You are on page 1of 2

BLACK & VEATCH PT.

INDONESIA POWER REVIEW DOES NOT RELIEVE CONTRACTOR FROM


INFORMATION MGT REPORT PJ-DM-XMT-L7 TAMBAK LOROK CC POWER PLANT BLOCK 3 RESPONSIBILITY FOR ERRORS OR DEVIATIONS
B&V PROJECT 196541 FROM CONTRACT REQUIREMENTS.
ALL DATES SPECIFIED IN DD/MON/RR FORMAT
DRAWING MANIFEST
PACKET NUMBER: MM-00671 TRANSMITTAL NO.: TRANSMITTAL NO.0041
SPEC NUMBER: 66.1211.0
GEN SUBJ MATL: 66.1211 CLIENT REF:
DIST PURPOSE: RETURN B&V FILE NO: 66.1211.05
PROCESS DATE: 18/NOV/19 COMMENTS:

STATUS/
B&V MFR DWG NO/ MFR STATUS
DWG NO MFR NAME SHT REV MFR DRAWING TITLE DATE B&V DRAWING TITLE
------- ------------------------------ ----- --- ---------------------------------------- ---------- ------------------------
5-33007 J19058-GAD 3 PIPE SUPPORT DETAILS DRAWING NE
PT. KOKOH 18/NOV/19

HARDCOPY ELEC-
CONTRACTOR DISTRIBUTION FS HS TRONIC OTHER
-------------------------------- -- -- ------ ------------------------
ATTN:EFRI IPDA SIREGAR 0 0 1 ALL DWG - PROJECTCENTRAL
PT. KOKOH SEMESTA
JALAN KEBANTENAN RAY
NO. 2A, SEMPER TIMUR, CILINCING,
JAKARTA UTARA
ATTN:JACOB DJAJA 0 0 1 ALL DWG - PROJECTCENTRAL
PT. KOKOH SEMESTA
JALAN KEBANTENAN RAY
NO. 2A, SEMPER TIMUR, CILINCING,
JAKARTA UTARA

INTERNAL DISTRIBUTION
-------------------------------- -- -- ------ ------------------------
JAKGAPAN, NUAMDEE B&V 0 0 0 E-MENIFEST
KASIDIT, CHANSAWAT B&V 0 0 0 E-MENIFEST
PAKAKAEW, SURANAKAPAN B&V 0 0 0 E-MENIFEST
YASIN, KHANTHONG B&V 0 0 0 E-MENIFEST
YOOTTHANAI, PHASUK B&V 0 0 0 E-MENIFEST

PJ-DM-XMT-L7/ MM-00671
MANUFACTURERS DRAWING MANIFEST PAGE 1
BLACK & VEATCH PT. INDONESIA POWER REVIEW DOES NOT RELIEVE CONTRACTOR FROM
INFORMATION MGT REPORT PJ-DM-XMT-L7 TAMBAK LOROK CC POWER PLANT BLOCK 3 RESPONSIBILITY FOR ERRORS OR DEVIATIONS
B&V PROJECT 196541 FROM CONTRACT REQUIREMENTS.
ALL DATES SPECIFIED IN DD/MON/RR FORMAT

DESCRIPTION OF STATUS CODES


The following status codes are used to designate the
results of the Black & Veatch review of the documents
submitted by manufacturers.
RC - Returned for Correction
Indicates the document is deficient and
corrections shall be made before work is to
proceed. Revise and resubmit the document.
EN - Exceptions Noted
Indicates there are noted exceptions on the
document which must be revised by the
manufacturer. Work may proceed in accordance
with the comments. Revise and resubmit the
document.
NE - No Exceptions Noted
Indicates no specific objections to the
document. Work may proceed. Submit only
future revisions of the document.
RD - Received for Distribution
Acknowledges the document was received and
distributed without review. Submit any future
revisions of the document.
HO - Hold
Indicates an intentional interruption of the
review process for a particular document. The
final status of the document will be determined
at a later date.
SS - Superseded
Indicates a different document replaces a
previously submitted document. This status
DOES NOT pertain to revisions of the same
document. No action required.
VO - Void
Indicates a document is no longer applicable to
the project and IS NOT being replaced by another
document. No action required.
RR - Release for Record
Indicates no specific objections to the document.
Work may proceed. Certain required Project information
has been added electronically to the drawing and
provided to the supplier for record. Resubmittal is
not required by the supplier. Submit only future
revisions of the document. Engineers project specific
information to be added if future revisions and
submittals are made.
PJ-DM-XMT-L7/ MM-00671
MANUFACTURERS DRAWING MANIFEST PAGE 2

You might also like