DOCUMENT TITLE : PROJECT DELIVERABLE LIST

DOCUMENT NO : 4020-GE-LST-001

CLIENT : HERITAGE MINERALS PTY LTD

PROJECT : TOKA TINDUNG FEED

PROJECT NO : 4033

Revision History

REV DATE DESCRIPTION ORIGINATOR CHECKED APPROVED

A 24-Jul-23 Issued for Proposal


Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : TOKA TINDUNG FEED
Revision : A
Date : 27-Mar-2020

DOC. Person In START FINISH


ITEM PROJ DISC SEQ REV DOCUMENT NO. DESCRIPTION HISTORY DATE R
TYPE Charge DATE DATE

A B
PROCESS
1 4033 PR DCR 001 4033-PR-DCR-001_ PROCESS DESIGN CRITERIA
2 4033 PR MBP 001 4033-PR-MBP-001_ MASS BALANCE

GENERAL
1 4033 GE ESP 001 A 4033-GE-ESP-001_A SURFACE PROTECTION 21-Jan-20
2 4033 GE DSH 001 B 4033-GE-DSH-001_B SITE DATA SHEET 9-Dec-19 18-Dec-19
3 4033 GE EST 001 4033-GE-EST-001_ CAPITAL COST ESTIMATE
4 4033 GE EST 002 4033-GE-EST-002_ ENGINEERING HOURS ESTIMATE
5 4033 GE SCH 001 4033-GE-SCH-001_ PROJECT SCHEDULE
6 4033 GE LST 001 4033-GE-LST-001_ ENGINEERING DELIVERABLE LIST
7 4033 GE REG 001 4033-GE-REG-001_ RFT REGISTER

MECHANICAL
1 4033 ME DCR 001 A 4033-ME-DCR-001_A MECHANICAL DESIGN CRITERIA 18-Dec-19

2 4033 PI DCR 001 4033-PI-DCR-001_ PIPING DESIGN CRITERIA

3 4033 ME MEL 001 4033-ME-MEL-001_ MECHANICAL EQUIPMENT LIST

4 3017 ME BOQ 001 A 3017-ME-BOQ-001_A BILL OF QUANTITY - BELT FEEDER 27-Feb-20

5 4033 GE PPS 001 A 4033-GE-PPS-001_A PRICE & PAYMENT SCHEDULE - SLURRY AGITATORS PACKAGE 20-Jan-20
6 4033 GE PPS 002 4033-GE-PPS-002_ PRICE & PAYMENT SCHEDULE - FABRICATED COLUMN PACKAGE
7 4033 GE PPS 003 4033-GE-PPS-003_ PRICE & PAYMENT SCHEDULE - CYANIDE RECOVERY FAN
8 4033 GE PPS 004 A 4033-GE-PPS-004_A PRICE & PAYMENT SCHEDULE - REAGENT & SOLUTION PUMPS 24-Jan-20
9 4033 GE PPS 005 A 4033-GE-PPS-005_A PRICE & PAYMENT SCHEDULE - SLURRY PUMPS PACKAGE 13-Jan-20
10 4033 GE PPS 006 A 4033-GE-PPS-006_A PRICE & PAYMENT SCHEDULE - COPPER PRECIPITATE FILTER 13-Jan-20
11 4033 GE PPS 007 A 4033-GE-PPS-007_A PRICE & PAYMENT SCHEDULE - VIBRATING SCREEN 9-Jan-20
12 4033 GE PPS 008 A 4033-GE-PPS-008_A PRICE & PAYMENT SCHEDULE - COMPRESSED AIR SYSTEM 27-Jan-20
13 4033 GE PPS 009 A 4033-GE-PPS-009_A PRICE & PAYMENT SCHEDULE - CONVEYOR PACKAGES 14-Jan-20
14 4033 GE PPS 010 4033-GE-PPS-010_ PRICE & PAYMENT SCHEDULE - COLUMN INTERNAL PART
15 4033 GE PPS 011 A 4033-GE-PPS-011_A PRICE & PAYMENT SCHEDULE - BELT FEEDERS 26-Feb-20
16 4033 GE PPS 012 A 4033-GE-PPS-012_A PRICE & PAYMENT SCHEDULE - OVEN & FURNACE 24-Jan-20
17 4033 GE PPS 013 A 4033-GE-PPS-013_A PRICE & PAYMENT SCHEDULE - VACUUM SYSTEM 24-Jan-20
18 4033 GE PPS 014 4033-GE-PPS-014_ PRICE & PAYMENT SCHEDULE - GOLD ROOM SCRUBBER
19 4033 GE PPS 014 A 4033-GE-PPS-014_A PRICE & PAYMENT SCHEDULE -CYANIDE SCRUBBING COLUMN EXHAUST FAN 24-Jan-20
20 4033 GE PPS 015 A 4033-GE-PPS-015_A PRICE & PAYMENT SCHEDULE - LIME SLAKING PACKAGE 9-Jan-20
21 4033 GE PPS 016 4033-GE-PPS-016_ PRICE & PAYMENT SCHEDULE - WATER TREATMENT SYSTEM
22 4033 GE PPS 017 4033-GE-PPS-017_ PRICE & PAYMENT SCHEDULE - INLINE MIXER PACKAGE
23 4033 GE PPS 018 A 4033-GE-PPS-018_A PRICE & PAYMENT SCHEDULE - WEIGHTOMETER PACKAGE 14-Jan-20
24 4033 GE PPS 019 4033-GE-PPS-019_ PRICE & PAYMENT SCHEDULE - ROTARY VALVES
25 4033 GE PPS 020 4033-GE-PPS-020_ PRICE & PAYMENT SCHEDULE - HOIST
26 4033 GE PPS 021 A 4033-GE-PPS-021_A PRICE & PAYMENT SCHEDULE - CYCLONE 19-Dec-20
27 4033 GE PPS 022 A 4033-GE-PPS-022_A PRICE & PAYMENT SCHEDULE - MAGNETIC SEPARATOR PACKAGE 22-Jan-20
28 4033 GE PPS 023 A 4033-GE-PPS-023_A PRICE & PAYMENT SCHEDULE - SHOP FABRICATED TANKS AND PLATEWORK 13-Jan-20
29 4033 GE PPS 024 A 4033-GE-PPS-024_A PRICE & PAYMENT SCHEDULE - SHOP ELECTROWINNING CELL 24-Jan-20
30 4033 GE PPS 025 A 4033-GE-PPS-025_A PRICE & PAYMENT SCHEDULE - THICKENER 24-Jan-20
31 4033 GE PPS 026 A 4033-GE-PPS-026_A PRICE & PAYMENT SCHEDULE - WATER TREATMENT AND SERVICE PUMPS 7-Feb-20
32 4033 GE PPS 027 A 4033-GE-PPS-027_A PRICE & PAYMENT SCHEDULE - RETORTING 11-Feb-20
33 4033 GE PPS 028 4033-GE-PPS-028_ PRICE & PAYMENT SCHEDULE - BOLTED TANK
34 4033 GE PPS 065 A 4033-GE-PPS-065_A PRICE & PAYMENT SCHEDULE - BALL MILL 31-Dec-19

CALCULATION
33 4033 ME CAL 001 A 4033-ME-CAL-001_A CALCULATION - TRAMMING / BUCKET SIZE 29-Jan-20
34 4033 ME CAL 002 4033-ME-CAL-002_ CALCULATION - ROM BIN HOPPER
35 4033 ME CAL 002 A 4033-ME-CAL-002_A CALCULATION - SURGE BIN CALCULATION 4-Feb-20
36 4033 ME CAL 003 A 4033-ME-CAL-003_A CALCULATION - BELT FEEDER 7-Feb-20
37 4033 ME CAL 004 B 4033-ME-CAL-004_B CALCULATION - SCRUBBER CONVEYOR 15-Jan-20 19-Feb-20
38 4033 ME CAL 005 4033-ME-CAL-005_ CALCULATION - STOCKPILE CONVEYOR
39 4033 ME CAL 006 A 4033-ME-CAL-006_A CALCULATION - HOPPERS CALCULATION 19-Dec-19
40 4033 ME CAL 007 4033-ME-CAL-007_ CALCULATION - LAUNDERS SIZING CALCULATION
41 4033 ME CAL 008 A 4033-ME-CAL-008_A CALCULATION - SLURRY PUMPS CALCULATION 10-Jan-20
42 4033 ME CAL 009 A 4033-ME-CAL-009_A CALCULATION - REAGENT AND SOLUTION PUMPS CALCULATION 24-Jan-20
43 4033 ME CAL 010 A 4033-ME-CAL-010_A CALCULATION - FABRICATED TANKS CALCULATION 13-Jan-20
44 4033 ME CAL 011 4033-ME-CAL-011_ CALCULATION - MILL FEED CONVEYOR
DATA SHEET
45 4033 ME DSH 001 A 4033-ME-DSH-001_A DATASHEET - BELT FEEDER #1 7-Feb-20
46 4033 ME DSH 002 A 4033-ME-DSH-002_A DATASHEET - CONVEYOR BELT - SCRUBBER FEED CONVEYOR 13-Jan-20
47 4033 ME DSH 003 A 4033-ME-DSH-003_A DATASHEET - BELT CONVEYOR DRIVES UNITS 13-Jan-20
48 4033 ME DSH 004 A 4033-ME-DSH-004_A DATASHEET - TRASH SCREEN 8-Jan-20
49 4033 ME DSH 005 A 4033-ME-DSH-005_A DATASHEET - LOADED RESIN SCREEN 8-Jan-20
50 4033 ME DSH 006 B 4033-ME-DSH-006_B DATASHEET - COPPER FILTER NO. 1&2 9-Jan-20 15-Jan-20
51 4033 ME DSH 007 A 4033-ME-DSH-007_A DATASHEET - LEACH TANK AGITATOR 20-Jan-20
52 4033 ME DSH 008 A 4033-ME-DSH-008_A DATASHEET - CYANIDE ADSORPTION AGITATOR 20-Jan-20
53 4033 ME DSH 009 A 4033-ME-DSH-009_A DATASHEET - LOADED RESIN TANK AGITATOR 17-Jan-20
54 4033 ME DSH 010 A 4033-ME-DSH-010_A DATASHEET - COPPER REACTOR TANK AGITATOR 20-Jan-20
55 4033 ME DSH 011 4033-ME-DSH-011_ DATASHEET - COPPER FILTER FEED SURGE TANK AGITATOR 20-Jan-20
56 4033 ME DSH 012 A 4033-ME-DSH-012_A DATASHEET - GOLD ELUANT TANK AGITATOR 20-Jan-20
57 4033 ME DSH 013 A 4033-ME-DSH-013_A DATASHEET - RESIN WASHING SCREEN 20-Jan-20
58 4033 ME DSH 014 4033-ME-DSH-014_ DATASHEET - LIME STORAGE TANK AGITATOR
59 4033 ME DSH 015 A 4033-ME-DSH-015_A DATASHEET - SODIUM CHLORIDE MIXING TANK AGITATOR 20-Jan-20
60 4033 ME DSH 016 4033-ME-DSH-016_ DATASHEET - ZINC SULPHATE MIXING TANK AGITATOR
61 4033 ME DSH 017 A 4033-ME-DSH-017_A DATASHEET - SODIUM HYDRO SULFIDE MIXING TANK AGITATOR 20-Jan-20
62 4033 ME DSH 018 A 4033-ME-DSH-018_A DATASHEET - ELECTROWINNINGS 17-Jan-20
63 4033 ME DSH 019 A 4033-ME-DSH-019_A DATASHEET - SMELTING FURNACE 24-Jan-20
64 4033 ME DSH 020 A 4033-ME-DSH-020_A DATASHEET - VACUUM SYSTEM 24-Jan-20
65 4033 ME DSH 021 A 4033-ME-DSH-021_A DATASHEET - GOLD ROOM SCRUBBER 27-Jan-20
66 4033 ME DSH 022 4033-ME-DSH-022_ DATASHEET - CYANIDE RECOVERY FAN
67 4033 ME DSH 023 A 4033-ME-DSH-023_A DATASHEET - CYANIDE SCRUBBING COLUMN EXHAUST FAN 24-Jan-20
68 4033 ME DSH 024 A 4033-ME-DSH-024_A DATASHEET - SCRUBBER DISCHARGE PUMP 13-Jan-20
69 4033 ME DSH 025 A 4033-ME-DSH-025_A DATASHEET - CYCLONE FEED PUMPS 13-Jan-20
70 4033 ME DSH 026 A 4033-ME-DSH-026_A DATASHEET - LEACH TANK FEED PUMPS 13-Jan-20
71 4033 ME DSH 027 A 4033-ME-DSH-027_A DATASHEET - ELUTED RESIN TRANSFER PUMP 13-Jan-20
72 4033 ME DSH 028 A 4033-ME-DSH-028_A DATASHEET - LOADED RESIN PUMP 13-Jan-20
73 4033 ME DSH 029 A 4033-ME-DSH-029_A DATASHEET - MILLING AREA SUMP PUMP 13-Jan-20
74 4033 ME DSH 030 4033-ME-DSH-030_ DATASHEET - TAILS ROM BIN AREA SUMP PUMP
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : TOKA TINDUNG FEED
Revision : A
Date : 27-Mar-2020

DOC. Person In START FINISH


ITEM PROJ DISC SEQ REV DOCUMENT NO. DESCRIPTION HISTORY DATE R
TYPE Charge DATE DATE

A B
75 4033 ME DSH 031 A 4033-ME-DSH-031_A DATASHEET - LEACH AREA SUMP PUMP 13-Jan-20
76 4033 ME DSH 032 4033-ME-DSH-032_ DATASHEET - ELUTED RESIN AREA SUMP PUMP
77 4033 ME DSH 033 A 4033-ME-DSH-033_A DATASHEET - RIP AREA SUMP PUMP 13-Jan-20
78 4033 ME DSH 034 4033-ME-DSH-034_ DATASHEET - LOADED RESIN AREA SUMP PUMP
79 4033 ME DSH 035 A 4033-ME-DSH-035_A DATASHEET - CYANIDE SCRUBBING COLUMN CIRCULATION PUMP NO.1 & 2 24-Jan-20
80 4033 ME DSH 036 A 4033-ME-DSH-036_A DATASHEET - CYANIDE SCRUBBING PRODUCT PUMPS NO.1 & 2 24-Jan-20
81 4033 ME DSH 037 4033-ME-DSH-037_ DATASHEET - NEUTRALIZATION PUMP
82 4033 ME DSH 038 A 4033-ME-DSH-038_A DATASHEET - pH ADJUSTMENT AREA SUMP PUMP 24-Jan-20
83 4033 ME DSH 039 4033-ME-DSH-039_ DATASHEET - COPPER REACTOR PUMP
84 4033 ME DSH 040 A 4033-ME-DSH-040_A DATASHEET - COPPER FILTER FEED PUMP 13-Jan-20
85 4033 ME DSH 041 A 4033-ME-DSH-041_A DATASHEET - COPPER WASH WATER PUMPS 24-Jan-20
86 4033 ME DSH 042 A 4033-ME-DSH-042_A DATASHEET - COPPER RECOVERY AREA SUMP PUMP 24-Jan-20
87 4033 ME DSH 043 A 4033-ME-DSH-043_A DATASHEET - COPPER FILTER FEED AREA SUMP PUMP 24-Jan-20
88 4033 ME DSH 044 A 4033-ME-DSH-044_A DATASHEET - GOLD ELUANT PUMPS NO.1 & 2 24-Jan-20
89 4033 ME DSH 045 A 4033-ME-DSH-045_A DATASHEET - ZINC ELECTROLYTE FEED PUMP NO.1 & 2 24-Jan-20
90 4033 ME DSH 046 A 4033-ME-DSH-046_A DATASHEET - GOLD ROOM SCRUBBER DISCHARGE PUMP 24-Jan-20
91 4033 ME DSH 047 4033-ME-DSH-047_ DATASHEET - VACUUM SYSTEM PUMP
92 4033 ME DSH 048 A 4033-ME-DSH-048_A DATASHEET - GOLD RECOVERY AREA SUMP PUMP 24-Jan-20
93 4033 ME DSH 049 A 4033-ME-DSH-049_A DATASHEET - SODIUM CYANIDE UNLOADING PUMP 24-Jan-20
94 4033 ME DSH 050 A 4033-ME-DSH-050_A DATASHEET - SODIUM CYANIDE FEED PUMPS NO.1 & 2 24-Jan-20
95 4033 ME DSH 051 A 4033-ME-DSH-051_A DATASHEET - SODIUM CYANIDE AREA SUMP PUMP 24-Jan-20
96 4033 ME DSH 052 A 4033-ME-DSH-052_A DATASHEET - LIME TRANSFER PUMP 13-Jan-20
97 4033 ME DSH 053 A 4033-ME-DSH-053_A DATASHEET - LIME RING MAIN PUMP 13-Jan-20
98 4033 ME DSH 054 4033-ME-DSH-054_ DATASHEET - LIME AREA SUMP PUMP
99 4033 ME DSH 055 A 4033-ME-DSH-055_A DATASHEET - SODIUM HYDROXIDE UNLOADING PUMP 24-Jan-20
100 4033 ME DSH 056 A 4033-ME-DSH-056_A DATASHEET - SODIUM HYDROXIDE TRANSFER PUMPS NO.1 & 2 24-Jan-20
101 4033 ME DSH 057 A 4033-ME-DSH-057_A DATASHEET - SODIUM HYDROXIDE DOSING PUMP NO.1 & 2 24-Jan-20
102 4033 ME DSH 058 A 4033-ME-DSH-058_A DATASHEET - SODIUM HYDROXIDE AREA SUMP PUMP 24-Jan-20
103 4033 ME DSH 059 4033-ME-DSH-059_ DATASHEET - HYDROCHLORIC ACID FEED PUMP
104 4033 ME DSH 060 A 4033-ME-DSH-060_A DATASHEET - HYDROCHLORIC ACID AREA SUMP PUMP 24-Jan-20
105 4033 ME DSH 061 A 4033-ME-DSH-061_A DATASHEET - SODIUM CHLORIDE TRANSFER PUMP 24-Jan-20
106 4033 ME DSH 062 A 4033-ME-DSH-062_A DATASHEET - COPPER ELUANT FEED PUMPS NO.1 & 2 24-Jan-20
107 4033 ME DSH 063 A 4033-ME-DSH-063_A DATASHEET - SODIUM CHLORIDE AREA SUMP PUMP 24-Jan-20
108 4033 ME DSH 064 A 4033-ME-DSH-064_A DATASHEET - SULPHURIC ACID UNLOADING PUMP 24-Jan-20
109 4033 ME DSH 065 A 4033-ME-DSH-065_A DATASHEET - SULPHURIC ACID FEED PUMPS NO.1,2 & 3 24-Jan-20
110 4033 ME DSH 066 A 4033-ME-DSH-066_A DATASHEET - SULPHURIC ACID AREA SUMP PUMP 24-Jan-20
111 4033 ME DSH 067 A 4033-ME-DSH-067_A DATASHEET - ZINC SULPHATE TRANSFER PUMP 24-Jan-20
112 4033 ME DSH 068 4033-ME-DSH-068_ DATASHEET - ZINC SULPHATE FEED PUMP
113 4033 ME DSH 069 4033-ME-DSH-069_ DATASHEET - ZINC SULPHATE AREA SUMP PUMP
114 4033 ME DSH 070 A 4033-ME-DSH-070_A DATASHEET - SODIUM HYDRO SULFIDE TRANSFER PUMPS 24-Jan-20
115 4033 ME DSH 071 A 4033-ME-DSH-071_A DATASHEET - SODIUM HYDRO SULFIDE FEED PUMPS NO.1 & 2 24-Jan-20
116 4033 ME DSH 072 A 4033-ME-DSH-072_A DATASHEET - SODIUM SULFIDE AREA SUMP PUMP 24-Jan-20
117 4033 ME DSH 073 A 4033-ME-DSH-073_A DATASHEET - RAW WATER PUMP 6-Feb-20
118 4033 ME DSH 074 A 4033-ME-DSH-074_A DATASHEET - FIRE WATER PUMPS (ELECTRIC,DIESEL,JOCKEY) 6-Feb-20
119 4033 ME DSH 075 A 4033-ME-DSH-075_A DATASHEET - PROCESS WATER PUMP NO.1 & NO.2 6-Feb-20
120 4033 ME DSH 076 4033-ME-DSH-076_ DATASHEET - RO POTABLE WATER PUMP
121 4033 ME DSH 077 A 4033-ME-DSH-077_A DATASHEET - COMPRESSED AIR SYSTEM 27-Jan-20
122 4033 ME DSH 078 A 4033-ME-DSH-078_A DATASHEET - LIME SYSTEM 9-Dec-19
123 4033 ME DSH 079 4033-ME-DSH-079_ DATASHEET - WATER TREATMENT PLANT
124 4033 ME DSH 080 4033-ME-DSH-080_ DATASHEET - COLUMN INTERNAL PARTS
125 4033 ME DSH 081 A 4033-ME-DSH-081_A DATASHEET - SCRUBBER FEED WEIGHTOMETER, MILL FEED WEIGHTOMETER 13-Jan-20
126 4033 ME DSH 082 A 4033-ME-DSH-082_A DATASHEET - MAGNETIC SEPARATOR #1 21-Jan-20
127 4033 ME DSH 083 4033-ME-DSH-083_ DATASHEET - ACID INLINE MIXER 
128 4033 ME DSH 084 4033-ME-DSH-084_ DATASHEET - ROTARY VALVE
129 4033 ME DSH 085 4033-ME-DSH-085_ DATASHEET - HOIST #1
130 4033 ME DSH 086 A 4033-ME-DSH-086_A DATASHEET - RECYN TAILING PUMPS 13-Jan-20
131 4033 ME DSH 087 4033-ME-DSH-087_ DATASHEET - BELT FEEDER #2
132 4033 ME DSH 088 A 4033-ME-DSH-088_A DATASHEET - CONVEYOR PULLEY, IDLER,SCRAPER,SKIRT 13-Jan-20
133 4033 ME DSH 089 4033-ME-DSH-089_ DATASHEET - IDLER, PULLEY BELT SCRAPER, SKIRT - SCRUBBER FEED CONVEYOR
134 4033 ME DSH 090 4033-ME-DSH-090_ DATASHEET - DRIVES UNIT - STOCKPILE CONVEYOR
135 4033 ME DSH 091 4033-ME-DSH-091_ DATASHEET - IDLER, PULLEY BELT SCRAPER, SKIRT - STOCKPILE CONVEYOR
136 4033 ME DSH 092 4033-ME-DSH-092_ DATASHEET - CONVEYOR BELT - MILL FEED CONVEYOR
137 4033 ME DSH 093 4033-ME-DSH-093_ DATASHEET - DRIVES UNIT - MILL FEED CONVEYOR
138 4033 ME DSH 094 4033-ME-DSH-094_ DATASHEET - IDLER, PULLEY BELT SCRAPER, SKIRT - MILL FEED CONVEYOR
139 4033 ME DSH 095 4033-ME-DSH-095_ DATASHEET - HOIST #2
140 4033 ME DSH 096 B 4033-ME-DSH-096_B DATASHEET - BALL MILL CYCLONES 19-Dec-19 7-Jan-20
141 4033 ME DSH 097 A 4033-ME-DSH-097_A DATASHEET - PH ADJUSTMENT TANK AGITATOR 17-Jan-20
142 4033 ME DSH 098 A 4033-ME-DSH-098_A DATASHEET - BALL MILL 31-Dec-19
143 4033 ME DSH 099 A 4033-ME-DSH-099_A DATASHEET - WTP LIME PUMPS 13-Jan-20
144 4033 ME DSH 100 A 4033-ME-DSH-100_A DATASHEET - ELUTED RESIN TRANSFER PUMPS NO.3 13-Jan-20
145 4033 ME DSH 101 A 4033-ME-DSH-101_A DATASHEET - RAW AND FIRE WATER TRANSFER PUMP NO.1 & NO.2 6-Feb-20
146 4033 ME DSH 102 A 4033-ME-DSH-102_A DATASHEET - TSF RETURN WATER PUMP NO.1 & NO.2 6-Feb-20
147 4033 ME DSH 103 A 4033-ME-DSH-103_A DATASHEET - MERCURY RETOR 11-Feb-20

APPROV
HISTORY DATE REVISION ED HISTORY DATE SENT TO CLIENT HISTORY TRANSMITTAL NO. SENT TO CLIENT
SIGNED
C D E 0 1 2 A B C D E 0 1 2 A B C D E 0





























APPROV
HISTORY DATE REVISION ED HISTORY DATE SENT TO CLIENT HISTORY TRANSMITTAL NO. SENT TO CLIENT
SIGNED
C D E 0 1 2 A B C D E 0 1 2 A B C D E 0






































HISTORY TRANSMITTAL NO. SENT TO CLIENT REMARKS

1 2

PRICE REFERS TO THE DATABASE

PRICE REFERS TO THE DATABASE

PRICE REFERS TO THE DATABASE


PRICE REFERS TO THE DATABASE

DELETED - COMBINED WITH 3017-ME-CAL-001

DELETED - LAYOUT UPDATE

DELETED - COMBINED WITH 3017-ME-CAL-004


HISTORY TRANSMITTAL NO. SENT TO CLIENT REMARKS

1 2

CANCELLED

PRICE REFERS TO THE DATABASE

PRICE REFERS TO THE DATABASE


PRICE REFERS TO THE DATABASE
PRICE REFERS TO THE DATABASE

DELETED - LAYOUT UPDATE

DELETED - COMBINED WITH 3017-ME-DSH-088

DELETED - COMBINED WITH 3017-ME-DSH-003

DELETED - COMBINED WITH 3017-ME-DSH-088

DELETED - COMBINED WITH 3017-ME-DSH-002

DELETED - COMBINED WITH 3017-ME-DSH-003

DELETED - COMBINED WITH 3017-ME-DSH-088

DELETED - COMBINED WITH 3017-ME-DSH-085


Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : TOKA TINDUNG FEED
Revision : A
Date : 27-Mar-2020

DOC. CLIENT Person In START FINISH


ITEM PROJ DISC SEQ REV DOCUMENT NO. DESCRIPTION HISTORY DATE REVISION
TYPE DOCUMENT NO. Charge DATE DATE

A B C

ELECTRICAL
1 4033 EL DCR 001 0 4033-EL-DCR-001_0 ELECTRICAL DESIGN CRITERIA
2 4033 EL LST 001 A 4033-EL-LST-001_A ELECTRICAL EQUIPMENT LIST 5-Feb-20
3 4033 EL TSP 001 A 4033-EL-TSP-001_A EMERGENCY DIESEL GENERATOR SPECIFICATION 8-Jan-20
4 4033 EL TSP 002 A 4033-EL-TSP-002_A DISTRIBUTION TRANSFORMER SPECIFICATION 8-Jan-20
5 4033 EL TSP 003 A 4033-EL-TSP-003_A MV SWITCHBOARD SPECIFICATION 8-Jan-20
6 4033 EL TSP 004 A 4033-EL-TSP-004_A LV SWITCHBOARD SPECIFICATION 20-Jan-20
7 4033 EL TSP 005 A 4033-EL-TSP-005_A UPS AND BATTERIES-SPECIFICATION 4-Feb-20
8 4033 EL TSP 006 A 4033-EL-TSP-006_A MV VSD SPECIFICATION 20-Jan-20
9 4033 EL TSP 007 A 4033-EL-TSP-007_A LV VSD SPECIFICATION 28-Jan-20
10 4033 EL TSP 008 4033-EL-TSP-008_ ELECTRIC HEATER SPECIFICATION
11 4033 EL TSP 009 4033-EL-TSP-009_ RECTIFIER SPECIFICATION
12 4033 EL TSP 010 A 4033-EL-TSP-010_A MV AND LV ELECTRIC MOTOR SPECIFICATION 8-Jan-20
13 4033 EL TSP 011 4033-EL-TSP-011_ NEUTRAL EARTHING RESISTORS SPECIFIATION
14 4033 EL ESP 002 4033-EL-ESP-002_ ELECTRICAL FOR PACKAGED EQUIPMENT SPECIFICATION
15 4033 EL ESP 0XX 4033-EL-ESP-0XX_ EARTHING TRANSFORMER SPECIFICATION
16 4033 EL ESP 0XX 4033-EL-ESP-0XX_ ELECTRICAL INSTALLATION SPECIFICATION
17 4033 EL CAL 001 B 4033-EL-CAL-001_B ELECTRICAL LOAD ANALYSIS 23-Jan-20 10-Feb-20
18 4033 EL CAL 002 4033-EL-CAL-002_ UPS SIZING
19 4033 EL DSH 001 A 4033-EL-DSH-001_A EMERGENCY DIESEL GENERATOR SET DATASHEET 17-Jan-20
20 4033 EL DSH 002 A 4033-EL-DSH-002_A MAIN DISTRIBUTION TRANSFORMER DATASHEET 27-Jan-20
21 4033 EL DSH 003 A 4033-EL-DSH-003_A MV SWITCHBOARD DATASHEET 28-Jan-20
22 4033 EL DSH 004 A 4033-EL-DSH-004_A LV SWITCHBOARD DATASHEET 28-Jan-20
23 4033 EL DSH 005 4033-EL-DSH-005_ MV VARIABLE SPEED DRIVE DATA SHEET
24 4033 EL DSH 006 A 4033-EL-DSH-006_A LV VARIABLE SPEED DRIVE DATA SHEET 6-Feb-20
25 4033 EL DSH 007 A 4033-EL-DSH-007_A 50 kVA UPS DATASHEET 11-Feb-20
26 4033 EL DSH 008 A 4033-EL-DSH-008_A RECTIFIER FOR GOLD ELECTROWINNING 31-Jan-20
27 4033 EL DSH 009 A 4033-EL-DSH-009_A NEUTRAL EARTHING RESISTORS DATASHEET 29-Jan-20
28 4033 EL DSH 010 A 4033-EL-DSH-010_A DISTRIBUTION TRANSFORMER DATASHEET 27-Jan-20
29 4033 EL DSH 011 A 4033-EL-DSH-011_A EARTHING TRANSFORMER 27-Jan-20
30 4033 EL DSH 012 A 4033-EL-DSH-012_A RECTIFIER FOR ZINC ELECTROWINNING 31-Jan-20
31 4033 EL DSH 013 A 4033-EL-DSH-013_A 66kV DISCONNECTOR SWITCH & FUSE CUT DATASHEET 31-Jan-20
32 4033 EL DSH 014 4033-EL-DSH-014_ ELECTRICAL HEATER DATA SHEET 11-Feb-20
33 4033 EL DSH 015 A 4033-EL-DSH-015_A 10 kVA UPS DATASHEET 11-Feb-20

ELECTRICAL
1 4033 IN DCR 001 A 4033-IN-DCR-001_A INSTRUMENTATION & TELECOMMUNICATION DESIGN CRITERIA 18-Feb-20
2 4033 IN DCR 002 A 4033-IN-DCR-002_A SCADA SYSTEM DESIGN CRITERIA 18-Feb-20
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : TOKA TINDUNG FEED
Revision : A
Date : 27-Mar-2020

DOC. CLIENT Person In START FINISH


ITEM PROJ DISC SEQ REV DOCUMENT NO. DESCRIPTION HISTORY DATE REVISION
TYPE DOCUMENT NO. Charge DATE DATE

A B C

APPROV
HISTORY DATE REVISION ED HISTORY DATE SENT TO CLIENT HISTORY TRANSMITTAL NO. SENT TO CLIENT REMARKS
SIGNED
D E 0 1 2 A B C D E 0 1 2 A B C D E 0 1 2

31-Dec-19 √








HOLD
CANCELLED

HOLD
HOLD


CANCELLED




CANCELLED








√ HOLD



Two Weeks Look Ahead Schedule
up to 08-Mar-2019

Weekly Progress % Marking (WE 20190301)


ACTUAL Red fonts indicate missed Finish date
Target
PROGRE
Date
SS
(%)
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : TOKA TINDUNG FEED
Revision : A
Date : 24-Jul-2023

DOC. Person In Procentage


ITEM PROJ DISC SEQ REV DOCUMENT NO. DESCRIPTION Start Date End Date
TYPE Charge %

SPESIFICATION DOCUMENT
1 4020 CI CAL 001 A 4020-CI-CAL-001_A CYANIDE ADSORPTION TANK STEEL PLATFORM FOUNDATION MTF 30-May-22 03-Jun-22 70%
2 4020 CI CAL 002 A 4020-CI-CAL-002_A METAL ADSORPTION TANK STEEL PLATFORM FOUNDATION MTF 30-May-22 03-Jun-22 70%
3 4020 CI CAL 013 A 4020-CI-CAL-013_A THICKENER STEEL STRUCTURE FOUNDATION MTF 6-Jun-22 10-Jun-22 60%
1 4020 CI CAL 021 A 4020-CI-CAL-021_A BAG BREAKER 1 STEEL STRUCTURE FOUNDATION MTF 30-May-22 03-Jun-22 100%
2 4020 CI CAL 022 A 4020-CI-CAL-022_A GOLD ELECTROWINNING CELL PLATFORM FOUNDATION MTF 20-Jun-22 25-Jun-22 0%
1 4020 CI CAL 031 A 4020-CI-CAL-031_A CYANIDE LOADED SCREEN STEEL STRUCTURE FOUNDATION MTF 6-Jun-22 10-Jun-22 70%
1 4020 CI CAL 061 A 4020-CI-CAL-061_A BAG BREAKER 2 STEEL STRUCTURE FOUNDATION MTF 13-Jun-22 17-Jun-22 100%
2 4020 CI CAL 073 A 4020-CI-CAL-073_A TANK FOUNDATION MTF 13-Jun-22 17-Jun-22 60%
4 4020 CI CAL 076 A 4020-CI-CAL-076_A CARBON SAFETY SCREEN STEEL STRUCTURE FOUNDATION MTF 13-Jun-22 17-Jun-22 60%
4 4020 CI CAL 077 A 4020-CI-CAL-077_A EXISTING PIPERACK STEEL STRUCTURE FOUNDATION MTF 13-Jun-22 17-Jun-22 60%
1 4020 ST CAL 001 A 4020-ST-CAL-001_A CYANIDE ADSORPTION TANK STEEL PLATFORM MTF 30-May-22 03-Jun-22 80%
2 4020 ST CAL 002 A 4020-ST-CAL-002_A METAL ADSORPTION TANK STEEL PLATFORM MTF 30-May-22 03-Jun-22 80%
3 4020 ST CAL 003 A 4020-ST-CAL-003_A SUPPORT REACTION OF CYANID ADSORPTION PLATFORM MTF 30-May-22 03-Jun-22 80%
4 4020 ST CAL 004 A 4020-ST-CAL-004_A SUPPORT REACTION OF METAL ADSORPTION PLATFORM MTF 30-May-22 03-Jun-22 80%
1 4020 ST CAL 021 A 4020-ST-CAL-021_A BAG BREAKER 1 STEEL STRUCTURE MTF 30-May-22 03-Jun-22 100%
2 4020 ST CAL 022 A 4020-ST-CAL-022_A GOLD ELECTROWINNING CELL PLATFORM MTF 21-Jun-22 25-Jun-22 0%
1 4020 ST CAL 031 A 4020-ST-CAL-031_A CYANIDE LOADED SCREEN STEEL STRUCTURE MTF 6-Jun-22 10-Jun-22 70%
2 4020 ST CAL 042 A 4020-ST-CAL-042_A SODIUM CHLORIDE BUILDING STRUCTURE MTF 13-Jun-22 17-Jun-22 0%
1 4020 ST CAL 061 A 4020-ST-CAL-061_A BAG BREAKER 2 STEEL STRUCTURE MTF 13-Jun-22 17-Jun-22 100%
4 4020 ST CAL 074 A 4020-ST-CAL-074_A CARBON SAFETY SCREEN STEEL STRUCTURE MTF 13-Jun-22 17-Jun-22 60%
5 4020 ST CAL 075 A 4020-ST-CAL-075_A EXISTING PIPERACK STEEL STRUCTURE MTF 13-Jun-22 17-Jun-22 60%
CAD DESIGNER
STEEL FABRICATION 01-Aug-22 MH
DED working days -264 days
Lead Eng Sr Eng Sr Dsg
Hrs Hrs Hrs
Days DOCUMENTS CALCULATION
40.5 431 0 29.46875 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 9 10 11 13 14 15
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
4 24 0 1.1666666666667
6 days 276
13248
CALCULATION MTO
17 18 19 21 22 23 25 26 27 29 30 31 32 33
Document No : 3017-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

Person In Lead Eng Sr Eng Sr Dsg


ITEM PROJ AREA DISC SEQ REV DOCUMENT NO. DESCRIPTION DAYS 3D AND STANDARD DRA
Charge Hrs Hrs Hrs

1 2 3 4 5
3D 12 12 48 9
CIVIL 6 6 24 4.5
1 AREA 66
2 2 8 1.5
2 AREA 68
2 2 8 1.5
3 AREA 71
2 2 8 1.5

STRUCTURE 6 6 24 4.5
1 AREA 66
2 2 8 1.5
2 AREA 68
2 2 8 1.5
3 AREA 71
2 2 8 1.5

GENERAL 2 2 40 5.5
1 3017 00 G 001 A 3017-00-G-001_A MOUNT MORGAN PLOT PLANT – OVERALL SITE LAYOUT WIN 2 2 40 5.5

CIVIL STANDARD DRAWINGS 19 19 76 7.125


1 3017 00 CS 001 A 3017-00-CS-001_A Standard Drawing List CHV 1 1 4 0.75
2 3017 00 CS 002 A 3017-00-CS-002_A Standard Drawing General Note CHV 1 1 4 0.75
3 3017 00 CS 003 A 3017-00-CS-003_A Standard Drawing Abbreviation & Symbol CHV 1 1 4 0.75
A Standard Drawing Foundation of Pipe and Tray Support on
4 3017 00 CS 004 3017-00-CS-004_A CHV 1 1 4 0.75
Footing and on Paving
A Standard Drawing Guard Post, Hose Box and Lighting Pole
5 3017 00 CS 005 3017-00-CS-005_A CHV 1 1 4 0.75
Foundation
6 3017 00 CS 006 A 3017-00-CS-006_A Standard Drawing Vent Pipe CHV 1 1 4 0.75
7 3017 00 CS 007 A 3017-00-CS-007_A Standard Drawing Weir Manhole, Valve Box & Sump Box CHV 1 1 4 0.75

A Standard Drawing Storm Water Sewer, Open Ditch and


8 3017 00 CS 008 3017-00-CS-008_A CHV 1 1 4 0.75
Joint Box
9 3017 00 CS 009 A 3017-00-CS-009_A Standard Drawing Cable Trench and Duct Bank CHV 1 1 4 0.75
10 3017 00 CS 010 A 3017-00-CS-010_A Standard Drawing Sewer & Drainage Miscellaneous Details CHV 1 1 4 0.75
11 3017 00 CS 011 A 3017-00-CS-011_A Standard Drawing Foundation top detail CHV 1 1 4 0.75
12 3017 00 CS 012 A 3017-00-CS-012_A Standard Drawing Foundation for stair and ladder CHV 1 1 4 0.75
13 3017 00 CS 013 A 3017-00-CS-013_A Standard Drawing Security Fence and Gate CHV 1 1 4 0.75
14 3017 00 CS 014 A 3017-00-CS-014_A Standard Drawing Detail Typical of Insert Plate CHV 1 1 4 0.75
15 3017 00 CS 015 A 3017-00-CS-015_A Standard Drawing Anchor Bolt for Structure Foundation CHV 1 1 4 0.75
16 3017 00 CS 016 A 3017-00-CS-016_A Standard Drawing Rebar Arrangement CHV 1 1 4 0.75
17 3017 00 CS 017 A 3017-00-CS-017_A Standard Drawing Concrete Reinforcement CHV 1 1 4 0.75
18 3017 00 CS 018 A 3017-00-CS-018_A Standard Drawing Pipe Sleeper or Pipe Support CHV 1 1 4 0.75
19 3017 00 CS 019 A 3017-00-CS-019_A Standard Drawing Detail Slab on Ground CHV 1 1 4 0.75

STRUCTURAL STANDARD DRAWINGS 23 23 92 8.625


1 3017 00 SS 001 A 3017-00-SS-001_A Standard Drawing List CHV 1 1 4 0.75
2 3017 00 SS 002 A 3017-00-SS-002_A Standard Drawing General Note CHV 1 1 4 0.75
3 3017 00 SS 003 A 3017-00-SS-003_A Standard Drawing Abbreviation & Symbol CHV 1 1 4 0.75
4 3017 00 SS 004 A 3017-00-SS-004_A Standard Drawing Member Schedule CHV 1 1 4 0.75
5 3017 00 SS 005 A 3017-00-SS-005_A Standard Drawing Beam to Column Pinned Connection CHV 1 1 4 0.75
6 3017 00 SS 006 A 3017-00-SS-006_A Standard Drawing Beam to Column Moment Connection CHV 1 1 4 0.75
7 3017 00 SS 007 A 3017-00-SS-007_A Standard Drawing Post Connection to Beam CHV 1 1 4 0.75
8 3017 00 SS 008 A 3017-00-SS-008_A Standard Drawing Column and Beam Splice Details CHV 1 1 4 0.75
9 3017 00 SS 009 A 3017-00-SS-009_A Standard Drawing Base Plate Connection Details CHV 1 1 4 0.75
10 3017 00 SS 010 A 3017-00-SS-010_A Standard Drawing Horizontal Bracing Connection Details CHV 1 1 4 0.75

A Standard Drawing Vertical Bracing Connection Details


11 3017 00 SS 011 3017-00-SS-011_A CHV 1 1 4 0.75
Sheet 1 of 2
A Standard Drawing Vertical Bracing Connection Details
12 3017 00 SS 012 3017-00-SS-012_A CHV 1 1 4 0.75
Sheet 2 of 2
13 3017 00 SS 013 A 3017-00-SS-013_A Standard Drawing Grating Floor CHV 1 1 4 0.75
14 3017 00 SS 014 A 3017-00-SS-014_A Standard Drawing FRP Floor CHV 1 1 4 0.75
15 3017 00 SS 015 A 3017-00-SS-015_A Standard Drawing Cladding Details Sheet 1 of 2 CHV 1 1 4 0.75
16 3017 00 SS 016 A 3017-00-SS-016_A Standard Drawing Cladding Details Sheet 2 of 2 CHV 1 1 4 0.75
A Standard Drawing Stair, Walkway and Handrail Details
17 3017 00 SS 017 3017-00-SS-017_A CHV 1 1 4 0.75
Sheet 1 of 2
A Standard Drawing Stair, Walkway and Handrail Details
18 3017 00 SS 018 3017-00-SS-018_A CHV 1 1 4 0.75
Sheet 2 of 2
19 3017 00 SS 019 A 3017-00-SS-019_A Standard Drawing Ladder Detail Sheet 1 of 3 CHV 1 1 4 0.75
20 3017 00 SS 020 A 3017-00-SS-020_A Standard Drawing Ladder Detail Sheet 2 of 3 CHV 1 1 4 0.75
21 3017 00 SS 021 A 3017-00-SS-021_A Standard Drawing Ladder Detail Sheet 3 of 3 CHV 1 1 4 0.75
22 3017 00 SS 022 A 3017-00-SS-022_A Standard Drawing Lifting Lug CHV 1 1 4 0.75
23 3017 00 SS 023 A 3017-00-SS-023_A Standard Drawing Monorel Details CHV 1 1 4 0.75

2D GA DWGS 65 65 360 30.625


Area 66 - Cyanide Adsorption Circuit 27 27 160 13.375
Adsorption Platform 15 15 88 7.375
1 4033 66 R 001 A 4033-66-R-001_A Cyanide Adsorption Tank - Foundation Plan 1 1 8 0.625
2 4033 66 R 002 A 4033-66-R-002_A Cyanide Adsorption Tank - Foundation Section and Detail 2 2 8 0.75
3 4033 66 R 003 A 4033-66-R-003_A Cyanide Adsorption Tank - Confinement Slab Plan 2 2 8 0.75
A Cyanide Adsorption Tank - Foundation Rebar Schedule 2 2 16
4 4033 66 REE 001 4033-66-REE-001_A 1.25
Sheet 1 of 2
A Cyanide Adsorption Tank - Foundation Rebar Schedule 2 2 16
5 4033 66 REE 002 4033-66-REE-002_A 1.25
Sheet 2 of 2
A Cyanide Adsorption Tank - Confinement Slab Rebar 2 2 16
6 4033 66 REE 003 4033-66-REE-003_A 1.25
Schedule
7 4033 66 S 001 A 4033-66-S-001_A Cyanide Adsorption Tank - Platform Plan 2 2 8 0.75
A Cyanide Adsorption Tank - Platform Section, Elevation and 2 2 8
8 4033 66 S 002 4033-66-S-002_A 0.75
Details
MCC & Transformer Foundation 12 12 72 6
9 4033 66 R 020 A 4033-66-R-020_A MCC & Transformer - Foundation Plan 2 2 8 0.75
A MCC & Transformer - Foundation Section, Elevation and 2 2 8
10 4033 66 R 021 4033-66-R-021_A 0.75
Details
11 4033 66 R 022 A 4033-66-R-022_A MCC & Transformer - Slab Plan & Detail 2 2 8 0.75
12 4033 66 REE 020 A 4033-66-REE-020_A MCC & Transformer - Footing Rebar Schedule Sheet 1 of 3 2 2 16 1.25

13 4033 66 REE 021 A 4033-66-REE-021_A MCC & Transformer - Footing Rebar Schedule Sheet 2 of 3 2 2 16 1.25
14 4033 66 REE 022 A 4033-66-REE-022_A MCC & Transformer - Slab Rebar Schedule Sheet 3 of 3 2 2 16 1.25

Area 68 - Cyanide Elution and Recovery 24 24 128 11


Cyanide Elution and Recovery Steel Structure 24 24 128 11
15 4033 68 R 020 A 4033-68-R-020_A Cyanide Elution and Recovery - Slab Plan, Section & Detail 2 2 8 0.75
16 4033 68 R 021 A 4033-68-R-021_A Cyanide Elution and Recovery - Foundation Plan 2 2 8 0.75
Cyanide Elution and Recovery - Foundation Section and 2 2 8
17 4033 68 R 022 A 4033-68-R-022_A 0.75
Details
18 4033 68 REE 020 A 4033-68-REE-020_A Cyanide Elution and Recovery - Slab Rebar Schedule 2 2 16 1.25
Cyanide Elution and Recovery - Foundation Rebar 2 2 16
19 4033 68 REE 021 A 4033-68-REE-021_A 1.25
Schedule Sheet 1 of 3
Cyanide Elution and Recovery - Foundation Rebar 2 2 16
20 4033 68 REE 022 A 4033-68-REE-022_A 1.25
Schedule Sheet 2 of 3
Cyanide Elution and Recovery - Foundation Rebar 2 2 16
21 4033 68 REE 023 A 4033-68-REE-023_A 1.25
Schedule Sheet 3 of 3
Cyanide Elution and Recovery - Structure Framing Plan 2 2 8
22 4033 68 S 020 A 4033-68-S-020_A 0.75
Sheet 1 of 2
Cyanide Elution and Recovery - Structure Framing Plan 2 2 8
23 4033 68 S 021 A 4033-68-S-021_A 0.75
Sheet 2 of 2
Cyanide Elution and Recovery - Structure Framing Section, 2 2 8
24 4033 68 S 022 A 4033-68-S-022_A 0.75
Elevation and Details Sheet 1 of 3
Document No : 3017-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

Person In Lead Eng Sr Eng Sr Dsg


ITEM PROJ AREA DISC SEQ REV DOCUMENT NO. DESCRIPTION DAYS 3D AND STANDARD DRA
Charge Hrs Hrs Hrs

Cyanide Elution and Recovery - Structure Framing Section, 2 2 8


25 4033 68 S 023 A 4033-68-S-023_A 0.75
Elevation and Details Sheet 2 of 3
Cyanide Elution and Recovery - Structure Framing Section, 2 2 8
26 4033 68 S 024 A 4033-68-S-024_A 0.75
Elevation and Details Sheet 3 of 3

Area 71 - REAGENT 14 14 72 6.25


Reagent Steel Structure 14 14 72 6.25
27 4033 71 R 040 A 4033-71-R-040_A Reagent - Foundation Plan 2 2 8 0.75
28 4033 71 R 041 A 4033-71-R-041_A Reagent - Foundation Section, Elevation and Details 2 2 8 0.75
29 4033 71 REE 040 A 4033-71-REE-040_A Reagent - Foundation Rebar Schedule Sheet 1 of 2 2 2 16 1.25
30 4033 71 REE 041 A 4033-71-REE-041_A Reagent - Foundation Rebar Schedule Sheet 2 of 2 2 2 16 1.25
31 4033 71 S 040 A 4033-71-S-040_A Reagent - Structure Framing Plan Sheet 2 2 8 0.75
Reagent - Structure Framing Section, Elevation and Details 2 2 8
32 4033 71 S 042 A 4033-71-S-042_A 0.75
Sheet 1 of 2
Reagent - Structure Framing Section, Elevation and Details 2 2 8
33 4033 71 S 043 A 4033-71-S-043_A 0.75
Sheet 2 of 2
121 121 616 61 DAYS
3D AND STANDARD DRAWINGS AREA 66 - 2D GA DRAWINGS AREA 66 - 2D GA DRAWINGS

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
AREA 66 - 2D GA DRAWINGS AREA 66 - 2D GA DRAWINGS

29 30 31 32 33 34 35 36 37
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

3D
CIVIL
185 RESIN ADSORPTION
1 4020 185 3D 001 A 4020-185-3D-001_A SP3D
2 4020 185 3D 002 A 4020-185-3D-002_A SP3D
186 COPPER RECOVERY
1 4020 186 3D 011 A 4020-186-3D-011_A SP3D
2 4020 186 3D 012 A 4020-186-3D-012_A SP3D
3 4020 186 3D 013 A 4020-186-3D-013_A SP3D
187 GOLD AND ZINC RECOVERY
1 4020 187 3D 021 A 4020-187-3D-021_A SP3D
2 4020 187 3D 022 A 4020-187-3D-022_A SP3D
188 CYANIDE RECOVERY
1 4020 188 3D 031 A 4020-188-3D-031_A SP3D
211 SODIUM CYANIDE
1 N/A N/A N/A N/A N/A N/A
222 RAW WATER
1 N/A N/A N/A N/A N/A N/A
241 AIR SERVICE
1 N/A N/A N/A N/A N/A N/A
272 SODIUM CHLORIDE
1 N/A N/A N/A N/A N/A N/A
273 SULPHURIC ACID
1 4020 273 3D 041 A 4020-273-3D-041_A SP3D
274 SODIUM HYDROSULFIDE
1 4020 274 3D 051 A 4020-274-3D-051_A SP3D
ALL AREA
1 4020 000 3D 061 A 4020-000-3D-061_A SP3D
2 4020 000 3D 062 A 4020-000-3D-062_A SP3D
3 4020 000 3D 063 A 4020-000-3D-063_A SP3D
4 4020 000 3D 064 A 4020-000-3D-064_A SP3D
5 4020 000 3D 065 A 4020-000-3D-065_A SP3D
6 4020 000 3D 066 A 4020-000-3D-066_A SP3D
7 4020 000 3D 067 A 4020-000-3D-067_A SP3D

STRUCTURE
185 RESIN ADSORPTION
1 4020 185 3D 001 A 4020-185-3D-001_A SP3D
2 4020 185 3D 002 A 4020-185-3D-002_A SP3D
3 4020 185 3D 003 A 4020-185-3D-003_A SP3D
4 4020 186 3D 004 A 4020-186-3D-004_A SP3D
186 COPPER RECOVERY
1 4020 186 3D 011 A 4020-186-3D-011_A SP3D
2 4020 186 3D 012 A 4020-186-3D-012_A SP3D
3 4020 187 3D 013 A 4020-187-3D-013_A SP3D
187 GOLD AND ZINC RECOVERY
1 4020 187 3D 021 A 4020-187-3D-021_A SP3D
2 4020 187 3D 022 A 4020-187-3D-022_A SP3D
188 CYANIDE RECOVERY
1 4020 188 3D 031 A 4020-188-3D-031_A SP3D
211 SODIUM CYANIDE
1 N/A N/A N/A N/A N/A N/A
222 RAW WATER
1 N/A N/A N/A N/A N/A N/A
241 AIR SERVICE
1 N/A N/A N/A N/A N/A N/A
272 SODIUM CHLORIDE
1 N/A N/A N/A N/A N/A N/A
273 SULPHURIC ACID
1 4020 273 3D 041 A 4020-273-3D-041_A SP3D
274 SODIUM HYDROSULFIDE
1 4020 274 3D 051 A 4020-274-3D-051_A SP3D
ALL AREA
1 4020 000 3D 061 A 4020-000-3D-061_A SP3D
2 4020 000 3D 062 A 4020-000-3D-062_A SP3D
3 4020 000 3D 063 A 4020-000-3D-063_A SP3D
4 4020 000 3D 064 A 4020-000-3D-064_A SP3D
5 4020 000 3D 065 A 4020-000-3D-065_A SP3D

CIVIL STANDARD DRAWINGS


1 1991 000 SCDST 0001 0 1991-000-SCDST-0001_0 CAD
2 1991 000 SCDST 0002 0 1991-000-SCDST-0002_0 CAD
3 1991 000 SCDST 0003 0 1991-000-SCDST-0003_0 CAD
4 1991 000 SCDST 0004 0 1991-000-SCDST-0004_0 CAD
5 1991 000 SCDST 0005 0 1991-000-SCDST-0005_0 CAD
6 1991 000 SCDST 0006 0 1991-000-SCDST-0006_0 CAD
7 1991 000 SCDST 0007 0 1991-000-SCDST-0007_0 CAD
8 1991 000 SCDST 0008 0 1991-000-SCDST-0008_0 CAD
9 1991 000 SCDST 0009 0 1991-000-SCDST-0009_0 CAD
10 1991 000 SCDST 0010 0 1991-000-SCDST-0010_0 CAD
11 1991 000 SCDST 0016 0 1991-000-SCDST-0016_0 CAD
12 1991 000 SCDST 0017 0 1991-000-SCDST-0017_0 CAD
13 1991 000 SCDST 0019 0 1991-000-SCDST-0019_0 CAD
14 1991 000 SCDST 0020 0 1991-000-SCDST-0020_0 CAD
15 1991 000 SCDST 0024 0 1991-000-SCDST-0024_0 CAD

STRUCTURAL STANDARD DRAWINGS


1 1991 000 SSDST 0001 1_IFA 1991-000-SSDST-0001_1_IFA CAD
2 1991 000 SSDST 0002 0 1991-000-SSDST-0002_0 CAD
3 1991 000 SSDST 0003 0 1991-000-SSDST-0003_0 CAD
4 1991 000 SSDST 0004 0 1991-000-SSDST-0004_0 CAD
5 1991 000 SSDST 0005 0 1991-000-SSDST-0005_0 CAD
6 1991 000 SSDST 0006 0 1991-000-SSDST-0006_0 CAD
7 1991 000 SSDST 0007 0 1991-000-SSDST-0007_0 CAD
8 1991 000 SSDST 0008 0 1991-000-SSDST-0008_0 CAD
9 1991 000 SSDST 0009 0 1991-000-SSDST-0009_0 CAD
10 1991 000 SSDST 0010 0 1991-000-SSDST-0010_0 CAD
11 1991 000 SSDST 0011 0 1991-000-SSDST-0011_0 CAD
12 1991 000 SSDST 0012 0 1991-000-SSDST-0012_0 CAD
13 1991 000 SSDST 0013 0 1991-000-SSDST-0013_0 CAD
14 1991 000 SSDST 0014 0 1991-000-SSDST-0014_0 CAD
15 1991 000 SSDST 0015 0 1991-000-SSDST-0015_0 CAD
16 1991 000 SSDST 0016 0 1991-000-SSDST-0016_0 CAD
17 1991 000 SSDST 0017 0 1991-000-SSDST-0017_0 CAD
18 1991 000 SSDST 0018 0 1991-000-SSDST-0018_0 CAD
19 1991 000 SSDST 0019 0 1991-000-SSDST-0019_0 CAD
20 1991 000 SSDST 0020 0 1991-000-SSDST-0020_0 CAD
21 1991 000 SSDST 0021 0 1991-000-SSDST-0021_0 CAD
22 1991 000 SSDST 0022 0 1991-000-SSDST-0022_0 CAD
23 1991 000 SSDST 0023 1_IFA 1991-000-SSDST-0023_1_IFA CAD
24 1991 000 SSDST 0024 1_IFA 1991-000-SSDST-0024_1_IFA CAD
25 1991 000 SSDST 0027 1_IFA 1991-000-SSDST-0027_1_IFA CAD
26 1991 000 SSDST 0028 1_IFA 1991-000-SSDST-0028_1_IFA CAD
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

27 1991 000 SSDST 0035 1_IFA 1991-000-SSDST-0035_1_IFA CAD


28 1991 000 SSDST 0036 1_IFA 1991-000-SSDST-0036_1_IFA CAD
29 1991 000 SSDST 0040 1_IFA 1991-000-SSDST-0040_1_IFA CAD
30 1991 000 SSDST 0050 0 1991-000-SSDST-0050_0 CAD
31 1991 000 SSDST 0051 0 1991-000-SSDST-0051_0 CAD
32 1991 000 SSDST 0052 0 1991-000-SSDST-0052_0 CAD
33 1991 000 SSDST 0053 0 1991-000-SSDST-0053_0 CAD
34 1991 000 SSDST 0054 0 1991-000-SSDST-0054_0 CAD
35 1991 000 SSDST 0055 0 1991-000-SSDST-0055_0 CAD
36 1991 000 SSDST 0056 0 1991-000-SSDST-0056_0 CAD
37 1991 000 SSDST 0057 0 1991-000-SSDST-0057_0 CAD
38 1991 000 SSDST 0058 0 1991-000-SSDST-0058_0 CAD
39 1991 000 SSDST 0080 0 1991-000-SSDST-0080_0 CAD

GENERAL PLOT PLAN 2D DRAWING


1 4020 000 G 001 A 4020-000-G-001_A SP3D

CIVIL AND INFRASTRUCTURE 2D DRAWINGS


1 4020 000 CI 001 A 4020-000-CI-001_A SP3D
2 4020 000 CI 002 A 4020-000-CI-002_A SP3D
3 4020 000 CI 003 A 4020-000-CI-003_A SP3D
4 4020 000 CI 004 A 4020-000-CI-004_A SP3D
5 4020 000 CI 011 A 4020-000-CI-011_A SP3D
6 4020 000 CI 012 A 4020-000-CI-012_A SP3D
7 4020 000 CI 013 A 4020-000-CI-013_A SP3D
8 4020 000 CI 014 A 4020-000-CI-014_A SP3D
9 4020 000 CI 015 A 4020-000-CI-015_A SP3D
10 4020 000 CI 016 A 4020-000-CI-016_A SP3D
11 4020 000 CI 017 A 4020-000-CI-017_A SP3D
12 4020 000 CI 018 A 4020-000-CI-018_A SP3D
13 4020 000 CI 021 A 4020-000-CI-021_A SP3D
14 4020 000 CI 022 A 4020-000-CI-022_A SP3D

2D GA Drawing
185 RESIN ADSORPTION
CYANIDE ADSORPTION TANK STEEL PLATFORM
1 4020 185 R 001 A 4020-185-R-001_A SP3D
4020 185 R 002 A 4020-185-R-002_A SP3D
4020 185 R 003 A 4020-185-R-003_A SP3D
4020 185 R 004 A 4020-185-R-004_A SP3D
4020 185 R 005 A 4020-185-R-005_A SP3D
4020 185 R 006 A 4020-185-R-006_A SP3D
4020 185 R 007 A 4020-185-R-007_A SP3D
4020 185 R 008 A 4020-185-R-008_A SP3D
4020 185 REE 001 A 4020-185-REE-001_A CAD
4020 185 REE 002 A 4020-185-REE-002_A CAD
4020 185 REE 003 A 4020-185-REE-003_A CAD
4020 185 REE 004 A 4020-185-REE-004_A CAD
4020 185 REE 005 A 4020-185-REE-005_A CAD
4020 185 REE 006 A 4020-185-REE-006_A CAD
4020 185 S 001 A 4020-185-S-001_A SP3D
4020 185 S 002 A 4020-185-S-002_A SP3D
4020 185 S 003 A 4020-185-S-003_A SP3D
4020 185 S 004 A 4020-185-S-004_A SP3D
4020 185 S 005 A 4020-185-S-005_A SP3D
METAL ADSORPTION TANK STEEL PLATFORM FOUNDATION
4020 185 R 010 A 4020-185-R-010_A SP3D
4020 185 R 011 A 4020-185-R-011_A SP3D
4020 185 R 012 A 4020-185-R-012_A SP3D
4020 185 R 013 A 4020-185-R-013_A SP3D
4020 185 R 014 A 4020-185-R-014_A SP3D
4020 185 R 015 A 4020-185-R-015_A SP3D
4020 185 R 016 A 4020-185-R-016_A SP3D
4020 185 R 017 A 4020-185-R-017_A SP3D
4020 185 REE 010 A 4020-185-REE-010_A CAD
4020 185 REE 011 A 4020-185-REE-011_A CAD
4020 185 REE 012 A 4020-185-REE-012_A CAD
4020 185 REE 013 A 4020-185-REE-013_A CAD
4020 185 REE 014 A 4020-185-REE-014_A CAD
4020 185 REE 015 A 4020-185-REE-015_A CAD
4020 185 S 010 A 4020-185-S-010_A SP3D
4020 185 S 011 A 4020-185-S-011_A SP3D
4020 185 S 012 A 4020-185-S-012_A SP3D
4020 185 S 013 A 4020-185-S-013_A SP3D
4020 185 S 014 A 4020-185-S-014_A SP3D
ReCYN PLANT FEED PUMP NO.1
4020 185 R 020 A 4020-185-R-020_A SP3D
4020 185 R 021 A 4020-185-R-021_A SP3D
4020 185 REE 020 A 4020-185-REE-020_A CAD
4020 185 REE 021 A 4020-185-REE-021_A CAD
ReCYN PLANT FEED PUMP NO.2
4020 185 R 030 A 4020-185-R-030_A SP3D
4020 185 R 031 A 4020-185-R-031_A SP3D
4020 185 REE 030 A 4020-185-REE-030_A CAD
4020 185 REE 031 A 4020-185-REE-031_A CAD
METAL EUTED RESIN TRANSFER PUMP NO. 1
4020 185 R 040 A 4020-185-R-040_A SP3D
4020 185 R 041 A 4020-185-R-041_A SP3D
4020 185 REE 040 A 4020-185-REE-040_A CAD
4020 185 REE 041 A 4020-185-REE-041_A CAD
METAL EUTED RESIN TRANSFER PUMP NO. 2
4020 185 R 050 A 4020-185-R-050_A SP3D
4020 185 R 051 A 4020-185-R-051_A SP3D
4020 185 REE 050 A 4020-185-REE-050_A CAD
4020 185 REE 051 A 4020-185-REE-051_A CAD
METAL EUTED RESIN TRANSFER PUMP NO. 3
4020 185 R 060 A 4020-185-R-060_A SP3D
4020 185 R 061 A 4020-185-R-061_A SP3D
4020 185 REE 060 A 4020-185-REE-060_A CAD
4020 185 REE 061 A 4020-185-REE-061_A CAD
COPPER ELUTED RESIN AREA SUMP PUMP
4020 185 R 070 A 4020-185-R-070_A SP3D
4020 185 R 071 A 4020-185-R-071_A SP3D
4020 185 REE 070 A 4020-185-REE-070_A CAD
4020 185 REE 071 A 4020-185-REE-071_A CAD
CYANIDE ELUTED RESIN TRANSFER PUMP NO. 1
4020 185 R 080 A 4020-185-R-080_A SP3D
4020 185 R 081 A 4020-185-R-081_A SP3D
4020 185 REE 080 A 4020-185-REE-080_A CAD
4020 185 REE 081 A 4020-185-REE-081_A CAD
CYANIDE ELUTED RESIN TRANSFER PUMP NO. 2
4020 185 R 090 A 4020-185-R-090_A SP3D
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

4020 185 R 091 A 4020-185-R-091_A SP3D


4020 185 REE 090 A 4020-185-REE-090_A CAD
4020 185 REE 091 A 4020-185-REE-091_A CAD
CYANIDE ELUTED RESIN TRANSFER PUMP NO. 3
4020 185 R 0100 A 4020-185-R-0100_A SP3D
4020 185 R 0101 A 4020-185-R-0101_A SP3D
4020 185 REE 0100 A 4020-185-REE-0100_A CAD
4020 185 REE 0101 A 4020-185-REE-0101_A CAD
TAILINGS PUMP NO. 1
4020 185 R 0110 A 4020-185-R-0110_A SP3D
4020 185 R 0111 A 4020-185-R-0111_A SP3D
4020 185 REE 0110 A 4020-185-REE-0110_A CAD
4020 185 REE 0111 A 4020-185-REE-0111_A CAD
TAILINGS PUMP NO. 2
4020 185 R 0120 A 4020-185-R-0120_A SP3D
4020 185 R 0121 A 4020-185-R-0121_A SP3D
4020 185 REE 0120 A 4020-185-REE-0120_A CAD
4020 185 REE 0121 A 4020-185-REE-0121_A CAD
186 COPPER RECOVERY
METAL LOADED SCREEN STEEL STRUCTURE
4020 186 R 001 A 4020-186-R-001_A SP3D
4020 186 R 002 A 4020-186-R-002_A SP3D
4020 186 R 003 A 4020-186-R-003_A SP3D
4020 186 R 004 A 4020-186-R-004_A SP3D
4020 186 R 005 A 4020-186-R-005_A SP3D
4020 186 R 006 A 4020-186-R-006_A SP3D
4020 186 R 007 A 4020-186-R-007_A SP3D
4020 186 R 008 A 4020-186-R-008_A SP3D
4020 186 REE 001 A 4020-186-REE-001_A CAD
4020 186 REE 002 A 4020-186-REE-002_A CAD
4020 186 REE 003 A 4020-186-REE-003_A CAD
4020 186 REE 004 A 4020-186-REE-004_A CAD
4020 186 REE 005 A 4020-186-REE-005_A CAD
4020 186 REE 006 A 4020-186-REE-006_A CAD
4020 186 S 001 A 4020-186-S-001_A SP3D
4020 186 S 002 A 4020-186-S-002_A SP3D
4020 186 S 003 A 4020-186-S-003_A SP3D
4020 186 S 004 A 4020-186-S-004_A SP3D
4020 186 S 005 A 4020-186-S-005_A SP3D
4020 186 S 006 A 4020-186-S-006_A SP3D
4020 186 S 007 A 4020-186-S-007_A SP3D
COPPER PRECIPITATE CONCRETE AND STEEL STRUCTURE
4020 186 R 020 A 4020-186-R-020_A SP3D
4020 186 R 021 A 4020-186-R-021_A SP3D
4020 186 R 022 A 4020-186-R-022_A SP3D
4020 186 R 023 A 4020-186-R-023_A SP3D
4020 186 R 024 A 4020-186-R-024_A SP3D
4020 186 R 025 A 4020-186-R-025_A SP3D
4020 186 REE 020 A 4020-186-REE-020_A CAD
4020 186 REE 021 A 4020-186-REE-021_A CAD
4020 186 REE 022 A 4020-186-REE-022_A CAD
4020 186 REE 023 A 4020-186-REE-023_A CAD
4020 186 S 020 A 4020-186-S-020_A SP3D
4020 186 S 021 A 4020-186-S-021_A SP3D
4020 186 S 022 A 4020-186-S-022_A SP3D
4020 186 S 023 A 4020-186-S-023_A SP3D
4020 186 S 024 A 4020-186-S-024_A SP3D
THICKENER STEEL STRUCTURE FOUNDATION
4020 186 R 030 A 4020-186-R-030_A SP3D
4020 186 R 031 A 4020-186-R-031_A SP3D
4020 186 R 032 A 4020-186-R-032_A SP3D
4020 186 R 033 A 4020-186-R-033_A SP3D
4020 186 R 034 A 4020-186-R-034_A SP3D
4020 186 R 035 A 4020-186-R-035_A SP3D
4020 186 REE 030 A 4020-186-REE-030_A CAD
4020 186 REE 031 A 4020-186-REE-031_A CAD
4020 186 REE 032 A 4020-186-REE-032_A CAD
4020 186 REE 033 A 4020-186-REE-033_A CAD
4020 186 S 030 A 4020-186-S-030_A SP3D
4020 186 S 031 A 4020-186-S-031_A SP3D
4020 186 S 032 A 4020-186-S-032_A SP3D
4020 186 S 033 A 4020-186-S-033_A SP3D
COPPER REACTOR PUMP NO. 1
4020 186 R 040 A 4020-186-R-040_A SP3D
4020 186 R 041 A 4020-186-R-041_A SP3D
4020 186 REE 040 A 4020-186-REE-040_A CAD
4020 186 REE 041 A 4020-186-REE-041_A CAD
COPPER REACTOR PUMP NO. 2
4020 186 R 050 A 4020-186-R-050_A SP3D
4020 186 R 051 A 4020-186-R-051_A SP3D
4020 186 REE 050 A 4020-186-REE-050_A CAD
4020 186 REE 051 A 4020-186-REE-051_A CAD
COPPER FILTER FEED PUMP NO. 1
4020 186 R 060 A 4020-186-R-060_A SP3D
4020 186 R 061 A 4020-186-R-061_A SP3D
4020 186 REE 060 A 4020-186-REE-060_A CAD
4020 186 REE 061 A 4020-186-REE-061_A CAD
COPPER FILTER FEED PUMP NO. 2
4020 186 R 070 A 4020-186-R-070_A SP3D
4020 186 R 071 A 4020-186-R-071_A SP3D
4020 186 REE 070 A 4020-186-REE-070_A CAD
4020 186 REE 071 A 4020-186-REE-071_A CAD
THICKENER UNDERFLOW PUMP NO. 1
4020 186 R 080 A 4020-186-R-080_A SP3D
4020 186 R 081 A 4020-186-R-081_A SP3D
4020 186 REE 080 A 4020-186-REE-080_A CAD
4020 186 REE 081 A 4020-186-REE-081_A CAD
THICKENER UNDERFLOW PUMP NO. 2
4020 186 R 090 A 4020-186-R-090_A SP3D
4020 186 R 091 A 4020-186-R-091_A SP3D
4020 186 REE 090 A 4020-186-REE-090_A CAD
4020 186 REE 091 A 4020-186-REE-091_A CAD
COPPER RECOVERY AREA SUMP PUMP
4020 186 R 0100 A 4020-186-R-0100_A SP3D
4020 186 R 0101 A 4020-186-R-0101_A SP3D
4020 186 REE 0100 A 4020-186-REE-0100_A CAD
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

4020 186 REE 0101 A 4020-186-REE-0101_A CAD


COPPER FILTRATE PUMP
4020 186 R 0110 A 4020-186-R-0110_A SP3D
4020 186 R 0111 A 4020-186-R-0111_A SP3D
4020 186 REE 0110 A 4020-186-REE-0110_A CAD
4020 186 REE 0111 A 4020-186-REE-0111_A CAD
COPPER FILTER AREA SUMP PUMP
4020 186 R 0120 A 4020-186-R-0120_A SP3D
4020 186 R 0121 A 4020-186-R-0121_A SP3D
4020 186 REE 0120 A 4020-186-REE-0120_A CAD
4020 186 REE 0121 A 4020-186-REE-0121_A CAD
THICKENER OVERFLOW PUMP NO. 1
4020 186 R 0130 A 4020-186-R-0130_A SP3D
4020 186 R 0131 A 4020-186-R-0131_A SP3D
4020 186 REE 0130 A 4020-186-REE-0130_A CAD
4020 186 REE 0131 A 4020-186-REE-0131_A CAD
THICKENER OVERFLOW PUMP NO. 2
4020 186 R 0140 A 4020-186-R-0140_A SP3D
4020 186 R 0141 A 4020-186-R-0141_A SP3D
4020 186 REE 0140 A 4020-186-REE-0140_A CAD
4020 186 REE 0141 A 4020-186-REE-0141_A CAD
COPPER REACTOR AREA SUMP PUMP
4020 186 R 0150 A 4020-186-R-0150_A SP3D
4020 186 R 0151 A 4020-186-R-0151_A SP3D
4020 186 REE 0150 A 4020-186-REE-0150_A CAD
4020 186 REE 0151 A 4020-186-REE-0151_A CAD
COPPER REACTOR TANK
4020 186 R 0160 A 4020-186-R-0160_A SP3D
4020 186 R 0161 A 4020-186-R-0161_A SP3D
4020 186 REE 0160 A 4020-186-REE-0160_A CAD
4020 186 REE 0161 A 4020-186-REE-0161_A CAD
COPPER FILTER FEED SURGE TANK
4020 186 R 0170 A 4020-186-R-0170_A SP3D
4020 186 R 0171 A 4020-186-R-0171_A SP3D
4020 186 REE 0170 A 4020-186-REE-0170_A CAD
4020 186 REE 0171 A 4020-186-REE-0171_A CAD
COPPER FILTRATE TANK
4020 186 R 0180 A 4020-186-R-0180_A SP3D
4020 186 R 0181 A 4020-186-R-0181_A SP3D
4020 186 REE 0180 A 4020-186-REE-0180_A CAD
4020 186 REE 0181 A 4020-186-REE-0181_A CAD
STRIPPER FEED SURGE TANK
4020 186 R 0190 A 4020-186-R-0190_A SP3D
4020 186 R 0191 A 4020-186-R-0191_A SP3D
4020 186 R 0192 A 4020-186-R-0192_A SP3D
4020 186 REE 0190 A 4020-186-REE-0190_A CAD
4020 186 REE 0191 A 4020-186-REE-0191_A CAD
187 GOLD AND ZINC RECOVERY
BAG BREAKER 1 STEEL STRUCTURE
4020 187 R 001 A 4020-187-R-001_A SP3D
4020 187 R 002 A 4020-187-R-002_A SP3D
4020 187 R 003 A 4020-187-R-003_A SP3D
4020 187 R 004 A 4020-187-R-004_A SP3D
4020 187 R 005 A 4020-187-R-005_A SP3D
4020 187 R 006 A 4020-187-R-006_A SP3D
4020 187 REE 001 A 4020-187-REE-001_A CAD
4020 187 REE 002 A 4020-187-REE-002_A CAD
4020 187 REE 003 A 4020-187-REE-003_A CAD
4020 187 REE 004 A 4020-187-REE-004_A CAD
4020 187 S 001 A 4020-187-S-001_A SP3D
4020 187 S 002 A 4020-187-S-002_A SP3D
4020 187 S 003 A 4020-187-S-003_A SP3D
4020 187 S 004 A 4020-187-S-004_A SP3D
4020 187 S 005 A 4020-187-S-005_A SP3D
GOLD ELECTROWINNING CELL PLATFORM
4020 187 R 020 A 4020-187-R-020_A SP3D
4020 187 R 021 A 4020-187-R-021_A SP3D
4020 187 REE 020 A 4020-187-REE-020_A CAD
4020 187 REE 021 A 4020-187-REE-021_A CAD
4020 187 S 020 A 4020-187-S-020_A SP3D
4020 187 S 021 A 4020-187-S-021_A SP3D
4020 187 S 022 A 4020-187-S-022_A SP3D
4020 187 S 023 A 4020-187-S-023_A SP3D
GOLD ELUANT FEED PUMP NO. 1
4020 187 R 030 A 4020-187-R-030_A SP3D
4020 187 R 031 A 4020-187-R-031_A SP3D
4020 187 REE 030 A 4020-187-REE-030_A CAD
4020 187 REE 031 A 4020-187-REE-031_A CAD
GOLD ELUANT FEED PUMP NO. 2
4020 187 R 040 A 4020-187-R-040_A SP3D
4020 187 R 041 A 4020-187-R-041_A SP3D
4020 187 REE 040 A 4020-187-REE-040_A CAD
4020 187 REE 041 A 4020-187-REE-041_A CAD
ZINC REACTOR DISCHARGE PUMP
4020 187 R 050 A 4020-187-R-050_A SP3D
4020 187 R 051 A 4020-187-R-051_A SP3D
4020 187 REE 050 A 4020-187-REE-050_A CAD
4020 187 REE 051 A 4020-187-REE-051_A CAD
GOLD ELUANT TRANSFER PUMP
4020 187 R 060 A 4020-187-R-060_A SP3D
4020 187 R 061 A 4020-187-R-061_A SP3D
4020 187 REE 060 A 4020-187-REE-060_A CAD
4020 187 REE 061 A 4020-187-REE-061_A CAD
SPENT GOLD ELECTROLYTE PUMP NO. 1
4020 187 R 070 A 4020-187-R-070_A SP3D
4020 187 R 071 A 4020-187-R-071_A SP3D
4020 187 REE 070 A 4020-187-REE-070_A CAD
4020 187 REE 071 A 4020-187-REE-071_A CAD
SPENT GOLD ELECTROLYTE PUMP NO. 2
4020 187 R 080 A 4020-187-R-080_A SP3D
4020 187 R 081 A 4020-187-R-081_A SP3D
4020 187 REE 080 A 4020-187-REE-080_A CAD
4020 187 REE 081 A 4020-187-REE-081_A CAD
ZINC FILTRATE PUMP
4020 187 R 090 A 4020-187-R-090_A SP3D
4020 187 R 091 A 4020-187-R-091_A SP3D
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

4020 187 REE 090 A 4020-187-REE-090_A CAD


4020 187 REE 091 A 4020-187-REE-091_A CAD
GOLD COLUMN SUMP PUMP
4020 187 R 0100 A 4020-187-R-0100_A SP3D
4020 187 R 0101 A 4020-187-R-0101_A SP3D
4020 187 REE 0100 A 4020-187-REE-0100_A CAD
4020 187 REE 0101 A 4020-187-REE-0101_A CAD
GOLD ELUANT TANK
4020 187 R 0110 A 4020-187-R-0110_A SP3D
4020 187 R 0111 A 4020-187-R-0111_A SP3D
4020 187 REE 0110 A 4020-187-REE-0110_A CAD
4020 187 REE 0111 A 4020-187-REE-0111_A CAD
ZINC MAKE UP TANK
4020 187 R 0120 A 4020-187-R-0120_A SP3D
4020 187 R 0121 A 4020-187-R-0121_A SP3D
4020 187 REE 0120 A 4020-187-REE-0120_A CAD
4020 187 REE 0121 A 4020-187-REE-0121_A CAD
ZINC REACTOR TANK
4020 187 R 0130 A 4020-187-R-0130_A SP3D
4020 187 R 0131 A 4020-187-R-0131_A SP3D
4020 187 REE 0130 A 4020-187-REE-0130_A CAD
4020 187 REE 0131 A 4020-187-REE-0131_A CAD
SPENT GOLD ELECTROLYTE TANK
4020 187 R 0140 A 4020-187-R-0140_A SP3D
4020 187 R 0141 A 4020-187-R-0141_A SP3D
4020 187 REE 0140 A 4020-187-REE-0140_A CAD
4020 187 REE 0141 A 4020-187-REE-0141_A CAD
ZINC FILTRATE TANK FOUNDATION
4020 187 R 0150 A 4020-187-R-0150_A SP3D
4020 187 R 0151 A 4020-187-R-0151_A SP3D
4020 187 REE 0150 A 4020-187-REE-0150_A CAD
4020 187 REE 0151 A 4020-187-REE-0151_A CAD
188 CYANIDE RECOVERY
CYANIDE LOADED SCREEN
1 4020 188 R 001 A 4020-188-R-001_A SP3D
4020 188 R 002 A 4020-188-R-002_A SP3D
4020 188 R 003 A 4020-188-R-003_A SP3D
4020 188 R 004 A 4020-188-R-004_A SP3D
4020 188 R 005 A 4020-188-R-005_A SP3D
4020 188 R 006 A 4020-188-R-006_A SP3D
4020 188 R 007 A 4020-188-R-007_A SP3D
4020 188 R 008 A 4020-188-R-008_A SP3D
4020 188 REE 001 A 4020-188-REE-001_A CAD
4020 188 REE 002 A 4020-188-REE-002_A CAD
4020 188 REE 003 A 4020-188-REE-003_A CAD
4020 188 REE 004 A 4020-188-REE-004_A CAD
4020 188 REE 005 A 4020-188-REE-005_A CAD
4020 188 REE 006 A 4020-188-REE-006_A CAD
4020 188 S 001 A 4020-188-S-001_A SP3D
4020 188 S 002 A 4020-188-S-002_A SP3D
4020 188 S 003 A 4020-188-S-003_A SP3D
4020 188 S 004 A 4020-188-S-004_A SP3D
4020 188 S 005 A 4020-188-S-005_A SP3D
4020 188 S 006 A 4020-188-S-006_A SP3D
4020 188 S 007 A 4020-188-S-007_A SP3D
RECYCLED CYANIDE PUMP NO. 1
4020 188 R 020 A 4020-188-R-020_A SP3D
4020 188 R 021 A 4020-188-R-021_A SP3D
4020 188 REE 020 A 4020-188-REE-020_A CAD
4020 188 REE 021 A 4020-188-REE-021_A CAD
RECYCLED CYANIDE PUMP NO. 2
4020 188 R 030 A 4020-188-R-030_A SP3D
4020 188 R 031 A 4020-188-R-031_A SP3D
4020 188 REE 030 A 4020-188-REE-030_A CAD
4020 188 REE 031 A 4020-188-REE-031_A CAD
CYANIDE SCRUBBING PRODUCT PUMP
4020 188 R 040 A 4020-188-R-040_A SP3D
4020 188 R 041 A 4020-188-R-041_A SP3D
4020 188 REE 040 A 4020-188-REE-040_A CAD
4020 188 REE 041 A 4020-188-REE-041_A CAD
CYANIDE RECOVERY AREA SUMP PUMP
4020 188 R 050 A 4020-188-R-050_A SP3D
4020 188 R 051 A 4020-188-R-051_A SP3D
4020 188 REE 050 A 4020-188-REE-050_A CAD
4020 188 REE 051 A 4020-188-REE-051_A CAD
RECYCLED CYANIDE TANK
4020 188 R 060 A 4020-188-R-060_A SP3D
4020 188 R 061 A 4020-188-R-061_A SP3D
4020 188 REE 060 A 4020-188-REE-060_A CAD
4020 188 REE 061 A 4020-188-REE-061_A CAD
211 SODIUM CYANIDE
ReCYN PLANT CYANIDE DOSING PUMP
4020 211 R 001 A 4020-211-R-001_A SP3D
4020 211 R 002 A 4020-211-R-002_A SP3D
4020 211 REE 001 A 4020-211-REE-001_A CAD
4020 211 REE 002 A 4020-211-REE-002_A CAD
CYANIDE STORAGE TANK (EXISTING)
4020 211 R 020 A 4020-211-R-020_A SP3D
4020 211 R 021 A 4020-211-R-021_A SP3D
4020 211 REE 020 A 4020-211-REE-020_A CAD
4020 211 REE 021 A 4020-211-REE-021_A CAD
213 Flocculant
ReCYN PLANT FLOCCULANT DOSING PUMP NO. 1
4020 213 R 001 A 4020-213-R-001_A SP3D
4020 213 R 002 A 4020-213-R-002_A SP3D
4020 213 REE 001 A 4020-213-REE-001_A CAD
4020 213 REE 002 A 4020-213-REE-002_A CAD
ReCYN PLANT FLOCCULANT DOSING PUMP NO. 2
4020 213 R 020 A 4020-213-R-020_A SP3D
4020 213 R 021 A 4020-213-R-021_A SP3D
4020 213 REE 020 A 4020-213-REE-020_A CAD
4020 213 REE 021 A 4020-213-REE-021_A CAD
FLOCCULANT STORAGE TANK (EXISTING)
4020 213 R 030 A 4020-213-R-030_A SP3D
4020 213 R 031 A 4020-213-R-031_A SP3D
4020 213 REE 030 A 4020-213-REE-030_A CAD
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

4020 213 REE 031 A 4020-213-REE-031_A CAD


214 Acid & Caustic
SODIUM HYDROXIDE TRANSFER PUMP (EXISTING)
4020 214 R 001 A 4020-214-R-001_A SP3D
4020 214 R 002 A 4020-214-R-002_A SP3D
4020 214 REE 001 A 4020-214-REE-001_A CAD
4020 214 REE 002 A 4020-214-REE-002_A CAD
ReCYN PLANT CAUSTIC DOSING PUMP
4020 214 R 020 A 4020-214-R-020_A SP3D
4020 214 R 021 A 4020-214-R-021_A SP3D
4020 214 REE 020 A 4020-214-REE-020_A CAD
4020 214 REE 021 A 4020-214-REE-021_A CAD
SODIUM HYDROXIDE MIXING TANK (EXISTING)
4020 214 R 030 A 4020-214-R-030_A SP3D
4020 214 R 031 A 4020-214-R-031_A SP3D
4020 214 REE 030 A 4020-214-REE-030_A CAD
4020 214 REE 031 A 4020-214-REE-031_A CAD
SODIUM HYDROXIDE STORAGE TANK (EXISTING)
4020 214 R 040 A 4020-214-R-040_A SP3D
4020 214 R 041 A 4020-214-R-041_A SP3D
4020 214 REE 040 A 4020-214-REE-040_A CAD
4020 214 REE 041 A 4020-214-REE-041_A CAD
221 Water Service - General
FILTERED WATER FEED PUMP NO. 1
4020 221 R 001 A 4020-221-R-001_A SP3D
4020 221 R 002 A 4020-221-R-002_A SP3D
4020 221 REE 001 A 4020-221-REE-001_A CAD
4020 221 REE 002 A 4020-221-REE-002_A CAD
FILTERED WATER FEED PUMP NO. 2
4020 221 R 020 A 4020-221-R-020_A SP3D
4020 221 R 021 A 4020-221-R-021_A SP3D
4020 221 REE 020 A 4020-221-REE-020_A CAD
4020 221 REE 021 A 4020-221-REE-021_A CAD
ReCYN PLANT GLAND SEAL WATER PUMP NO. 1
4020 221 R 030 A 4020-221-R-030_A SP3D
4020 221 R 031 A 4020-221-R-031_A SP3D
4020 221 REE 030 A 4020-221-REE-030_A CAD
4020 221 REE 031 A 4020-221-REE-031_A CAD
ReCYN PLANT GLAND SEAL WATER PUMP NO. 2
4020 221 R 040 A 4020-221-R-040_A SP3D
4020 221 R 041 A 4020-221-R-041_A SP3D
4020 221 REE 040 A 4020-221-REE-040_A CAD
4020 221 REE 041 A 4020-221-REE-041_A CAD
FILTERED WATER REAGENT MIXING PUMP
4020 221 R 050 A 4020-221-R-050_A SP3D
4020 221 R 051 A 4020-221-R-051_A SP3D
4020 221 REE 050 A 4020-221-REE-050_A CAD
4020 221 REE 051 A 4020-221-REE-051_A CAD
COPPER FILTER WASH WATER PUMP
4020 221 R 060 A 4020-221-R-060_A SP3D
4020 221 R 061 A 4020-221-R-061_A SP3D
4020 221 REE 060 A 4020-221-REE-060_A CAD
4020 221 REE 061 A 4020-221-REE-061_A CAD
FILTERED WATER ACID DILUTION PUMP NO. 1
4020 221 R 070 A 4020-221-R-070_A SP3D
4020 221 R 071 A 4020-221-R-071_A SP3D
4020 221 REE 070 A 4020-221-REE-070_A CAD
4020 221 REE 071 A 4020-221-REE-071_A CAD
FILTERED WATER ACID DILUTION PUMP NO. 2
4020 221 R 080 A 4020-221-R-080_A SP3D
4020 221 R 081 A 4020-221-R-081_A SP3D
4020 221 REE 080 A 4020-221-REE-080_A CAD
4020 221 REE 081 A 4020-221-REE-081_A CAD

222 RAW WATER


RAW WATER STORAGE TANK (EXISTING)
4020 222 R 001 A 4020-222-R-001_A SP3D
4020 222 R 002 A 4020-222-R-002_A SP3D
4020 222 REE 001 A 4020-222-REE-001_A CAD
4020 222 REE 002 A 4020-222-REE-002_A CAD
241 AIR SERVICE
272 SODIUM CHLORIDE
SODIUM CHLORIDE TRANSFER PUMP
4020 272 R 001 A 4020-272-R-001_A SP3D
4020 272 R 002 A 4020-272-R-002_A SP3D
4020 272 REE 001 A 4020-272-REE-001_A
4020 272 REE 002 A 4020-272-REE-002_A
COPPER ELUANT FEED PUMP NO. 1
4020 272 R 020 A 4020-272-R-020_A SP3D
4020 272 R 021 A 4020-272-R-021_A SP3D
4020 272 REE 020 A 4020-272-REE-020_A CAD
4020 272 REE 021 A 4020-272-REE-021_A CAD
COPPER ELUANT FEED PUMP NO. 2
4020 272 R 030 A 4020-272-R-030_A SP3D
4020 272 R 031 A 4020-272-R-031_A SP3D
4020 272 REE 030 A 4020-272-REE-030_A CAD
4020 272 REE 031 A 4020-272-REE-031_A CAD
COPPER ELUANT FEED PUMP NO. 3
4020 272 R 040 A 4020-272-R-040_A SP3D
4020 272 R 041 A 4020-272-R-041_A SP3D
4020 272 REE 040 A 4020-272-REE-040_A CAD
4020 272 REE 041 A 4020-272-REE-041_A CAD
SODIUM CHLORIDE MIXING AREA SUMP PUMP
4020 272 R 050 A 4020-272-R-050_A SP3D
4020 272 R 051 A 4020-272-R-051_A SP3D
4020 272 REE 050 A 4020-272-REE-050_A CAD
4020 272 REE 051 A 4020-272-REE-051_A CAD
SODIUM CHLORIDE STORAGE
AREA SUMP PUMP
4020 272 R 060 A 4020-272-R-060_A SP3D
4020 272 R 061 A 4020-272-R-061_A SP3D
4020 272 REE 060 A 4020-272-REE-060_A CAD
4020 272 REE 061 A 4020-272-REE-061_A CAD
SODIUM CHLORIDE MIXING TANK
4020 272 R 070 A 4020-272-R-070_A SP3D
4020 272 R 071 A 4020-272-R-071_A SP3D
4020 272 REE 070 A 4020-272-REE-070_A CAD
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

4020 272 REE 071 A 4020-272-REE-071_A CAD


SODIUM CHLORIDE STORAGE TANK
4020 272 R 080 A 4020-272-R-080_A SP3D
4020 272 R 081 A 4020-272-R-081_A SP3D
4020 272 REE 080 A 4020-272-REE-080_A CAD
4020 272 REE 081 A 4020-272-REE-081_A CAD
SULPHURIC ACID HOLDING TANK
4020 272 R 090 A 4020-272-R-090_A SP3D
4020 272 R 091 A 4020-272-R-091_A SP3D
4020 272 REE 090 A 4020-272-REE-090_A CAD
4020 272 REE 091 A 4020-272-REE-091_A CAD
CONVEYOR STEEL STRUCTURE
4020 272 R 100 A 4020-272-R-100_A SP3D
4020 272 R 101 A 4020-272-R-101_A SP3D
4020 272 R 102 A 4020-272-R-102_A SP3D
4020 272 R 103 A 4020-272-R-103_A SP3D
4020 272 R 104 A 4020-272-R-104_A SP3D
4020 272 R 105 A 4020-272-R-105_A SP3D
4020 272 REE 100 A 4020-272-REE-100_A CAD
4020 272 REE 101 A 4020-272-REE-101_A CAD
4020 272 REE 102 A 4020-272-REE-102_A CAD
4020 272 REE 103 A 4020-272-REE-103_A CAD
4020 272 S 100 A 4020-272-S-100_A SP3D
4020 272 S 101 A 4020-272-S-101_A SP3D
4020 272 S 102 A 4020-272-S-102_A SP3D
4020 272 S 103 A 4020-272-S-103_A SP3D
SODIUM CHLORIDE BUILDING
4020 272 R 0110 A 4020-272-R-0110_A SP3D
4020 272 R 0111 A 4020-272-R-0111_A SP3D
4020 272 R 0112 A 4020-272-R-0112_A SP3D
4020 272 R 0113 A 4020-272-R-0113_A SP3D
4020 272 R 0114 A 4020-272-R-0114_A SP3D
4020 272 R 0115 A 4020-272-R-0115_A SP3D
4020 272 REE 0110 A 4020-272-REE-0110_A CAD
4020 272 REE 0111 A 4020-272-REE-0111_A CAD
4020 272 REE 0112 A 4020-272-REE-0112_A CAD
4020 272 REE 0113 A 4020-272-REE-0113_A CAD
4020 272 S 0110 A 4020-272-S-0110_A SP3D
4020 272 S 0111 A 4020-272-S-0111_A SP3D
4020 272 S 0112 A 4020-272-S-0112_A SP3D
4020 272 S 0113 A 4020-272-S-0113_A SP3D
4020 272 S 0114 A 4020-272-S-0114_A SP3D
4020 272 S 0115 A 4020-272-S-0115_A SP3D
4020 272 S 0116 A 4020-272-S-0116_A SP3D
REAGENT BUILDING
4020 272 R 0120 A 4020-272-R-0120_A SP3D
4020 272 R 0121 A 4020-272-R-0121_A SP3D
4020 272 R 0122 A 4020-272-R-0122_A SP3D
4020 272 R 0123 A 4020-272-R-0123_A SP3D
4020 272 R 0124 A 4020-272-R-0124_A SP3D
4020 272 R 0125 A 4020-272-R-0125_A SP3D
4020 272 REE 0120 A 4020-272-REE-0120_A CAD
4020 272 REE 0121 A 4020-272-REE-0121_A CAD
4020 272 REE 0122 A 4020-272-REE-0122_A CAD
4020 272 REE 0123 A 4020-272-REE-0123_A CAD
4020 272 S 0120 A 4020-272-S-0120_A SP3D
4020 272 S 0121 A 4020-272-S-0121_A SP3D
4020 272 S 0122 A 4020-272-S-0122_A SP3D
4020 272 S 0123 A 4020-272-S-0123_A SP3D
4020 272 S 0124 A 4020-272-S-0124_A SP3D
4020 272 S 0125 A 4020-272-S-0125_A SP3D
4020 272 S 0126 A 4020-272-S-0126_A SP3D
BAG BREAKER 3 STEEL STRUCTURE
4020 272 R 131 A 4020-272-R-131_A SP3D
4020 272 R 132 A 4020-272-R-132_A SP3D
4020 272 R 133 A 4020-272-R-133_A SP3D
4020 272 R 134 A 4020-272-R-134_A SP3D
4020 272 R 135 A 4020-272-R-135_A SP3D
4020 272 R 136 A 4020-272-R-136_A SP3D
4020 272 REE 131 A 4020-272-REE-131_A CAD
4020 272 REE 132 A 4020-272-REE-132_A CAD
4020 272 REE 133 A 4020-272-REE-133_A CAD
4020 272 REE 134 A 4020-272-REE-134_A CAD
4020 272 S 131 A 4020-272-S-131_A SP3D
4020 272 S 132 A 4020-272-S-132_A SP3D
4020 272 S 133 A 4020-272-S-133_A SP3D
4020 272 S 134 A 4020-272-S-134_A SP3D
4020 272 S 135 A 4020-272-S-135_A SP3D
273 SULPHURIC ACID
SULPHURIC ACID PLATFORM
4020 273 R 001 A 4020-273-R-001_A SP3D
4020 273 R 002 A 4020-273-R-002_A SP3D
4020 273 R 003 A 4020-273-R-003_A SP3D
4020 273 R 004 A 4020-273-R-004_A SP3D
4020 273 R 005 A 4020-273-R-005_A SP3D
4020 273 R 006 A 4020-273-R-006_A SP3D
4020 273 REE 001 A 4020-273-REE-001_A CAD
4020 273 REE 002 A 4020-273-REE-002_A CAD
4020 273 REE 003 A 4020-273-REE-003_A CAD
4020 273 REE 004 A 4020-273-REE-004_A CAD
4020 273 S 001 A 4020-273-S-001_A SP3D
4020 273 S 002 A 4020-273-S-002_A SP3D
4020 273 S 003 A 4020-273-S-003_A SP3D
4020 273 S 004 A 4020-273-S-004_A SP3D
SULPHURIC ACID UNLOADING PUMP
4020 273 R 020 A 4020-273-R-020_A SP3D
4020 273 R 021 A 4020-273-R-021_A SP3D
4020 273 REE 020 A 4020-273-REE-020_A CAD
4020 273 REE 021 A 4020-273-REE-021_A CAD
SULPHURIC ACID TRANSFER PUMP NO. 1
4020 273 R 030 A 4020-273-R-030_A SP3D
4020 273 R 031 A 4020-273-R-031_A SP3D
4020 273 REE 030 A 4020-273-REE-030_A CAD
4020 273 REE 031 A 4020-273-REE-031_A CAD
SULPHURIC ACID TRANSFER PUMP NO. 2
4020 273 R 040 A 4020-273-R-040_A SP3D
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

4020 273 R 041 A 4020-273-R-041_A SP3D


4020 273 REE 040 A 4020-273-REE-040_A CAD
4020 273 REE 041 A 4020-273-REE-041_A CAD
CYANIDE COLUMN ACID FEED PUMP NO. 1
4020 273 R 050 A 4020-273-R-050_A SP3D
4020 273 R 051 A 4020-273-R-051_A SP3D
4020 273 REE 050 A 4020-273-REE-050_A CAD
4020 273 REE 051 A 4020-273-REE-051_A CAD
CYANIDE COLUMN ACID FEED PUMP NO. 2
4020 273 R 060 A 4020-273-R-060_A SP3D
4020 273 R 061 A 4020-273-R-061_A SP3D
4020 273 REE 060 A 4020-273-REE-060_A CAD
4020 273 REE 061 A 4020-273-REE-061_A CAD
CYANIDE COLUMN ACID FEED PUMP NO. 3
4020 273 R 070 A 4020-273-R-070_A SP3D
4020 273 R 071 A 4020-273-R-071_A SP3D
4020 273 REE 070 A 4020-273-REE-070_A CAD
4020 273 REE 071 A 4020-273-REE-071_A CAD
COPPER REACTOR ACID FEED PUMP NO. 1
4020 273 R 080 A 4020-273-R-080_A SP3D
4020 273 R 081 A 4020-273-R-081_A SP3D
4020 273 REE 080 A 4020-273-REE-080_A CAD
4020 273 REE 081 A 4020-273-REE-081_A CAD
COPPER REACTOR ACID FEED PUMP NO. 2
4020 273 R 090 A 4020-273-R-090_A SP3D
4020 273 R 091 A 4020-273-R-091_A SP3D
4020 273 REE 090 A 4020-273-REE-090_A CAD
4020 273 REE 091 A 4020-273-REE-091_A CAD
SULPURIC ACID AREA SUMP PUMP
4020 273 R 0100 A 4020-273-R-0100_A SP3D
4020 273 R 0101 A 4020-273-R-0101_A SP3D
4020 273 R 0102 A 4020-273-R-0102_A SP3D
4020 273 REE 0100 A 4020-273-REE-0100_A CAD
4020 273 REE 0101 A 4020-273-REE-0101_A CAD
SLPHURIC ACID STORAGE TANK
4020 273 R 0110 A 4020-273-R-0110_A SP3D
4020 273 R 0111 A 4020-273-R-0111_A SP3D
4020 273 REE 0110 A 4020-273-REE-0110_A CAD
4020 273 REE 0111 A 4020-273-REE-0111_A CAD
DILUTED SULPHURIC ACID TANK
4020 273 R 0120 A 4020-273-R-0120_A SP3D
4020 273 R 0121 A 4020-273-R-0121_A SP3D
4020 273 REE 0120 A 4020-273-REE-0120_A CAD
4020 273 REE 0121 A 4020-273-REE-0121_A CAD
ISOTAINER FOUNDATION
4020 273 R 0130 A 4020-273-R-0130_A SP3D
4020 273 R 0131 A 4020-273-R-0131_A SP3D
4020 273 R 0132 A 4020-273-R-0132_A SP3D
4020 273 R 0133 A 4020-273-R-0133_A SP3D
4020 273 REE 0130 A 4020-273-REE-0130_A CAD
4020 273 REE 0131 A 4020-273-REE-0131_A CAD
274 SODIUM HYDROSULFIDE
BAG BREAKER 2
4020 274 R 001 A 4020-274-R-001_A SP3D
4020 274 R 002 A 4020-274-R-002_A SP3D
4020 274 R 003 A 4020-274-R-003_A SP3D
4020 274 R 004 A 4020-274-R-004_A SP3D
4020 274 R 005 A 4020-274-R-005_A SP3D
4020 274 R 006 A 4020-274-R-006_A SP3D
4020 274 REE 001 A 4020-274-REE-001_A CAD
4020 274 REE 002 A 4020-274-REE-002_A CAD
4020 274 REE 003 A 4020-274-REE-003_A CAD
4020 274 REE 004 A 4020-274-REE-004_A CAD
4020 274 S 001 A 4020-274-S-001_A SP3D
4020 274 S 002 A 4020-274-S-002_A SP3D
4020 274 S 003 A 4020-274-S-003_A SP3D
4020 274 S 004 A 4020-274-S-004_A SP3D
4020 274 S 005 A 4020-274-S-005_A SP3D
SODIUM HYDROSULFIDE TRANSFER PUMP
4020 274 R 020 A 4020-274-R-020_A SP3D
4020 274 R 021 A 4020-274-R-021_A SP3D
4020 273 REE 020 A 4020-273-REE-020_A CAD
4020 273 REE 021 A 4020-273-REE-021_A CAD
SODIUM HYDROSULFIDE FEED PUMP NO.1
4020 274 R 030 A 4020-274-R-030_A SP3D
4020 274 R 031 A 4020-274-R-031_A SP3D
4020 274 REE 030 A 4020-274-REE-030_A CAD
4020 274 REE 031 A 4020-274-REE-031_A CAD
SODIUM HYDROSULFIDE FEED PUMP NO.2
4020 274 R 040 A 4020-274-R-040_A SP3D
4020 274 R 041 A 4020-274-R-041_A SP3D
4020 274 REE 040 A 4020-274-REE-040_A CAD
4020 274 REE 041 A 4020-274-REE-041_A CAD
SODUM HYDROSULFIDE AREA SUMP PUMP
4020 274 R 050 A 4020-274-R-050_A SP3D
4020 274 R 051 A 4020-274-R-051_A SP3D
4020 273 REE 050 A 4020-273-REE-050_A CAD
4020 273 REE 051 A 4020-273-REE-051_A CAD
SODIUM HYDROSULFIDE MIXING TANK
4020 274 R 060 A 4020-274-R-060_A SP3D
4020 274 R 061 A 4020-274-R-061_A SP3D
4020 273 REE 060 A 4020-273-REE-060_A CAD
4020 273 REE 061 A 4020-273-REE-061_A CAD
SODIUM HYDROSULFIDE STORAGE TANK
4020 274 R 070 A 4020-274-R-070_A SP3D
4020 274 R 071 A 4020-274-R-071_A SP3D
4020 273 REE 070 A 4020-273-REE-070_A CAD
4020 273 REE 071 A 4020-273-REE-071_A CAD
ALL AREA
MCC & TRANSFORMER
4020 ALL R 001 A 4020-ALL-R-001_A SP3D
4020 ALL R 002 A 4020-ALL-R-002_A SP3D
4020 ALL REE 001 A 4020-ALL-REE-001_A CAD
4020 ALL REE 002 A 4020-ALL-REE-002_A CAD
4020 ALL S 001 A 4020-ALL-S-001_A SP3D
4020 ALL S 002 A 4020-ALL-S-002_A SP3D
Document No : 4020-GE-LST-001
Desription : PROJECT DELIVERABLE LIST
Project : MOUNT MORGAN GOLD PROJECT
Revision : A
Date : 27-Mar-2020

ITEM PROJ AREA DISC SEQ REV DOCUMENT NO.

4020 ALL S 003 A 4020-ALL-S-003_A SP3D


4020 ALL S 004 A 4020-ALL-S-004_A SP3D
4020 ALL S 005 A 4020-ALL-S-005_A SP3D
PIPERACK & MISC SUPPORT
4020 ALL R 020 A 4020-ALL-R-020_A SP3D
4020 ALL R 021 A 4020-ALL-R-021_A SP3D
4020 ALL R 022 A 4020-ALL-R-022_A SP3D
4020 ALL R 023 A 4020-ALL-R-023_A SP3D
4020 ALL REE 020 A 4020-ALL-REE-020_A CAD
4020 ALL REE 021 A 4020-ALL-REE-021_A CAD
4020 ALL S 020 A 4020-ALL-S-020_A SP3D
4020 ALL S 021 A 4020-ALL-S-021_A SP3D
4020 ALL S 022 A 4020-ALL-S-022_A SP3D
4020 ALL S 023 A 4020-ALL-S-023_A SP3D
4020 ALL S 024 A 4020-ALL-S-024_A SP3D
AIR COMPRESSOR STEEL
4020 ALL R 030 A 4020-ALL-R-030_A SP3D
4020 ALL R 031 A 4020-ALL-R-031_A SP3D
4020 ALL REE 030 A 4020-ALL-REE-030_A CAD
4020 ALL S 030 A 4020-ALL-S-030_A SP3D
4020 ALL S 031 A 4020-ALL-S-031_A SP3D
4020 ALL S 032 A 4020-ALL-S-032_A SP3D
CARBON SAFETY SCREEN STEEL STRUCTURE
4020 ALL R 040 A 4020-ALL-R-040_A SP3D
4020 ALL R 041 A 4020-ALL-R-041_A SP3D
4020 ALL R 042 A 4020-ALL-R-042_A SP3D
4020 ALL R 043 A 4020-ALL-R-043_A SP3D
4020 ALL REE 040 A 4020-ALL-REE-040_A CAD
4020 ALL REE 041 A 4020-ALL-REE-041_A CAD
4020 ALL S 040 A 4020-ALL-S-040_A SP3D
4020 ALL S 041 A 4020-ALL-S-041_A SP3D
4020 ALL S 042 A 4020-ALL-S-042_A SP3D
4020 ALL S 043 A 4020-ALL-S-043_A SP3D
4020 ALL S 044 A 4020-ALL-S-044_A SP3D
EXISTING PIPERACK STEEL STRUCTURE
4020 ALL R 050 A 4020-ALL-R-050_A SP3D
4020 ALL R 051 A 4020-ALL-R-051_A SP3D
4020 ALL REE 050 A 4020-ALL-REE-050_A CAD
4020 ALL REE 051 A 4020-ALL-REE-051_A CAD
4020 ALL S 050 A 4020-ALL-S-050_A SP3D
4020 ALL S 051 A 4020-ALL-S-051_A SP3D
4020 ALL S 052 A 4020-ALL-S-052_A SP3D
4020 ALL S 053 A 4020-ALL-S-053_A SP3D
4020 ALL S 054 A 4020-ALL-S-054_A SP3D
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

68 68 816 9
34 34 408 4

CYANIDE ADSORPTION TANK STEEL PLATFORM FOUNDATION ASC 4-Jul-22 08-Jul-22 0% 2 2 24 0.25
METAL ADSORPTION TANK STEEL PLATFORM FOUNDATION ASC 4-Jul-22 08-Jul-22 0% 2 2 24 0.25

METAL LOADED SCREEN STEEL STRUCTURE FOUNDATION ASC 18-Jul-22 22-Jul-22 0% 2 2 24 0.25
COPPER PRECIPITATE CONCRETE AND STEEL STRUCTURE FOUNDATION ASC 25-Jul-22 29-Jul-22 0% 2 2 24 0.25
THICKENER STEEL STRUCTURE FOUNDATION ASC 25-Jul-22 29-Jul-22 0% 2 2 24 0.25

BAG BREAKER 1 STEEL STRUCTURE FOUNDATION ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25


GOLD ELECTROWINNING CELL PLATFORM FOUNDATION ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25

CYANIDE LOADED SCREEN STEEL STRUCTURE FOUNDATION ASC 11-Jul-22 15-Jul-22 0% 2 2 24 0.25

N/A

N/A

N/A

N/A

SULPHURIC ACID PLATFORM FOUNDATION ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25

BAG BREAKER 2 STEEL STRUCTURE FOUNDATION ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25

MCC & TRANSFORMER STRUCTURE FOUNDATION ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25


PIPERACK & MISC SUPPORT FOUNDATION ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25
TANK FOUNDATION ASC 8-Aug-22 12-Aug-22 100% 2 2 24 0.25
PUMP FOUNDATION ASC 8-Aug-22 12-Aug-22 100% 2 2 24 0.25
AIR COMPRESSOR STEEL STRUCTURE FOUNDATION ASC 8-Aug-22 12-Aug-22 100% 2 2 24 0.25
ASSESMENT OF CARBON SCREEN EXISTING STEEL STRUCTURE FOUNDATION ASC 1-Aug-22 05-Aug-22 100% 2 2 24 0.25
ASSESMENT OF PIPERACK EXISTING STEEL STRUCTURE FOUNDATION ASC 1-Aug-22 05-Aug-22 100% 2 2 24 0.25

34 34 408 4

CYANIDE ADSORPTION TANK STEEL PLATFORM ASC 4-Jul-22 08-Jul-22 0% 2 2 24 0.25


METAL ADSORPTION TANK STEEL PLATFORM ASC 4-Jul-22 08-Jul-22 0% 2 2 24 0.25
SUPPORT REACTION OF CYANID ADSORPTION PLATFORM ASC 4-Jul-22 08-Jul-22 0% 2 2 24 0.25
SUPPORT REACTION OF METAL ADSORPTION PLATFORM ASC 4-Jul-22 08-Jul-22 0% 2 2 24 0.25

METAL LOADED SCREEN STEEL STRUCTURE ASC 18-Jul-22 22-Jul-22 0% 2 2 24 0.25


COPPER PRECIPITATE CONCRETE AND STEEL STRUCTURE ASC 25-Jul-22 29-Jul-22 0% 2 2 24 0.25
THICKENER STEEL STRUCTURE ASC 25-Jul-22 29-Jul-22 0% 2 2 24 0.25

BAG BREAKER 1 STEEL STRUCTURE ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25


GOLD ELECTROWINNING CELL PLATFORM ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25

CYANIDE LOADED SCREEN STEEL STRUCTURE ASC 11-Jul-22 15-Jul-22 0% 2 2 24 0.25

N/A

N/A

N/A

N/A

SULPHURIC ACID PLATFORM ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25

BAG BREAKER 2 STEEL STRUCTURE ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25

MCC & TRANSFORMER STRUCTURE ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25


PIPERACK & MISC SUPPORT ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25
AIR COMPRESSOR STEEL STRUCTURE ASC 8-Aug-22 12-Aug-22 0% 2 2 24 0.25
ASSESMENT OF CARBON SCREEN EXISTING STEEL STRUCTURE ASC 1-Aug-22 05-Aug-22 0% 2 2 24 0.25
ASSESMENT OF PIPERACK EXISTING STEEL STRUCTURE ASC 1-Aug-22 05-Aug-22 0% 2 2 24 0.25

0 0 0 0
CONCRETE STANDARDS DRAWING - NOTES AND HOLDING DOWN BOLT N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CAST-IN ITEMS DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE SUMP ARRANGEMENT & DETAILSD N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE SLAB DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE PEDESTAL DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE FOOTING DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE DETAILS SHEET 1 OF 3 N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE DETAILS SHEET 2 OF 3 N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE DETAILS SHEET 3 OF 3 N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE CONDUITS AND EARTHING DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - RING BEAM DRAINAGE ARRANGEMENT AND DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - OIL TRAP SUMP ARRANGEMENT AND DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - ELECTRICAL KIOSK FOOTING ARRANGEMENT AND DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - SERVICE PITS ARRANGEMENT AND DETAILS N/A N/A N/A 100% 0 0 0 0.00
CONCRETE STANDARDS DRAWING - CONCRETE PEDESTALS WITH SHEAR KEYS DETAILS N/A N/A N/A 100% 0 0 0 0.00

0 0 0 0
STANDARD -STEELWORK STRUCTURAL STEEL WORK NOTES & BASEPLATE DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTUAL CONNECTIONS BEAM DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS FLOOR AND KNEE BRACE DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS ANGLE WALL BRACING DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS CHS WALL BRACING DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS UC WALL BRACING DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS MONORAIL AND CRANE BEAM DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS COLUMN AND BEAM DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS PORTAL FRAME DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRUCTURAL CONNECTIONS STUB COLUMN DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STAIRWAY - ANGLE HANDRAIL ARRANGEMENT AND DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STAIRWAY CONNECTION DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD HANDRAILING - ANGLE SYSTEM DETAIL SHEET 1 0F 2 N/A N/A N/A 100% 0 0 0 0.00
STANDARD HANDRAILING - ANGLE SYSTEM DETAIL SHEET 2 0F 2 N/A N/A N/A 100% 0 0 0 0.00
STANDARD LADDER - SIDE STEP DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD LADDER - STEP THROUGH DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD LADDER - ACCESS PREVENTION PLATE AND LADDER DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD FLOOR DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD LIFTING LUG DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD CONVEYOR STRINGERS SUPPORT TYPE ARRANGEMENT AND DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD CONVEYOR STRINGERS DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRINGERS MODULE TYPE ARRANGEMENT AND DETAILS N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRINGERS STRINGERS SKIRT AND GUARD SUPPORT N/A N/A N/A 100% 0 0 0 0.00
STANDARD STRINGERS STRINGERS STAIR AND WALKWAY ARRANGEMENT AND DETAILS N/A N/A N/A 200% 0 0 0 0.00
STANDARD 15 M CONVEYOR WELDED ARRANGEMENT N/A N/A N/A 300% 0 0 0 0.00
STANDARD 20 M CONVEYOR WELDED ARRANGEMENT N/A N/A N/A 400% 0 0 0 0.00
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

STANDARD CONVEYOR WELDED TRUSSES DETAILS SHEET 1 OF 2 N/A N/A N/A 500% 0 0 0 0.00
STANDARD CONVEYOR WELDED TRUSSES DETAILS SHEET 2 OF 2 N/A N/A N/A 600% 0 0 0 0.00
STANDARD STRUCTURAL STEEL WORK MEMBER LEGEND N/A N/A N/A 700% 0 0 0 0.00
STANDARD CLADDING DETAILS SHEET 1 OF 4 N/A N/A N/A 800% 0 0 0 0.00
STANDARD CLADDING DETAILS SHEET 2 OF 4 N/A N/A N/A 900% 0 0 0 0.00
STANDARD CLADDING DETAILS SHEET 3 OF 4 N/A N/A N/A 1000% 0 0 0 0.00
STANDARD CLADDING DETAILS SHEET 4 OF 4 N/A N/A N/A 1100% 0 0 0 0.00
STANDARD SWITCH ROOM STEELWORK - DETAILS N/A N/A N/A 1200% 0 0 0 0.00
STANDARD CIRCULAR AND RECTANGULAR PLATFORMS ARRANGEMENT AND DETAILS N/A N/A N/A 1300% 0 0 0 0.00
STANDARD CIRCULAR AND RECTANGULAR PLATFORMS SECTION N/A N/A N/A 1400% 0 0 0 0.00
STANDARD WELDED FRAMES CONNECTION DETAILS N/A N/A N/A 1500% 0 0 0 0.00
STANDARD SWITCH ROOM FLOORING STEELWORK - DETAILS N/A N/A N/A 1600% 0 0 0 0.00
STANDARDS 750 AND 1200 BELT WIDTH TRESTLE ELEVATIONS N/A N/A N/A 1700% 0 0 0 0.00

2 2 40 0.25
OVERALL SITE LAYOUT WIN 11-Jul-22 15-Jul-22 0% 2 2 40 0.25

28 28 336 3.5
SETTING OUT SHEET 1 OF 2 WIN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
SETTING OUT SHEET 2 OF 2 WIN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
GRADING PLAN SHEET 1 OF 2 WIN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
GRADING PLAN SHEET 2 OF 2 WIN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL STRUCTURE FOUNDATION PLAN SHEET 1 OF 4 STV 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL STRUCTURE FOUNDATION PLAN SHEET 2 OF 4 STV 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL STRUCTURE FOUNDATION PLAN SHEET 3 OF 4 STV 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL STRUCTURE FOUNDATION PLAN SHEET 4 OF 4 STV 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL TANK & PUMP FOUNDATION PLAN SHEET 1 OF 4 AN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL TANK & PUMP FOUNDATION PLAN SHEET 2 OF 4 AN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL TANK & PUMP FOUNDATION PLAN SHEET 3 OF 4 AN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL TANK & PUMP FOUNDATION PLAN SHEET 4 OF 4 AN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL BURIED SERVICE LAYOUT SHEET 1 OF 2 WIN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25
OVERALL BURIED SERVICE LAYOUT SHEET 2 OF 2 WIN 11-Jul-22 15-Jul-22 0% 2 2 24 0.25

250.0 250.0 4608.0 31.3


23 23 376 3
10 10 148 1.1875
Cyanide AdsorptionTank - Confinement Slab Plan HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Confinement Slab Section, Elevation and Details HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Confinement Slab Schedule Sheet 1 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Confinement Slab Schedule Sheet 2 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Sump Pump Foundation Plan HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Sump Pump Foundation Section, Elevation and Details HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Foundation Plan HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Foundation Section, Elevation and Details HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide AdsorptionTank - Confinement Slab Foundation Rebar Schedule 1 of 2 HDW 1-Aug-22 05-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide AdsorptionTank - Confinement Slab Foundation Rebar Schedule 2 of 2 HDW 1-Aug-22 05-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide AdsorptionTank - Sump Pump Foundation Rebar Schedule 1 of 2 HDW 1-Aug-22 05-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide AdsorptionTank - Sump Pump Foundation Rebar Schedule 2 of 2 HDW 1-Aug-22 05-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide AdsorptionTank - Foundation Rebar Schedule 1 of 2 HDW 1-Aug-22 05-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide Adsorption Tank - Foundation Rebar Schedule 2 of 2 HDW 1-Aug-22 05-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide Adsorption Tank - Platform Plan Sheet 1 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Adsorption Tank - Platform Plan Sheet 2 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Adsorption Tank - Platform Section, Elevation and Details Sheet 1 of 3 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Adsorption Tank - Platform Section, Elevation and Details Sheet 2 of 3 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Adsorption Tank - Platform Section, Elevation and Details Sheet 3 of 3 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
8 8 108 0.9375
Metal Adsorption Tank - Confinement Slab Plan HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Confinement Slab Section, Elevation and Details HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Confinement Slab Schedule Sheet 1 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Confinement Slab Schedule Sheet 2 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Sump Pump Foundation Plan HDW 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
Metal Adsorption Tank - Sump Pump Foundation Section, Elevation and Details HDW 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
Metal Adsorption Tank - Foundation Plan HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Foundation Section, Elevation and Details HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal AdsorptionTank - Confinement Slab Foundation Rebar Schedule 1 of 2 HDW 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Metal AdsorptionTank - Confinement Slab Foundation Rebar Schedule 2 of 2 HDW 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Metal Adsorption Tank - Sump Pump Foundation Rebar Schedule 1 of 2 HDW 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Metal Adsorption Tank - Sump Pump Foundation Rebar Schedule 2 of 2 HDW 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Metal Adsorption Tank - Foundation Rebar Schedule 1 of 2 HDW 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Metal Adsorption Tank - Foundation Rebar Schedule 2 of 2 HDW 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Metal Adsorption Tank - Platform Plan Sheet 1 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Platform Plan Sheet 2 of 2 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Platform Section, Elevation and Details Sheet 1 of 3 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Platform Section, Elevation and Details Sheet 2 of 3 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
Metal Adsorption Tank - Platform Section, Elevation and Details Sheet 3 of 3 HDW 7-Jul-22 11-Jul-22 0% 0.5 0.5 4 0.0625
2 2 40 0.25
ReCYN PLANT FEED PUMP NO.1 FOUNDATION PLAN ASC 7-Jul-22 11-Jul-22 0% 0.50 0.50 4 0.0625
ReCYN PLANT FEED PUMP NO.1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 7-Jul-22 11-Jul-22 0% 0.50 0.50 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.50 0.50 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.50 0.50 16 0.0625
0 0 0 0.00
ReCYN PLANT FEED PUMP NO.2 FOUNDATION PLAN ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
ReCYN PLANT FEED PUMP NO.2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
2 2 40 0.25
METAL EUTED RESIN TRANSFER 11-Jul-22
ASC 7-Jul-22 0% 0.50 0.50 4 0.0625
PUMP
METALNO.1 FOUNDATION
EUTED PLAN
RESIN TRANSFER
ASC 7-Jul-22 11-Jul-22 0% 0.50 0.50 4 0.0625
PUMP NO.1 FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.50 0.50 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.50 0.50 16 0.0625
0 0 0 0.00
METAL EUTED RESIN TRANSFER 11-Jul-22
ASC 7-Jul-22 0% 0.0 0.0 0 0
PUMP NO.2
METAL FOUNDATION
EUTED PLAN
RESIN TRANSFER
ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
PUMP NO.2 FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
METAL EUTED RESIN TRANSFER 11-Jul-22
ASC 7-Jul-22 0% 0.0 0.0 0 0
PUMP NO.3
METAL FOUNDATION
EUTED PLAN
RESIN TRANSFER
ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
PUMP NO.3 FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
COPPER ELUTED RESIN AREA SUMP PUMP FOUNDATION PLAN ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
COPPER ELUTED RESIN AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
CYANIDE ELUTED RESIN TRANSFER 11-Jul-22
ASC 7-Jul-22 0% 0.0 0.0 0 0
PUMP NO.ELUTED
CYANIDE 1 FOUNDATION PLAN
RESIN TRANSFER
ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
CYANIDE ELUTED RESIN TRANSFER 11-Jul-22
ASC 7-Jul-22 0% 0.0 0.0 0 0
PUMP NO. 2 FOUNDATION PLAN
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

CYANIDE ELUTED RESIN TRANSFER 11-Jul-22


ASC 7-Jul-22 0% 0.0 0.0 0 0
PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
CYANIDE ELUTED RESIN TRANSFER 11-Jul-22
ASC 7-Jul-22 0% 0.0 0.0 0 0
PUMP NO.ELUTED
CYANIDE 3 FOUNDATION PLAN
RESIN TRANSFER
ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
PUMP NO. 3 FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
2 2 40 0.25
TAILINGS PUMP NO. 1 FOUNDATION PLAN ASC 7-Jul-22 11-Jul-22 0% 0.50 0.50 4 0.0625
TAILINGS PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 7-Jul-22 11-Jul-22 0% 0.50 0.50 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.50 0.50 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.50 0.50 16 0.0625
0 0 0 0.00
TAILINGS PUMP NO. 2 FOUNDATION PLAN ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
TAILINGS PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 7-Jul-22 11-Jul-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
48 48 732 6
9 9 92 1
Metal Loaded Screen Structure - Confinement Slab Plan ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Confinement Slab Section, Elevation and Details ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Confinement Slab Schedule Sheet 1 of 2 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Confinement Slab Schedule Sheet 2 of 2 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Confinement Slab Foundation Plan ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Confinement Slab Foundation Section, Elevation and Details ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Foundation Plan ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Foundation Section, Elevation and Details ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Sump Pump Foundation Rebar Schedule 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Metal Loaded Screen Structure - Sump Pump Foundation Rebar Schedule 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Metal Loaded Screen Structure - Sump Pump Foundation Rebar Schedule 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Metal Loaded Screen Structure - Sump Pump Foundation Rebar Schedule 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Metal Loaded Screen Structure - Foundation Rebar Schedule 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Metal Loaded Screen Structure - Foundation Rebar Schedule 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Metal Loaded Screen Structure - Platform Plan Sheet 1 of 3 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Platform Plan Sheet 2 of 3 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Platform Plan Sheet 3 of 3 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Platform Section, Elevation and Details Sheet 1 of 4 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Platform Section, Elevation and Details Sheet 2 of 4 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Platform Section, Elevation and Details Sheet 3 of 4 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
Metal Loaded Screen Structure - Platform Section, Elevation and Details Sheet 4 of 4 ASC 25-Jul-22 29-Jul-22 0% 0.5 0.5 4 0.0625
8 8 108 1
Copper Precipitate Concrete & Steel - Confinement Slab Plan ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Confinement Slab Section, Elevation and Details ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Confinement Slab Schedule Sheet 1 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Confinement Slab Schedule Sheet 2 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Foundation Plan ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Foundation Section, Elevation and Details ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Confinement Slab Rebar Schedule 1 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Copper Precipitate Concrete & Steel - Confinement Slab Rebar Schedule 2 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Copper Precipitate Concrete & Steel - Foundation Rebar Schedule 1 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Copper Precipitate Concrete & Steel - Foundation Rebar Schedule 2 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Copper Precipitate Concrete & Steel - Platform Plan Sheet 1 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Platform Plan Sheet 2 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Platform Section, Elevation and Details Sheet 1 of 3 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Platform Section, Elevation and Details Sheet 2 of 3 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Copper Precipitate Concrete & Steel - Platform Section, Elevation and Details Sheet 3 of 3 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
7 7 104 1
Thickener Structure - Confinement Slab Plan ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Confinement Slab Section, Elevation and Details ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Confinement Slab Schedule Sheet 1 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Confinement Slab Schedule Sheet 2 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Foundation Plan ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Foundation Section, Elevation and Details ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Confinement Slab Rebar Schedule 1 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Thickener Structure - Confinement Slab Rebar Schedule 2 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Thickener Structure - Foundation Rebar Schedule 1 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Thickener Structure - Foundation Rebar Schedule 2 of 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Thickener Structure - Platform Plan Sheet 1 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Platform Plan Sheet 2 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Platform Section, Elevation and Details Sheet 1 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
Thickener Structure - Platform Section, Elevation and Details Sheet 2 of 2 ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
2 2 40 0.25
COPPER REACTOR PUMP NO. 1 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER REACTOR PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
1 1 8 0.13
COPPER REACTOR PUMP NO. 2 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER REACTOR PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
COPPER FILTER FEED PUMP NO. 1 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER FILTER FEED PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
1 1 8 0.13
COPPER FILTER FEED PUMP NO. 2 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER FILTER FEED PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
1 1 8 0.13
THICKENER UNDERFLOW PUMP NO. 1 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
THICKENER UNDERFLOW PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
1 1 8 0.13
THICKENER UNDERFLOW PUMP NO. 2 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
THICKENER UNDERFLOW PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
COPPER RECOVERY AREA SUMP PUMP FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER RECOVERY AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
2 2 24 0.19
COPPER FILTRATE PUMP NO. 1 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER FILTRATE PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
1 1 8 0.13
COPPER FILTER AREA SUMP PUMP FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER FILTER AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
THICKENER OVERFLOW PUMP NO. 1 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
THICKENER OVERFLOW PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
THICKENER OVERFLOW PUMP NO. 2 FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
THICKENER OVERFLOW PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
COPPER REACTOR AREA SUMP PUMP FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
COPPER REACTOR AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
COPPER REACTOR TANK FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER REACTOR TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
COPPER FILTER FEED SURGE TANK FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER FILTER FEED SURGE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
COPPER FILTRATE TANK FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
COPPER FILTRATE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
3 3 44 0.31
STRIPPER FEED SURGE TANK FOUNDATION PLAN ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
STRIPPER FEED SURGE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
STRIPPER FEED PUMP NO. 1 & NO. 2 FOUNDATION PLAN, SECTION, ELEVATION AND DETAILS ASC 1-Aug-22 05-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 29-Aug-22 02-Sep-22 0% 0.5 0.5 16 0.0625
26.5 26.5 472.0 3.3
8 8 108 1
Bag Breaker 1 - Confinement Slab Plan ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Confinement Slab Section, Elevation and Details ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Confinement Slab Schedule Sheet 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Confinement Slab Schedule Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Foundation Plan ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Foundation Section, Elevation and Details ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Confinement Slab Rebar Schedule 1 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 1 - Confinement Slab Rebar Schedule 2 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 1 - Foundation Rebar Schedule 1 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 1 - Foundation Rebar Schedule 2 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 1 - Platform Plan Sheet 1of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Platform Plan Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Platform Section, Elevation and Details Sheet 1 of 3 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Platform Section, Elevation and Details Sheet 2 of 3 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 1 - Platform Section, Elevation and Details Sheet 3 of 3 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
4 4 56 1
Gold Electrowinning Cell - Foundation Plan ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Gold Electrowinning Cell - Foundation Section, Elevation and Details ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Gold Electrowinning Cell - Foundation Rebar Schedule 1of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Gold Electrowinning Cell - Foundation Rebar Schedule 2 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Gold Electrowinning Cell - Platform Plan Sheet 1of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Gold Electrowinning Cell - Platform Plan Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Gold Electrowinning Cell - Platform Section, Elevation and Details Sheet 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Gold Electrowinning Cell - Platform Section, Elevation and Details Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
2 2 40 0.25
GOLD ELUANT FEED PUMP NO. 1 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
GOLD ELUANT FEED PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
GOLD ELUANT FEED PUMP NO. 2 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
GOLD ELUANT FEED PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
2 2 40 0.25
ZINC REACTOR DISCHARGE PUMP FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
ZINC REACTOR DISCHARGE PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
GOLD ELUANT TRANSFER PUMP FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
GOLD ELUANT TRANSFER PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SPENT GOLD ELECTROLYTE PUMP NO. 1 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
SPENT GOLD ELECTROLYTE PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
SPENT GOLD ELECTROLYTE PUMP NO. 2 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
SPENT GOLD ELECTROLYTE PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
ZINC FILTRATE PUMP FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
ZINC FILTRATE PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0


FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
1 1 20 0.13
GOLD COLUMN SUMP PUMP FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
ZINC RECOVERY AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
2 2 48 0.25
GOLD ELUANT TANK FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 8 0.0625
GOLD ELUANT TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 8 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
ZINC MAKE UP TANK FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
ZINC MAKE UP TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
ZINC REACTOR TANK FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
ZINC REACTOR TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.0 0.0 0 0
2 2 40 0.25
SPENT GOLD ELECTROLYTE 12-Aug-22
ASC 8-Aug-22 0% 0.5 0.5 4 0.0625
TANK FOUNDATION
SPENT PLAN
GOLD ELECTROLYTE
ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
TANK FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
ZINC FILTRATE TANK FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
ZINC FILTRATE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
16.5 16.5 300.0 2.1
10 10 124 1
Cyanide Loaded Screen Structure - Confinement Slab Plan ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Confinement Slab Section, Elevation and Details ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Confinement Slab Schedule Sheet 1 of 2 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Confinement Slab Schedule Sheet 2 of 2 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Sump Pump Foundation Plan ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Sump Pump Foundation Section, Elevation and Details ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Foundation Plan ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Foundation Section, Elevation and Details ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Sump Pump Confinement Slab Rebar Schedule 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide Loaded Screen Structure - Sump Pump Confinement Slab Rebar Schedule 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide Loaded Screen Structure - Sump Pump Foundation Rebar Schedule 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
Cyanide Loaded Screen Structure - Sump Pump Foundation Rebar Schedule 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
Cyanide Loaded Screen Structure - Foundation Rebar Schedule 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide Loaded Screen Structure - Foundation Rebar Schedule 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Cyanide Loaded Screen Structure - Platform Plan Sheet 1 of 3 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Platform Plan Sheet 2 of 3 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Platform Plan Sheet 3 of 3 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Platform Section, Elevation and Details Sheet 1 of 4 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Platform Section, Elevation and Details Sheet 2 of 4 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Platform Section, Elevation and Details Sheet 3 of 4 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
Cyanide Loaded Screen Structure - Platform Section, Elevation and Details Sheet 4 of 4 ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
2 2 40 0.25
RECYCLED CYANIDE PUMP NO. 1 FOUNDATION PLAN ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
RECYCLED CYANIDE PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
1 1 32 0.13
RECYCLED CYANIDE PUMP NO. 2 FOUNDATION PLAN ASC 18-Jul-22 22-Jul-22 0% 0.0 0.0 0 0
RECYCLED CYANIDE PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 18-Jul-22 22-Jul-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
1 1 32 0.13
CYANIDE SCRUBBING PRODUCT PUMP NO. 1 FOUNDATION PLAN ASC 18-Jul-22 22-Jul-22 0% 0.0 0.0 0 0
CYANIDE SCRUBBING PRODUCT PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 18-Jul-22 22-Jul-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
1 1 32 0.13
CYANIDE RECOVERY AREA SUMP PUMP FOUNDATION PLAN ASC 18-Jul-22 22-Jul-22 0% 0.0 0.0 0 0
CYANIDE RECOVERY AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 18-Jul-22 22-Jul-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
RECYCLED CYANIDE TANK FOUNDATION PLAN ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
RECYCLED CYANIDE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 18-Jul-22 22-Jul-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
4 4 80 1
2 2 40 0.25
ReCYN PLANT CYANIDE DOSING PUMP FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
ReCYN PLANT CYANIDE DOSING PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
CYANIDE STORAGE TANK (EXISTING) FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
CYANIDE STORAGE TANK (EXISTING) FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
4 4 80 1
2 2 40 0.25
ReCYN PLANT FLOCCULANT DOSING PUMP NO.1 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
ReCYN PLANT FLOCCULANT DOSING PUMP NO.1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
ReCYN PLANT FLOCCULANT DOSING PUMP NO.2 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
ReCYN PLANT FLOCCULANT DOSING PUMP NO.2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
FLOCCULANT STORAGE TANK (EXISTING) FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FLOCCULANT STORAGE TANK (EXISTING) FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
8 8 160 1
2 2 40 0.25
SODIUM HYDROXIDE TRANSFER PUMP (EXISTING) FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM HYDROXIDE TRANSFER PUMP (EXISTING) FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
ReCYN PLANT CAUSTIC DOSING PUMP FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
ReCYN PLANT CAUSTIC DOSING PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SODIUM HYDROXIDE MIXING TANK (EXISTING) FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM HYDROXIDE MIXING TANK (EXISTING) FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SODIUM HYDROXIDE STORAGE TANK (EXISTING) FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM HYDROXIDE STORAGE TANK (EXISTING) FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
10 10 188 1
2 2 40 0.25
FILTERED WATER FEED PUMP NO. 1 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FILTERED WATER FEED PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
FILTERED WATER FEED PUMP NO. 2 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
FILTERED WATER FEED PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
ReCYN PLANT GLAND SEAL WATER PUMP NO. 1 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
ReCYN PLANT GLAND SEAL WATER PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
ReCYN PLANT GLAND SEAL WATER PUMP NO. 2 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
ReCYN PLANT GLAND SEAL WATER PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
FILTERED WATER REAGENT MIXING PUMP FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FILTERED WATER REAGENT MIXING PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
COPPER FILTER WASH WATER PUMP FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
COPPER FILTER WASH WATER PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 24 0.19
FILTERED WATER ACID DILUTION PUMP NO. 1 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FILTERED WATER ACID DILUTION PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
1 1 4 0.06
FILTERED WATER ACID DILUTION PUMP NO. 2 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
ReCYN PLANT FILTERED WATER STORAGE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0

2 2 40 0.25
2 2 40 0.25
RAW WATER STORAGE TANK (EXISTING) FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
RAW WATER STORAGE TANK (EXISTING) FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625

43 43 1084 5
1 1 8 0.13
SODIUM CHLORIDE TRANSFER PUMP FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM CHLORIDE TRANSFER PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
COPPER ELUANT FEED PUMP NO. 1 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
COPPER ELUANT FEED PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
COPPER ELUANT FEED PUMP NO. 2 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
COPPER ELUANT FEED PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
0 0 0 0.00
COPPER ELUANT FEED PUMP NO. 3 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
COPPER ELUANT FEED PUMP NO. 3 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
SODIUM CHLORIDE MIXING AREA SUMP PUMP FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM CHLORIDE MIXING AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
SODIUM CHLORIDE STORAGE 19-Aug-22
ASC 15-Aug-22 0% 0.0 0.0 0 0
AREA SUMP
SODIUM PUMP FOUNDATION
CHLORIDE STORAGE PLAN
ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
SODIUM CHLORIDE MIXING TANK FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM CHLORIDE MIXING TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SODIUM CHLORIDE STORAGE TANK FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM CHLORIDE STORAGE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SULPHURIC ACID HOLDING TANK FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SULPHURIC ACID HOLDING TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
7 7 224 1
Conveyor Steel Structure - Foundation Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Foundation Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Confinement Slab Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Confinement Slab Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Confinement Slab Schedule Sheet 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Confinement Slab Schedule Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Confinement Slab Rebar Schedule Sheet 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Confinement Slab Rebar Schedule Sheet 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Foundation Rebar Schedule 1of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Foundation Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Platform Plan Sheet 1of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Platform Plan Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Platform Section, Elevation and Details Sheet 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Conveyor Steel Structure - Platform Section, Elevation and Details Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
9 9 272 1
Sodium Chloride Building - Foundation Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Foundation Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Confinement Slab Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Confinement Slab Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Confinement Slab Schedule Sheet 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Confinement Slab Schedule Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Confinement Slab Rebar Schedule Sheet 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Confinement Slab Rebar Schedule Sheet 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Foundation Rebar Schedule 1of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Foundation Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Building Plan Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Building Plan Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Building Plan Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Building Section, Elevation Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Building Section, Elevation Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Building Section, Elevation Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Sodium Chloride Building - Building Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
9 9 272 1
Reagent Building - Foundation Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Foundation Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Confinement Slab Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Confinement Slab Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Confinement Slab Schedule Sheet 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Confinement Slab Schedule Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Confinement Slab Rebar Schedule Sheet 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Reagent Building - Confinement Slab Rebar Schedule Sheet 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Reagent Building - Foundation Rebar Schedule 1of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Reagent Building - Foundation Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Reagent Building - Building Plan Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Building Plan Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Building Plan Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Building Section, Elevation Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Building Section, Elevation Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Building Section, Elevation Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Reagent Building - Building Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
8 8 108 1
Bag Breaker 3 - Confinement Slab Plan ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Confinement Slab Section, Elevation and Details ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Confinement Slab Schedule Sheet 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Confinement Slab Schedule Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Foundation Plan ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Foundation Section, Elevation and Details ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Confinement Slab Rebar Schedule 1 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 3 - Confinement Slab Rebar Schedule 2 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 3 - Foundation Rebar Schedule 1 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 3 - Foundation Rebar Schedule 2 of 2 ASC 22-Aug-22 26-Aug-22 0% 0.5 0.5 16 0.0625
Bag Breaker 3 - Platform Plan Sheet 1of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Platform Plan Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Platform Section, Elevation and Details Sheet 1 of 3 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Platform Section, Elevation and Details Sheet 2 of 3 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 3 - Platform Section, Elevation and Details Sheet 3 of 3 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
25 25 496 3
7 7 104 1
Sulphuric Acid - Foundation Plan ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Foundation Section, Elevation and Details ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Confinement Slab Plan ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Confinement Slab Section, Elevation and Details ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Confinement Slab Schedule Sheet 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Confinement Slab Schedule Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Confinement Slab Rebar Schedule Sheet 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Sulphuric Acid - Confinement Slab Rebar Schedule Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Sulphuric Acid - Foundation Rebar Schedule 1of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Sulphuric Acid - Foundation Rebar Schedule 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
Sulphuric Acid - Platform Plan Sheet 1of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Platform Plan Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Platform Section, Elevation and Details Sheet 1 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
Sulphuric Acid - Platform Section, Elevation and Details Sheet 2 of 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
2 2 40 0.25
SULPHURIC ACID UNLOADING PUMP FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
SULPHURIC ACID UNLOADING PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SULPHURIC ACID TRANSFER PUMP NO. 1 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
SULPHURIC ACID TRANSFER PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
SULPHURIC ACID TRANSFER PUMP NO. 2 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

SULPHURIC ACID TRANSFER PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
2 2 48 0.25
CYANIDE COLUMN ACID FEED PUMP NO. 1 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 8 0.0625
CYANIDE COLUMN ACID FEED PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 8 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
CYANIDE COLUMN ACID FEED PUMP NO. 2 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
CYANIDE COLUMN ACID FEED PUMP NO. 2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
0 0 0 0.00
CYANIDE COLUMN ACID FEED PUMP NO. 3 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
CYANIDE COLUMN ACID FEED PUMP NO. 3 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
2 2 40 0.25
COPPER REACTOR ACID FEED PUMP NO. 1 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
COPPER REACTOR ACID FEED PUMP NO. 1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
1 1 4 0.06
COPPER REACTOR ACID FEED PUMP NO. 2 FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
GOLD COLUMN ACID FEED PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.0 0.0 0 0
3 3 44 0.31
SULPURIC ACID AREA SUMP PUMP FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
SULPURIC ACID AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
SULPURIC ACID TRANSFER PUMP NO. 3 & NO. 4 FOUNDATION PLAN, SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SLPHURIC ACID STORAGE TANK FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
SLPHURIC ACID STORAGE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
DILUTED SULPHURIC ACID TANK FOUNDATION PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
DILUTED SULPHURIC ACID TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
3 3 96 0.38
ISOTAINER - CONFINEMENT SLAB PLAN ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
ISOTAINER - CONFINEMENT SLAB SECTION, ELEVATION AND DETAILS ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
ISOTAINER - CONFINEMENT SLAB SCHEDULE SHEET 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
ISOTAINER - CONFINEMENT SLAB SCHEDULE SHEET 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
ISOTAINER - CONFINEMENT SLAB REBAR SCHEDULE 1 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
ISOTAINER - CONFINEMENT SLAB REBAR SCHEDULE 2 OF 2 ASC 8-Aug-22 12-Aug-22 0% 0.5 0.5 16 0.0625
17.5 17.5 308.0 2.2
8 8 108 1
Bag Breaker 2 - Confinement Slab Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Confinement Slab Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Confinement Slab Schedule Sheet 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Confinement Slab Schedule Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Foundation Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Foundation Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Confinement Slab Rebar Schedule 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Bag Breaker 2 - Confinement Slab Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Bag Breaker 2 - Foundation Rebar Schedule 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Bag Breaker 2 - Foundation Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Bag Breaker 2 - Platform Plan Sheet 1of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Platform Plan Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Platform Section, Elevation and Details Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Platform Section, Elevation and Details Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Bag Breaker 2 - Platform Section, Elevation and Details Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
2 2 40 0.25
SODIUM HYDROSULFIDE TRANSFER 19-Aug-22
ASC 15-Aug-22 0% 0.5 0.5 4 0.0625
PUMP FOUNDATION
SODIUM PLANTRANSFER
HYDROSULFIDE
ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
PUMP FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SODIUM HYDROSULFIDE FEED PUMP NO.1 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM HYDROSULFIDE FEED PUMP NO.1 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
0 0 0 0.00
SODIUM HYDROSULFIDE FEED PUMP NO.2 FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
SODIUM HYDROSULFIDE FEED PUMP NO.2 FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.0 0.0 0 0
2 2 40 0.25
SODUM HYDROSULFIDE AREA SUMP PUMP FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODUM HYDROSULFIDE AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SODIUM HYDROSULFIDE MIXING TANK FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM HYDROSULFIDE MIXING TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
2 2 40 0.25
SODIUM HYDROSULFIDE STORAGE TANK FOUNDATION PLAN ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
SODIUM HYDROSULFIDE STORAGE TANK FOUNDATION SECTION, ELEVATION AND DETAILS ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
FOUNDATION REBAR SCHEDULE SHEET 1 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
FOUNDATION REBAR SCHEDULE SHEET 2 OF 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
23 23 292 3
5 5 60 1
Mcc & Transformer - Foundation Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Mcc & Transformer - Foundation Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Mcc & Transformer - Foundation Rebar Schedule 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Mcc & Transformer - Foundation Rebar Schedule 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 16 0.0625
Mcc & Transformer - Structure Plan Sheet 1of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Mcc & Transformer - Structure Plan Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Person In Procentage Lead Eng Sr Eng
DESCRIPTION Start Date End Date Sr Dsg Hrs DAYS
Charge % Hrs Hrs

Mcc & Transformer - Structure Section, Elevation and Details Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Mcc & Transformer - Structure Section, Elevation and Details Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Mcc & Transformer - Structure Section, Elevation and Details Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
6 6 68 1
Piperack - Foundation Plan 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Foundation Plan 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Foundation Section, Elevation and Details 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Foundation Section, Elevation and Details 12 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Foundation Rebar Schedule 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Piperack - Foundation Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Piperack - Structure Plan Sheet 1of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Structure Plan Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Structure Section, Elevation and Details Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Structure Section, Elevation and Details Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Piperack - Structure Section, Elevation and Details Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
3 3 36 0.38
Air Compressor - Foundation Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Air Compressor - Foundation Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Air Compressor - Foundation Rebar Schedule ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Air Compressor - Structure Plan Sheet 1of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Air Compressor - Structure Section, Elevation and Details Sheet 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Air Compressor - Structure Section, Elevation and Details Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
6 6 68 1
Carbon Safety Screen Steel Structure - Foundation Plan 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Foundation Plan 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Foundation Section, Elevation and Details 1 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Foundation Section, Elevation and Details 12 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Foundation Rebar Schedule 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Carbon Safety Screen Steel Structure - Foundation Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Carbon Safety Screen Steel Structure - Structure Plan Sheet 1of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Structure Plan Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Structure Section, Elevation and Details Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Structure Section, Elevation and Details Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Carbon Safety Screen Steel Structure - Structure Section, Elevation and Details Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
5 5 60 1
Existing Piperack Steel Structure - Foundation Plan ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Existing Piperack Steel Structure - Foundation Section, Elevation and Details ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Existing Piperack Steel Structure - Foundation Rebar Schedule 1 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Existing Piperack Steel Structure - Foundation Rebar Schedule 2 of 2 ASC 5-Sep-22 09-Sep-22 0% 0.5 0.5 16 0.0625
Existing Piperack Steel Structure - Structure Plan Sheet 1of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Existing Piperack Steel Structure - Structure Plan Sheet 2 of 2 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Existing Piperack Steel Structure - Structure Section, Elevation and Details Sheet 1 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Existing Piperack Steel Structure - Structure Section, Elevation and Details Sheet 2 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625
Existing Piperack Steel Structure - Structure Section, Elevation and Details Sheet 3 of 3 ASC 15-Aug-22 19-Aug-22 0% 0.5 0.5 4 0.0625

348 348 5800 44


13248
Area No. Area Description
10 ROM & SCREENING AREA
MILLING & CLASSIFICATION AREA
20 LEACHING AREA
30 RESIN ADSORPTION
40 CYANIDE RECOVERY
50 COPPER RECOVERY
60 GOLD & ZINC RECOVERY
70 REAGENTS AREA
70A SODIUM CYANIDE (NaCN)
70B SODIUM HYDROXIDE (NaOH)
70C LIME
70D HYDROCHLORIC ACID
70E SODIUM CHLORIDE (NaCL)
70F ZINC SULPHATE HEPTAHYDRATE
70G SUPLHURIC ACID
70H SODIUM SULFIDE
80 SERVICES AREA
80A RAW WATER
80B PROCESS WATER
80C WATER TREATMENT PLANT
80D RO POTABLE WATER
80E FUEL - DIESEL
80F FIRE WATER
80G PLANT AIR
90 PLANT OPERATION CENTER
90A PLANT OFFICE
90B PLANT WORK SHOP
90C WARE HOUSE
90D METALLURGY LABORATORY
100 MINING
100A OFFICES AND INFRASTRUCTURE
100B HEAVY EQUIPMENT WORKSHOP
100C ENVIRONMENT LABORATORY
110 HEALTH, SAFETY & ENVIROMENTAL
120 ACCESS ROAD & TEMPORARY FACILITY
- N/A
ABBREVIATION GGE EQUIPMENT ABBREVIATIONS ABBV. REFERENCE DOC.
N/A NOT AVAILABLE
- - -
AD AIR DRYER
AG AGITATOR
AT BIN ACTIVATOR
BH BOLT HAMMER
BN BIN
BR BURNER
BS BAG SPLITTER
BW BELT WASHING
CA CYANIDE ANALYZER
CH CHUTE
CL COLUMN
CP COMPRESSOR
CR CRUSHER
CS CLOTH RINSING SYSTEM
CV CONVEYOR
CY CYCLONE
DB DISTRIBUTION BOX
DC DUST COLLECTOR
DG DIVIDER GATE
DR DRIVE
EC ELECTROWINNING CELL
FA FAN
FB FEED BOX
FE FEEDER
FH FIRE HYDRANT
FL FILTER
FU FURNACE
GE GENERATOR
GO GENERATOR OXYGEN
GZ STATIC GRIZZLY
HE HEATER
HP HOPPER
HR HOSE REEL
HT HOIST
HX HEAT EXCHANGER
HY HYDRAULIC POWER PACK
KN KILN
LH LINER HANDLER
LS LIQUID RESISTANCE STARTER
MA MAGNETIC SEPARATOR
ML MILL
MX MIXER
OV OVEN
PC PRESSURE CLEANER
PP PUMP
PS SUMP PUMP
PV PRESSURE VESSEL
SA SAMPLER
SC SCREEN
SR SCRUBBER
SP SEPARATOR
TH THICKENER
TK TANK
VL VAULT
VT VALVE TECH TAYLOR
WT WEIGHTOMETER
XM MISCELLANEOUS
- N/A
LINED VSD GLAND WATER
N/A N/A N/A
BUTYL RUBBER YES YES
HYPALON RUBBER - -
INTERNAL COATING NO NO
186 COPPER RECOVERY
187 GOLD AND ZINC RECOVERY
188 CYANIDE RECOVERY
211 SODIUM CYANIDE Only Tank
222 RAW WATER Tank and pump
241 AIR SERVICE Canopy Masuk COPPER PRECIPITATE
272 SODIUM CHLORIDE Tank dan coresheed
273 SULPHURIC ACID
274 SODIUM HYDROSULFIDE
MCC TRANSFORMER
PIPERACK
R PRECIPITATE

Concrete standards drawing - notes and holding down bolt


Concrete standards drawing - cast-in items details
Concrete standards drawing - Concrete sump arrangement & detailsd
Concrete standards drawing - Concrete slab details
Concrete standards drawing - Concrete pedestal details
Concrete standards drawing - Concrete footing details
Concrete standards drawing - Concrete details sheet 1 of 3
Concrete standards drawing - Concrete details sheet 2 of 3
Concrete standards drawing - Concrete details sheet 3 of 3
Concrete standards drawing - Concrete conduits and earthing details
Concrete standards drawing - ring beam drainage arrangement and details
Concrete standards drawing - oil trap sump arrangement and details
Concrete standards drawing - electrical kiosk footing arrangement and details
Concrete standards drawing - service pits arrangement and details
Concrete standards drawing - Concrete pedestals with shear keys details

Standard -steelwork structural steel work notes & baseplate details


Standard structual connections beam details
Standard structural connections floor and knee brace details
Standard structural connections angle wall bracing details
Standard structural connections chs wall bracing details
Standard structural connections uc wall bracing details
Standard structural connections monorail and crane beam details
Standard structural connections column and beam details
Standard structural connections portal frame details
Standard structural connections stub column details
Standard stairway - angle handrail arrangement and details
Standard stairway connection details
Standard handrailing - angle system detail sheet 1 0f 2
Standard handrailing - angle system detail sheet 2 0f 2
Standard ladder - side step details
Standard ladder - step through details
Standard ladder - access prevention plate and ladder details
Standard floor details
Standard lifting lug details
Standard conveyor stringers support type arrangement and details
Standard conveyor stringers details
Standard stringers module type arrangement and details
Standard stringers stringers skirt and guard support
Standard stringers stringers stair and walkway arrangement and details
Standard 15 m conveyor welded arrangement
Standard 20 m conveyor welded arrangement
Standard conveyor welded trusses details sheet 1 of 2
Standard conveyor welded trusses details sheet 2 of 2
Standard structural steel work member legend
Standard cladding details sheet 1 of 4
Standard cladding details sheet 2 of 4
Standard cladding details sheet 3 of 4
Standard cladding details sheet 4 of 4
Standard switch room steelwork - details
Standard circular and rectangular platforms arrangement and details
Standard circular and rectangular platforms section
Standard welded frames connection details
Standard switch room flooring steelwork - details
Standards 750 and 1200 belt width trestle elevations

Overall Site Layout

Cut and fill Coordinate ( lihat martabe)


Overall Structure Foundation Plan (lihat nama di morgan)
Overall Tank & pump Foundation Plan (lihat nama di morgan)

CONCRETE STANDARDS DRAWING - NOTES AND HOLDING DOWN BOLT


CONCRETE STANDARDS DRAWING - CAST-IN ITEMS DETAILS
CONCRETE STANDARDS DRAWING - CONCRETE SUMP ARRANGEMENT & DETAILSD
CONCRETE STANDARDS DRAWING - CONCRETE SLAB DETAILS
CONCRETE STANDARDS DRAWING - CONCRETE PEDESTAL DETAILS
CONCRETE STANDARDS DRAWING - CONCRETE FOOTING DETAILS
CONCRETE STANDARDS DRAWING - CONCRETE DETAILS SHEET 1 OF 3
CONCRETE STANDARDS DRAWING - CONCRETE DETAILS SHEET 2 OF 3
CONCRETE STANDARDS DRAWING - CONCRETE DETAILS SHEET 3 OF 3
CONCRETE STANDARDS DRAWING - CONCRETE CONDUITS AND EARTHING DETAILS
CONCRETE STANDARDS DRAWING - RING BEAM DRAINAGE ARRANGEMENT AND DETAILS
CONCRETE STANDARDS DRAWING - OIL TRAP SUMP ARRANGEMENT AND DETAILS
CONCRETE STANDARDS DRAWING - ELECTRICAL KIOSK FOOTING ARRANGEMENT AND DETAILS
CONCRETE STANDARDS DRAWING - SERVICE PITS ARRANGEMENT AND DETAILS
CONCRETE STANDARDS DRAWING - CONCRETE PEDESTALS WITH SHEAR KEYS DETAILS

STANDARD -STEELWORK STRUCTURAL STEEL WORK NOTES & BASEPLATE DETAILS


STANDARD STRUCTUAL CONNECTIONS BEAM DETAILS
STANDARD STRUCTURAL CONNECTIONS FLOOR AND KNEE BRACE DETAILS
STANDARD STRUCTURAL CONNECTIONS ANGLE WALL BRACING DETAILS
STANDARD STRUCTURAL CONNECTIONS CHS WALL BRACING DETAILS
STANDARD STRUCTURAL CONNECTIONS UC WALL BRACING DETAILS
STANDARD STRUCTURAL CONNECTIONS MONORAIL AND CRANE BEAM DETAILS
STANDARD STRUCTURAL CONNECTIONS COLUMN AND BEAM DETAILS
STANDARD STRUCTURAL CONNECTIONS PORTAL FRAME DETAILS
STANDARD STRUCTURAL CONNECTIONS STUB COLUMN DETAILS
STANDARD STAIRWAY - ANGLE HANDRAIL ARRANGEMENT AND DETAILS
STANDARD STAIRWAY CONNECTION DETAILS
STANDARD HANDRAILING - ANGLE SYSTEM DETAIL SHEET 1 0F 2
STANDARD HANDRAILING - ANGLE SYSTEM DETAIL SHEET 2 0F 2
STANDARD LADDER - SIDE STEP DETAILS
STANDARD LADDER - STEP THROUGH DETAILS
STANDARD LADDER - ACCESS PREVENTION PLATE AND LADDER DETAILS
STANDARD FLOOR DETAILS
STANDARD LIFTING LUG DETAILS
STANDARD CONVEYOR STRINGERS SUPPORT TYPE ARRANGEMENT AND DETAILS
STANDARD CONVEYOR STRINGERS DETAILS
STANDARD STRINGERS MODULE TYPE ARRANGEMENT AND DETAILS
STANDARD STRINGERS STRINGERS SKIRT AND GUARD SUPPORT
STANDARD STRINGERS STRINGERS STAIR AND WALKWAY ARRANGEMENT AND DETAILS
STANDARD 15 M CONVEYOR WELDED ARRANGEMENT
STANDARD 20 M CONVEYOR WELDED ARRANGEMENT
STANDARD CONVEYOR WELDED TRUSSES DETAILS SHEET 1 OF 2
STANDARD CONVEYOR WELDED TRUSSES DETAILS SHEET 2 OF 2
STANDARD STRUCTURAL STEEL WORK MEMBER LEGEND
STANDARD CLADDING DETAILS SHEET 1 OF 4
STANDARD CLADDING DETAILS SHEET 2 OF 4
STANDARD CLADDING DETAILS SHEET 3 OF 4
STANDARD CLADDING DETAILS SHEET 4 OF 4
STANDARD SWITCH ROOM STEELWORK - DETAILS
STANDARD CIRCULAR AND RECTANGULAR PLATFORMS ARRANGEMENT AND DETAILS
STANDARD CIRCULAR AND RECTANGULAR PLATFORMS SECTION
STANDARD WELDED FRAMES CONNECTION DETAILS
STANDARD SWITCH ROOM FLOORING STEELWORK - DETAILS
STANDARDS 750 AND 1200 BELT WIDTH TRESTLE ELEVATIONS

OVERALL SITE LAYOUT

CUT AND FILL COORDINATE ( LIHAT MARTABE)


OVERALL STRUCTURE FOUNDATION PLAN (LIHAT NAMA DI MORGAN)
OVERALL TANK & PUMP FOUNDATION PLAN (LIHAT NAMA DI MORGAN)
Foundation Plan

SODIUM HYDROSULFIDE TRANSFER FOUNDATION PLAN


PUMP
SODIUM HYDROSULFIDE FEED PUMP NO.1 FOUNDATION PLAN
SODIUM HYDROSULFIDE FEED PUMP NO.2 FOUNDATION PLAN
SODUM HYDROSULFIDE AREA SUMP PUMP FOUNDATION PLAN
SODIUM HYDROSULFIDE MIXING TANK FOUNDATION PLAN
SODIUM HYDROSULFIDE STORAGE TANK FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
Zinc Filtrate Tank - Foundation Plan
Zinc Filtrate Tank - Foundation Section, Elevation and
Details
SODIUM HYDROSULFIDE TRANSFER
PUMP FOUNDATION PLAN
SODIUM HYDROSULFIDE FEED PUMP NO.1 FOUNDATION P
SODIUM HYDROSULFIDE FEED PUMP NO.2 FOUNDATION P
SODUM HYDROSULFIDE AREA SUMP PUMP FOUNDATION P
SODIUM HYDROSULFIDE MIXING TANK FOUNDATION PLAN
SODIUM HYDROSULFIDE STORAGE TANK FOUNDATION PL
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN
- FOUNDATION PLAN

SODIUM HYDROSULFIDE TRANSFER


PUMP FOUNDATION
SODIUM PLAN
HYDROSULFIDE TRANSFER
PUMP FOUNDATION SECTION, ELEVATION AND DETAILS
SODIUM HYDROSULFIDE FEED PUMP NO.1 FOUNDATION PLAN
SODIUM HYDROSULFIDE FEED PUMP NO.1 FOUNDATION SECTION, ELEVATION AND DETAILS
SODIUM HYDROSULFIDE FEED PUMP NO.2 FOUNDATION PLAN
SODIUM HYDROSULFIDE FEED PUMP NO.2 FOUNDATION SECTION, ELEVATION AND DETAILS
SODUM HYDROSULFIDE AREA SUMP PUMP FOUNDATION PLAN
SODUM HYDROSULFIDE AREA SUMP PUMP FOUNDATION SECTION, ELEVATION AND DETAILS
SODIUM HYDROSULFIDE MIXING TANK FOUNDATION PLAN
SODIUM HYDROSULFIDE MIXING TANK FOUNDATION SECTION, ELEVATION AND DETAILS
SODIUM HYDROSULFIDE STORAGE TANK FOUNDATION PLAN
SODIUM HYDROSULFIDE STORAGE TANK FOUNDATION SECTION, ELEVATION AND DETAILS
- FOUNDATION PLAN
- FOUNDATION SECTION, ELEVATION AND DETAILS
- FOUNDATION PLAN
- FOUNDATION SECTION, ELEVATION AND DETAILS
- FOUNDATION PLAN
- FOUNDATION SECTION, ELEVATION AND DETAILS
- FOUNDATION PLAN
- FOUNDATION SECTION, ELEVATION AND DETAILS
- FOUNDATION PLAN
- FOUNDATION SECTION, ELEVATION AND DETAILS
- FOUNDATION PLAN
- FOUNDATION SECTION, ELEVATION AND DETAILS
- FOUNDATION PLAN
- FOUNDATION SECTION, ELEVATION AND DETAILS
Foundation Section, Elevation and Details
SODIUM HYDROSULFIDE TRANSFER
FOUNDATION SECTION, ELEVATION AND DETAILS PUMP FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS SODIUM HYDROSULFIDE FEED PUMP NO.1 FOUNDATION SECTION, EL
FOUNDATION SECTION, ELEVATION AND DETAILS SODIUM HYDROSULFIDE FEED PUMP NO.2 FOUNDATION SECTION, EL
FOUNDATION SECTION, ELEVATION AND DETAILS SODUM HYDROSULFIDE AREA SUMP PUMP FOUNDATION SECTION, EL
FOUNDATION SECTION, ELEVATION AND DETAILS SODIUM HYDROSULFIDE MIXING TANK FOUNDATION SECTION, ELEVA
FOUNDATION SECTION, ELEVATION AND DETAILS SODIUM HYDROSULFIDE STORAGE TANK FOUNDATION SECTION, ELEV
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS - FOUNDATION SECTION, ELEVATION AND DETAILS

UNDATION PLAN
UNDATION SECTION, ELEVATION AND DETAILS
UNDATION PLAN
UNDATION SECTION, ELEVATION AND DETAILS
UNDATION PLAN
UNDATION SECTION, ELEVATION AND DETAILS
ATION PLAN
ATION SECTION, ELEVATION AND DETAILS
DATION PLAN
DATION SECTION, ELEVATION AND DETAILS
AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS
FOUNDATION SECTION, ELEVATION AND DETAILS
UNDATION SECTION, ELEVATION AND DETAILS
OUNDATION SECTION, ELEVATION AND DETAILS