DOCUMENT TRANSMITALL SHEET PROJECT : 13.18.

08
PLTU SORONG (EX-TIMIKA) 4 x 7 MW DATE : 03 / 08 / 2021

REF. NO : 1808-T- RJ / PJ-102S

PT REKADAYA ELEKTRIKA

To : Mr. Sabran Ramli From : Mr. Aries Susanto


(Project Team Leader – Engineering Supervision) (Project Manager PLTU Sorong (Ex-Timika) 4x7 MW)
PT Prima Layanan Nasional Enjiniring (PLNE) Gedung 18 office Park, Lt 18-19
Menara Enjiniring, Jl. Ciputat Raya No. 123, Pd Pinang JL. T.B. Simatupang No. 18, Kebagusan, Pasar Minggu
Kebayoran Lama, Jakarta Selatan 12310 Jakarta Selatan 12520

Dear Sir,
We are pleased to submit the following drawings and documents.

Status
No Document / Drawing No. Rev. Qty Description / Title Remark
*1
1 1808-00-M-03-GKC-001 FA 0 1 Hydraulic Calculation of Potable Water Distribution
2 1808-00-M-03-LAC-001 FA 0 1 Hydraulic Calculation of Boiler Feed Water Pump
3 1808-00-M-03-LFJ-200 FI 0 1 Strength Calculation Water Tube Boiler 40 TPH
4 1808-00-M-03-PAR-001 FA 0 1 Hydraulic Calculation of Cooling Water Make Up Pump
5 1808-00-M-03-PCC-001 FA 0 1 Hydraulic Calculation of Closed Cooling Water Pump
6 1808-00-M-03-SA-003 FA 0 1 Calculation Sheet of VAC Sizing 20 kV Switchgear Room
7 1808-00-M-03-SA-007 FA 0 1 Calculation Sheet of VAC Sizing ESP & Fly Ash Control Building
Calculation Sheet of VAC Sizing Coal Handling & Weighing Bridge
8 1808-00-M-03-SA-008 FA 0 1
Building
9 1808-01-M-04-HA-008 FI 0 1 CALCULATION SHEET OF BOILER ECONOMIZER HEADER
10 1808-00-M-05-G-729 FI 0 1 Technical Specification Storage Tank
11 1808-00-M-05-GB-002 FI 0 1 Datasheet for Chlorination - Continuous Dosing Pump
12 1808-00-M-05-GB-003 FI 0 1 Datasheet for Chlorination - Shock Dosing Pump
13 1808-00-M-05-GB-004 FI 0 1 Datasheet for Chlorination - Hypochlorite Generator
14 1808-00-M-05-GB-005 FI 0 1 Datasheet for Chlorination - Degassing Storage Tank
15 1808-00-M-05-GB-006 FI 0 1 Datasheet for Chlorination - H2 Dilution Air Blower
16 1808-00-M-05-GB-007 FI 0 1 Datasheet for Chlorination - Acid Cleaning Pump
17 1808-00-M-05-GB-008 FI 0 1 Datasheet for Chlorination - Seawater Chlorination Supply Pump
18 1808-00-M-05-GBN-002 FI 0 1 Datasheet for Chemical Injection - Sodium Phosphate Pump
19 1808-00-M-05-GBN-003 FI 0 1 Datasheet for Chemical Injection - Hydrazine Pump
20 1808-00-M-05-GHC-001 FA 0 1 Mechanical Datasheet of Demineralized Water Pump
21 1808-00-M-05-HHE-001 FA 1 1 Datasheet of Hopper and Belt Feeder
22 1808-00-M-05-HHE-002 FA 1 1 Datasheet of Transfer Conveyor
23 1808-00-M-05-HHE-003 FA 1 1 Datasheet of Coal Crusher
24 1808-00-M-05-HHE-004 FA 1 1 Datasheet of Vibrating Screen
25 1808-00-M-05-HHE-005 FA 1 1 Datasheet of Magnetic Separator
26 1808-00-M-05-HHE-006 FA 1 1 Datasheet of Belt Scale
27 1808-00-M-05-HP-001 FA 0 1 Datasheet of Dust Collector
28 1808-00-M-05-LAC-001 FA 0 1 Mechanical Datasheet for Boiler Feed Water Pump
29 1808-00-M-05-LDH-001 FA 0 1 Datasheet of Deaerator
30 1808-00-M-05-PAC-001 FA 0 1 Mechanical Datasheet of Circulating Water Pump
31 1808-00-M-05-PG-001 FA 0 1 Mechanical Datasheet of Closed Cooling Water Pump
32 1808-00-M-05-PG-002 FA 0 1 Mechanical Datasheet of Cooling Water Make Up Pump
33 1808-00-M-05-SGA-001 FA 0 1 Mechanical Datasheet for Electric Fire Pump & Driver
34 1808-00-M-05-SGA-002 FA 0 1 Mechanical Datasheet for Diesel Fire Pump & Driver
35 1808-00-M-05-SGA-003 FA 0 1 Mechanical Datasheet for Jockey Pump & Driver
36 1808-00-M-07-SGA-001 FA 0 1 Drawing of Hydrant Layout
37 1808-00-M-07-SGC-001 FA 0 1 Arrangement Drawing of Deluge Spray Piping Steam Turbine
38 1808-00-M-07-SGE-008 FA 0 1 Arrangement Drawing of Foam Piping HSD Oil Tank
39 1808-00-M-08-GKC-001 FA 0 1 Piping Layout of Potable Water Distribution

1 of 3
DOCUMENT TRANSMITALL SHEET PROJECT : 13.18.08
PLTU SORONG (EX-TIMIKA) 4 x 7 MW DATE : 03 / 08 / 2021

REF. NO : 1808-T- RJ / PJ-102S

PT REKADAYA ELEKTRIKA

Status
No Document / Drawing No. Rev. Qty Description / Title Remark
*1
40 1808-00-M-08-QE-001 FA 0 1 Piping Layout of Service Air System
41 1808-00-M-08-QE-002 FA 0 1 Equipment Layout of Service Air System
42 1808-00-M-08-QF-001 FA 0 1 Equipment Layout of Instrument Air System
43 1808-00-M-08-SAC-003 FA 0 1 VAC Layout Drawing of 20 kV Switchgear Room
44 1808-00-M-08-SAC-007 FA 0 1 VAC Layout Drawing of ESP & Fly Ash Control Building
45 1808-00-M-08-SAC-008 FA 0 1 VAC Layout Drawing of Coal Handling & Weighing Bridge Building
46 1808-00-M-10-GKC-001 FA 0 1 P&ID of Potable Water System
ARRANGEMENT INSTALLATION OF CONTINUED BLOWDOWN
47 1808-01-M-07-QHE-200 FI 0 1
FLASH TANK
ARRANGEMENT INSTALLATION OF PERIODIC BLOWDOWN FLASH
48 1808-01-M-07-QHE-201 FI 0 1
TANK
49 1808-00-M-01-MAA-607 FI 1 1 QUALITY CONTROL PLAN TURBINE & CONDENSER
50 1808-00-M-01-MAA-637 FI 1 1 QUALITY CONTROL PLAN GEARBOX
51 1808-00-M-05-MAA-526 FI 0 1 START UP CURVES OF STEAM TURBINE
52 1808-00-M-05-MAA-527 FI 0 1 MAXIMUM PERMISSIBLE SUDDEN TEMPERATURE
53 1808-00-M-05-MAA-528 FI 0 1 PERMISSIBLE CHANGE OF LOAD
54 1808-00-M-05-MAA-529 FI 0 1 STEAM CONSUMPTION DIAGRAM
55 1808-00-M-05-MAG-514 FI 0 1 TUBE CLEANING SYSTEM
56 1808-00-M-05-MAK-516 FI 0 1 DATASHEET OF GEARBOX
57 1808-00-M-08-MAA-559 FI 0 1 DETAILS TO LAYOUT DRAWING
58 1808-00-M-10-MAA-542 FI 0 1 LEGEND FOR P&I DIAGRAM
PLANNING NOTES FOR STEAM BLOWING OF THE MAIN STEAM
59 1808-00-M-22-LBA-623 FI 0 1
LINES
60 1808-00-M-22-MAA-540 FI 0 1 CLEANLINESS OF STEAM PIPES
61 1808-00-M-22-MAA-622 FI 0 1 PLANNING NOTES FOR INSULATION OF THE STEAM LINES
62 1808-00-M-22-MAY-537 FI 0 1 PLANNING NOTES FOR LIMITING & PROTECTING DEVICES
63 1808-01-M-01-MAA-643 FI 1 1 GENERAL ARRANGEMENT DATA FOR BALANCING
64 1808-01-M-05-MAA-504 FI 0 1 DATASHEET OF STEAM TURBINE
65 1808-01-M-05-MAG-507 FI 0 1 DATASHEET OF CONDENSATE PUMP
66 1808-01-M-05-MAG-648 FI 0 1 ONLINE TUBE CLEANING DOCUMENTS
DATASHEET & GENERAL ARRRANGEMENT OF STEAM JET AIR
67 1808-01-M-05-MAJ-506 FI 0 1
EJECTOR
68 1808-01-M-05-MAV-508 FI 0 1 DATASHEET OF OIL TANK
69 1808-01-M-05-MAV-509 FI 0 1 DATASHEET OF OIL COOLER
70 1808-01-M-05-MAV-510 FI 0 1 DATASHEET OF MAIN OIL PUMP
71 1808-01-M-05-MAV-511 FI 0 1 DATASHEET OF AUX. OIL PUMP
72 1808-01-M-05-MAV-512 FI 0 1 DATASHEET OF EMERGENCY OIL PUMP
73 1808-01-M-05-MAV-523 FI 1 1 OIL PIPING LAYOUT
74 1808-01-M-08-LBA-524 FI 0 1 DRAIN PIPING LAYOUT
75 1808-01-M-08-LBA-525 FI 0 1 STEAM PIPING LAYOUT
76 1808-01-M-08-MAA-558 FI 0 1 LAYOUT DRAWING
77 1808-01-M-08-MAA-639 FI 0 1 GEARBOX OUTLINE DRAWING
78 1808-01-M-12-MAA-520 FI 0 1 LINE LIST AND FLUID LIST
79 1808-01-M-12-MAA-522 FI 1 1 ISOMETRICS DRAWING WITH PIPING AND FITTING LIST
80 1808-01-M-12-MAY-553 FI 0 1 LIST OF FEEDER (ELECTRICAL CONSUMER LIST)
81 1808-01-M-13-MAA-645 FI 0 1 EXHAUST SAFETY VALVE
82 1808-01-M-15-MAA-534 FI 0 1 NAME PLATE TURBINE
83 1808-01-M-22-MAA-535 FI 0 1 PLANNING NOTES FOR PIPING, VALVES, FOUNDATIONS
84 1808-01-M-22-MAA-536 FI 1 1 PLANNING NOTES FOR DRAINS

2 of 3
DOCUMENT TRANSMITALL SHEET PROJECT : 13.18.08
PLTU SORONG (EX-TIMIKA) 4 x 7 MW DATE : 03 / 08 / 2021

REF. NO : 1808-T- RJ / PJ-102S

PT REKADAYA ELEKTRIKA

Status
No Document / Drawing No. Rev. Qty Description / Title Remark
*1
85 1808-01-M-22-MAA-538 FI 1 1 PLANNING NOTES FOR GROUTING
86 1808-01-M-22-MAA-551 FI 0 1 TABLE OF TERMINATING CONNECTIONS
87 1808-01-M-22-MAV-539 FI 0 1 REQUIREMENT FOR TURBINE OILS
88 1808-01-M-22-MAV-541 FI 0 1 STEAM QUALITY REQUIREMENT
89 1808-01-P-03-MAA-513 FI 0 1 DATASHEET OF LUBE OIL FILTER
90 1808-01-P-03-MAA-519 FI 0 1 SAFETY ANALYSIS FUNCTION EVALUATION CHART (SAFE CHART)

Submission Status *1 Signature,


PT Rekadaya Elektrika
FI : For Information
a/n
FR : For Review
FA : For Approval
FC : For Construction

Aries Susanto
Project Manager
Receipt not required Signature :
Receipt required
Please acknowledge receipt on the duplicate and return Name :
Position :
Date :

3 of 3