You are on page 1of 4

1-Ras Abu Aboud Stadium-

SC-C06-CAG-HBK-IRM-ST-00868
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-00868

Author HBK QAQC - 1 Assigned To Ahmad Nadeem

Author's Email raahbkbim2@gmail.com Assigned Email raahbkbim1@gmail.com

Author's Company HBK Contracting Co. W.L.L. Assigned Company HBK Contracting Co. W.L.L.

Author's Phone # <not set> Assignee Phone # <not set>

Responsible Louis Berger Resp. Company


Company Phone #

Date Created 23 Mar 2020 6:02 PM Scheduled For 13 Jul 2021 9:57 AM

Name IRW Status New

Description Types
Material inspection for Secondary Steel support As per attached IRW: Structural
Delivery note.

Locations Location Detail


Stadium Steel Yard

Attached Checklists

Custom Properties on ID SC-C06-CAG-HBK-IRM-ST-00868


01 Revision 3
02 Reference Drawing/s
03 Priority High
04 Method of Statement ref:
05 Inspection Test Plan (ITP) ref: SC-C06-CAG-HBK-ITP-ST-00112
06 Inspection Test Plan Item/s 1.5
07 Inspection Activity as described in the ITP
08 Checklist Ref:
09 Material Submittal Ref. SC-C06-CAG-HBK-MAS-ST-00772/773/00542
10 Material Storage Location
11 Delivery/Packing List As Attached
12 Manufacturer Test Certificate
12 Originator Company
13 *
13 IRM Approval References
14 * We confirm that the work to be inspected has been coordinated with all related sub-
contractor and direct contractor
15 Originator Company HBKSF
20 Status Level
22 IRW Comment Category
23 Status Level L3 No Objection
24 CSC Inspector Ramil
25 Resubmitted for Closure

Report run on 05 Sep 2021 8:09 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 1 of 4


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-00868
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-00868

Signatures for ID SC-C06-CAG-HBK-IRM-ST-00868

16 HBK Site Engineer: HBK SITE1 11 Jul 2021 10:56 AM 17 HBK QA/QC Engineer: HBK SITE1 11 Jul 2021 10:56 AM

18 Project Director/ QAQC Manager: Amol Rajhans 12 Jul 202119


3:43
CSCPM
Inspector/Sr. Engineer: Structural - CSC2 RAA 13 Jul 20

20 CSC Sr. Engineer: Aristofanis Chalyvopoulos 14 Jul 2021 4:10


21 CSC
PM Lead Engineer/Director: Bhikesh Rajyagor 15 Jul 2021 1

Report run on 05 Sep 2021 8:09 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 2 of 4


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-00868
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-00868

C06-HBK-S-STA-T-ST-AL-AZ-5808.pdf SC-C06-CAG-HBK-MAS-ST-00542.pdf DN..pdf (1 / 7)

DN..pdf (2 / 7) DN..pdf (3 / 7) DN..pdf (4 / 7)

DN..pdf (5 / 7) DN..pdf (6 / 7) DN..pdf (7 / 7)

2021-05-18 09:02:30 2021-05-18 09:02:29 C06-HBK-S-STA-T-ST-AL-AZ-5809.pdf

SC-C06-CAG-HBK-CAL-ST-00180_Rev_4.pdf MAS-ST-00773_Plate_S275_ArcelorMittal.pdf

Issues for ID SC-C06-CAG-HBK-IRM-ST-00868

Report run on 05 Sep 2021 8:09 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 3 of 4


1-Ras Abu Aboud Stadium-
SC-C06-CAG-HBK-IRM-ST-00868
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-ST-00868

Issue ID Description Type Status Company Date Due Date


Created
003089 Rev.3 IRM Open Louis Berger 06 Jun 2020 null
1. Final acceptance shall be as per Comment
approved installation to its final location
as per approved shop drawings of MEP
support Layout.
3. This IRM covers only Delivery Note DN-
20-0113 and 0122
Total delivered materials in this IRM
8nos - C60*50*4 LSSC/LSCC
45nos - C50*50*3 LSSD
40nos - C70*80*4 LSSA
316nos.- L115*85*5
=========

Rev.2
1. (L1) Attach Approved Shop Drawing
confirming the acceptability of L115*85*5
- Attached Drawing C06-HBK-S-STA-T-ST-
AL-AZ-5808
2. Final acceptance shall be as per
approved installation to its final location
as per approved shop drawings of MEP
support Layout.
3. This IRM covers only Delivery Note DN-
20-0113 and 0122
Total delivered materials in this IRM
8nos - C60*50*4 LSSC/LSCC ==>section
profile confirmed
45nos - C50*50*3 LSSD ==>section
profile confirmed
40nos - C70*80*4 LSSA ==>section
profile confirmed
316nos.- L115*85*5 ==> (L1 - No
Approved SD)
=========================
=========================
===

Rev.1
1. Provide the approved shop drawings
.Element L angle not included in the
drawing details. (Contractor Response:
Attached)  
2. Attached delivery notes are without
stamp/signature of dispatcher and
receiver.    Mismatch in material grade
noted in delivery note and material
summary (Contractor Response:
Attached)  
3. Unique identification and QR code
including channels for mounting MEP
services not provided Close NCR-ST-
00407. (Contractor Response: QR code is
not required for secondary support plate
bended sheet as subject related to
material supply only)

Report run on 05 Sep 2021 8:09 AM by HBK SITE1 (raahbkbim8@gmail.com) Page 4 of 4