Doc. No:
INSPECTION REPORT Revision:
Date: 27-Feb-2023
I. Agenda & Details
Project name: VREC WWTP
Project code: 21O021
Vendor: Anh Thy
Item: MCC& PLC

II. Executive Summary & Evaluation


Please list all essential points summarizing the meeting in a few words
No. Inspection point Comments Remark

- Due to some changes from the owner, the inverters of


cabinets have not been fully installed yet so can't run test.
- The wiring is not completely arranged.
- Paint thickness, dimension of electrical cabinets, frame
Factory Acceptance Test
1 are accepted.
(FAT)
- The parameters of insulation, current, ampere, control
circuit have been fully tested.
- Vendor has not updated the list of equipment that has
changed compared to the drawings

III. Action Points


Please list all actions for correction and improvement (if any)
No. Subject Suggestion

1
Prepared by

Le Phuoc Phu