You are on page 1of 8

PT. PERTAMINA HULU ROKAN PT.

EPSINDO JAYA PRATAMA

PENGADAAN 2 (DUA) UNIT POMPA INJEKSI HORIZONTAL PUMP


SYSTEM DI WIP ALUR BEMBAN FIELD RANTAU

PROJECT TITLE : PENGADAAN 2 (DUA) UNIT POMPA INJEKSI


HORIZONTAL PUMP SYSTEM
PROJECT LOCATION : WIP ALUR BEMBAN
DOCUMENT TITLE : MV SWITCHGEAR DATA SHEET
DOCUMENT NO. : PHR-Z1-OSF-RTU-21-NON AFE-EL-DTS-002

Attachment No.

Attachment No. of Pages

PT. EJP PT. PHR


REV DATE PURPOSE
ORIGIN CHECK APPR CHECK APPR DATE

A 29/06/2022 Issued for Review MTH SDR REI ARN/BS DN

B 08/07/2022 Issued for Approval MTH SDR REI ARN/BS DN

B 05/09/2022 Issued For Construction MTH SDR REI ARN/BS DN


Doc No. : PHR-Z1-OSF-RTU-21-NON
ELECTRICAL AFE-EL-DTS-002
Rev : B
Date : 08 / 07 / 2022
MV SWITCHGEAR DATA SHEET
Page : 2 of 8

TABULATION OF REVISION SHEET

REVISION REVISION
SHEET REMARKS SHEET REMARKS
A B

1/8 x x

2/8 x x

3/8 x x

4/8 x x

5/8 x x

6/8 x x

7/8 x x

8/8 x x

ATTACHMENT
Doc No. : PHR-Z1-OSF-RTU-21-NON
ELECTRICAL AFE-EL-DTS-002
Rev : B
Date : 08 / 07 / 2022
MV SWITCHGEAR DATA SHEET
Page : 3 of 8

REVISION SHEET DESCRIPTION

NO PAGE SUBJECT DESCRIPTION OF CHANGE REV


1 1-8 Format Laporan Revisi Format Laporan B
2 6-8 Data Sheet Revisi MV Switchgear Data Sheet B
Doc No. : PHR-Z1-OSF-RTU-21-NON
ELECTRICAL AFE-EL-DTS-002
Rev : B
Date : 08 / 07 / 2022
MV SWITCHGEAR DATA SHEET
Page : 4 of 8

COMMENTED RESPONSE SHEET

NO PAGE SUBJECT DESCRIPTION OF CHANGE REV

1 1-8 Format Laporan Revisi Format Laporan B


2 6-8 Data Sheet Revisi MV Switchgear Data Sheet B
Doc No. : PHR-Z1-OSF-RTU-21-NON
ELECTRICAL AFE-EL-DTS-002
Rev : B
Date : 08 / 07 / 2022
MV SWITCHGEAR DATA SHEET
Page : 5 of 8

TABLE OF CONTENT

COVER SHEET…........................................................................................................................ 1
TABULATION OF REVISION SHEET……………….................................................................... 2
RECORD OF REVISION…........................................................................................................... 3
COMMENT RESPONSE SHEET…………………………............................................................. 4
TABLE OF CONTENT….............................................................................................................. 5
MV SWITCHGEAR DATA SHEET……………............................................................................. 6
Doc No. : PHR-Z1-OSF-RTU-21-NON
ELECTRICAL AFE-EL-DTS-002
Rev : B
Date : 08 / 07 / 2022
MV SWITCHGEAR DATA SHEET
Page : 6 of 8

MV SWITCHGEAR DATA SHEET


Doc No. : PHR-Z1-OSF-RTU-21-NON
ELECTRICAL AFE-EL-DTS-002
Rev : B
Date : 08 / 07 / 2022
MV SWITCHGEAR DATA SHEET
Page : 7 of 8
Doc No. : PHR-Z1-OSF-RTU-21-NON
ELECTRICAL AFE-EL-DTS-002
Rev : B
Date : 08 / 07 / 2022
MV SWITCHGEAR DATA SHEET
Page : 8 of 8

You might also like