You are on page 1of 2

F03/QCD-03.

01

Doc. No:
INSPECTION NOTIFICATION Revision:
Date: 20-Feb-2023

Agenda & Details


Project name: VREC WASTE WATER TREATMENT PLANT
Project code: 22O021

Inspection result
No Equipment Vendor Plan Actual plan Inspection point Remark
Accept Repair Reject
13-Feb-23 13-Feb-23 Leakage test x
14-Feb-23 14-Feb-23 Inside surface preparation x
1 No.9 Neutralization Tank Ha Dung
17-Feb-23 17-Feb-23 Painting x
17-Feb-23 17-Feb-23 FRP lining x
14-Feb-23 14-Feb-23 Leakage test x
15-Feb-23 15-Feb-23 Inside surface preparation x
2 No.10 Neutralization Tank Ha Dung
17-Feb-23 17-Feb-23 Painting x
C:\Users\SJ00311\
17-Feb-23 17-Feb-23 FRP lining x Desktop\22O021 - VREC WW

17-Feb-23 17-Feb-23 Painting x


3 No.4 Neutralization Tank Ha Dung
17-Feb-23 17-Feb-23 FRP lining x
4 DCH-1 Neutralization Tank Ha Dung 16-Feb-23 16-Feb-23 Welding visual x
18-Feb-23 18-Feb-23 Inside surface preparation x
5 TH1 & TH2 Thickener Tanks Ha Dung Inside surface preparation
19-Feb-23 19-Feb-23 x
(2nd)
6 Sludge Scrapper (TH1 & TH2) Hong Ha 13-Feb-23 13-Feb-23 Incoming materials x
Prepared by

Le Phuoc Phu
Page 1 of 2
F03/QCD-03.01

Page 2 of 2