Material inspection for Secondary Steel support As per attached IRW: Structural
Delivery note.
Attached Checklists
16 HBK Site Engineer: HBK SITE1 11 Jul 2021 10:56 AM 17 HBK QA/QC Engineer: HBK SITE1 11 Jul 2021 10:56 AM
SC-C06-CAG-HBK-CAL-ST-00180_Rev_4.pdf MAS-ST-00773_Plate_S275_ArcelorMittal.pdf
Rev.2
1. (L1) Attach Approved Shop Drawing
confirming the acceptability of L115*85*5
- Attached Drawing C06-HBK-S-STA-T-ST-
AL-AZ-5808
2. Final acceptance shall be as per
approved installation to its final location
as per approved shop drawings of MEP
support Layout.
3. This IRM covers only Delivery Note DN-
20-0113 and 0122
Total delivered materials in this IRM
8nos - C60*50*4 LSSC/LSCC ==>section
profile confirmed
45nos - C50*50*3 LSSD ==>section
profile confirmed
40nos - C70*80*4 LSSA ==>section
profile confirmed
316nos.- L115*85*5 ==> (L1 - No
Approved SD)
=========================
=========================
===
Rev.1
1. Provide the approved shop drawings
.Element L angle not included in the
drawing details. (Contractor Response:
Attached)
2. Attached delivery notes are without
stamp/signature of dispatcher and
receiver. Mismatch in material grade
noted in delivery note and material
summary (Contractor Response:
Attached)
3. Unique identification and QR code
including channels for mounting MEP
services not provided Close NCR-ST-
00407. (Contractor Response: QR code is
not required for secondary support plate
bended sheet as subject related to
material supply only)