Doc. No:
INSPECTION NOTIFICATION Revision:
Date: 20-Feb-2023
Inspection result
No Equipment Vendor Plan Actual plan Inspection point Remark
Accept Repair Reject
13-Feb-23 13-Feb-23 Leakage test x
14-Feb-23 14-Feb-23 Inside surface preparation x
1 No.9 Neutralization Tank Ha Dung
17-Feb-23 17-Feb-23 Painting x
17-Feb-23 17-Feb-23 FRP lining x
14-Feb-23 14-Feb-23 Leakage test x
15-Feb-23 15-Feb-23 Inside surface preparation x
2 No.10 Neutralization Tank Ha Dung
17-Feb-23 17-Feb-23 Painting x
C:\Users\SJ00311\
17-Feb-23 17-Feb-23 FRP lining x Desktop\22O021 - VREC WW