn).
Numbering starts a new when one of the preceding code elements changes.
Numbering conventions, once established, may not be altered, not even in the event of
changes made in the progress of planning.
Project counting directives referred to local layouts are related to breakdown level “0”,
and prefix number for system code “F1” and structures (F1=U) only.
Case3 Equipment locates in the direction Number from the West to the
21
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
22
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
In two lines
e.g. 01PAC10
AP001(-M01)
2.6 Exception
All the systems and equipment within boiler supplier scope which are controlled or
monitored by the plant DCS shall equip the KKS number. The systems and equipment
which are controlled or monitored by the local control equipment under supervision of
the plant DCS shall also equip the KKS number.
Very minor pipes, such as pipes for instrument, vent & drain for pressure test,
equipment vent & drain indicated in P&ID shall not equip the KKS number.
Parts and components of civil work, such as structure, floor and beam etc shall not
equip the KKS number.
The numbering system for control panel cables shall not equip the KKS number.
Point of installation identification and location identification are not applicable to boiler
supplier scope.
23
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Caution
1. Character “O” & “I” shall not be used in KKS function code.
2. KKS function code not defined in the following list can be only used after the Contractor’s
approval.
AB ≥ 420kV systems
ABA Lightning Arresters
ABB Current Limiting Reactor
AC Not used
AD Not used
AP Control consoles
APA Control panel (free for use up to APD) 1)
APE Interposing relay panel (free for use up to APN) 1)
AR Protection equipment
ARA Protection relay panel (free for use up to ARZ)
24
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
AT Transformer equipment
ATA Transformer equipment (free for use up to ATZ)
ATB Current Transformers
ATC Capacitive Voltage Transformers
AV Marshalling racks
AVA Marshalling racks (free for use up to AVZ)
AW Operating equipment
AX Central equipment
AY Communication equipment
AYA Telephone system (PABX)
AYC Alarm system
AYE Fire alarm system
AYF Clock system
AYG Remote Control system
AYH Telemetry system
AYJ Remote metering system
AYP Optical monitoring system
AYT Not Used
25
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
BA Power transmission
BAA Generator leads
BAB Neutral grounding cubicles
BAC Generator circuit breaker, including Voltage transformers
BAD Isolated Phase Bus-Duct (IPB)
BAE Voltage Transformers / Lightning Arrester Cubicles
BAS Compensation
BAT Generator transformers, including cooling system
BAW Not used
BAU Earthing and lightning protection systems
BAX Fluid supply system for control and protection equipment
BAY Control and protection equipment
26
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
BM Low voltage distribution boards and transformers, (diesel) emergency power system
BMA Low voltage emergency distribution boards (free for use up to BMD)
BME Low voltage emergency distribution boards, motor control center (free for use up to
BMS)
BMT Low voltage auxiliary power transformers (free for use according to voltage level up to
BMW)
BMX Fluid supply system for control and protection equipment
BMY Control and protection equipment
27
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
BZ Not Used
BZA Not Used
28
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
CA Protective interlocks
CAA Cabinets for Protective interlocks (free for use up to CAC)
CAD Turbine protection cabinets 1)
CE Annunciation
CEA Cabinets for Annunciation systems (free for use up to CEJ)
CEK Fault recording (free for use up to CEQ)
CF Measurement, recording
CFA Cabinets for measurement
1)
CFB Cabinets for temperature measurement (if not DCS.)
CFC Cabinets for electrical measurement 1)
CFQ Cabinets for recording (meters, pen recorders)
29
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
CJL Instrumentation and control cabinets for steam turbine set (Turbine run-up system) 1)
CJN Instrumentation and control cabinets for steam turbine set
CJR Not used
CJU Instrumentation and control cabinets for other main and heavy machinery (free for use
up to CJY)
CM Instrumentation and control equipment (free for use for system combination)
CMA Large screen (free for use up to CMT) 1)
CP Instrumentation and control equipment (free for use for system combination)
CPE Interposing relay panel 1)
CQ Not used
CR Not used
CS Not used
30
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
CV Marshalling racks
CVA Marshalling racks (free for use up to CVN)
CVP Marshalling racks for remote-electric 1)
CW Control rooms
CWA Main control consoles (free for use up to CWE)
CWF Main control panel (free for use up to CWP)
CWQ Cubicles and panels for electrical equipment and supply, Control rooms 1)
CWV Not used
CX Local control stations (e.g. for cooling water systems, diesel units, supervision of
generator cooling, remote shutdown station)
CXA Local control stations (free for use up to CXD)
CXL HVAC systems switchgear building 1)
CXM Fuel oil pumping station 1)
CXU Reserved
CXX Reserved
CXV Reserved
CXZ Not used
CY Communication equipment
CYA Telephone system (PABX)
CYB Control console telephone system
CYC Public Address System
CYD Alarm system
CYE Fire alarm system
CYF Clock system
CYG Remote control system
CYH Telemetry system
CYJ Remote metering system
CYK HF carrier telephone system
CYL Staff paging system
CYM Not used
CYN Not used
31
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
32
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
EB Mechanical treatment of solid fuels (also for gas generation and treatment)
(Crushing, mixing, drying, etc.)
EBA Transport system
EBB Mixing system
EBC Crushing system, pulverizing system
EBD Screening system
EBE Separator system and discharge equipment
EBF Temporary storage system for milled raw coal
EBG Predrying system
EBH Main drying system
EBJ Dried coal transport system including aftercooling
EBK Dried coal temporary storage system
EBL Vapor compressor system
EBM Exhaust system
EBR Residues removal system
EBT Weighing equipment
EBU Sampling system
EBY Control and protection equipment
33
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
34
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
EN Supply of other fuels (as main fuel : light fuel oil, heavy fuel oil or crude oil)
ENA Receiving equipment incl. Pipeline 1)
ENB Tank farm 1)
ENC Pump system 1)
END Piping system 1)
ENE Mechanical cleaning, scrubbing system 1)
ENF Temporary storage system 1)
ENG Preheating system 1)
35
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
36
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
EU Treatment and transport system for combustion, fuel treatment, fuel conversion,
flue gas cleaning, gas generation residues
EUA Treatment system for fuel treatment residues
EUB Treatment system for fuel conversion residues
EUC Treatment system for fuel combustion residues
EUD Treatment system for flue gas cleaning residues
EUE Treatment system for gas generation and treatment residues
EUF Treatment system for fuel treatment residues
EUH Treatment system for fuel conversion residues
EUK Treatment system for fuel combustion residues
EUM Treatment system for flue gas cleaning residues
EUP Treatment system for gas generation and treatment residues
37
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
38
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
39
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
40
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
41
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
HA Pressure system
HAA IP/LP part-flow feed heating system (flue-gas-heated) 1)
HAB HP part-flow feed heating system (flue-gas-heated)
HAC Economizer system
HAD Evaporator system
HAG Circulating system (not used in natural-circulating boiler)
HAH HP Superheater system
HAJ Reheater system
HAK Secondary reheater system
HAM Triflux system
HAN Pressure system drainage and venting systems
HAV Lubricant supply system
HAW Sealing fluid supply system
HAX Fluid supply system for control and protection equipment
HAY Control and protection equipment
42
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
43
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
44
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
HR Chemical flue gas treatment system including residues removal, adsorptive process
(e.g. dry additives)
HRA Limestone silo in boiler area 2)
HRB Limestone feed system in boiler area 2)
HRW Limestone sealing air in boiler area
HS Chemical flue gas treatment system including residues removal, catalytic process
(e.g. DENOX)
HSA Flue gas ducting system within *HS*
HSB Flue gas-side heat exchanger, gas heater (not *HU*)
HSC Flue gas fan system
HSD Reactor (reduction)
HSE Converter (oxidation)
HSF Flue gas-side cleaning equipment for reactor
HSG Reduction agent dilution system
HSH (Residues) separator
HSJ Reduction agent supply system including storage system
HSK Reduction agent treatment and distribution system
HSL Water supply and disposal system
HSM Chemicals and additives supply system
HSN Drainage system
HSP Fly ash collecting system (including filtering) and removal system
HSQ Sprinkler system including drainage
HSR Oxidizing agent treatment and distribution system
45
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
HT Chemical flue gas treatment system including residues removal, absorptive process
(e.g. flue gas desulfurization plants)
HTA Flue gas ducting system within *HT*
HTB Flue gas-side heat exchanger, gas heater (not *HU*)
HTC Flue gas fan system
HTD Flue gas scrubbing system
HTE Flue gas cleaning, filtering and purging system (Electrostatic precipitator)
HTF Absorption cycle
HTG Oxidation system including supply system
HTH Flue gas cooling system
HTJ Absorbent supply system including storage system
HTK Absorbent preparation and distribution system
HTL Piping system for discharge of solids
HTM Thickening and solids dewatering system
HTN Solid drying, compacting system
HTP (Solids / product) forwarding, storage, loading system
HTQ FGD plant water supply and disposal system
HTR Not used
HTS Chemicals and additives supply system
HTT Drainage system
HTV Lubricant supply system
HTW Sealing fluid supply system
HTX Fluid supply system for control and protection equipment
HTY Control and protection equipment
46
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
L STEAM-WATER CYCLE
LA Feedwater system
LAA Storage, deaeration (incl. Feedwater tank)
LAB Feedwater piping system
LAC Feedwater pump system
LAD HP feedwater heating system
LAE HP desuperheating spray system
LAF IP desuperheating spray system
LAH Start-up and shutdown piping system
LAJ Start-up and shutdown pump system
LAV Lubricant supply system
LAW Sealing fluid supply system
LAX Fluid supply system for control and protection equipment
LAY Control and protection equipment
LB Steam system
LBA Main steam piping system
LBB Hot reheat piping system
LBC Cold reheat piping system
LBD Extraction piping system
LBE Back-pressure piping system
LBF HP reducing station
LBG Auxiliary steam piping system
LBH Start-up steam system, shutdown steam system
LBJ Moisture separator / reheater (MSR)
LBQ Extraction steam piping system for HP feedwater heating
LBR Piping system for branch or auxiliary turbine
LBS Extraction steam piping system for LP feedwater heating (main condensate)
LBT Emergency condensing system
LBU Common dump line
LBW Sealing steam system
LBX Fluid supply system for control and protection equipment
LBY Control and protection equipment
LC Condensate system
LCA Main condensate piping system (excl. main condensate pump system,
LP feedwater heating system, condensate polishing plant)
47
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
48
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
49
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
50
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
MK Generator plant
MKA Generator complete incl. stator, rotor and all integral cooling Equipment.
MKB Generator exciter set, including set with electrical breaking system
(use only if *MKC* is not sufficient for identification)
MKC Generator exciter set, including set with electrical breaking system, complete
(10 auxiliary excitation, 20 main excitation unit)
MKD Bearings
MKF Stator/rotor liquid cooling system, including coolant supply system
MKG Stator/rotor hydrogen(H2) cooling system, including coolant supply system
MKH Stator/rotor nitrogen(N2) / carbon dioxide(CO2) cooling system, including
coolant supply system
MKJ Stator/rotor air cooling system, including coolant supply system
MKQ Exhaust gas system (if separate from *MKG* and *MKH*)
MKP Not Used
MKT Not Used
MKV Lubricant supply system (if separate system for generator)
MKW Sealing fluid supply system (Sealing oil system, incl. supply and treatment)
MKX Fluid supply system for control and protection equipment
MKY Control and protection equipment
MM Compressor plant
MMA Compressor including internal systems
MMC Air intake piping system
MMD Bearings
MME Intercooling system
MMF Aftercooling system
MMG Final cooling system
MMH Discharge piping system
MMV Lubricant supply system
MMW Sealing fluid supply system
MMX Fluid supply system for control and protection equipment
MMY Control and protection equipment
51
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
MPB Sheathing
MPG Frame, support structure
MPR Forced cooling system
MPS Drying and layup system
52
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
53
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
54
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
55
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Q AUXILIARY SYSTEMS
56
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
QJ Central gas supply, also inert gas for main and heavy machinery
QJB N2 filling system 1)
QJC Gas supply and distribution system H2 1)
QJE Gas supply and distribution system CO2 1)
QJY Control and protection equipment
57
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
58
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
S ANCILLARY SYSTEMS
SD Cleaning system
SDL Lube oil cleaning
SDP Liquid fuel purges
SDT Washing skid and distribution
59
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
SN Elevators
SNA in Turbine house
SNB in ESP/FGD control & Ash control building
SNC Elevators assigned to structures (free for use up to SNG) 1)
SNH in Boiler structure 1)
SNJ in Stack 1)
SNM in Central control building 1)
SNV Not Used
60
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
61
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
62
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
63
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
64
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
65
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
66
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
XK Generator Plant
XKA Generator, complete, including stator, rotor and all integral cooling equipment
XKB Generator exciter set, including set with electrical braking system
XKC Exciter
XKD Bearings
XKG Cooling system
XKQ Exhaust gas system
XKV Lubricating system
67
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Y Not Used
YA Not Used
YAE Not Used
YAG Not Used
YAS Not Used
YAZ Not Used
68
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Note :
1) These system codes are defined specifically in Quang Trach I Project among all the
reserved codes in “Guideline-KKS-Identification System for Power Station, VGB-B 105 E,
8th Edition, 2018”.
2) These system codes are used inevitably in Quang Trach I Project among all blocked or
other defined codes in “Guideline-KKS-Identification System for Power Station, VGB-B
105 E, 8th Edition, 2018”. Because relevant design progress have been done too much.
69
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
A Mechanical equipment
AA Valves, dampers, etc., incl. actuators, also manual; Rupture disk equipment
AB Isolating elements, airlocks
AC Heat exchangers, heat transfer surfaces
AE Turning, driving, lifting and slewing gear (also manipulators)
AF Continuous conveyors, feeders (escalators)
AG Generator units
AH Heating, cooling and air conditioning units.
AJ Size reduction equipment, only as part of process
AK Compacting and packaging equipment, only as part of process
AL Attemperator, desuperheater.
AM Mixers, agitators
AN Compressor, fans and blower unit
AP Pump units
AS Adjusting and tensioning equipment for non-electrical variables(to be applied only,
if the actuator forms itself a constructive unit with another equipment unit)
AT Cleaning, drying, filtering and separating equipment and trap, excl. *BT*
AU Braking, gearbox, coupling equipment, non-electrical converters
AV Combustion equipment
AW Stationary tooling, including crane and hoist, treatment equipment
AX Test and monitoring equipment for plant maintenance
B Mechanical equipment
70
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
CB Radiation variables
CD Density
CE Electrical variables (e.g. current, voltage, power, electric, frequency)
CF Flow instrument
CG Distance, length, position, direction of rotation
CH Manual input as manually operated sensor (e.g. fire detector)
CK Time
CL Level instrument
CM Moisture, humidity
CP Pressure instrument
CQ Quality variables (analysis, material properties), other than *CD*, *CM*,*CV*
CS Velocity, speed, frequency (mechanical), acceleration
CT Temperature instrument
CU Combined and other variables
CV Viscosity
CW Weight, mass
CY Vibration and expansion instrument
DD Density
DE Electrical variables (e.g. current, voltage, power, electric, frequency)
DF Flow, rate
DG Distance, length, position, direction of rotation
DK Time
DL Level (also for dividing line)
DM Moisture, humidity
DP Pressure
DQ Quality variables (analysis, material properties), other than *DD*, *DM*,*DV*
DS Velocity, speed, frequency (mechanical), acceleration
DT Temperature
DU Combined and other variables
DV Viscosity
71
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
DW Weight, mass
DY Vibration, expansion
EA Unit control
EB Group control
EC Subgroup control
EE Sub-loop control, equipment unit changeover
EG Alarm logics
EH Hard-wired alarm annunciation system
EJ Visualization of operation and monitoring displays
EK Alarm logics
EM Access control
EN State-display computer, criterion display
EP Supervisory computer
EQ Internal automation (signal processing)
ES Internal automation (signal conditioning)
EU Combined analog and binary signal conditioning
EV Signal transmission, bus coupling
EY Protective logics, priority, non-equipment-unit-related
EZ Super-ordinate equipment unit protection
FD Density
FE Electrical variables (e.g. electr. Efficiency, power)
FF Flow, rate
FG Distance, length, position, direction of rotation
FJ Power (mechanical, thermal)
FK Time
FL Level (also for dividing line)
FM Moisture, humidity
FP Pressure
FQ Quality variables (analysis, material properties), other than *DD*, *DM*,*DV*
FS Velocity, speed, frequency (mechanical), acceleration
FT Temperature
FU Combined and other variables
72
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
FV Viscosity
FW Weight, mass
FY Vibration, expansion
G Electrical equipment
73
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
HD Bearing assembly
74
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
- Electrical components
75
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
K Mechanical components
M Mechanical components
MB Brakes
MF Foundations
MG Gearboxes
MK Clutches, couplings
MM Engines, not electrical
MP Piping supports
MR Piping components, ductwork components
MS Petitioners, not electrical
MT Turbines
MU Transmission gear, non electrical, converters and boosters other than
couplings and gearboxes
76
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
X Signal origins
77
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Y Signal applications
78
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
LCR CCR
-P41 -P01 Indicator tile (current motor or valve position)
-P42 -P02 Single indicator
-P43 -P03 Digital indicator
-P50 -P10 Syncronoscop
-P44 -P11 Multiple indication station
-P45 -P21 Two or three pen recorder
-P46 -P22 Multi-points recorder
-P40 -P30 Totalizers
79
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
LCR CCR
-S41 -S01 Signalling and command tile for motor
-S42 -S02 Signalling and command tile for pneumatic valve/solenoid
-S45 -S15 Signalling and command tile for valve with intermediate stop
-S40 -S20 Signalling and command tile for remote LOCAL/REMOTE selection
-S43 -S21 Signalling and command tile for selection of stand-by users
-S46 -S22 Signalling and command tile for STOP/RELEASE selection
-S44 -S24 Signalling and command tile for sequence
-S48 -S32 Signalling tile with 2 LEDS
-S47 -S33 Signalling tile with 3 LEDS
-S34 Signalling tile with 4 LEDS
-S36 Signalling tile with 6 LEDS
-S51 A/M station (closed loop control)
-S61 Digital logic station
-S82 Selector switch
-S90 Key switch
-S70 Local control station
-S71 Local emergency push-buttons
80
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Signal range XB
81
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Signal range XG
Signal range XQ
82
TWO(2) X 700MW QUANG TRACH I THERMAL POWER PLANT
KKS NUMBERING SYSTEM Rev.0
Signal Range YB
YB01 Valve OPEN / Breaker Close command
YB04 Valve CLOSE / Breaker Open command
YB07 Local Permit
YB08 Stop Command (valve only)
YB09 Emergency stop command
YB11 Increase
YB12 Decrease
Signal range YG
Signal range YQ
YQ12 Valve position request (to Power switch cabinet, I/P converter)
YQ33 Analogue signal to other control system
Signal range YW
83