DRAWING LIST
Project : REALOKASI TANGKI 18 KAP. 1500 KL DI TBBM BIMA
Job No. : P.09.18
Location : BIM Padang
Owner : PT. Pertamina MOR I
Update : 13 Maret 2019
Tanggal Pengesahan
No Index Ukuran Lbr Deskripsi Nomor Gambar Rev. Issued For Issued For
Awal Selesai Tahap 2
Approval Construction
A. PEKERJAAN SIPIL
1 10 A3 1 LAYOUT TANGKI 5000KL BARU PS0219-A-01-001 0
2 10 A3 1 DENAH TITIK STRAUSS PILE PS0219-A-02-001 0 14-Mar
3 10 A3 1 DENAH PLAT PONDASI TANGKI PS0219-A-03-001 0
4 10 A3 1 PONDASI TANGKI TAMPAK SAMPING PS0219-A-04-001 0 14-Mar
5 10 A3 3 LAYOUT DRYING BED DAN TPS B3 PS0219-A-05-001 0 14-Mar
6 10 A3 2 LAYOUT RENCANA GUDANG ARSIP BARU PS0219-A-06-001 0 14-Mar
7 10 A3 1 LAYOUT RENCANA BUNDWALL DAN PIPA BARU PS0219-A-07-001 0 14-Mar
8 10 A3 1 LAYOUT RENCANA BUNDWALL DAN PIPA BARU PS0219-A-08-001 0 14-Mar
9 10 A3 1 PARIT KELILING PONDASI TANGKI PS0219-A-09-001 0
10 10 A3 1 BUNDWALL KELILING TANGKI PS0219-A-10-001 0
11 10 A3 1 BUNDWALL PENAHAN TANAH DI SISI PAGAR PS0219-A-11-001 0
12 10 A3 1 DRAIN BOX UNTUK TANGKI BARU PS0219-A-12-001 0
13 10 A3 1 SALURAN BUANGAN MENUJU OIL CATCHER PS0219-A-13-001 0
14 10 A3 1 SUPPORT PIPA PRODUK PS0219-A-14-001 0
15 10 A3 1 SUPPORT PIPA PMK PS0219-A-15-001 0
16 10 A3 1 SUPPORT JALUR PIPA FOAM PS0219-A-16-001 0
17 10 A3 1 PROTEKSI PIPA UNTUK CROSSING JALAN PS0219-A-17-001 0
Tanggal Pengesahan
No Index Ukuran Lbr Deskripsi Nomor Gambar Rev. Issued For Issued For
Awal Selesai Tahap 2
Approval Construction
8 20 A3 1 ASSEMBLY STRUKTUR ATAP PS0219-B-08-001 0 -
9 20 A3 1 SINGLE PART STRUKTUR ATAP PS0219-B-09-001 0 -
10 20 A3 1 DETAIL MANHOLE & NOZZLE PS0219-B-10-001 0 - 19 Juli 2019
11 20 A3 1 NOZZLE & MANHOLE ORIENTATION PS0219-B-11-001 0 14 Juli 2019 R1. 18 Juli 2019
12 20 A3 1 DETAIL STAIRWAY & HANDRAIL PS0219-B-12-001 0 -
13 20 A3 1 DETAIL HANDRAIL ATAP & JALUR INSPEKSI ATAP PS0219-B-13-001 0 -
14 20 A3 1 PIPA STILLING WELL PS0219-B-14-001 0 -
15 20 A3 1 CENTER DRAIN SUMP PS0219-B-15-001 0 - 18 Juli 2019
16 20 A3 1 MEJA UKUR PS0219-B-16-001 0 -
C. PEKERJAAN PEMIPAAN
1 30 A3 1 PIPA WATER SPRINKLER KELILING TANGKI P0918-C-01-001 0
2 30 A3 1 LAYOUT JALUR PEMIPAAN INLET & OUTLET TANGKI P0918-C-02-001 0
3 30 A3 1 LAYOUT JALUR PEMIPAAN FIRE SYSTEM P0918-C-03-001 0
4 30 A3 1 LAYOUT JALUR PEMIPAAN FOAM TANGKI P0918-C-04-001 0
5 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN INLET & OUTLET TANGKI P0918-C-05-001 0
6 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN FIRE SYSTEM P0918-C-06-001 0
7 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN FOAM SYSTEM P0918-C-07-001 0
8 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN PRESSURE RELIEF P0918-C-08-001 0
9 30 A3 1 LAYOUT PONDASI PIPE SUPPORT P0918-C-09-001 0
10 30 A3 1 DETAIL PIPE SUPPORT P0918-C-10-001 0
D. PEKERJAAN PENGUJIAN
1 40 A3 1 WELDING & NDE MAP P0918-D-01-001 0
2 40 A3 1 GROUNDING PS-E1-EL-DN-002 0
DRAWINGS LIST Index Code
10 : Civil & Structure CN : Calculation
Proyek : PERBAIKAN TANGKI TIMBUN KAPASITAS 5000 KL PRODUK PREMIUM DI TBBM AMPENAN 20 : Tankage SP : Specification
Job No. : PS.02.19 30 : Piping A3 : Drawing ( A3 Size)
Lokasi : TBBM AMPENAN 40 : Mechanical A4 : Drawing ( A4 Size)
Owner : PT. Pertamina MOR V 50 : Electrical DS : Data Sheet
60 : Instrument
Update : 18 Juli 2019 70 : P & ID
Tanggal Pengesahan
No Index Ukuran Lbr Deskripsi Nomor Gambar Rev. Issued For Issued For
Awal Selesai Tahap 2
Approval Construction
DRAWING LIST Index Code
10 : Civil & Structure CN : Calculation
Proyek : Pembangunan Tangki Timbun Kapasitas 5000 KL Produk Premium di TBBM Ampenan 20 : Tankage SP : Specification
Job No. : PS.02.19 30 : Piping A3 : Drawing ( A3 Size)
40 : Mechanical A4 : Drawing ( A4 Size)
Lokasi : TBBM Ampenan 50 : Electrical DS : Data Sheet
Owner : PT Pertamina MOR V 60 : Instrument
Update : 70 : P & ID
Tanggal Pengesahan
No Index Ukuran Lbr Deskripsi Nomor Gambar Rev. Belum, Revisi,
Ready atau Issued For Issued For Approval Issued For Not Issued For
Proses Submitted Approval Construction
A. PEKERJAAN SIPIL
1 10 A3 1 GAMBAR SITUASI RENCANA PS0219-A-01-001 0.00 Ready READY APP CONS
2 10 A3 1 PERPANJANGAN BANGUNAN GUDANG ARSIP PS0219-A-02-001 0.00 Ready READY APP CONS
3 10 A3 1 DENAH TEMPORARY BUNDWALL & TAMPAK POTONGA A-A PS0219-A-03-001 0.00 Ready READY APP CONS
4 10 A3 1 DETAIL DRYING BED PS0219-A-04-001 0.00 Ready READY APP WITH CMMENT CONS
5 10 A3 1 DETAIL RUMAH LIMBAH B3 BARU PS0219-A-05-001 0.00 Ready READY APP CONS
6 10 A3 1 DETAIL GUDANG MATERIAL & ARSIP BARU PS0219-A-06-001 0.00 Ready READY WAITING (PPD) WAITING WAITING
7 10 A3 1 ISOMETRIK TEMPORARY PIPA HYDRANT & FOAM EXISTING PS0219-A-07-001 0.00 Ready READY APP CONS
8 10 A3 1 JALUR KABEL ATG BARU, CCTV DAN LAMPU PS0219-A-08-001 0.00 Ready READY APP CONS
9 10 A3 1 LAYOUT TANGKI 5000 KL BARU PS0219-A-09-001 0.00 Ready
10 10 A3 1 DENAH TITIK SPUN PILE PONDASI TANGKI PS0219-A-10-001 0.00 Revisi NOT READY
11 10 A3 1 DENAH PLAT PONDASI TANGKI PS0219-A-11-001 0.00 Revisi NOT READY
12 10 A3 1 PONDASI TANGKI TAMPAK SAMPING PS0219-A-12-001 0.00 Revisi NOT READY
13 10 A3 1 DENAH PENULANGAN PLAT PONDASI TANGKI PS0219-A-13-001 0.00 Belum
14 10 A3 1 DETAIL RING PONDASI TANGKI PS0219-A-14-001 0.00 Belum
15 10 A3 1 TANGGA AKSES RING PONDASI PS0219-A-15-001 0.00 Belum
16 10 A3 1 TANGGA NAIK TURUN TANGKI PS0219-A-16-001 0.00 Belum
17 10 A3 1 BAK DRAIN PS0219-A-17-001 0.00 Belum
18 10 A3 1 PARIT KELILING PONDASI TANGKI PS0219-A-18-001 0.00 Belum
19 10 A3 1 BUNDWALL KELILING TANGKI PS0219-A-19-001 0.00 Belum
20 10 A3 1 DRAIN BOX UNTUK TANGKI BARU PS0219-A-20-001 0.00 Belum
21 10 A3 1 SALURAN BUANGAN MENUJU OIL CATCHER PS0219-A-21-001 0.00 Belum
22 10 A3 1 PROTEKSI PIPA CROSSING JALAN PS0219-A-22-001 0.00 Belum
B. PEKERJAAN TANGKI
1 20 A3 1 GENERAL ARRANGEMENT OF TANK PS0219-B-01-001 0.00 Ready READY APP WTH CMMNT CONS
2 20 A3 1 SHELL ARRANGEMENT OF TANK PS0219-B-02-001 0.00 Ready READY APP CONS
3 20 A3 1 BOTTOM ARRANGEMENT OF TANK PS0219-B-03-001 0.00 Revisi READY APP CONS
4 20 A3 1 ROOF ARRANGEMENT OF TANK PS0219-B-04-001 0.00 Ready READY APP CONS
5 20 A3 1 URUTAN LAS PS0219-B-05-001 0.00 Dihapus Dihapus Dihapus Dihapus
6 20 A3 1 3D ISOMETRIK STRUKTUR ATAP PS0219-B-06-001 0.00 Ready WAITING WAITING WAITING
7 20 A3 1 STRUKTUR ATAP TAMPAK SAMPING PS0219-B-07-001 0.00 Ready WAITING WAITING WAITING
DRAWING LIST Index Code
10 : Civil & Structure CN : Calculation
Proyek : Pembangunan Tangki Timbun Kapasitas 5000 KL Produk Premium di TBBM Ampenan 20 : Tankage SP : Specification
Job No. : PS.02.19 30 : Piping A3 : Drawing ( A3 Size)
40 : Mechanical A4 : Drawing ( A4 Size)
Lokasi : TBBM Ampenan 50 : Electrical DS : Data Sheet
Owner : PT Pertamina MOR V 60 : Instrument
Update : 70 : P & ID
Tanggal Pengesahan
No Index Ukuran Lbr Deskripsi Nomor Gambar Rev. Belum, Revisi,
Ready atau Issued For Issued For Approval Issued For Not Issued For
Proses Submitted Approval Construction
8 20 A3 1 DETAIL STRUKTUR ATAP PS0219-B-08-001 0.00 Ready WAITING WAITING WAITING
9 20 A3 1 SINGLE PART STRUKTUR ATAP PS0219-B-09-001 0.00 Belum
10 20 A3 1 DETAIL MAINHOLE & NOZZLE PS0219-B-10-001 0.00 Ready WAITING WAITING WAITING
11 20 A3 1 DETAIL STAIRWAY & HANDRAIL PS0219-B-11-001 0.00 Proses
12 20 A3 1 DETAIL HANDRAIL ATAP & JALUR INSPEKSI ATAP PS0219-B-12-001 0.00 Proses
13 20 A3 1 PIPA STILLING WELL PS0219-B-13-001 0.00 Belum
14 20 A3 1 CENTRE DRAIN SUMP PS0219-B-14-001 0.00 Belum
15 20 A3 1 MEJA UKUR PS0219-B-15-001 0.00 Belum
C. PEKERJAAN PEMIPAAN
1 30 A3 1 PIPA WATER SPRINKLER KELILING TANGKI PS0219-C-01-001 0.00 Belum
2 30 A3 1 JALUR WATER SPRINKLER TANGKI PS0219-C-02-001 0.00 Belum
3 30 A3 1 LAYOUT JALUR PEMIPAAN INLET & OUTLET TANGKI PS0219-C-03-001 0.00 Belum
4 30 A3 1 DETAIL PIPA PRODUK INLET & OUTLET PS0219-C-04-001 0.00 Belum
5 30 A3 1 LAYOUT JALUR PEMIPAAN FIRE SYSTEM PS0219-C-05-001 0.00 Belum
6 30 A3 1 DETAIL PIPA PRODUK PMK PS0219-C-06-001 0.00 Belum
7 30 A3 1 LAYOUT JALUR PEMIPAAN FOAM TANGKI PS0219-C-07-001 0.00 Belum
8 30 A3 1 DETAIL PIPA PRODUK FOAM PS0219-C-08-001 0.00 Belum
9 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN INLET & OUTLET TANGKI PS0219-C-09-001 0.00 Belum
10 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN FIRE SYSTEM PS0219-C-10-001 0.00 Belum
11 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN FOAM SYSTEM PS0219-C-11-001 0.00 Belum
12 30 A3 1 TAMPAK ISOMETRIC JALUR PEMIPAAN PRESSURE RELIEF PS0219-C-12-001 0.00 Belum
13 30 A3 1 LAYOUT SUPPORT PONDASI PIPA PS0219-C-13-001 0.00 Belum
14 30 A3 1 DETAIL SUPPORT PONDASI PIPA PS0219-C-14-001 0.00 Belum
15 30 A3 1 SALURAN KELILING TANGKI BARU PS0219-C-15-001 0.00 Belum
C. PEKERJAAN PEMIPAAN
1 40 A3 1 WELDING & NDE MAP PS0219-D-01-001 0.00 Belum
2 40 A3 1 GROUNDING PS0219-D-02-001 0.00 Belum