You are on page 1of 9

Ras Abu Aboud Stadium-

Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

Author Dastgeer - Garcia Assigned To Bhikesh Rajyagor

Author's Email raahbkbim2@gmail.com Assigned Email csc6.raa@gmail.com

Author's Company HBK Contracting Co. W.L.L. Assigned Company Louis Berger

Author's Phone # <not set> Assignee Phone # <not set>

Responsible Louis Berger Resp. Company


Company Phone #

Date Created 19 Aug 2020 8:07 PM Scheduled For 22 Aug 2020 9:10 AM

Name IRM Status New

Description Types
Material Receiving Inspection of Balustrade MTW. As per Attached IRM: Architectural/Interior
Delivery Not/Dossier Reference No. ET-QD-HBK-20-44

Locations Location Detail


Stadium Steel Yard

Attached Checklists

Custom Properties on ID SC-C06-CAG-HBK-IRM-AR-01623


01 Revision 0
03 Priority High
04 Method of Statement ref: SC-C06-CAG-HBK-MST-AR-00162
05 Inspection Test Plan (ITP) ref: SC-C06-CAG-HBK-ITP-AR-00097
06 Inspection Test Plan Item/s 1.5
09 Material Submittal Ref. SC-C06-CAG-HBK-MAS-AR-00578/00575
11 Delivery/Packing List As Attached
13 * We confirm that the work to be inspected has been coordinated with all related sub-
contractor and direct contractor
20 Status Level L3 No Objection

Signatures for ID SC-C06-CAG-HBK-IRM-AR-01623

14 HBK Site Engineer: Dastgeer - Garcia 19 Aug 2020 8:09 PM15 HBK QA/QC Engineer: Dastgeer - Garcia 19 Aug 2020 8:09 P

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 1 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

16 Project Director- Rohit Kakroo: Dastgeer - Garcia 19 Aug 2020


17 CSC
8:09
Inspector/Sr.
PM Engineer: CSC3 Architectural RAA 24 Aug

18 CSC Sr. Engineer: Kumar Seri Kiran 24 Aug 2020 11:31 AM19 CSC Lead Engineer/Director:

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 2 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

2020-08-24 00:53:00 2020-08-24 00:52:59 2020-08-24 00:52:58

2020-08-24 00:52:57 2020-08-24 00:52:54 2020-08-24 00:52:52

2020-08-24 00:52:49 2020-08-24 00:52:48 2020-08-24 00:52:47

2020-08-24 00:52:46 2020-08-24 00:52:44 2020-08-24 00:52:41

SC-C06-CAG-HBK-MAS-AR-
MRR_Form_DN-CG-20-91___19.08.2020.pdf ET-QD-HBK-20-44.pdf (1 / 51)
00578_Rev_0_Reply_1.pdf

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 3 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

ET-QD-HBK-20-44.pdf (2 / 51) ET-QD-HBK-20-44.pdf (3 / 51) ET-QD-HBK-20-44.pdf (4 / 51)

ET-QD-HBK-20-44.pdf (5 / 51) ET-QD-HBK-20-44.pdf (6 / 51) ET-QD-HBK-20-44.pdf (7 / 51)

ET-QD-HBK-20-44.pdf (8 / 51) ET-QD-HBK-20-44.pdf (9 / 51) ET-QD-HBK-20-44.pdf (10 / 51)

ET-QD-HBK-20-44.pdf (11 / 51) ET-QD-HBK-20-44.pdf (12 / 51) ET-QD-HBK-20-44.pdf (13 / 51)

ET-QD-HBK-20-44.pdf (14 / 51) ET-QD-HBK-20-44.pdf (15 / 51) ET-QD-HBK-20-44.pdf (16 / 51)

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 4 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

ET-QD-HBK-20-44.pdf (17 / 51) ET-QD-HBK-20-44.pdf (18 / 51) ET-QD-HBK-20-44.pdf (19 / 51)

ET-QD-HBK-20-44.pdf (20 / 51) ET-QD-HBK-20-44.pdf (21 / 51) ET-QD-HBK-20-44.pdf (22 / 51)

ET-QD-HBK-20-44.pdf (23 / 51) ET-QD-HBK-20-44.pdf (24 / 51) ET-QD-HBK-20-44.pdf (25 / 51)

ET-QD-HBK-20-44.pdf (26 / 51) ET-QD-HBK-20-44.pdf (27 / 51) ET-QD-HBK-20-44.pdf (28 / 51)

ET-QD-HBK-20-44.pdf (29 / 51) ET-QD-HBK-20-44.pdf (30 / 51) ET-QD-HBK-20-44.pdf (31 / 51)

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 5 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

ET-QD-HBK-20-44.pdf (32 / 51) ET-QD-HBK-20-44.pdf (33 / 51) ET-QD-HBK-20-44.pdf (34 / 51)

ET-QD-HBK-20-44.pdf (35 / 51) ET-QD-HBK-20-44.pdf (36 / 51) ET-QD-HBK-20-44.pdf (37 / 51)

ET-QD-HBK-20-44.pdf (38 / 51) ET-QD-HBK-20-44.pdf (39 / 51) ET-QD-HBK-20-44.pdf (40 / 51)

ET-QD-HBK-20-44.pdf (41 / 51) ET-QD-HBK-20-44.pdf (42 / 51) ET-QD-HBK-20-44.pdf (43 / 51)

ET-QD-HBK-20-44.pdf (44 / 51) ET-QD-HBK-20-44.pdf (45 / 51) ET-QD-HBK-20-44.pdf (46 / 51)

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 6 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

ET-QD-HBK-20-44.pdf (47 / 51) ET-QD-HBK-20-44.pdf (48 / 51) ET-QD-HBK-20-44.pdf (49 / 51)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST-
ET-QD-HBK-20-44.pdf (50 / 51) ET-QD-HBK-20-44.pdf (51 / 51)
00055_Rev_2.pdf (1 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (2 / 26) 00055_Rev_2.pdf (3 / 26) 00055_Rev_2.pdf (4 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (5 / 26) 00055_Rev_2.pdf (6 / 26) 00055_Rev_2.pdf (7 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (8 / 26) 00055_Rev_2.pdf (9 / 26) 00055_Rev_2.pdf (10 / 26)

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 7 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (11 / 26) 00055_Rev_2.pdf (12 / 26) 00055_Rev_2.pdf (13 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (14 / 26) 00055_Rev_2.pdf (15 / 26) 00055_Rev_2.pdf (16 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (17 / 26) 00055_Rev_2.pdf (18 / 26) 00055_Rev_2.pdf (19 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (20 / 26) 00055_Rev_2.pdf (21 / 26) 00055_Rev_2.pdf (22 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (23 / 26) 00055_Rev_2.pdf (24 / 26) 00055_Rev_2.pdf (25 / 26)

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 8 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01623

Approved_WPS_SC-C06-CAG-HBK-PRC-ST-
00055_Rev_2.pdf (26 / 26)

Issues for ID SC-C06-CAG-HBK-IRM-AR-01623


Issue ID Description Type Status Company Date Due Date
Created
006258 Approved and Accepted External Open Louis Berger 24 Aug 2020 null
Snaglist

Report run on 24 Aug 2020 9:57 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 9 of 9