MB No.COM/ITBP/SO's Mess/PD/
Measurement Book
P-(i)
Issued to : Assistant Engineer, Project Division, SPSD-II, CPWD, on
When this book change hands, the transfer expressed in similar terms, should be
recorded under the dated initial of both the relieving and Relieved Officer, below the last
entry of measurement made by the Relived Officer
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
P - ( ii )
Review Note
I - By superior Officer of Department
Date Pages recording Value of Result of the Dated initial and
measurments Measurment check designation of the
subjected to test subjected to test exercised checking officer
check check
P - ( iii )
Certified that the Measurement book contains (pages)
Measurement Book
02/CE/SE/EE/PD-II/2019-20
Central PWD code Para 37, Central P.W.A Code Para 208 to 211 and 220 to 223)
NOTE
Officer and subordinate using this book are expected to keep themselves fully
conversant with the above and the other subsidiary rules, as correct up to the date
of measurement
No.:
P - ( iv )
II - By Divisional Accountant
Dated initial of
Pages Calculation Selected by Defect
Divisional Divisional
Reviewed Divisional Officer for recheck discrepancies etc
Accountant Officer
generally noticed
Pages Dated Initial
P-(v)
RECORD ENTRY OF MEASUREMENT
Name of Work construction of 45 Nos. SO'S suites (ASI Accommodation ) for 33rd bn, ITBP at
Karchia Sonapur (Assam) including water supply , saniitary installation & internal
Agreement No. 04/CE/EE/PD/2020-21
electrical installation
Name of Agency M/S KHATRI ENTERPRISES
Date of Start(Stp) 8/10/2020
Date of Completion (Stp) 8/9/2021
Time allowed 365 DAYS
Date of Measurement 5/12/2023
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Name of Work construction of 45 Nos. SO'S suites (ASI Accommodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam)
including water supply , saniitary installation & internal electrical installation
Steel reinforcement for R.C.C work including straightening , cutting , bending placing in position
Agreement No. 3.4
and binding all complete above plinth level
3.4.1 Thermo-Mechanically Treated bars of Grade Fe-500D or more
Reinforcement of 1st floor slab Beam Re-inforcement
Long Direction
FB-02 (C8-C9-C10-C11-C12 ) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 18.70 = --- --- --- 56.10 --- ---
Bottom Main Bar 16 mm 1 x 3 x 18.70 = --- --- --- 56.10 --- ---
Top Lap 16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Bottom Lap 16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Stirrup
10 mm 1 x 70 x 1.42 = --- 99.40 --- --- --- ---
8 mm 1 x 52 x 1.38 = 71.76 --- --- --- --- ---
FB-03 (C13-C14 ) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 3.30 = --- --- --- 6.60 --- ---
Bottom Main Bar 16 mm 1 x 2 x 3.30 = --- --- --- 6.60 --- ---
Stirrup
10 mm 1 x 8 x 1.42 = --- 11.36 --- --- --- ---
8 mm 1 x 5 x 1.38 = 6.90 --- --- --- --- ---
FB-04 (C8-C9 ) (230 X 500) (Lift Bam)
Top Main Bar 12 mm 1 x 2 x 3.70 = --- --- 7.40 --- --- ---
Bottom Main Bar 12 mm 1 x 2 x 3.70 = --- --- 7.40 --- --- ---
Stirrup 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
FB-05 (C8-C9 ) (230 X 500) (Lift Bam)
Top Main Bar 12 mm 1 x 2 x 3.70 = --- --- 7.40 --- --- ---
Bottom Main Bar 12 mm 1 x 2 x 3.70 = --- --- 7.40 --- --- ---
Stirrup 8 mm 1 x 19 x 1.38 = 26.22 --- --- --- --- ---
FB-07 (FB 22- FB 29) (230 X 500)
Top Main Bar 12 mm 1 x 2 x 4.27 = --- --- 8.54 --- --- ---
Bottom Main Bar 12 mm 1 x 2 x 4.27 = --- --- 8.54 --- --- ---
Extra Bar bottom mid spam 12 mm 1 x 1 x 2.28 = --- --- 2.28 --- --- ---
Stirrup
10 mm 1 x 14 x 1.42 = --- 19.88 --- --- --- ---
8 mm 1 x 7 x 1.38 = 9.66 --- --- --- --- ---
FB-08 (FB 27- FB 28) (230 X 500)
Top Main Bar 12 mm 1 x 2 x 3.70 = --- --- 7.40 --- --- ---
Bottom Main Bar 12 mm 1 x 2 x 3.70 = --- --- 7.40 --- --- ---
Extra Bar bottom mid spam 12 mm 1 x 1 x 1.85 = --- --- 1.85 --- --- ---
Stirrup
10 mm 1 x 16 x 1.42 = --- 22.72 --- --- --- ---
8 mm 1 x 5 x 1.38 = 6.90 --- --- --- --- ---
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam
20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C10
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam
20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C11
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C12
New Vertical Re-inforcement
Bar embedded in Beam 20 mm 1 x 8 x 1.46 = --- --- --- --- 11.68 ---
C13
New Vertical Re-inforcement
Bar embedded in Beam 20 mm 1 x 8 x 1.46 = --- --- --- --- 11.68 ---
C14
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C21
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C22
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C23
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C24
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C25
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C26
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C33
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.70 = --- --- --- --- --- 13.60
C34 1.71
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C35
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C36
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C37
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C45
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C46
New Vertical Re-inforcement
Bar embedded in Beam 25 mm 1 x 8 x 1.71 = --- --- --- --- --- 13.68
C47
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C48
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C49
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
C50
New Vertical Re-inforcement 25 mm 1 x 4 x 1.71 = --- --- --- --- --- 6.84
Bar embedded in Beam 20 mm 1 x 4 x 1.46 = --- --- --- --- 5.84 ---
TOTAL = 0.00 0.00 0.00 0.00 116.80 218.80
Provisional Weight considered for Measurements 0.395 0.616 0.888 1.579 2.467 3.850
Weight in Kg 0.00 0.00 0.00 0.00 288.15 842.38
Total (in Kg) 1130.53
C/O TCMB / P -
Qty C/O from 3rd R.A Bill CMB No852 page no-38 = 69.22 Cum
Qty C/O from 3rd R.A Bill CMB No852 page no-39 = 1.52 Cum
Qty C/O from 3rd R.A Bill CMB No852 page no- 60 = 64.09 Cum
In R.M.C Concrete
Quantity Of cement as per Design Mix = 360.00 kg
Quantity Of cement as per Item = 330.00 kg
Additional Cement used in 1cum of concrete = 30.00 kg
Total Quantity of cement in excess = 134.83 X 30.00 = 4044.90 kg
Total Quantity in Quintal(B) = 40.45 Quintal
Name of Work construction of 45 Nos. SO'S suites (ASI Accommodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam)
including water supply , saniitary installation & internal electrical installation
Steel reinforcement for R.C.C work including straightening , cutting , bending placing in position
Agreement No. 3.4
and binding all complete above plinth level
3.4.1 Thermo-Mechanically Treated bars of Grade Fe-500D or more
Reinforcement of Column S.O.S Side 2nd Floor upto 3.3 m ht
C1
Vertical Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stirrups 10 mm 1 x 24 x 1.78 = --- 42.72 --- --- --- ---
10 mm 1 x 24 x 0.72 = --- 17.28 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C2
Vertical Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stirrups 10 mm 1 x 24 x 1.78 = --- 42.72 --- --- --- ---
10 mm 1 x 24 x 0.72 = --- 17.28 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C3
Vertical Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Stirrups 10 mm 1 x 23 x 1.58 = --- 36.34 --- --- --- ---
10 mm 1 x 23 x 0.62 = --- 14.26 --- --- --- ---
Link
10 mm 1 x 23 x 0.47 = --- 10.81 --- --- --- ---
C4
Vertical Bar 25 mm 1 x 3 x 1.15 = --- --- --- --- --- 3.45
25 mm 1 x 3 x 1.30 = --- --- --- --- --- 3.90
20 mm 1 x 3 x 2.15 = --- --- --- --- 6.45 ---
20 mm 1 x 3 x 2.00 = --- --- --- --- 6.00 ---
20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C5
Vertical Bar 25 mm 1 x 1 x 1.50 = --- --- --- --- --- 1.50
25 mm 1 x 1 x 1.60 = --- --- --- --- --- 1.60
25 mm 1 x 1 x 1.12 = --- --- --- --- --- 1.12
25 mm 1 x 1 x 1.10 = --- --- --- --- --- 1.10
20 mm 1 x 1 x 1.80 = --- --- --- --- 1.80 ---
20 mm 1 x 1 x 1.70 = --- --- --- --- 1.70 ---
20 mm 1 x 1 x 2.18 = --- --- --- --- 2.18 ---
20 mm 1 x 1 x 2.20 = --- --- --- --- 2.20 ---
20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Total In(Kg) Kg Kg Kg Kg Kg Kg kg
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam)
1 Name of work :
including water supply, sanitary installation & internal electrical installation.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas
1.2 (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal
of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Earth Work in excavation by mechanical means ( Hydraulic exavator) / manual means in foundation
1.3 trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including getting out the excavated
soil and disposal of surplus excavated soil as directed within a lead of 50m
1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from natural sources : 10 graded stone aggregate 40
2.1.2
mm nominal size derived from natural sources )
Agrt. Qnty - 142.97 Cum
Qty. B/F CMB No
COM/ITBP/PD-II/690 vide 54 86.86
Page No. cum
Total 86.86 cum 5524.40 5524.40 cum : 479849.38
3.2 Centering and shuttering including strutting, propping etc. and removal of form for
3.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Agrt. Qnty - 413.00 Sqm
Qty. B/F CMB No
COM/ITBP/PD-II/690 vide 55 386.26
Page No. sqm
Total 386.26 sqm 234.05 234.05 Sqm : 90404.15
3.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Agrt. Qnty - 367.24 Sqm
Qty. B/F CMB No
COM/ITBP/PD-II/690 vide 55 35.96 sqm
Page No.
Qty B/F TCMB 2 57.96 sqm
Total 93.92 sqm 500.05 500.05 Sqm : 46964.70
3.2.3 suspended floor s, roof ,landings balconies and access platform
Agrt. Qnty - 2273.75 Sqm
Qty. B/F CMB No
COM/ITBP/PD-II/690 vide 55 583.67 sqm
Page No.
Qty B/F TCMB 17 284.40 sqm
Total 868.07 sqm 546.55 546.55 Sqm : 474443.66
3.2.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Agrt. Qnty - 2964.90 Sqm
Qty. B/F CMB No
COM/ITBP/PD-II/690 vide 55 919.70 sqm
Page No.
4.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in :
Total : 12233885.50
Contractor enhancement. @3.65% (below) : -446536.82
Gross value upto work done 11787348.68
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of
E/S-1 unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
:
In Cement Mortar :
Qty. B/F CMB No
COM/ITBP/PD-II/690 vide 10.18 cum
Page No.
Total 10.18 cum 1698.45 1273.84 cum : 12967.67
E/S-2 Add for using extra cement in the items of design mix over and above the specified cement content therein
RECOVERIES:
1 Security Deposit @ 2.5% on "Gross value " : 51731.00
Already recovered in pervious bill :
Now to be recovered : 51731.00
Certify that:-
1. The work has been done as per CPWD specification and agreement
2. No Govt. T&P has been issued to the contractor
3. No Labour complaint has been received so far.
4. Water has been arranged by the contractor at his own source.
5. Contractor has engaged technical staff.
6. F.N.Labour report has been submitted by the contractor
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
4th R.A. Bill
RECOVERIES:
1 Security Deposit @ 2.5% on "Gross value " : 51731.00
Already recovered in pervious bill :
Now to be recovered : 51731.00
Rs.134,500.00
2 Income Tax @2% on 2,069,234.63 : 41385.00
Executive Engineer
Project Division
CPWD, guwahati-15
Based On DSR 2021 Item No 5.35
EIS-II Add for using extra cement in the items of design mix over and above the specified
cement content therein
Code Description Unit Quantity Rate Amount
MATERIAL:
TOTAL 734.38
7.34
Add for water charge @ 1 %
741.72
Total
845.94
Total
126.89
Add for contractor’s profit and over-heads @ 15%
972.83
Total
Cost of 1 Quintal 972.83
Say 972.85
PROFORMA FOR SUBMISSION OF BILL
Assistant Engineer
SPSD-II, Project Division
CPWD, (Assam)
4th R/A Bill C.P.W.A.-26 (Revised)
RUNNING ACCOUNT BILL
(Referred to in Paragraph 10-2-10 and 10-2-12)
(Final Payment must invariably the made on forms Printed on Yellow paper which should not be used for intermediate payment)
(For Contractor : This form provides for (1) advance payment (2) Payment for Measured Works. The form of Account Secured Advance which
has been printed separately should be attached, where necessary).
1. The work has been done as per CPWD specification as per direction of Engineer in charge
4. Water and electricity has been arranged by the contractor at his own source.
N.B.-- When there are two or more entries in column 6 relating to each Sub-head of estimate they should in case of work the
accounts of which are kept by sub-heads be totalled and the recorded in column 7 for posting the work abstract.
II. Certificate & Signature
1. The measurement on which are based the entires in column 1 to 6 of account I were verified by Kapil Teli, JE, SPSD-II on
____________ and are recorded at Computer Measurement Book No.
2. Certified that in addition to and quite a part from the quantities of work actually executed as shown in column 4 of the account I
some work has actually been done in connection with several items and the value of such work after deducting there from
proportionate amount of required advance if any ultimately recoverable on account of the materials used therein) is in no case less
than the advance payment as per item 2 of the memorandum if payments made or proposed to be made for the convenience of the
contractor in anticipation of and subject to the result of detailed measurements which will be made as such as possible.
*This figure should be tested to see that it agree with the total of item 7 & 8.
If the net amount be paid is less than Rs.10 and it cannot be included in cheque the payment should be made in cash this entry being
alteered suitable and the alteration attested by dated initials.
Remarks
This space is reserved for any remarks which the Disbursing Officer of the Divisional Officer may wish to recorded in respect
of the execution of the work check of measurements or the state of contractor's amount.
Checked
2.1.2 1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from natural sources : 10
graded stone aggregate 40 mm nominal size derived from natural sources )
E/S-2 Add for using extra cement in the items of design mix over and above the
specified cement content therein
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
Theoritical Consumption of Cement Statement
1 Name of Work: Construction of 45 Nos. SO's suites (ASI Accomodation )
for 33rd bn, ITBP at Karchia Sonapur (Assam) including
water supply, sanitary installation & internal electrical
installation.
3.6.1 All works upto plinth level. 263.19 Cum 4.076 (Qtl/cum) 1,072.76 Qntal
3.6.2 All works above plinth level upto floor V level 267.51
23.42 Cum 4.076 (Qtl/cum) 95.46 Qntal
4.12
Quantity Excuted By R.M.C
69.22
1.52 Cum 4.076 (Qtl/cum) 6.20 Qntal
9.82 Cum 4.076 (Qtl/cum) 40.03 Qntal
64.09
Quantity Excuted By R.M.C
3.74
6.11 Cum 4.076 (Qtl/cum) 24.90 Qntal
77.49 Quantity Excuted By R.M.C
4.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) 48.03 cum 0.625 (Qtl/cum) 30.02 Qntal
10.1 12 mm Cement Plaster of Mix :
10.1.1 1:4 (1 Cement : 4 coarse sand) 262.00 sqm 0.055 (Qtl/Sqm) 14.33 Qntal
1,429.15
Variation (+2%) 28.58 Qtl
1,457.73 Qtl
2,915.00 Bags
Variation (-2%) 28.58 Qtl
2,886.42 Bags
Qty brought at site = 2895.00 Bags
Actual Consumption = 2865.00 Bags
Balance = 30.00 Bags
Curing on Progress.
28 Days Test Report
3.6.2 All works upto plinth level. 91.58 9098.00 6823.50 Cum Awaited
GRAND TOTAL 3534.97 22835.97 7002.49 23042.20 4203.42 6241.07 66860.12 Kgs
TOTAL (In M.T) 3.53 22.84 7.00 23.04 4.20 6.24 66.86 M.T
Brought at site (In M.T) 3.62 23.07 8.28 23.98 9.47 9.56 77.98 M.T
0.00
Say 0.00
* Total amount outstanding as per this account © Rs. 0.00
Deduct :- amount outstanding as per entry (C) of Annexure to previous bil Rs. 0.00
Net Amount since Previous bill (in words) 0.00
(-) (E) Rs. 0.00
* Entries relating to each description of materials should be posted thus in column 3 first enter the difference between quantities in column 1 and 2 then show below this entry, the
quantities of any brought to site against which a f
** Entries in column 8 show the money values of the total quantities outstanding as per column 3.
*** Certified (1) that the plus quantities of materials shown in the column 3 of the account have actually been brought by the Contractor at site of the work and the Contractor has not
previously received any advance on these quantities.
(2) that these materials are of an imperishable nature and all required by the contractor for use on the work in connection with the items for which rates for finished work have been
agreed upon .
(3) that a formal agreement in form 31 signed and executed by the Contractor in accordance with the pragraphs 10.2.24 (a) of the CPWD Account Code is recorded in the Divisional
Office
(4) The quality of materilas is as per the specifications.
Dated Signature of Officer preparing the bill (Rank) Dated Signature of Officer authorising payment (Rank)
Assistant Engineer(Civil) Executive Engineer
Sonapur Project Sub Division-II Project Division-II
CPWD, Guwahati-15 CPWD, Guwahati-15.
*** These Certificate must be signed by the Sub-Divisional or Divisional Officer.
# This signature is necessary only when officer who prepares the bill is not the Officeer who authorises the payment.
In such case the two signatures are essential.
RECOVERY STATEMENT
1) Name of work Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia
Sonapur (Assam) including water supply, sanitary installation & internal electrical
installation.
Assistant Engineer
Sonapur Project Sub-Division -II
CPWD, Guwahati-15
0 5/1/2023 TO 5/15/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn,
2. Name of work : ITBP at Karchia Sonapur (Assam) including water supply, sanitary
installation & internal electrical installation.
TOTAL : ₹ 129,300.00
Signature of Contractor
Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 5/16/2023 TO 5/31/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn,
2. Name of work : ITBP at Karchia Sonapur (Assam) including water supply, sanitary
installation & internal electrical installation.
TOTAL : ₹ 139,700.00
Signature of Contractor
Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 6/1/2023 TO 6/15/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn,
2. Name of work : ITBP at Karchia Sonapur (Assam) including water supply, sanitary
installation & internal electrical installation.
TOTAL : ₹ 190,500.00
Signature of Contractor
Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 6/16/2023 TO 6/26/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn,
2. Name of work : ITBP at Karchia Sonapur (Assam) including water supply, sanitary
installation & internal electrical installation.
TOTAL : ₹ 128,400.00
Signature of Contractor
Date :
TEST CHECK STATEMENT
1 Name of Work :- Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at
Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.
Ref. of Amount of
SL Amount of AE Test
No.
Description of Items MB & Quantity EE Test Remarks
page Check
Check
57.18
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
MANDATORY TEST
4th R.A Bill
1 Name of Work: Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia
Sonapur (Assam) including water supply, sanitary installation & internal electrical
installation.
Date of
7 09.08.2021
Completion(Stp.):
8 Time Allowed: 365 Days
Remarks/
Frequency as per No. of tests No of tests
Sl. No. Description of item Qty Upto date Qty Reasons for
specification required. actually done
shortfall, if any.
5 nos Report
Awaited ( Work
suspended
1 Water Test 20 Months 3 Months 7 Nos 7 Nos 8 Nos 14/7/21-7/3/22
17/3/22-5/10/22
12/10/22-
14/3/23)
2 Steel Test
8mm dia 3.62 tonne 25 tonnes 1 No. 1 No. 4 No. Satisfactory
10mm dia 23.07 tonne 35 tonnes 2 No. 2 No. 5 No. Satisfactory
12 mm dia 8.28 tonne 35 tonnes 2 No. 2 No. 4 No. Satisfactory
16mm dia 23.98 tonne 35 tonnes 2 No. 2 No. 5 No. Satisfactory
20mm dia 9.47 tonne 35 tonnes 2 No. 2 No. 4 No. Satisfactory
25mm dia 9.56 tonne 45 tonnes 1 Nos. 1 Nos. 3 No. Satisfactory
1Nos test Report
3 Cement Test 2895.00 Bags 1000 Bags 3 Nos. 3 Nos. 6 Nos. Awaited
1Nos lab test
4 Cube Test of RCC M-25 530.70 Cum 50 Cum 11 Nos. 11 Nos. 27 Nos. Report Awaited
1Nos test Report
5 Slump Test M-25 530.70 Cum 50 Cum 11 Nos. 9 Nos. 44 Nos. Awaited
8 Brick test 24000.00 Nos. 50000 Nos. 1 Nos. 1 Nos. 1 Nos. Satisfactory
6 Coarse Sand
i) Bulking Test 312.46 Cum 20 Cum 16 Nos. 16 Nos. 17 Nos. Satisfactory
ii) Silt Content Test. 312.46 Cum 20 Cum 16 Nos. 16 Nos. 17 Nos. Satisfactory
iii) Particle Size Distribution. 312.46 Cum 40 Cum 8 Nos. 8 Nos. 8 Nos. Satisfactory
7 Stone Aggregate
(i) 40 mm stone aggregate 56.46 Cum
(a) Particle Size Distribution 56.46 Cum 40 cum 2 Nos. 2 Nos. 3 Nos. Satisfactory
(b) Deleterious Material 56.46 Cum 40 cum 2 Nos. 2 Nos, 3 Nos. Satisfactory
(ii) 20 mm stone aggregate 281.22 Cum
(a) Particle Size Distribution 281.22 Cum 40 cum 8 Nos. 8 Nos. 8 Nos. Satisfactory
(b) Deleterious Material 281.22 Cum 40 cum 8 Nos. 8 Nos, 8 Nos. Satisfactory
(iii) 10 mm stone aggregate 122.95 Cum
(a) Particle Size Distribution 122.95 Cum 40 cum 4 Nos. 4 Nos. 6 Nos. Satisfactory
(b) Deleterious Material 122.95 Cum 40 cum 4 Nos. 4 Nos, 6 Nos. Satisfactory
09.08.2021
7 Date of Completion(Stp.):
450.00 21614.00
56.46 351.17 162.26 21614.00 0.00
Assistant Engineer
Sl. N. Description of item Qty Unit Co. off (In Qtl) Cement Reqd.
= 407.60 kg
= 330.00 kg
= 77.60 kg
= ### kg
= qntl