You are on page 1of 11

PT 

PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 MAIN FLOW DIAGRAM (V2) WATER TREATMENT SYSTEM
4 BAU-0-GHD-ME-PFD-001 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 FLOW DIAGRAM (V2) WATER DSITRIBUTION SYSTEM C 26-Sep-17 17-Oct-17 0996/KON.01.03/PUSENLIS/2017 009/PV-BB/BAC/09/2017 25-Sep-17 000009 000004

11 0 ALL-0-XXX-ME-PFD-001 PROCESS FLOW DIAGRAM FOR WATER SYSTEM C 26-Sep-17 17-Oct-17 0996/KON.01.03/PUSENLIS/2017 009/PV-BB/BAC/09/2017 25-Sep-17 000009 000004
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

2 30-Apr-18 072/TRANS/PV-BAU/BAC/04/18 27-Apr-18 000076


BAU-0-EVA-ME-DSH-002 CLEAN LUBE OIL TANK DATASHEET
18 1 C 11-Jan-18 6-Mar-18 0497/KON.01.03/PUSENLIS/2018 008/TRANS/PV-BAU/BAC/01/18 11-Jan-18 000037 000030

0 ALL-0-EVA-ME-DSH-002 LUBE OIL UNLOADING PUMP SPECIFICATION & DATASHEET C 26-Sep-17 17-Oct-17 0996/KON.01.03/PUSENLIS/2017 009/PV-BB/BAC/09/2017 25-Sep-17 000009 000004

19 0 ALL-0-SGA-ME-SPC-001 FIRE PUMP SPECIFICATION C 26-Sep-17 17-Oct-17 0996/KON.01.03/PUSENLIS/2017 009/PV-BB/BAC/09/2017 25-Sep-17 000009 000004

20 0 ALL-0-SGA-ME-DSH-001 FIRE PUMP DATASHEET C 26-Sep-17 17-Oct-17 0996/KON.01.03/PUSENLIS/2017 009/PV-BB/BAC/09/2017 25-Sep-17 000009 000004

22 0 BAU-0-OCA-GE-MAN-001 PROJECT DESIGN MANUAL C 26-Sep-17 17-Oct-17 0996/KON.01.03/PUSENLIS/2017 009/PV-BB/BAC/09/2017 25-Sep-17 000009 000004

26 0 BAU-0-OCA-GE-MAN-001 WARTSILA TECHNICAL SPECIFICATION I 26-Sep-17 17-Oct-17 0996/KON.01.03/PUSENLIS/2017 009/PV-BB/BAC/09/2017 25-Sep-17 000009 000004

2 C 2-May-18 30-Aug-18 2234/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000085


GENERAL DOMESTIC WATER SCHEMATIC DIAGRAM
36 1 BAU-0-GHD-ME-SDG-001 B 8-Jan-18 23-May-18 1256/KON.01.03/PUSENLIS/2018 003/TRANS/PV-BAU/BAC/01/18 5-Jan-18 000030 000056

0 DOMESTIC WATER SCHEMATIC DIAGRAM C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

3 C 2-May-18 19-Jul-18 1787/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000066

2 GENERAL SANITARY SCHEMATIC DIAGRAM B 8-Jan-18 23-May-18 1256/KON.01.03/PUSENLIS/2018 003/TRANS/PV-BAU/BAC/01/18 5-Jan-18 000030 000056
37 BAU-0-GQA-ME-SDG-001
1 B 22-Nov-17 22-Nov-17 MOM 22112017 MOMDRM1 22-Nov-17 DRM1 DRM 1

0 GENERAL WASTE WATER SCHEMATIC DIAGRAM C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

COMPACT WORKSHOP & WAREHOUSE VAC INSTALLATION PLAN,


PLAN DETAIL
2 C 2-May-18 3-Sep-18 2292/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000088
& SCHEDULE

1 C 26-Feb-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 028/TRANS/PV-BAU/BAC/02/18 23-Feb-18 000049 000035


COMPACT WORKSHOP & WAREHOUSE VAC INSTALLATION PLAN AND
45 BAU-0-SAC-ME-PLA-001
SCHEDULE
- - 8-Jan-18 - - 003/TRANS/PV-BAU/BAC/01/18 5-Jan-18 000030 -

0 COMPACT WORKSHOP & WAREHOUSE VAC INSTALLATION C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

49 0 BAU-0-SCA-ME-DET-003 STARTING AIR COMPRESSOR I 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

3 C 2-May-18 3-Sep-18 2292/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000088

2 C 26-Feb-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 028/TRANS/PV-BAU/BAC/02/18 23-Feb-18 000049 000035


50 BAU-0-SAC-ME-SDG-001 GENERAL VAC SCHEMATIC DIAGRAM
1 C 11-Jan-18 6-Mar-18 0497/KON.01.03/PUSENLIS/2018 008/TRANS/PV-BAU/BAC/01/18 11-Jan-18 000037 000030

0 C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

51 0 BAU-0-SCB-ME-SDG-001 GENERAL COMPRESSED AIR SCHEMATIC DIAGRAM C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

53 0 BAU-0-GN#-ME-PFD-001 PROCESS FLOW DIAGRAM OILY WATER SYSTEM C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

0 BAU-0-GN#-ME-PFD-002 PROCESS FLOW DIAGRAM OILY WATER SYSTEM C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

0 BAU-0-GN#-ME-PFD-003 PROCESS FLOW DIAGRAM OILY WATER SYSTEM C 3-Nov-17 22-Nov-17 MOM 22112017 007/TRANS/PV-BAU/BAC/11/17 2-Nov-17 000015 DRM 1

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2
TANK NAME DETAIL 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

58 2 BAU-0-EGB-ME-DET-003 C 27-Apr-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 070//TRANS/PV-BAU/BAC/04/18 26-Apr-18 000075 000062

1 C 11-Jan-18 6-Mar-18 0497/KON.01.03/PUSENLIS/2018 008/TRANS/PV-BAU/BAC/01/18 11-Jan-18 000037 000030


TANK NAME & TANK CAPACITY PAINT DETAIL
0 C 21-Nov-17 5-Dec-17 1297/KON.01.03/PUSENLIS/2017 009/TRANS/PV-BAU/BAC/11/17 21-Nov-17 000021 000011
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

1 C 25-Jun-18 3-Sep-18 2292/KON.01.03/PUSENLIS/2018 117/TRANS/PV-BAU/BAC/06/18 25-Jun-18 000086 000089


70 BAU-0-SGA-ME-LST-001 FIRE PROTECTION SYSTEM LIST FOR BUILDINGS
0 C 20-Dec-17 12-Jan-18 0138/KON.01.03/PUSENLIS/2018 026/TRANS/PV-BAU/BAC/12/17 19-Dec-17 000027 000022

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2 (T) COMPRESSED AIR SYSTEM 1 (2)
4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
87 BAU-0-SCA-ME-PID-001
1 (T) COMPRESSED AIR SYSTEM 1 (2) C 2-May-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000062

0 (T) COMPRESSED AIR SYSTEM 1 (2) PLTMG BAU BAU 4 x W20V34DF C 4-Jan-18 12-Jan-18 0138/KON.01.03/PUSENLIS/2018 001/TRANS/PV-BAU/BAC/01/18 3-Jan-18 000028 000022

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2 (T) COMPRESSED AIR SYSTEM 2 (2)
88 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
BAU-0-SCA-ME-PID-002
1 (T) COMPRESSED AIR SYSTEM 2 (2) C 2-May-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000062

90 0 (T) COMPRESSED AIR SYSTEM 1 (2) PLTMG BAU BAU 4 x W20V34DF C 4-Jan-18 12-Jan-18 0138/KON.01.03/PUSENLIS/2018 001/TRANS/PV-BAU/BAC/01/18 3-Jan-18 000028 000022

89 0 BAU-0-SMA-SC-ERP-001 ENGINE HALL CRANE DESIGN SUMMARY C 5-Jan-18 6-Mar-18 0497/KON.01.03/PUSENLIS/2018 002/TRANS/PV-BAU/BAC/01/18 4-Jan-18 000029 000030

1 25-Jun-18 117/TRANS/PV-BAU/BAC/06/18 25-Jun-18 000086


90 BAU-0-GTC-ME-DSH-001 SLUDGE TANK DATASHEET AND DIMENSIONAL DRAWING
0 C 8-Jan-18 23-May-18 1255/KON.01.03/PUSENLIS/2018 003/TRANS/PV-BAU/BAC/01/18 5-Jan-18 000030 000055

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
91 BAU-0-OCB-ME-CAL-001 MAIN AUXILIARIES CALCULATION REPORT 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 C 11-Jan-18 6-Mar-18 0497/KON.01.03/PUSENLIS/2018 008/TRANS/PV-BAU/BAC/01/18 11-Jan-18 000037 000030

1 B 30-Apr-18 16-Jul-18 1733/KON.01.03/PUSENLIS/2018 072/TRANS/PV-BAU/BAC/04/18 27-Apr-18 000076 000065


92 BAU-0-EVA-ME-DSH-003 SERVICE/USED LUBE OIL TANK DATASHEET
0 C 11-Jan-18 6-Mar-18 0497/KON.01.03/PUSENLIS/2018 008/TRANS/PV-BAU/BAC/01/18 11-Jan-18 000037 000030
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

1 INSTRUMENT AIR CALCULATION 18-Jul-18 132/TRANS/PV-BAU/BAC/07/18 17-Jul-18 000095


93 BAU-0-SCA-ME-CAL-001
0 INSTRUMENT AIR CALCULATION REPORT C 11-Jan-18 6-Mar-18 0497/KON.01.03/PUSENLIS/2018 008/TRANS/PV-BAU/BAC/01/18 11-Jan-18 000037 000030

SYSTEM DESCRIPTION PROCESS VENTILATION WITH ROOF MONITOR


105 0 BAU-0-SAA-ME-SPC-001 B 23-Jan-18 14-Mar-18 0553/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000032
COMMISSIONING IINSTRUCTION
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
117 BAU-0-PAB-ME-PFD-003 MAIN FLOW DIAGRAM EXPANSION VESSEL 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 C 23-Jan-18 14-Mar-18 0557/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000033

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
120 BAU-0-MRD-ME-PFD-003 MAIN FLOW DIAGRAM ENGINE FUEL BOOSTER 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 C 23-Jan-18 14-Mar-18 0557/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000033

121 0 BAU-0-MRD-ME-DET-004 DIMENSIONAL DRAWING EXHAUST GAS MODULE I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

122 0 BAU-0-MRD-ME-DET-003 DIMENSIONAL DRAWING ENGINE FUEL BOOSTER I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

123 0 BAU-0-MRD-ME-DET-001 DIMENSIONAL DRAWING ENGINE AUXILIARY MODULE I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

124 0 BAU-0-MRB-ME-DET-001 DIMENSIONAL DRAWING TURBINE WASHING UNIT I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

DIMENSIONAL DRAWING GENERATING SET W20V34DF SERVICE SPACES


125 0 BAU-0-MRA-ME-DET-012 I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000033
FOR W34DF GENSET

126 0 BAU-0-MRD-ME-DET-002 DIMENSIONAL DRAWING MC APPENDIX I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FLOW DIAGRAM OILY WATER TRANSFER PUMP
127 BAU-0-GTA-ME-PFD-005 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 MAIN FLOW DIAGRAM OILY WATER TRANSFER PUMP C 23-Jan-18 14-Mar-18 0557/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000033

DIMENSIONAL DRAWING VENTILATION UNIT 12


12m3/s, AUX-SIDE
3/ AUX SIDE PROCESS
133 0 BAU-0-SAA-ME-DET-002 I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034
VENTILATION
DIMENSIONAL DRAWING VENTILATION UNIT 18m3/s, GEN-SIDE PROCESS
134 0 BAU-0-SAA-ME-DET-001 I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034
VENTILATION

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
135 BAU-0-SAA-ME-SCN-001 SECTION VIEW ENGINE HALL PROCESS VENTILATION 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
136 BAU-0-SAA-ME-PLA-001 LAYOUT DRAWING ENGINE HALL PROCESS VENTILATION 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

DIMENSIONAL DRAWING GENERATOR OUTLET DUCT PROCESS


137 0 BAU-0-SAB-ME-DET-001 I 23-Jan-18 14-Mar-18 0561/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034
VENTILATION

1 I 18-Jul-18 3-Aug-18 1985/KON.01.03/PUSENLIS/2018 132/TRANS/PV-BAU/BAC/07/18 17-Jul-18 000095 000076


SYSTEM DESCRIPTION FREQUENCY CONTROLLED PROCESS
138 BAU-0-SAA-ME-RPT-001
VENTILATION SYSTEM WITH ROOF MONITOR
0 C 23-Jan-18 14-Mar-18 0557/KON.01.03/PUSENLIS/2018 013/TRANS/PV-BAU/BAC/01/18 23-Jan-18 000037 000034

139 0 BAU-0-OFA-PI-PLA-001 PIPING PLAN DRAWING INDEX B 20-Feb-18 27-Feb-18 430/KON.01.03/PUSENLIS/2018 024/TRANS/PV-BAU/BAC/02/18 19-Feb-18 000048 000028

1 BAU-0-OFA-PI-SCN-001 PIPING SECTIONS B 2-May-18 10-Jul-18 1676/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000063
147
0 PIPING SECTIONS C 20-Feb-18 27-Feb-18 431/KON.01.03/PUSENLIS/2018 024/TRANS/PV-BAU/BAC/02/18 19-Feb-18 000048 000029

2 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117

148 1 BAU-0-OCB-ME-CAL-002 PLUMBING & FIRE PROTECTION CALCULATION REPORT C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

0 C 20-Feb-18 27-Feb-18 431/KON.01.03/PUSENLIS/2018 024/TRANS/PV-BAU/BAC/02/18 19-Feb-18 000048 000029

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2 PIPING SPECIFICATION AND DATASHEET
4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
149 BAU-0-OFA-PI-SPC-001
1 C 2-May-18 7-Aug-18 2019/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000077
PIPING SPECIFICATION AND DATASHEET
0 C 20-Feb-18 27-Feb-18 431/KON.01.03/PUSENLIS/2018 024/TRANS/PV-BAU/BAC/02/18 19-Feb-18 000048 000029

150 0 BAU-0-EGA-ME-SPC-001 (P) FUEL OIL SYSTEM PROCESS DESCRIPTION I 26-Feb-18 12-Apr-18 0847/KON.01.03/PUSENLIS/2018 027/TRANS/PV-BAU/BAC/02/18 20-Feb-18 000049 000044
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

1 DESCRIPTION (P) FUEL GAS SYSTEM PROCESS DESCRIPTION 16-Jul-18 128/TRANS/PV-BAU/BAC/07/18 13-Jul-18 000094
151 BAU-0-EKA-ME-SPC-001
0 (Z) FUEL GAS SYSTEM PROCESS DESCRIPTION C 26-Feb-18 23-May-18 1255/KON.01.03/PUSENLIS/2018 027/TRANS/PV-BAU/BAC/02/18 20-Feb-18 000049 000055

1 P&ID INSTRUMENT AIR COMPRESSOR 11-Jul-18 127/TRANS/PV-BAU/BAC/07/18 11-Jul-18 000093


152 BAU-0-SCA-ME-PID-003
0 INSTRUMENT AIR COMPRESSOR C 5-Mar-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 032/TRANS/PV-BAU/BAC/02/18 2-Mar-18 000053 000035

ADMINISTRATION BUILDING VAC INSTALLATION PLAN, DETAIL &


1 A 2-May-18 3-Sep-18 2293/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000087
SCHEDULE
160 BAU-0-SAD-ME-PLA-001
ADMINISTRATION BUILDING VAC INSTALLATION PLAN,
PLAN DETAIL &
0 C 26-Feb-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 028/TRANS/PV-BAU/BAC/02/18 23-Feb-18 000049 000035
SCHEDULE

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2
4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
164 BAU-0-SAA-ME-CAL-002 VENTILATION AND AIR CONDITIONING CALCULATION REPORT
1 C 30-Apr-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 072/TRANS/PV-BAU/BAC/04/18 27-Apr-18 000076 000062

0 C 26-Feb-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 028/TRANS/PV-BAU/BAC/02/18 23-Feb-18 000049 000035

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 LAYOUT DRAWING EXHAUST GAS SYSTEM VIEW - A
165 BAU-0-MRR-PI-PLA-002 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 EXHAUST GAS SYSTEM VIEW-A C 2-Mar-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 031/TRANS/PV-BAU/BAC/02/18 1-Mar-18 000052 000035

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
178 BAU-0-SAA-ME-PLA-002 LAYOUT DRAWING ENGINE HALL UNIT LOCATION 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 C 5-Mar-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 032/TRANS/PV-BAU/BAC/02/18 2-Mar-18 000053 000035

1 LAYOUT DRAWING WALL PENETRATION FOR PIPES ENGINE HALL 11-Jul-18 127/TRANS/PV-BAU/BAC/07/18 11-Jul-18 000093
181 BAU-0-SAA-ME-PLA-003
0 WALL PENETRATION FOR PIPES ENGINE HALL C 5-Mar-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 032/TRANS/PV-BAU/BAC/02/18 2-Mar-18 000053 000035

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 GAS PRESSURE REDUCTION STATION P&ID
184 BAU-0-RHN-ME-PID-001 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 GAS PRESSURE REDUCTION STATION C 5-Mar-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 032/TRANS/PV-BAU/BAC/02/18 2-Mar-18 000053 000035

191 0 BAU-0-EVA-ME-PID-006 OIL MIST SEPARATOR C 5-Mar-18 22-Mar-18 0637/KON.01.03/PUSENLIS/2018 032/TRANS/PV-BAU/BAC/02/18 2-Mar-18 000053 000035

1 B 30-Apr-18 10-Jul-18 1676/KON.01.03/PUSENLIS/2018 072/TRANS/PV-BAU/BAC/04/18 27-Apr-18 000076 000063


209 BAU-0-SMA-ME-DSH-001 MECHANICAL DATASHEET FOR WORKSHOP OVERHEAD CRANE
0 C 8-Mar-18 14-Mar-18 0557/KON.01.03/PUSENLIS/2018 034/TRANS/PV-BAU/BAC/02/18 8-Mar-18 000055 000033

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2 PIPE ISOMETRIC, ALL PIPES, COMPRESSED AIR SYSTEM ENGINE HALL
4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
211 BAU-0-EGD-PI-ISO-007
1 PIPE ISOMETRIC ALL PIPES, COMPRESSED AIR SYSTEM ENGINE HALL C 16-Jul-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 128/TRANS/PV-BAU/BAC/07/18 13-Jul-18 000094 000073

0 ALL PIPES, COMPRESSED AIR SYSTEM ENGINE HALL C 8-Mar-18 14-Mar-18 0557/KON.01.03/PUSENLIS/2018 034/TRANS/PV-BAU/BAC/02/18 8-Mar-18 000055 000033

1 MATERIAL LIST FIRE FIGHTING SYSTEM ENGINE HALL I 29-Jun-18 10-Jul-18 1677/KON.01.03/PUSENLIS/2018 120/TRANS/PV-BAU/BAC/06/18 20-Jun-18 000087 000064
213 BAU-0-EGD-PI-LST-002
0 FIRE FIGHTING SYSTEM ENGINE HALL C 8-Mar-18 14-Mar-18 0557/KON.01.03/PUSENLIS/2018 034/TRANS/PV-BAU/BAC/02/18 8-Mar-18 000055 000033

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2
4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
229 BAU-0-OCC-ME-LST-002 LINE LIST
1 C 2-May-18 19-Jul-18 1787/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000066

0 C 12-Mar-18 4-Apr-18 0776/KON.01.03/PUSENLIS/2018 035/TRANS/PV-BAU/BAC/02/18 9-Mar-18 000056 000039

1 3-Jul-18 122/TRANS/PV-BAU/BAC/06/18 2-Jul-18 000088


230 BAU-0-OCC-ME-LST-003 VALVE LIST
0 C 12-Mar-18 4-Apr-18 0776/KON.01.03/PUSENLIS/2018 035/TRANS/PV-BAU/BAC/02/18 9-Mar-18 000056 000039

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.
1
231 BAU-0-SGA-ME-SPC-002 FIRE PROTECTION EQUIPMENT SPECIFICATION 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 C 27-Mar-18 12-Apr-18 0846/KON.01.03/PUSENLIS/2018 040/TRANS/PV-BAU/BAC/02/18 27-Mar-18 000061 000045

251 0 BAU-0-GTA-ME-SPC-001 WASTE WATER TREATMENT PLANT SPECIFICATION C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

0 BAU-0-GDF-ME-SPC-001 WATER TREATMENT PLANT SPECIFICATION C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

252 0 BAU-0-GAF-ME-DSH-001 SERVICE WATER BOOSTER PUMP DATASHEET C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

1 30-Apr-18 072/TRANS/PV-BAU/BAC/04/18 27-Apr-18 000076


BAU-0-EVA-ME-SPC-001 LUBE OIL UNLOADING PUMP SPECIFICATION
0 C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

354 0 BAU-0-GDL-ME-DSH-002 TREATED ENGINE WATER BOOSTER PUMP DATASHEET C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

MANUFACTURING ORDER SPECIFICATION (MOSP) SPECIFICATION OF


0 BAU-0-HNA-ME-LST-002 C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050
PREFABRICATED DUCTING

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


2
4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
256 BAU-0-HNA-ME-LST-001 EXHAUST GAS SYSTEM PREFAB PARTLIST
1 C 11-Jul-18 19-Jul-18 1787/KON.01.03/PUSENLIS/2018 127/TRANS/PV-BAU/BAC/07/18 11-Jul-18 000093 000066

0 C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

0 BAU-0-OCB-ME-SPC-004 LUBE OIL & SLUDGE TANKS - GENERAL SPECIFICATION C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

0 BAU-0-OCB-ME-SPC-003 LFO & STORAGE TANKS - GENERAL SPECIFICATION C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

258 0 BAU-0-OCB-ME-SPC-002 PAINTING SPECIFICATIONS C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

1 PART LIST CHARGE AIR SYSTEM PREFAB PART LIST B 29-Jun-18 16-Jul-18 1733/KON.01.03/PUSENLIS/2018 120/TRANS/PV-BAU/BAC/06/18 20-Jun-18 000087 000065
259 BAU-0-MRQ-PI-LST-001
0 CHARGE AIR SYSTEM PREFAB PART LIST C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

1 25-Jun-18 117/TRANS/PV-BAU/BAC/06/18 25-Jun-18 000086


260 BAU-0-SCB-ME-DSH-001 AIR RECEIVER TANK DATASHEET
0 C 19-Apr-18 8-May-18 1133/KON.01.03/PUSENLIS/2018 061/TRANS/PV-BAU/BAC/02/18 18-Apr-18 000071 000050

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
267 BAU-0-HNA-ME-DET-001 MANUFACTURING DRAWING EXHAUST GAS SYSTEM STACK PIPE 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 C 20-Apr-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000062

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 MANUFACTURING DRAWING EXHAUST GAS SYSTEM PIPE - 2
268 BAU-0-HNA-ME-DET-002 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 MANUFACTURING DRAWING EXHAUST GAS SYSTEM PIPE-2 C 20-Apr-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000062

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 MANUFACTURING DRAWING EXHAUST GAS SYSTEM PIPE - 3
269 BAU-0-HNA-ME-DET-003 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 MANUFACTURING DRAWING EXHAUST GAS SYSTEM PIPE-3 C 20-Apr-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000062

1 C 3-Jul-18 7-Aug-18 2019/KON.01.03/PUSENLIS/2018 122/TRANS/PV-BAU/BAC/06/18 2-Jul-18 000088 000077


283 BAU-0-SGA-PI-PLA-001 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA
0 C 20-Apr-18 28-May-18 1288/KON.01.03/PUSENLIS/2018 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000057

1 C 3-Jul-18 7-Aug-18 2019/KON.01.03/PUSENLIS/2018 122/TRANS/PV-BAU/BAC/06/18 2-Jul-18 000088 000077


284 BAU-0-SGA-PI-PLA-002 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (1/9)
0 C 20-Apr-18 28-May-18 1288/KON.01.03/PUSENLIS/2018 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000057

1 C 3-Jul-18 7-Aug-18 2019/KON.01.03/PUSENLIS/2018 122/TRANS/PV-BAU/BAC/06/18 2-Jul-18 000088 000077


285 BAU-0-SGA-PI-PLA-003 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (2/9)
0 C 20-Apr-18 28-May-18 1288/KON.01.03/PUSENLIS/2018 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000057

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FIRE PROTECTION SYSTEM FOR YARD AREA (3/9)
286 BAU-0-SGA-PI-PLA-004 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

0 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (3/9) C 20-Apr-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000073

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FIRE PROTECTION SYSTEM FOR YARD AREA (4/9)
287 BAU-0-SGA-PI-PLA-005 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (4/9) C 20-Apr-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000073

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FIRE PROTECTION SYSTEM FOR YARD AREA ((5/9))
288 BAU-0-SGA-PI-PLA-006 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (5/9) C 20-Apr-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000073

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FIRE PROTECTION SYSTEM FOR YARD AREA (6/9)
289 BAU-0-SGA-PI-PLA-007 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (6/9) C 20-Apr-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000073

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FIRE PROTECTION SYSTEM FOR YARD AREA (7/9)
290 BAU-0-SGA-PI-PLA-008 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (7/9) C 20-Apr-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000073

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FIRE PROTECTION SYSTEM FOR YARD AREA (8/9)
291 BAU-0-SGA-PI-PLA-009 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (8/9) C 20-Apr-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000073

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1 FIRE PROTECTION SYSTEM FOR YARD AREA (9/9)
292 BAU-0-SGA-PI-PLA-010 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 FIRE PROTECTION SYSTEM INDEX FOR YARD AREA (9/9) C 20-Apr-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 063/TRANS/PV-BAU/BAC/02/18 19-Apr-18 000072 000073

0 BAU-0-SGA-ME-DSH-003 API 650 STANDARD DATASHEET SERVICE/FIRE WATER TANK 700 M3 23-Apr-18 066/TRANS/PV-BAU/BAC/02/18 20-Apr-18 000073

0 BAU-0-EGB-ME-DSH-003 API 650 STANDARD DATASHEET LFO MAIN STORAGE TANK 3200 M3 23-Apr-18 066/TRANS/PV-BAU/BAC/02/18 20-Apr-18 000073

0 BAU-0-EGB-ME-DSH-004 API 650 STANDARD DATASHEET FUEL DAY TANK 700 M3 23-Apr-18 066/TRANS/PV-BAU/BAC/02/18 20-Apr-18 000073
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.

294 0 BAU-0-SGA-PI-ISO-001 FIRE PROTECTION SYSTEM ISOMETRIC DRAWING 27-Apr-18 070/TRANS/PV-BAU/BAC/04/18 26-Apr-18 000075

1 ELEVATED WATER TANK PLAN & SECTION 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117
296 BAU-0-GAD-ME-PLA-001
0 WATER TANK PLAN & SECTION C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

297 0 BAU-0-GHD-ME-DET-001 STANDARD DETAIL - 1 B 2-May-18 10-Jul-18 1676/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000063

298 0 BAU-0-GHD-ME-DET-002 STANDARD DETAIL - 2 B 2-May-18 10-Jul-18 1676/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000063

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


299 BAU-0-GHD-ME-PLA-001.1 GENERAL DOMESTIC WATER & WASTE WATER DETAIL 1 & 2
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 GENERAL DOMESTIC WATER & WASTE WATER INSTALLATION PLAN 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117
300 BAU-0-GHD-ME-PLA-001
0 GENERAL DOMESTIC & WASTE WATER INSTALLATION PLAN C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


WORKSHOP & WAREHOUSE BUILDING DOMESTIC WATER INSTALLATION
301 BAU-0-GHD-ME-PLA-002
PLAN DETAIL & ISOMETRIC
PLAN,
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


ADMINISTRATION BUILDING DOMESTIC WATER INSTALLATION PLAN,
302 BAU-0-GHD-ME-PLA-003
DETAIL & ISOMETRIC
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


303 BAU-0-GHD-ME-PLA-004 MOSQUE DOMESTIC WATER INSTALLATION PLAN, DETAIL & ISOMETRIC
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

GUARD HOUSE DOMESTIC WATER INSTALLATION PLAN,


PLAN DETAIL &
1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117
ISOMETRIC
304 BAU-0-GHD-ME-PLA-005
0 GUARD HOUSE DOMESTIC WATER INSTALLATION PLAN & ISOMETRIC C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


LABORATORY DOMESTIC WATER INSTALLATION PLAN, DETAIL &
305 BAU-0-GHD-ME-PLA-006
ISOMETRIC
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


ELECTRICAL EQUIPMENT BUILDING DOMESTIC WATER INSTALLATION
306 BAU-0-GHD-ME-PLA-007
PLAN, DETAIL & ISOMETRIC
PLAN
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

ELEVATED GUARD POST DOMESTIC WATER INSTALLATION PLAN &


1 B 13-Aug-18 30-Aug-18 2233/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000084
ISOMETRIC
307 BAU-0-GHD-ME-PLA-008
ELEVATED GUARD POST DOMESTIC WATER INSTALLATION PLAN, DETAIL
0 C 2-May-18 19-Jul-18 1787/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000066
& ISOMETRIC

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


308 BAU-0-GQA-ME-DET-001 GENERAL DETAIL PLUMBING - 1 STP CAP 3.5 CMD
0 C 2-May-18 19-Jul-18 1787/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000066

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


309 BAU-0-GQA-ME-DET-002 GENERAL DETAIL PLUMBING - 2 STP CAP 1, 1.4 & 1.8 CMD
0 2-May-18 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


ADMINISTRATION BUILDING WASTE WATER INSTALLATION PLAN, DETAIL
310 BAU-0-GQC-ME-PLA-001
& ISOMETRIC
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 MOSQUE WASTE WATER INSTALLATION PLAN, DETAIL & ISOMETRIC 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117
311 BAU-0-GQD-ME-PLA-001
MOSQUE WASTE WATER INSTALLATION PLAN,
PLAN SECTION,DETAIL
SECTION DETAIL &
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073
ISOMETRIC

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


312 BAU-0-GQE-ME-PLA-001 LABORATORY WASTE WATER INSTALLATION PLAN, DETAIL & ISOMETRIC
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


ELECTRICAL EQUIPMENT BUILDING WASTE WATER INSTALLATION PLAN,
313 BAU-0-GQF-ME-PLA-001
PT PLN (PERSERO)
PUSAT ENJINIRING KETENAGALISTRIKAN

DRAWING LIST MEKANIKAL PLTMG BAU BAU

DATE CONTRACTOR SUBMITTAL


NO. DRAWING
NO DRAWING/DOCUMENT TITLE STATUS LETTER NO.
IN OUT LETTER NO. DATE CCR IN CCR OUT
REV CONTRACTOR NO.
313 BAU-0-GQF-ME-PLA-001
DETAIL & ISOMETRIC
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117


314 BAU-0-GQH-ME-PLA-001 GUARD HOUSE WASTE WATER INSTALLATION PLAN & ISOMETRIC
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073

ELEVATED GUARD POST WASTE WATER INSTALLATION PLAN, SECTION &


1 29-Aug-18 191/TRANS/PV-BAU/BAC/08/18 14-Aug-18 000117
ISOMETRIC
315 BAU-0-GQH-ME-PLA-002
ELEVATED GUARD POST WASTE WATER INSTALLATION PLAN &
0 C 2-May-18 27-Jul-18 1896/KON.01.03/PUSENLIS/2015 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000073
ISOMETRIC
COMPRESSOR BUILDING PORTABLE FIRE EXTINGUISHER INSTALLATION
322 0 BAU-0-SGA-ME-PLA-019 B 2-May-18 16-Jul-18 1733/KON.01.03/PUSENLIS/2018 073/TRANS/PV-BAU/BAC/04/18 30-Apr-18 000077 000065
PLAN

6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125


1
323 BAU-0-SGA-ME-LST-002 DEVICE LIST (V3) FIRE PROTECTION SYSTEM 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

0 C 4-May-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 074/TRANS/PV-BAU/BAC/04/18 2-May-18 000078 000062

324 0 BAU-0-GDF-ME-AGT-001 WATER TREATMENT PLANT VENDOR DRAWINGS C 22-May-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 091/TRANS/PV-BAU/BAC/05/18 21-May-18 000079 000062

325 0 BAU-0-GTA-ME-DSH-001 WATER WASTE TREATMENT PLANT VENDOR DATASHEET C 22-May-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 091/TRANS/PV-BAU/BAC/05/18 21-May-18 000079 000062

326 0 BAU-0-GTA-ME-AGT-001 WATER WASTE TREATMENT PLANT VENDOR DRAWINGS C 22-May-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 091/TRANS/PV-BAU/BAC/05/18 21-May-18 000079 000062

327 0 BAU-0-GDK-ME-DSH-001 WATER TREATMENT PLANT VENDOR DATASHEET C 22-May-18 10-Jul-18 1678/KON.01.03/PUSENLIS/2018 091/TRANS/PV-BAU/BAC/05/18 21-May-18 000079 000062

1 A 6-Jun-18 6-Jun-18 MOM06062018 118/TRANS/PV-BAU/BAC/06/18 6-Jun-18 DRM5 DRM5


328 BAU-0-GTA-ME-SPC-002 (D) OILY WATER SYSTEM PROCESS DESCRIPTION
0 C 6-Jun-18 6-Jun-18 MOM25052018 118/TRANS/PV-BAU/BAC/06/18 6-Jun-18 DRM5 DRM5

CALCULATION PROCESS VENTILATION AIR FLOW CALCULATION


329 0 BAU-0-SAA-ME-CAL-001 A 6-Jun-18 6-Jun-18 MOM06062018 118/TRANS/PV-BAU/BAC/06/18 6-Jun-18 DRM 5 DRM 5
PROCESS VENTILATION

330 0 BAU-0-SAC-ME-DET-001 GENERAL STANDARD DETAIL VAC 29-Jun-18 120/TRANS/PV-BAU/BAC/06/18 20-Jun-18 000087

332 0 BAU-0-SAB-ME-PLA-002 COMPRESSOR BUILDING VENTILATION INSTALLATION PLAN 3-Jul-18 122/TRANS/PV-BAU/BAC/06/18 2-Jul-18 000088

333 0 BAU-0-GHD-ME-SPC-001 DESCRIPTION (V2) TREATED WATER SYSTEM PROCESS DESCRIPTION C 13-Aug-18 30-Aug-18 2234/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000085

334 0 BAU-0-SGA-ME-AGT-001 FIRE WATER TANK - 700 M3 GENERAL ARRANGEMENT & DETAILS C 13-Aug-18 23-Aug-18 2167/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000081

335 0 BAU-0-EGB-ME-AGT-002 FUEL DAY TANK - 700 M3 GENERAL ARRANGEMENT & DETAILS C 13-Aug-18 23-Aug-18 2167/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000081

MAIN FUEL STORAGE TANK - 3200 M3 GENERAL ARRANGEMENT &


336 0 BAU-0-EGB-ME-AGT-001 C 13-Aug-18 23-Aug-18 2167/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000081
DETAILS

337 0 BAU-0-OCB-ME-WMB-001 WATER TREATMENT PLANT WATER MASS BALANCE C 13-Aug-18 30-Aug-18 2234/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000085

WORKSHOP BUILDING WASTE WATER INSTALLATION PLAN, DETAIL &


338 0 BAU-0-GQB-ME-PLA-001 C 13-Aug-18 30-Aug-18 2234/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000085
ISOMETRIC

339 0 BAU-0-SCA-ME-SPC-001 DESCRIPTION (T) COMPRESSED AIR SYSTEM PROCESS DESCRIPTION C 13-Aug-18 30-Aug-18 2234/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000085

340 0 BAU-0-PAB-ME-SPC-001 DESCRIPTION (V) COOLING WATER SYSTEM PROCESS DESCRIPTION I 13-Aug-18 30-Aug-18 2235/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000086

DESCRIPTION (N) CHARGE AIR & EXHAUST GAS SYSTEM PROCESS


341 0 BAU-0-MRQ-ME-SPC-001 B 13-Aug-18 30-Aug-18 2233/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000084
DESCRIPTION

342 0 BAU-0-EVA-ME-SPC-005 DESCRIPTION (Q) LUBE OIL SYSTEM PROCESS DESCRIPTION C 13-Aug-18 30-Aug-18 2234/KON.01.03/PUSENLIS/2018 178/TRANS/PV-BAU/BAC/08/18 8-Aug-18 000117 000085

1 MAIN FLOW DIAGRAM OIL MIST SEPARATOR 6-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000125
BAU-0-EVA-ME-PFD-006
1 MAIN FLOW DIAGRAM OIL MIST SEPARATOR 4-Sep-18 202/TRANS/PV-BAU/BAC/08/18 31-Aug-18 000124

remark A