ROAD DATE
NO REG. NO. ACTIVITY
NUMBER START FINISH
lowering & loading unloading
1 JO/RCP/X/22/00001 532 21-Oct 26-Oct
material
lowering & loading unloading
2 JO/RCP/X/22/00002 539 21-Oct 26-Oct
material
35,37,39,4
4,47 JO CIVIL - TASK FORCE Half Close x
40 B1 &
JO CIVIL - TASK FORCE Half Close x
46
35, 37,39,
JO CIVIL - TASK FORCE Half Close x
47
41, 44 JO CIVIL Half Close x
44 PT. Kokoh Semesta Half Close x
42 PT. Kokoh Semesta Full Close x
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
3162/HSSESAFETY/X/2022 CLOSED
CLOSED
3109/HSSESAFETY/X/2022 CLOSED
3106/HSSESAFETY/X/2022 CLOSED
3107/HSSESAFETY/X/2022 CLOSED
3105/HSSESAFETY/X/2022 CLOSED
3104/HSSESAFETY/X/2022 CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Shall inform to JO HSE
Incharge if close the road and CLOSED
prepare alternate route
3222/HSSE/SAFETY/XI/2022 CLOSED
CLOSED
Inform to HSE JO prior to start
CLOSED
mobilization
CLOSED
CLOSED
3244/HSSE/SAFETY/XI/2022 CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
3247/HSSE/SAFETY/XI/2022 CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Lowering only, must reported
to KPB for blocking road CLOSED
duration
CLOSED
CLOSED
CLOSED
Temporary only CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Half Clsoe at Day ONLY CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Only allowed closing road,
CLOSED
afternoon only
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Open Close CLOSED
Open Close CLOSED
Open Close CLOSED
CLOSED
CLOSED
CLOSED
Alternate road 539 & 531 CLOSED
Coordination with other SC's :
CLOSED
ETI SEANTERO & JEL
CLOSED
CLOSED
CLOSED
Only allowed at Saturday & Sunday CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
SIKA : 3366 CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Open Close CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Coordinate with other SC'S CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
1 day only CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Full close during erection
CLOSED
equipment
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
SIKA = 3450 CLOSED
CLOSED
Coordinate with
SARENS/JEL(SSE-01) and KOIN CLOSED
ME
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
No. Sika : 3450 CLOSED
CLOSED
CLOSED
CLOSED
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLOSED
CLOSED
OPEN
OPEN
OPEN
One Day Only CLOSED
OPEN
OPEN
OPEN
OPEN
CLOSED
OPEN
R
Location Closing
DATE
Road
No. Road Closing
Code Registration Road
Date Issued Date Expired Date Area Number
PERSONE
Activity (Work Description) Company
Supervisor (by
SC)
JAYUS
Moving crane 80ton from area 40 to area 29 PT. JEL (SSE-01) SUWANDI
Repair drainage (Maintenance) RDMP JO - CIVIL ANANIAS W
Loading unloading & lowering pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading & lowering pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading, pouring concrete, excavation, dumping soil RDMP JO - TFT CIVIL M. SHOLEH
Loading unloading, pouring concrete, excavation, dumping soil RDMP JO - TFT CIVIL M. SHOLEH
Loading unloading, pouring concrete, excavation, dumping soil RDMP JO - TFT CIVIL MARZUKI
Excavation for Interconnecting R-60 PT. ENCONA INTI INDUSTRI (CV-05) RANDA
Loading unloading material electrical (lightning) & grounding cable PT. SHINBO GUT JO (EL-02) ADE KURNIA
Loading unloading & lowering pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Excavation for FW Line JO CIVIL - UNDERGROUND LUKY
Excavation for FW Line JO CIVIL - UNDERGROUND LUKY
Loading unloading & lowering pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading soil PT. TEKNIKO (CV-02) BUDIYANTO
Loading unloading material piping PT. KRD (PIF-08.01) IMAM PAMBUDI
Loading unloading equipment and load test SL-6000 PT. SARENS (HL-01) SUYANTO
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading, moving, lowering material pipe & support PT. KRD (PIU-02.01) BIMA CANDRA
PT. KOIN CONSTRUCTION
Pouring concrete, loading unloading and cutting pile BAMBANG ROY
(CV-23)
PT. BAHANA CIPTA
General civil work (install dutch bank) ANGGAR
INTERNUSA (CV-14)
Loading unloading material PT. POWERTECH (BD-02) CAHYADI
Repair drainage (Maintenance) JO CIVIL - UNDERGROUND ANANIAS W
Loading unloading material PT. SSP CV HARTONO
PT. INBANG DUTA FIRZA
Loading unloading material steel structure FAJAR
(SMP-04)
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) BAGAS
Loading unloading material steel structure PT. SSA (SM-02) GUNAWAN
Loading unloading material steel structure PT. SSA (SM-02) GUNAWAN
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading, ground assembly, erection material steel structure PT. YEONHAB (SM-02) KIKI IRAWAN
Loading unloading, soil dumping, excavation, pouring concrete RDMP JO - TFT CIVIL M SHOLEH
Loading unloading and lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Moving crane 80ton from area 29 to area 40 PT. JEL (SSE-01) JAYUS SUWANDI
Excavation for Interconnecting R-60 PT. ENCONA INTI INDUSTRI (CV-05) RANDA
Loading unloading and lowering material pipe PT. DAEAH E&C (PIU-03) BAGAS
Loading unloading material pipe 42 inch using crane kato 55 ton PT. INBANG DUTA FIRZA (PIF-13)
NOVA LUDIANTO
Excavation, loading unloading, dumping soil and concrete work RDMP JO - TFT CIVIL LINUS. A
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Disposal soil, lifting rebar & formwork, pouring concrete PT. THE FAR EAST (CV-16) M. SALMA
Moving crane 150 ton from area 29 to area 31 PT. JEL (SSE-01) JAYUS SUWANDI
Loading and lifting cargo PT. SARENS (HL-01) SUYANTO
Loading unloading material, cutting and pouring concrete PT. KOIN CONSTRUCTION (CV-23)
AGUS BUDIANTO
Loading unloading, moving, lowering material pipe & support PT. KRD (PIU-02.01) NOPRIN
Loading unloading, moving, lowering material pipe & support PT. KRD (PIU-02.01) NOPRIN
Loading unloading material steel structure, erection PT. YEONHAB (SM-02) KIKI IRAWAN
Loading unloading, erection, bolt tightening steel structure material PT. INBANG DUTA FIRZA (SMP-04) SUTOYO
Loading unloading, pouring concrete, excavation, dumping soil RDMP JO - TFT CIVIL M SHOLEH
Loading unloading, pouring concrete, excavation, dumping soil RDMP JO - TFT CIVIL LINUS SEPTA
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Moving crane from area 39 to area 44 PT. ETI SPUN PILE (PKG-03) NUR SETYADI
Loading unloading material & soil PT. TEKNIKO (CV-02) ALI RAHMAN
Loading unloading, excavation/leveling soil and concrete work RDMP JO - CIVIL ERVAN MAULANA
Sumpit work, concrete work and loading unloading material PT. THE FAR EAST (CV-16) M. SALMA
Loading unloading & lowering material pipe PT. KRD (PIU-02.01) NOPRIN
Loading unloading & lowering material pipe PT. KRD (PIU-02.01) NOPRIN
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading, moving, lowering material pipe & support PT. KRD (PIU-02.01) SIDIK
Loading unloading material, cutting pile and pouring concrete PT. KOIN CONSTRUCTION (CV-23) YULIANTO
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading material pipe & support PT. KRD (PIU-02.01) NOPRIN
Loading unloading material pipe & support and container PT. KRD (PIU-02.01) NOPRIN
Loading unloading, erection, bolt tightening steel structure material PT. INBANG DUTA FIRZA (SMP-04) SUTOYO
Erection, loading unloading material piping PT. INBANG DUTA FIRZA (PIF-13) SAEFANI
Erection, loading unloading material piping PT. INBANG DUTA FIRZA (PIF-13) SAEFANI
Loading unloading, cutting pile and pouring concrete RDMP JO - TFT CIVIL SETIYO WIDODO
Excavation, loading unloading, dumping soil and concrete work RDMP JO - TFT CIVIL MARZUKI
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) BAGAS
Loading unloading, pouring concrete, excavation, dumping soil RDMP JO - TFT CIVIL M SHOLEH
Loading unloading soil & material PT. TEKNIKO (CV-02) ALI RAHMAN
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading & Install sheet piles RDMP JO - TFT CIVIL PAUL LADJAR
Lifting material at Sumpit, concrete work and soil disposal PT. THE FAR EAST (CV-16) M. SALMA
Loading unloading ,assembly and erection material steel structure PT. YEONHAB (SM-02) PARULIAN
Loading unloading & erection material steel structure PT. BMI AINAYA
Installation stack including accessories and platform PT. YEONHAB (SM-02) PARULIAN
Loading unloading material & pouring concrete PT. KOIN CONSTRUCTION (CV-23) YULIANTO
Loading unloading material pipe PT. INBANG DUTA FIRZA (PIF-13) SAEFANI
Loading unloading material pipe PT. INBANG DUTA FIRZA (PIF-13) SAEFANI
Loading unloading material pipe PT. INBANG DUTA FIRZA (PIF-13) SAEFANI
Lifting material at Sumpit, concrete work and soil disposal PT. INBANG DUTA FIRZA (SMP-04) ADANG
General civil work (install dutch bank) PT. BAHANA CIPTA INTERNUSA (CV-14)
LUHUT P
Lifting mechanical equipment : C-054-17 / G-054-14,15/AB PT. KOIN CONSTRUCTION (ME-09) WAHYUDI
Loading unloading & lowering material pipe and pipe support PT. KRD (PIU-02.01) DEDY K
General lifting : installation platform & accessories, installation equi PT. YEONHAB (SM-02) PARULIAN
General civil work (install ductch bank) PT .BAHANA CIPTA INTERNUSA WAHYUDI
Loading unloading and lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading and lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
General lifting , installation platform & accessories deisohexanizer PT. YEONHAB (SM-02) PARULIAN
Loading unloading, erection, bolt tightening steel structure material PT. INBANG DUTA FIRZA (SMP-04) SUTOYO
Loading unloading soil & material PT. TEKNIKO (CV-02) ALI RAHMAN
Loading unloading soil & material, pouring concrete PT. TEKNIKO (CV-02) ALI RAHMAN
Excavation, loading unloading, dumping soil and concrete work RDMP JO - TFT CIVIL SONANG
Install sheet piles & loading unloading RDMP JO - TFT CIVIL PAUL LADJAR
Loading unloading & lowering pipe PT. DAEAH E&C (PIU-03) AYIK P
Lifting material at Sumpit, concrete work PT. THE FAR EAST (CV-16) M. SALMA
Loading unloading, moving, lowering material pipe & support PT. KRD (PIU-02.01) DEDY K
Loading unloading and erection material steel structure PT. BAKRIE METAL INDUSTRI
Boom down crane CC-2800 for Reconfiguration PT. SARENS (HL-01) SUYANTO
Loading unloading material PT. INBANG DUTA FIRZA (PIF-13) ARIE REZA
Loading unloading material PT. INBANG DUTA FIRZA (PIF-13) ARIE REZA
Pouring concete, excavation, loading unloading material, soil loading f PT
Excavation & install pre-cast u-ditch PT. BAHANA CIPTA INTERNUSA (CV-14)AKHID
Unloading pre-cast material for U-DITCH PT. BAHANA CIPTA INTERNUSA (CV-14)AKHID
Civil work : install ducthbank (Inside road unit 062-063 PT. BAHANA CIPTA INTERNUSA (CV-14)AKHID
Pouring concrete, loading unloading and cutting pile PT. RECARE SUTEJO
Pouring concrete, loading unloading and cutting pile PT. RECARE SUTEJO
Pouring concrete, loading unloading and cutting pile PT. RECARE SUTEJO
Installation of stack, including accessories & platform PT. YEONHAB (SM-02) PARULIAN
Loading unloading material, pouring concrete, lifting material at sump PT. THE FAR EAST (CV-16) M. SALMA
Loading unloading & lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading material using Tadano GR-300EXL PT. INBANG DUTA FIRZA (PIF-13)
NOVA LUDIANTO
Loading unloading material, pouring concrete, (manhole, rebar
PT. KOIN CONSTRUCTION (CV-23) MUJIMAN
bundle) and backfill
Loading unloading material, pouring concrete, (manhole, rebar
PT. KOIN CONSTRUCTION (CV-23) MUJIMAN
bundle) and backfill
Lifting for installation equipment & loading unloading PT. YEONHAB (SM-02) RAKHA
Loading unloading & erection material piping and support PT. DAEAH E&C (SMP-01) RIZKI
Loading unloading, erection, bolt tightening steel structure material PT. INBANG DUTA FIRZA (SMP-04) SUTOYO
Moving crawler crane 80 ton from area 40 to area 31 PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading material steel structure PT. JEL (SSE-05) JAYUS SUWANDI
Lifting waste pile, loading unloading RDMP JO - TFT CIVIL WIRA SUCITRA
General erection, install platform & accessories, loading unloading PT. YEONHAB (SM-02) RAKHA
General civil work : install duct bank PT. BAHANA CIPTA INTERNUSA (CV-14)
BAMBANG ROY
Excavation, loading unloading, dumping soil and concrete work RDMP JO - TFT CIVIL SONANG
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
General civil work : install duct bank PT. BAHANA CIPTA INTERNUSA (CV-14)
SUGITO
General civil work : install duct bank PT. BAHANA CIPTA INTERNUSA (CV-14)
SUGITO
Moving crawler crane 80 ton from area 29 to area 40 PT. JEL (SSE-05) JAYUS SUWANDI
Erection pipe spool 36 inch at top of piperack RDMP JO - TFT PIPING GILANG
General civil work : install duct bank PT. BAHANA CIPTA INTERNUSA (CV-14)AKHID
Erection pipe spool 37 inch at top side of piperack RDMP JO - TFT PIPING GILANG
Loading unloading material steel strcuture PT. JEL (SSE-05) JAYUS SUWANDI
General civil work : install duct bank PT. BAHANA CIPTA INTERNUSA (CV-14)AKHID
Loading unloading and lowering material pipe, fit-up, and cutting PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading material and pouring concrete PT. KOIN CONSTRUCTION (CV-23) MUJIMAN
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading material, pouring concrete, cutting pile, backfill PT. KOIN CONSTRUCTION (CV-23) YULIANTO
Loading unloading & lowering pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
General civil work : install duct bank PT. BAHANA CIPTA INTERNUSA (CV-14)
SUGITO
Excavation, loading unloading, dumping soil and concrete work RDMP JO - TFT CIVIL LINUS
PT. KOIN CONSTRUCTION
Ground assembly platform WAHYUDI
(ME-09)
Loading unloading & erection material steel structure PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Moving crane and load test CC-8800 PT. SARENS (HL-01) SUYANTO
Loading unloading material instrument, tray and cable drum JO CHANGWON PT ERA WIHARIYANTO
Loading unloading material, cutting pile and pouring concrete PT. KOIN CONSTRUCTION (CV-23) YULIANTO
Loading unloading material, assembly anderection material structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading material pipe and pipe support PT. KRD (PIF-08.01) RENGGA
Loading unloading material pipe nad lowering pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading material steel structure & erection material steel st PT. JEL (SSE-05) JAYUS SUWANDI
Pouring concrete, excavation aloading unloading material and loading RDMP JO - TFT CIVIL LINUS
General civil work : install duct bank PT. BAHANA CIPTA INTERNUSA (CV-14)
BAMBANG S
Moving crane CC-8800 to reposition lifint CNM PT. SARENS (HL-01) SUYANTO
Loading unloading, assembly & erection material steel structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Pouring concrete, cutting pile, loading unloading material, backfill PT. KOIN CONSTRUCTION (CV-23) YULIANTO
Loading unloading material instrument PT. CHANGWON WAWAN
General civil work : install duct bank (Perpanjangan SIKA - 1) PT. BAHANA CIPTA INTERNUSA (CV-14)AKHID
Excavation for sumpit, loading unloading , pouring concrete and soil RDMP JO - TFT CIVIL LINUS
Loading unloading material steel structure and erection steel structure PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading & lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading material, assembly anderection material structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading material, pouring concrete and cutting piles PT. KOIN CONSTRUCTION (CV-23) YULIANTO
Loading unloading material instrument, tray, bast frame & cable drum PT. CHANGWON WIHARIYANTO
Pouring concrete, loading unloading material PT. ETI BUILDING (BD-01) NYOMAN
Loading unloading material, assembly anderection material structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Moving crane 150 ton from area 29 to area 31 PT. BAKRIE METAL INDUSTRI RESMIANTON
Loading unloading material steel structure & erection material steel st PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Excavation, loading unloading soil dumping and concerete pump RDMP JO - TFT CIVIL LINUS
Loading unloading material, assembly & erection material structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading marterial, pouring concrete and cutting piles PT. KOIN CONSTRUCTION (CV-23) YULIANTO
Loading unloading & lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading, excavation, pouring concrete and cutting pile PT. RECARE SUTEJO
Loading unloading & erection material steel structure PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading & erection material steel structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading material instrument, tray, bast frame & cable drum PT. CHANGWON WIHARIYANTO
Excavation & backfill, pouring concrete, loading unloading, cutting pi PT. RECARE SUTEJO
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading material, pouring concrete and cutting piles PT. KOIN CONSTRUCTION (CV-23) SAMIRIN
Loading unloading, assembly & erection material steel structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading & lifting material pipe PT. TRIMITRA WISESA ABADI YUSUF
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Erection & bolt tightening steel structure (West side of SS-107) PT. SSA (SM-02) GUNAWAN
Erection & bolt tightening steel structure PT. SSA (SM-02) GUNAWAN
Loading unloading material rebar & formwork PT. TEKNIKO (CV-02) ARI
Loading unloading & erection steel structure PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading, cutting pile and pouring concrete PT. RECARE SUTEJO
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Lifting shell plate & loading unloading shell plate PT. FAJAR EKA YOUONE SUSANTO
Excavation, loading unloading, soil dumping, concrete work (*542 HALF CLOSE)
JO RDMP (TFT-CIVIL) SONANG
Moving crane CC-2800 to Area 22B (TENTATIVE) PT. SARENS (HL-01) SUYANTO
Loading unloading & lowering material pipe PT. KRD (PIU-02.01) SIDIK
Loading unloading material instrument, tray, bast frame & cable drum PT. CHANGWON WIHARIYANTO
Loading unloading, assembly & erection material steel structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading & lowering pipe PT. DAEAH E&C (PIU-03) AYIK P
Loading unloading material, pouring concrete, cutting pile PT. KOIN CONSTRUCTION (CV-23) SAMIRIN
Loading unloading material, pouring concrete, cutting pile PT. KOIN CONSTRUCTION (CV-23) SAMIRIN
Loading unloading & lowering material pipe PT. DAEAH E&C (PIU-03) SULIS
Loading unloading, cutting pile, excavation and pouring concrete PT. RECARE SUTEJO
Erection and bolt tightening steel structure PT. SSA (SM-02) EKO ARIANTO
Loading unloading material steel structure PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading & lowering pipe material (1 DAY & 2 Hours Only)PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Assembly accessories crane 150 ton (section boom) PT. BAKRIE METAL INDUSTRI RESMIANTON
Inside 40-45 road : Moving crane and lifting PT. SARENS (HL-01) ARJENIS
Install spun piles for road crossing : to support electrical team RDMP JO - CIVIL PILE ANANIAS W
Loading unloading material steel structure PT. SSA (SM-02) EKO ARIANTO
Loading unloading, assembly & erection material steel structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading and erection pipe PT. TRIMITRA WISESA ABADI YUSUF
Loading unloading material instrument, tray and cable drum PT. CHANGWON WIHARIYANTO
Loading unloading material shell plate PT. FAJAR EKA YOUONE SUSANTO
Erection & bolt tightening steel structure PT. SSA (SM-02) EKO ARIANTO
Excavation, loading unloading, cutting pile and pouring concrete PT. RECARE SUTOYO
Loading unloading material and dumping soil PT. TEKNIKO (CV-02) HENDRO P
Loading unloading & lowering material pipe (3 DAYS) PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading material steel structure & erection material steel st PT. JEL (SSE-05) JAYUS SUWANDI
Loading unloading & lowering pipe material PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading & lowering pipe material PT. DAEAH E&C (PIU-03) AYIK P
Lifting erection material pipe & loading unloading material pipe PT. TRIMITRA WISESA ABADI GILANG
Unloading pipe spool and material (Occasionally for max 1 hour) RDMP JO - TFT PIPING YUSUF
Loading unloading material instrument : tray, bast frame and cable dr PT. CHANGWON WIHARIYANTO
Assembly boom crane 275 ton PT. DAEAH E&C (SMP-01) SUGIARTO
Loading unloading material, assembly & erection material structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading material shell plate PT. FAJAR EKA YOUONE AGUS MULYONO
Loading unloading & lowering material pipe PT. KOKOH SEMESTA (PIU-04) MUNAJIR
Loading unloading, cutting pile, excavation and pouring concrete and b PT. RECARE SUTEJO
Erection & bolt tightening steel structure (Road between unit 052 - 062/063) PT. SSA (SM-02) EKO ARIANTO
Loading unloaidng, moving, lifting material pipe nad pipe surpport (onl PT. KRD (PIF-08.01) RENGGA
Assembly boom crane 275 ton (3 Days Only) PT. DAEAH E&C (SMP-01) SUGIARTO
Loading unloading, nmoving, lifting material pipe and pipe support PT. KRD (PIF-08.01) RENGGA
Loading unloading rebar & formwork and soil PT. TEKNIKO (CV-02) ALI RAHMAN
Loading unloading material, assembly & erection material structure PT. DAEAH E&C (SMP-01) HAFIF PRASETYO
Loading unloading material and spool pipe PT. DAEAH E&C (PIU-03) BAGAS
Assembly boom crane 275 ton PT. DAEAH E&C (SMP-01) SUGIARTO
Loading unloading, cutting pile, excavation, pouring concrete, backfill PT. RECARE SUTEJO
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN