MB No.COM/ITBP/SO's Mess/PD/
Measurement Book
P-(i)
Issued to : Assistant Engineer, Project Division, SPSD-II, CPWD, on
Issued to Shri Parameswar Das, Assistant Engineer , Sonapur Project Sub Division-II on
When this book change hands, the transfer expressed in similar terms, should be
recorded under the dated initial of both the relieving and Relieved Officer, below the last
entry of measurement made by the Relived Officer
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
P - ( ii )
Review Note
I - By superior Officer of Department
Date Pages recording Value of Result of the Dated initial and
measurments Measurment check designation of the
subjected to test subjected to test exercised checking officer
check check
P - ( iii )
Certified that the Measurement book contains 1 to (pages)
Measurement Book
02/CE/SE/EE/PD-II/2019-20
Central PWD code Para 37, Central P.W.A Code Para 208 to 211 and 220 to 223)
NOTE
Officer and subordinate using this book are expected to keep themselves fully
conversant with the above and the other subsidiary rules, as correct up to the date
of measurement
No.:
P - ( iv )
II - By Divisional Accountant
Dated initial of
Pages Calculation Selected by Defect
Divisional Divisional
Reviewed Divisional Officer for recheck discrepancies etc
Accountant Officer
generally noticed
Pages Dated Initial
P-(v)
RECORD ENTRY OF MEASUREMENT
Name of Work Construction of SO'S Mess (G+1), GO'S Mess (G+1), Bin Type Megazine and 10 bedded Hospital Including
internal Watervsupply, sanitary installation , IEI, Fans , services connection compound light, fire alarm &AC at
33rd Bn ITBP, Karachia Sonapur, Guwahati (Assam)
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all
Item No. - 4.5
complete above plinth level.
Item No. 4.5.1 Thermo-Mechanically Treated bars of Gradee Fe-500D or more
Reinforcement of 1st Flight Stairs Hospital
8MM 10MM 12MM 16MM 20MM 25MM
Main Bottom Bar 12 mm 1 x 9 x 4.27 = --- --- 38.43 --- --- ---
Lap 12 mm 1 x 9 x 0.60 = --- --- 5.40 --- --- ---
Suspended Slab Side 12 mm 1 x 8 x 0.60 = --- --- 4.80 --- --- ---
Landing Slab Side 12 mm 1 x 9 x 1.04 = --- --- 9.36 --- --- ---
Lap 12 mm 1 x 4 x 0.60 = --- --- 2.40 --- --- ---
Binder Bottom 12 mm 1 x 21 x 1.14 = --- --- 23.94 --- --- ---
Suspended Slab Side 12 mm 1 x 7 x 1.14 = --- --- 7.98 --- --- ---
Binder
Landing Slab Side Binder 12 mm 1 x 3 x 1.14 = --- --- 3.42 --- --- ---
Landing Slab
Bottom Bar 12 mm 1 x 6 x 2.40 = --- --- 14.40 --- --- ---
Long Top Main Bar 12 mm 1 x 6 x 2.40 = --- --- 14.40 --- --- ---
Landing Slab to Staircase 12 mm 1 x 9 x 2.38 = --- --- 21.42 --- --- ---
Landing Slab to Top Main 12 mm 1 x 8 x 1.65 = --- --- 13.20 --- --- ---
Bar
Landing Beam
Top Main Bar 20 mm 1 x 3 x 3.68 = --- --- --- --- 11.04 ---
Bottom Main Bar 20 mm 1 x 3 x 3.68 = --- --- --- --- 11.04 ---
Stirrups
mm 1 x 27 x = --- --- --- --- ---
8 1.10 29.70
measured by M/S Khatri Enterprises Checked by A.E Pag No- 1 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Date of Measurement: 4/7/2023
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth
Item No. - 4.5
level.
Item No. 4.5.1 Thermo-Mechanically Treated bars of Gradee Fe-500D or more
Reinforcement of Roof Slab Beam TMT .
Bottom Main Bar 12 mm 1 x 3 x 9.58 = --- --- 28.74 --- --- ---
Face Bar 8 mm 2 x 2 x 9.00 = 36.00 --- --- --- --- ---
Stirrups B1 (C1-C2) 8 mm 1 x 29 x 1.46 = 42.34 --- --- --- --- ---
Stirrups B2 (C2-C3) 8 mm 1 x 39 x 1.46 = 56.94 --- --- --- --- ---
B3-B4 (C4-C5-C6) (230X600) --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 8.28 = --- --- 24.84 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 8.28 = --- --- 24.84 --- --- ---
Face Bar 8 mm 2 x 2 x 7.70 = 30.80 --- --- --- --- ---
Stirrups B3 (C4-C5) 8 mm 1 x 28 x 1.46 = 40.88 --- --- --- --- ---
Stirrups B4 (C5-C6) 8 mm 1 x 32 x 1.46 = 46.72 --- --- --- --- ---
B5 (C7-C8) (230X600) --- --- --- --- ---
Top Main Bar 16 mm 1 x 2 x 7.83 = --- --- --- 15.66 --- ---
Top Extra Bar at C7 16 mm 1 x 1 x 2.14 = --- --- --- 2.14 --- ---
Top Extra Bar 2nd Layer at C7 16 mm 1 x 2 x 2.14 = --- --- --- 4.28 --- ---
Top Extra Bar at C8
16 mm 1 x 1 x 2.14 = --- --- --- 2.14 --- ---
Top Extra Bar 2nd Layer at C8 16 mm 1 x 2 x 2.14 = --- --- --- 4.28 --- ---
Bottom Main Bar
16 mm 1 x 3 x 7.83 = --- --- --- 23.49 --- ---
Bottom Extra Bar 12 mm 1 x 2 x 4.15 = --- --- 8.30 --- --- ---
Face Bar 8 mm 2 x 2 x 6.85 = 27.40 --- --- --- --- ---
Stirrups B5 (C7-C8)
8 mm 1 x 45 x 1.46 = 65.70 --- --- --- --- ---
Top Extra Bar at C13 16 mm 1 x 1 x 2.80 = --- --- --- 2.80 --- ---
Top Extra Bar 2nd Layer at
C13 16 mm 1 x 2 x 2.80 = --- --- --- 5.60 --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 2 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Top Extra Bar 2nd Layer at
C14 16 mm 1 x 2 x 1.79 = --- --- --- 3.58 --- ---
Bottom Main Bar 16 mm 1 x 2 x 11.76 = --- --- --- 23.52 --- ---
Bottom Extra Bar at B9
16 mm 1 x 1 x 3.37 = --- --- --- 3.37 --- ---
Face Bar
8 mm 2 x 2 x 10.78 = 43.12 --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 3.27 = --- --- 9.81 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 3.27 = --- --- 9.81 --- --- ---
Stirrups B12
8 mm 1 x 12 x 1.16 = 13.92 --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 3 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Face Bar (C22-C23-C24) 8 mm 2 x 2 x 13.28 = 53.12 --- --- --- --- ---
Lapping 8 mm 2 x 2 x 0.40 = 1.60 --- --- --- --- ---
Stirrups B13 (C16-C17) 8 mm 1 x 31 x 1.46 = 45.26 --- --- --- --- ---
Stirrups B14 (C17-C18) 8 mm 1 x 22 x 1.46 = 32.12 --- --- --- --- ---
Stirrups B15 (C18-C19) 8 mm 1 x 29 x 1.46 = 42.34 --- --- --- --- ---
Stirrups B16 (C19-C20) 10 mm 1 x 20 x 1.46 = --- 29.20 --- --- --- ---
Stirrups B17 (C20-C21)
10 mm 1 x 64 x 1.46 = --- 93.44 --- --- --- ---
B21 (B69-B73) (C12-C13) (230X600) --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 6.19 = --- --- 18.57 --- --- ---
Bottom Main Bar
16 mm 1 x 2 x 6.19 = --- --- --- 12.38 --- ---
Bottom Extra Bar 16 mm 1 x 1 x 3.35 = --- --- --- 3.35 --- ---
Face Bar 8 mm 2 x 2 x 5.39 = 21.56 --- --- --- --- ---
Stirrups B21
8 mm 1 x 38 x 1.46 = 55.48 --- --- --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 4.42 = --- --- --- 8.84 --- ---
Stirrups B23
8 mm 1 x 27 x 1.16 = 31.32 --- --- --- --- ---
B24-B25-B26-B27-B28-B29-B30-B31-B32-B33-B34(C25-C26-C27-C28-C29-C30-C31-C32-C33-C34-C35) (230X600)
measured by M/S Khatri Enterprises Checked by A.E Pag No- 4 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Face Bar 8 mm 2 x 2 x 30.00 = 120.00 --- --- --- --- ---
8 mm 2 x 2 x 23.88 = 95.52 --- --- --- --- ---
Face Bar Lap 8 mm 2 x 5 x 0.40 = 4.00 --- --- --- --- ---
Stirrups B24 8 mm 1 x 40 x 1.46 = 58.40 --- --- --- --- ---
Stirrups B25 8 mm 1 x 40 x 1.46 = 58.40 --- --- --- --- ---
Stirrups B26 8 mm 1 x 48 x 1.46 = 70.08 --- --- --- --- ---
Stirrups B27 8 mm 1 x 23 x 1.46 = 33.58 --- --- --- --- ---
Stirrups B28 8 mm 1 x 30 x 1.46 = 43.80 --- --- --- --- ---
Stirrups B29 8 mm 1 x 20 x 1.46 = 29.20 --- --- --- --- ---
Stirrups B30 8 mm 1 x 44 x 1.46 = 64.24 --- --- --- --- ---
Stirrups B31 8 mm 1 x 43 x 1.46 = 62.78 --- --- --- --- ---
Stirrups B32 8 mm 1 x 47 x 1.46 = 68.62 --- --- --- --- ---
Stirrups B33
8 mm 1 x 36 x 1.46 = 52.56 --- --- --- --- ---
Spacer Pin B32 20 mm 1 x 10 x 0.23 = --- --- --- --- 2.30 ---
Spacer Pin B33 20 mm 1 x 3 x 0.23 = --- --- --- --- 0.69 ---
Short Direction Beam
B124-B125-B126-B127 (C57-C46-C35-C24-C11) (230X600
Top Main Bar 16 mm 1 x 2 x 21.20 = --- --- --- 42.40 --- ---
Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Main Bar 16 mm 1 x 2 x 21.20 = --- --- --- 42.40 --- ---
Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Top Extra Bar at C57 16 mm 1 x 1 x 2.10 = --- --- --- 2.10 --- ---
Top Extra Bar at C46 16 mm 1 x 1 x 2.76 = --- --- --- 2.76 --- ---
Top Extra Bar at C46 12 mm 1 x 2 x 2.76 = --- --- 5.52 --- --- ---
Top Extra Bar at C35 16 mm 1 x 1 x 2.88 = --- --- --- 2.88 --- ---
Top Extra Bar at C24 16 mm 1 x 1 x 2.98 = --- --- --- 2.98 --- ---
Top Extra Bar at C24 12 mm 1 x 2 x 2.98 = --- --- 5.96 --- --- ---
Top Extra Bar at C11 16 mm 1 x 1 x 2.05 = --- --- --- 2.05 --- ---
Bottom Extra Bar at B46 16 mm 1 x 1 x 2.78 = --- --- --- 2.78 --- ---
Bottom Extra Bar at C24 16 mm 1 x 1 x 2.98 = --- --- --- 2.98 --- ---
Face Bar 8 mm 2 x 2 x 20.40 = 81.60 --- --- --- --- ---
Lap 8 mm 2 x 4 x 0.40 = 3.20 --- --- --- --- ---
Stirrups B124 8 mm 1 x 32 x 1.46 = 46.72 --- --- --- --- ---
Stirrups B125 10 mm 1 x 32 x 1.46 = --- 46.72 --- --- --- ---
Stirrups B126 8 mm 1 x 32 x 1.46 = 46.72 --- --- --- --- ---
Stirrups B127 8 mm 1 x 31 x 1.46 = 45.26 --- --- --- --- ---
Spacer Pin 20 mm 1 x 8 x 0.16 = --- --- --- --- 1.28 ---
B123 (230X600)
Top Main Bar 12 mm 1 x 3 x 6.17 = --- --- 18.51 --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 6.17 = --- --- --- 12.34 --- ---
Bottom Extra Mid Spam Bar 16 mm 1 x 1 x 3.24 = --- --- --- 3.24 --- ---
Face Bar 8 mm 2 x 2 x 5.27 = 21.08 --- --- --- --- ---
Stirrups B123 8 mm 1 x 40 x 1.46 = 58.40 --- --- --- --- ---
B122 (230X600)
Top Main Bar 12 mm 1 x 3 x 6.15 = --- --- 18.45 --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 6.15 = --- --- --- 12.30 --- ---
Face Bar 8 mm 2 x 2 x 5.35 = 21.40 --- --- --- --- ---
Stirrups B123 8 mm 1 x 38 x 1.46 = 55.48 --- --- --- --- ---
B121 (230X600) --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 6.13 = --- --- 18.39 --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 6.13 = --- --- --- 12.26 --- ---
Bottom Extra Bar 16 mm 1 x 1 x 3.35 = --- --- --- 3.35 --- ---
Face Bar
8 mm 2 x 2 x 5.32 = 21.28 --- --- --- --- ---
Stirrups B123 8 mm 1 x 37 x 1.46 = 54.02 --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 5 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B118-B119-B120 (B45-C34-C23-C10) (230X600
Top Main Bar 16 mm 1 x 2 x 16.25 = --- --- --- 32.50 --- ---
Bottom Main Bar 16 mm 1 x 2 x 16.25 = --- --- --- 32.50 --- ---
Top Extra Bar at C34 16 mm 1 x 1 x 2.73 = --- --- --- 2.73 --- ---
Top Extra Bar at C34 12 mm 1 x 2 x 2.73 = --- --- 5.46 --- --- ---
Top Extra Bar at C23 16 mm 1 x 1 x 2.87 = --- --- --- 2.87 --- ---
Top Extra Bar at C23 12 mm 1 x 3 x 2.87 = --- --- 8.61 --- --- ---
Top Extra Bar at C10
16 mm 1 x 1 x 2.13 = --- --- --- 2.13 --- ---
Top Extra Bar at C10 12 mm 1 x 2 x 2.13 = --- --- 4.26 --- --- ---
Bottom Extra Bar at C34
16 mm 1 x 1 x 2.73 = --- --- --- 2.73 --- ---
Bottom Extra Bar at C23 16 mm 1 x 1 x 7.40 = --- --- --- 7.40 --- ---
Face Bar 8 mm 2 x 2 x 15.25 = 61.00 --- --- --- --- ---
Stirrups B118 8 mm 1 x 32 x 1.46 = 46.72 --- --- --- --- ---
Stirrups B119 8 mm 1 x 35 x 1.46 = 51.10 --- --- --- --- ---
Stirrups B120 8 mm 1 x 37 x 1.46 = 54.02 --- --- --- --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Face Bar Lap 8 mm 2 x 2 x 0.40 = 1.60 --- --- --- --- ---
Spacer Pin 20 mm 1 x 8 x 0.16 = --- --- --- --- 1.28 ---
B117 (C56-C45) (230X600)
Top Main Bar 16 mm 1 x 2 x 6.30 = --- --- --- 12.60 --- ---
Bottom Main Bar 16 mm 1 x 3 x 6.30 = --- --- --- 18.90 --- ---
Top Extra Bar at C56 16 mm 1 x 1 x 2.22 = --- --- --- 2.22 --- ---
Top Extra Bar 2nd Layer at 16 mm 1 x 3 x 2.22 = --- --- --- 6.66 --- ---
C56
Top Extra Bar at C45 16 mm 1 x 1 x 2.22 = --- --- --- 2.22 --- ---
Top Extra Bar 2nd Layer at 16 mm 1 x 2 x 2.22 = --- --- --- 4.44 --- ---
C45
Face Bar 8 mm 2 x 2 x 5.40 = 21.60 --- --- --- --- ---
Stirrups B117 8 mm 1 x 30 x 1.46 = 43.80 --- --- --- --- ---
Spacer Pin 20 mm 1 x 6 x 0.16 = --- --- --- --- 0.96 ---
B114-B115-B116 (B44-B32-B19-C9) (230X600)
Top Main Bar 20 mm 1 x 2 x 16.10 = --- --- --- --- 32.20 ---
Top Extra Bar at C9 20 mm 1 x 1 x 1.83 = --- --- --- --- 1.83 ---
Top Extra Bar 2nd Layer at C9 12 mm 1 x 3 x 1.83 = --- --- 5.48 --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 16.10 = --- --- --- 32.20 --- ---
Bottom Extra Bar at Mid Spam 16 mm 1 x 1 x 3.20 = --- --- --- 3.20 --- ---
B115
Bottom Extra Bar at Mid Spam 16 mm 1 x 1 x 4.65 = --- --- --- 4.65 --- ---
B116
12 mm 1 x 2 x 4.55 = --- --- 9.10 --- --- ---
Face Bar 8 mm 2 x 2 x 15.10 = 60.40 --- --- --- --- ---
Top Lap
20 mm 1 x 2 x 1.00 = --- --- --- --- 2.00 ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Face Bar Lap 8 mm 2 x 2 x 0.40 = 1.60 --- --- --- --- ---
Spacer Pin 20 mm 1 x 9 x 0.16 = --- --- --- --- 1.44 ---
Stirrups B114 8 mm 1 x 30 x 1.46 = 43.80 --- --- --- --- ---
Stirrups B115 8 mm 1 x 33 x 1.46 = 48.18 --- --- --- --- ---
Stirrups B116 8 mm 1 x 35 x 1.46 = 51.10 --- --- --- --- ---
B113 (B63-B44) (230X600)
Top Main Bar 12 mm 1 x 3 x 6.25 = --- --- 18.75 --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 6.25 = --- --- --- 12.50 --- ---
Bottom Extra Mid Spam Bar
16 mm 1 x 1 x 3.30 = --- --- --- 3.30 --- ---
Stirrups
8 mm 1 x 39 x 1.46 = 56.94 --- --- --- --- ---
Top Extra Bar at C33 16 mm 1 x 2 x 1.95 = --- --- --- 3.90 --- ---
Top Extra Bar at C22 20 mm 1 x 1 x 1.65 = --- --- --- --- 1.65 ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 6 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Top Extra Bar at C22 16 mm 1 x 2 x 1.65 = --- --- --- 3.30 --- ---
Bottom Main Bar 20 mm 1 x 2 x 6.00 = --- --- --- --- 12.00 ---
Bottom Extra Bar at C33 20 mm 1 x 1 x 1.95 = --- --- --- --- 1.95 ---
Bottom Extra Bar at C22
20 mm 1 x 1 x 1.95 = --- --- --- --- 1.95 ---
Top Extra Bar at C54 16 mm 1 x 2 x 2.29 = --- --- --- 4.58 --- ---
Top Extra Bar at C43 16 mm 1 x 2 x 3.30 = --- --- --- 6.60 --- ---
Top Extra Bar at C43 20 mm 1 x 1 x 3.30 = --- --- --- --- 3.30 ---
Face Bar 8 mm 2 x 2 x 9.80 = 39.20 --- --- --- --- ---
Lap 8 mm 1 x 3 x 0.40 = 1.20 --- --- --- --- ---
Spacer Pin 8 mm 1 x 8 x 0.16 = 1.28 --- --- --- --- ---
Stirrups B106 8 mm 1 x 37 x 1.46 = 54.02 --- --- --- --- ---
Stirrups B107 8 mm 1 x 32 x 1.46 = 46.72 --- --- --- --- ---
B105 (B18-B5)
Top Main Bar 12 mm 1 x 3 x 6.48 = --- --- 19.44 --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 6.48 = --- --- --- 12.96 --- ---
Stirrups B106 8 mm 1 x 40 x 1.46 = 58.40 --- --- --- --- ---
B104 (C32-C21) (230X600) --- --- --- --- ---
Top Main Bar 16 mm 1 x 2 x 6.40 = --- --- --- 12.80 --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 7 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Bottom Main Bar 16 mm 1 x 3 x 6.40 = --- --- --- 19.20 --- ---
Top Extra Bar at C32 16 mm 1 x 1 x 1.98 = --- --- --- 1.98 --- ---
Top Extra Bar 2nd Layer at
C32 16 mm 1 x 3 x 1.98 = --- --- --- 5.94 --- ---
Top Extra Bar at C21 16 mm 1 x 1 x 1.65 = --- --- --- 1.65 --- ---
Top Extra Bar 2nd Layer at
C21 16 mm 1 x 2 x 2.00 = --- --- --- 4.00 --- ---
Top Extra Bar at C53 20 mm 1 x 1 x 3.97 = --- --- --- --- 3.97 ---
Top Extra Bar 2nd layer at C53
20 mm 1 x 3 x 3.97 = --- --- --- --- 11.91 ---
Top Extra Bar at C42 20 mm 1 x 1 x 3.66 = --- --- --- --- 3.66 ---
Top Extra Bar 2nd layer at C42
20 mm 1 x 2 x 3.66 = --- --- --- --- 7.32 ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 8 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Top Extra Bar at C25 16 mm 1 x 1 x 3.12 = --- --- --- 3.12 --- ---
Top Extra Bar 2nd layer at C25
16 mm 1 x 2 x 3.12 = --- --- --- 6.24 --- ---
Top Extra Bar at C12 16 mm 1 x 1 x 2.70 = --- --- --- 2.70 --- ---
Top Extra Bar 2nd layer at C12
16 mm 1 x 2 x 2.70 = --- --- --- 5.40 --- ---
Top Extra Bar at C37-C26 20 mm 1 x 1 x 6.98 = --- --- --- --- 6.98 ---
Top Extra Bar 2nd layer at 20 mm 1 x 2 x 6.98 = --- --- --- --- 13.96 ---
C37-C26
20 mm 1 x 1 x 3.56 = --- --- --- --- 3.56 ---
Top Extra Bar at C13 20 mm 1 x 1 x 2.82 = --- --- --- --- 2.82 ---
Top Extra Bar 2nd layer at C13
20 mm 1 x 2 x 2.82 = --- --- --- --- 5.64 ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 9 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B76-B77 (B22-B42-B1) --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 7.60 = --- --- 22.80 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.60 = --- --- 22.80 --- --- ---
Face Bar B76 8 mm 2 x 2 x 6.80 = 27.20 --- --- --- --- ---
Stirrups B76 8 mm 1 x 31 x 1.46 = 45.26 --- --- --- --- ---
Stirrups B77 8 mm 1 x 20 x 1.46 = 29.20 --- --- --- --- ---
B78-B79-B80 (B36-C27-C14-C2)
Top Main Bar 20 mm 1 x 2 x 14.25 = --- --- --- --- 28.49 ---
Bottom Main Bar 16 mm 1 x 2 x 14.25 = --- --- --- 28.50 --- ---
Top Extra Bar at C27 20 mm 1 x 1 x 3.32 = --- --- --- --- 3.32 ---
Top Extra Bar at C27 2nd layer
16 mm 1 x 3 x 3.32 = --- --- --- 9.95 --- ---
Top Extra Bar at C14 20 mm 1 x 1 x 3.32 = --- --- --- --- 3.32 ---
Top Extra Bar at C14 2nd layer
16 mm 1 x 3 x 3.32 = --- --- --- 9.95 --- ---
Bottom Extra Bar at B79 12 mm 1 x 1 x 4.16 = --- --- 4.16 --- --- ---
Face Bar 8 mm 2 x 2 x 13.25 = 52.98 --- --- --- --- ---
Top Lap 20 mm 1 x 2 x 1.00 = --- --- --- --- 2.00 ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Face Bar Lap 8 mm 2 x 2 x 0.40 = 1.60 --- --- --- --- ---
Spacer Pin 20 mm 1 x 9 x 0.16 = --- --- --- --- 1.44 ---
Stirrups B78 8 mm 1 x 24 x 1.46 = 35.04 --- --- --- --- ---
Stirrups B79 10 mm 1 x 47 x 1.46 = --- 68.62 --- --- --- ---
Stirrups B80 10 mm 1 x 21 x 1.46 = --- 30.66 --- --- --- ---
B81 (C49-C38)
Top Main Bar 20 mm 1 x 2 x 8.31 = --- --- --- --- 16.62 ---
Bottom Main Bar 20 mm 1 x 3 x 8.31 = --- --- --- --- 24.93 ---
Top Extra Bar at C49 20 mm 1 x 1 x 2.60 = --- --- --- --- 2.60 ---
Top Extra Bar at C49 2nd layer
16 mm 1 x 3 x 2.55 = --- --- --- 7.65 --- ---
Top Extra Bar at C38 20 mm 1 x 1 x 2.60 = --- --- --- --- 2.60 ---
Top Extra Bar at C38 2nd layer
16 mm 1 x 3 x 2.55 = --- --- --- 7.65 --- ---
Bottom Extra Bar Mid spam 12 mm 1 x 3 x 4.00 = --- --- 12.00 --- --- ---
Face Bar 8 mm 2 x 2 x 7.31 = 29.24 --- --- --- --- ---
Lap Top Main Bar 20 mm 1 x 1 x 1.00 = --- --- --- --- 1.00 ---
Lap Bottom Main Bar 20 mm 1 x 1 x 1.00 = --- --- --- --- 1.00 ---
Spacer Pin 20 mm 1 x 4 x 0.16 = --- --- --- --- 0.64 ---
Stirrups B81 8 mm 1 x 41 x 1.46 = 59.86 --- --- --- --- ---
B82-B83 (B26-C16-B11)
Top Main Bar 16 mm 1 x 2 x 8.03 = --- --- --- 16.06 --- ---
Bottom Main Bar 16 mm 1 x 2 x 8.03 = --- --- --- 16.06 --- ---
Top Extra Bar at C16 16 mm 1 x 1 x 2.58 = --- --- --- 2.58 --- ---
Top Extra Bar at C16 2nd layer
12 mm 1 x 3 x 2.52 = --- --- 7.55 --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 10 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Top Extra Bar at C39 16 mm 1 x 1 x 2.60 = --- --- --- 2.60 --- ---
Top Extra Bar at C39 2nd layer
16 mm 1 x 3 x 2.60 = --- --- --- 7.80 --- ---
Bottom Extra Bar Mid spam 12 mm 1 x 2 x 4.00 = --- --- 8.00 --- --- ---
Face Bar 8 mm 2 x 2 x 7.31 = 29.24 --- --- --- --- ---
Spacer Pin 20 mm 1 x 6 x 0.16 = --- --- --- --- 0.96 ---
Stirrups 8 mm 1 x 41 x 1.46 = 59.86 --- --- --- --- ---
B85-B86 (B13-C15-C3)
Top Main Bar 16 mm 1 x 2 x 6.09 = --- --- --- 12.18 --- ---
Bottom Main Bar 12 mm 1 x 3 x 6.09 = --- --- 18.27 --- --- ---
Top Extra Bar at C15 16 mm 1 x 1 x 2.02 = --- --- --- 2.02 --- ---
Face Bar 8 mm 2 x 2 x 5.29 = 21.16 --- --- --- --- ---
Stirrups B85 8 mm 1 x 13 x 1.46 = 18.98 --- --- --- --- ---
Stirrups B86 8 mm 1 x 27 x 1.46 = 39.42 --- --- --- --- ---
B87-B88-B89 (B38-C28-C17-C4)
Top Main Bar 16 mm 1 x 2 x 14.07 = --- --- --- 28.13 --- ---
Bottom Main Bar 16 mm 1 x 2 x 14.07 = --- --- --- 28.14 --- ---
Top Extra Bar at C28 16 mm 1 x 1 x 2.48 = --- --- --- 2.48 --- ---
Top Extra Bar at C17 16 mm 1 x 1 x 2.92 = --- --- --- 2.92 --- ---
Top Extra Bar at C17 2nd layer
12 mm 1 x 2 x 2.92 = --- --- 5.83 --- --- ---
Top Extra Bar at C4 16 mm 1 x 1 x 1.79 = --- --- --- 1.79 --- ---
Bottom Extra Bar at C17 16 mm 1 x 1 x 2.92 = --- --- --- 2.92 --- ---
Face Bar 8 mm 2 x 2 x 13.27 = 53.06 --- --- --- --- ---
Stirrups B87 8 mm 1 x 25 x 1.46 = 36.50 --- --- --- --- ---
Stirrups B88 8 mm 1 x 33 x 1.46 = 48.18 --- --- --- --- ---
Stirrups B89 8 mm 1 x 36 x 1.46 = 52.56 --- --- --- --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Face Bar Lap 8 mm 2 x 2 x 0.40 = 1.60 --- --- --- --- ---
Spacer Pin 20 mm 1 x 6 x 0.16 = --- --- --- --- 0.96 ---
B90 (C51-C40)
Top Main Bar 20 mm 1 x 2 x 8.25 = --- --- --- --- 16.50 ---
Bottom Main Bar 16 mm 1 x 3 x 8.25 = --- --- --- 24.75 --- ---
Top Extra Bar at C51 20 mm 1 x 1 x 2.20 = --- --- --- --- 2.20 ---
Top Extra Bar at C51 2nd layer
12 mm 1 x 3 x 2.20 = --- --- 6.60 --- --- ---
Top Extra Bar at C40 20 mm 1 x 1 x 2.20 = --- --- --- --- 2.20 ---
Top Extra Bar at C40 2nd layer
12 mm 1 x 3 x 2.20 = --- --- 6.60 --- --- ---
Top Extra Bar at C5 16 mm 1 x 1 x 1.74 = --- --- --- 1.74 --- ---
Bottom Extra Bar at C18 16 mm 1 x 1 x 3.00 = --- --- --- 3.00 --- ---
Face Bar 8 mm 2 x 2 x 10.63 = 42.52 --- --- --- --- ---
Lapping Top Main Bar 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Lapping Bottom Main Bar 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Lapping Face Bar 8 mm 1 x 3 x 0.40 = 1.20 --- --- --- --- ---
Stirrups B91 8 mm 1 x 33 x 1.46 = 48.18 --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 11 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Stirrups B92 8 mm 1 x 35 x 1.46 = 51.10 --- --- --- --- ---
Spacer Pin 20 mm 1 x 3 x 0.16 = --- --- --- --- 0.48 ---
B93-B94-B95-B96-B97 (C58-C52-C41-C30-C19-C6) (230X600)
Top Main Bar 20 mm 1 x 2 x 28.82 = --- --- --- --- 57.64 ---
Bottom Main Bar 20 mm 1 x 2 x 28.82 = --- --- --- --- 57.64 ---
Bottom Extra Bar 20 mm 1 x 1 x 14.45 = --- --- --- --- 14.45 ---
Bottom Extra Bar Mid spam at
B94 (C52-C41) 12 mm 1 x 3 x 4.70 = --- --- 14.10 --- --- ---
Top Extra Bar at C58 20 mm 1 x 1 x 2.29 = --- --- --- --- 2.29 ---
Top Extra Bar at C58 2nd layer
20 mm 1 x 2 x 2.29 = --- --- --- --- 4.57 ---
Top Extra Bar at C52 20 mm 1 x 1 x 3.97 = --- --- --- --- 3.97 ---
Top Extra Bar at C52 2nd layer
20 mm 1 x 2 x 3.97 = --- --- --- --- 7.93 ---
Top Extra Bar at C41-C30 20 mm 1 x 1 x 3.67 = --- --- --- --- 3.67 ---
Top Extra Bar at C41-C30 2nd 20 mm 1 x 2 x 3.67 = --- --- --- --- 7.34 ---
layer
Top Extra Bar at C19 20 mm 1 x 1 x 2.97 = --- --- --- --- 2.97 ---
Top Extra Bar at C19 2nd layer
20 mm 1 x 2 x 2.97 = --- --- --- --- 5.94 ---
Top Extra Bar at C20 20 mm 1 x 1 x 2.00 = --- --- --- --- 2.00 ---
Top Extra Bar at C20 2nd layer 16 mm 1 x 2 x 2.00 = --- --- --- 4.00 --- ---
Bottom Extra Bar at C31 12 mm 1 x 2 x 2.00 = --- --- 4.00 --- --- ---
Face Bar 8 mm 2 x 2 x 5.36 = 21.44 --- --- --- --- ---
Spacer Pin 20 mm 1 x 8 x 0.16 = --- --- --- --- 1.28 ---
Face Bar Lap 8 mm 2 x 2 x 0.40 = 1.60 --- --- --- --- ---
Stirrups 8 mm 1 x 34 x 1.46 = 49.64 --- --- --- --- ---
B65 (B93-B99)
Top Main Bar 12 mm 1 x 3 x 7.20 = --- --- 21.60 --- --- ---
Bottom Main Bar 16 mm 1 x 2 x 7.20 = --- --- --- 14.40 --- ---
Mid span 16 mm 1 x 1 x 4.10 = --- --- --- 4.10 --- ---
Mid span 2nd layer 12 mm 1 x 3 x 4.10 = --- --- 12.30 --- --- ---
Stirrups 8 mm 1 x 45 x 1.46 = 65.70 --- --- --- --- ---
Face Bar 8 mm 2 x 2 x 6.40 = 25.60 --- --- --- --- ---
Face Bar Lap 8 mm 1 x 3 x 0.40 = 1.20 --- --- --- --- ---
Spacer Pin 20 mm 1 x 4 x 0.16 = --- --- --- --- 0.64 ---
B66 (B93-B99)
Top Main Bar 16 mm 1 x 2 x 7.35 = --- --- --- 14.70 --- ---
Bottom Main Bar 16 mm 1 x 2 x 7.35 = --- --- --- 14.70 --- ---
Top extra bar at C58 16 mm 1 x 1 x 1.56 = --- --- --- 1.56 --- ---
Top extra bar at C59 16 mm 1 x 1 x 2.28 = --- --- --- 2.28 --- ---
Mid span bottom extra bar 16 mm 1 x 1 x 4.13 = --- --- --- 4.13 --- ---
Stirrups 8 mm 1 x 44 x 1.48 = 65.12 --- --- --- --- ---
Face Bar 8 mm 2 x 2 x 6.45 = 25.80 --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 12 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Spacer Pin 20 mm 1 x 4 x 0.16 = --- --- --- --- 0.64 ---
Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
B35-B36-B37-B38-B39-B40-B41 (C36-C37-C38-C39-C40-C41-C42-C43) (230X600)
Top Main bar 16 mm 1 x 2 x 30.00 = --- --- --- 60.00 --- ---
16 mm 1 x 2 x 7.21 = --- --- --- 14.42 --- ---
Top Extra Bar at C36 16 mm 1 x 1 x 2.03 = --- --- --- 2.03 --- ---
Top Extra Bar at C37 16 mm 1 x 1 x 3.12 = --- --- --- 3.12 --- ---
12 mm 1 x 2 x 3.12 = --- --- 6.24 --- --- ---
Top Extra Bar at C38 16 mm 1 x 1 x 2.78 = --- --- --- 2.78 --- ---
12 mm 1 x 2 x 2.78 = --- --- 5.56 --- --- ---
Top Extra Bar at C39 16 mm 1 x 1 x 2.04 = --- --- --- 2.04 --- ---
Top Extra Bar at C40 16 mm 1 x 1 x 2.52 = --- --- --- 2.52 --- ---
12 mm 1 x 2 x 2.52 = --- --- 5.04 --- --- ---
Top Extra Bar at C41 16 mm 1 x 1 x 3.18 = --- --- --- 3.18 --- ---
12 mm 1 x 2 x 3.18 = --- --- 6.36 --- --- ---
Top Extra Bar at C42 16 mm 1 x 1 x 2.92 = --- --- --- 2.92 --- ---
12 mm 1 x 2 x 2.92 = --- --- 5.84 --- --- ---
Top Extra Bar at C43 16 mm 1 x 1 x 2.03 = --- --- --- 2.03 --- ---
Bottom Main bar 16 mm 1 x 2 x 30.00 = --- --- --- 60.00 --- ---
16 mm 1 x 2 x 7.21 = --- --- --- 14.42 --- ---
Bottom Extra Bar at C37 16 mm 1 x 1 x 3.12 = --- --- --- 3.12 --- ---
Bottom Extra Bar at C38 16 mm 1 x 1 x 2.78 = --- --- --- 2.78 --- ---
Bottom Extra Bar at C40 16 mm 1 x 1 x 2.52 = --- --- --- 2.52 --- ---
Bottom Extra Bar at C41 16 mm 1 x 1 x 3.18 = --- --- --- 3.18 --- ---
Bottom Extra Bar at C42 16 mm 1 x 1 x 2.92 = --- --- --- 2.92 --- ---
Face Bar 8 mm 2 x 2 x 30.00 = 120.00 --- --- --- --- ---
8 mm 2 x 2 x 6.23 = 24.92 --- --- --- --- ---
Face Bar 8 mm 2 x 4 x 0.40 = 3.20 --- --- --- --- ---
Lapping at Top 16 mm 1 x 7 x 0.80 = --- --- --- 5.60 --- ---
Lapping at Bottom 16 mm 1 x 6 x 0.80 = --- --- --- 4.80 --- ---
Stirrups B35 Master Ring 8 mm 1 x 39 x 1.46 = 56.94 --- --- --- --- ---
Stirrups B36 Master Ring 10 mm 1 x 47 x 1.46 = --- 68.62 --- --- --- ---
Stirrups B37 Master Ring 8 mm 1 x 28 x 1.46 = 40.88 --- --- --- --- ---
Stirrups B38 Master Ring 8 mm 1 x 26 x 1.46 = 37.96 --- --- --- --- ---
Stirrups B39 Master Ring 8 mm 1 x 42 x 1.46 = 61.32 --- --- --- --- ---
Stirrups B40 Master Ring 8 mm 1 x 46 x 1.46 = 67.16 --- --- --- --- ---
Stirrups B41 Master Ring 8 mm 1 x 34 x 1.46 = 49.64 --- --- --- --- ---
Top Main bar 20 mm 1 x 2 x 19.11 = --- --- --- --- 38.22 ---
Top Extra Bar at C44 20 mm 1 x 1 x 3.01 = --- --- --- --- 3.01 ---
Top Extra Bar at C45 20 mm 1 x 1 x 3.71 = --- --- --- --- 3.71 ---
20 mm 1 x 3 x 3.71 = --- --- --- --- 11.13 ---
Top Extra Bar at C46 20 mm 1 x 1 x 2.30 = --- --- --- --- 2.30 ---
20 mm 1 x 2 x 2.30 = --- --- --- --- 4.60 ---
Bottom Main bar 16 mm 1 x 2 x 19.11 = --- --- --- 38.22 --- ---
Bottom Extra Bar at C44-C46 16 mm 1 x 2 x 13.80 = --- --- --- 27.60 --- ---
Bottom Extra Bar at B44 16 mm 1 x 1 x 4.45 = --- --- --- 4.45 --- ---
Face Bar 8 mm 2 x 2 x 17.92 = 71.68 --- --- --- --- ---
Face Bar lapping 8 mm 1 x 5 x 0.40 = 2.00 --- --- --- --- ---
Lapping at Top 20 mm 1 x 2 x 1.00 = --- --- --- --- 2.00 ---
Lapping at Bottom 16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Spacer pin 20 mm 1 x 16 x 0.16 = --- --- --- --- 2.56 ---
Stirrups B43 Master Ring 8 mm 1 x 28 x 1.46 = 40.88 --- --- --- --- ---
Stirrups B44 Master Ring 8 mm 1 x 48 x 1.46 = 70.08 --- --- --- --- ---
Stirrups B45 Master Ring 8 mm 1 x 45 x 1.46 = 65.70 --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 13 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B47-B48-B49-B50-B51-B52-B53 (B67-B71-B81-B84-B90-B94-B100-B106)
Top Main bar 12 mm 1 x 3 x 30.00 = --- --- 90.00 --- --- ---
12 mm 1 x 3 x 6.12 = --- --- 18.36 --- --- ---
Bottom Main bar 16 mm 1 x 2 x 30.00 = --- --- --- 60.00 --- ---
16 mm 1 x 2 x 6.12 = --- --- --- 12.24 --- ---
Bottom Extra Mid Spam B47 16 mm 1 x 1 x 3.35 = --- --- --- 3.35 --- ---
Bottom Extra Mid Spam B48 16 mm 1 x 1 x 4.23 = --- --- --- 4.23 --- ---
12 mm 1 x 3 x 4.23 = --- --- 12.69 --- --- ---
Bottom Extra Mid Spam B51 16 mm 1 x 1 x 3.72 = --- --- --- 3.72 --- ---
12 mm 1 x 2 x 3.72 = --- --- 7.44 --- --- ---
Bottom Extra Mid Spam B52 16 mm 1 x 1 x 3.76 = --- --- --- 3.76 --- ---
12 mm 1 x 2 x 3.76 = --- --- 7.52 --- --- ---
Face Bar 8 mm 2 x 2 x 30.00 = 120.00 --- --- --- --- ---
8 mm 2 x 2 x 5.12 = 20.48 --- --- --- --- ---
Face Bar lapping 8 mm 1 x 3 x 0.40 = 1.20 --- --- --- --- ---
Lapping Top Bar 12 mm 1 x 6 x 0.60 = --- --- 3.60 --- --- ---
Lapping Bottom Bar 16 mm 1 x 7 x 0.80 = --- --- --- 5.60 --- ---
Stirrups B47 8 mm 1 x 38 x 1.46 = 55.48 --- --- --- --- ---
Stirrups B48 8 mm 1 x 44 x 1.46 = 64.24 --- --- --- --- ---
Bottom Extra Bar at C53 16 mm 1 x 1 x 2.85 = --- --- --- 2.85 --- ---
Bottom Extra Bar mid Spam at
12 mm 1 x 2 x 11.80 = --- --- 23.60 --- --- ---
C55-C57
Face Bar 8 mm 2 x 2 x 30.00 = 120.00 --- --- --- --- ---
8 mm 2 x 2 x 23.89 = 95.56 --- --- --- --- ---
Lapping Face Bar 8 mm 2 x 6 x 0.40 = 4.80 --- --- --- --- ---
Lapping Top Bar 20 mm 2 x 5 x 1.00 = --- --- --- --- 10.00 ---
Lapping Bottom Bar 16 mm 2 x 5 x 0.80 = --- --- --- 8.00 --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 14 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Stirrups B60 8 mm 1 x 40 x 1.46 = 58.40 --- --- --- --- ---
Stirrups B61 8 mm 1 x 31 x 1.46 = 45.26 --- --- --- --- ---
Stirrups B62 8 mm 1 x 24 x 1.46 = 35.04 --- --- --- --- ---
Stirrups B63 8 mm 1 x 46 x 1.46 = 67.16 --- --- --- --- ---
Stirrups B64 8 mm 1 x 46 x 1.46 = 67.16 --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 15 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Date of Measurement 4/7/2023
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Date of Measurement: 4/11/2023
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth
Item No. - 4.5
level.
Item No. 4.5.1 Thermo-Mechanically Treated bars of Gradee Fe-500D or more
Reinforcement of Roof Slab TMT .
Long Direction Bottom Bar
(C1,C2,C3-C12,C13,C14,C15-B69,B,73,B76,C16,B85)
Main Bar 10 mm 1 x 13 x 10.35 = --- 134.55 --- --- --- ---
Near chajja 10 mm 1 x 8 x 17.33 = --- 138.64 --- --- --- ---
Lap 10 mm 1 x 8 x 0.50 = --- 4.00 --- --- --- ---
Main Bar 10 mm 1 x 11 x 17.33 = --- 190.63 --- --- --- ---
Lap 10 mm 1 x 11 x 0.50 = --- 5.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 14.34 = --- 14.34 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
(C4,C5,C6-C17,C18,C19) --- --- --- --- --- ---
Main Bar 10 mm 1 x 33 x 9.13 = --- 301.29 --- --- --- ---
(C7,C8-C21,B18,C22) --- --- --- --- --- ---
Main Bar 10 mm 1 x 34 x 8.26 = --- 280.84 --- --- --- ---
(C9,C10,C11-B19,C23,C24) --- --- --- --- --- ---
Main Bar 10 mm 1 x 33 x 11.52 = --- 380.16 --- --- --- ---
Main Bar 10 mm 1 x 1 x 8.83 = --- 8.83 --- --- --- ---
(B69,B21,B76,B73,C16,C17,C18,C19-C25,C26,C27,C28,C29,C30) --- --- --- --- --- ---
Main Bar 10 mm 1 x 9 x 25.85 = --- 232.65 --- --- --- ---
Lap 10 mm 2 x 9 x 0.50 = --- 9.00 --- --- --- ---
Main Bar B21-C19 10 mm 1 x 1 x 20.20 = --- 20.20 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar B69-B22 10 mm 1 x 1 x 6.57 = --- 6.57 --- --- --- ---
Main Bar B22-C19 10 mm 1 x 1 x 15.00 = --- 15.00 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar 10 mm 1 x 24 x 25.85 = --- 620.40 --- --- --- ---
Lap 10 mm 2 x 24 x 0.50 = --- 24.00 --- --- --- ---
(C20,C21,C22,C23,C24-C31,C32,C33,C34,.C35) --- --- --- --- --- ---
Main Bar 10 mm 1 x 33 x 26.97 = --- 890.01 --- --- --- ---
Lap 10 mm 2 x 33 x 0.50 = --- 33.00 --- --- --- ---
Main Bar 10 mm 1 x 1 x 14.35 = --- 14.35 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar B23-B126 10 mm 1 x 1 x 13.95 = --- 13.95 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar B98-B23 10 mm 1 x 1 x 10.40 = --- 10.40 --- --- --- ---
(C25-C26-C27-C28-C29-C30-C31-C32-C33-C34-C35)-(C36-C37-C38-C39-C40-C41- --- --- --- --- --- ---
Main Bar
10 mm 1 x 17 x 30.00 = --- 510.00 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 16 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
(B67-B71-B81-B84-B90-B94-B100-B106-C44-C45-C46)-(C47-C48-C49-C50-C51-C52-C53-C54-C55-C56-C57)
Main Bar 10 mm 1 x 33 x 30.00 = --- 990.00 --- --- --- ---
10 mm 1 x 33 x 25.17 = --- 830.61 --- --- --- ---
Lap 10 mm 1 x 167 x 0.50 = --- 83.50 --- --- --- ---
Main Bar B106-B124 10 mm 1 x 1 x 8.95 = --- 8.95 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Porch Area 10 mm 1 x 48 x 7.87 = --- 377.76 --- --- --- ---
Short Direction Bottom Bar --- --- --- --- --- ---
C9-C10-C11 --- --- --- --- --- ---
Main Bar 10 mm 1 x 60 x 21.77 = --- 1306.20 --- --- --- ---
Lap 10 mm 1 x 60 x 0.50 = --- 30.00 --- --- --- ---
Main Bar 10 mm 1 x 1 x 16.41 = --- 16.41 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 6.44 = --- 6.44 --- --- --- ---
Main Bar 10 mm 1 x 1 x 11.97 = --- 11.97 --- --- --- ---
Main Bar 10 mm 1 x 1 x 6.49 = --- 6.49 --- --- --- ---
Main Bar 10 mm 1 x 1 x 17.01 = --- 17.01 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
C8-C9 --- --- --- --- --- ---
Main Bar 10 mm 1 x 1 x 6.44 = --- 6.44 --- --- --- ---
Main Bar 10 mm 1 x 3 x 16.61 = --- 49.83 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 11.49 = --- 11.49 --- --- --- ---
Main Bar 10 mm 1 x 13 x 16.62 = --- 216.06 --- --- --- ---
Lap 10 mm 1 x 13 x 0.50 = --- 6.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 11.09 = --- 11.09 --- --- --- ---
Main Bar 10 mm 1 x 6 x 16.62 = --- 99.72 --- --- --- ---
Lap 10 mm 1 x 6 x 0.50 = --- 3.00 --- --- --- ---
C7-C8 --- --- --- --- --- ---
Main Bar 10 mm 1 x 2 x 21.77 = --- 43.54 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
Main Bar 10 mm 1 x 1 x 16.32 = --- 16.32 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar 10 mm 1 x 13 x 21.77 = --- 283.01 --- --- --- ---
Lap 10 mm 1 x 13 x 0.50 = --- 6.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 10.94 = --- 10.94 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
C7-C8 --- --- --- --- --- ---
Main Bar 10 mm 1 x 9 x 21.77 = --- 195.93 --- --- --- ---
Lap 10 mm 1 x 9 x 0.50 = --- 4.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 11.74 = --- 11.74 --- --- --- ---
Main Bar 10 mm 1 x 1 x 16.44 = --- 16.44 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar 10 mm 1 x 6 x 21.77 = --- 130.62 --- --- --- ---
Lap 10 mm 1 x 6 x 0.50 = --- 3.00 --- --- --- ---
Main Bar 10 mm 1 x 1 x 11.09 = --- 11.09 --- --- --- ---
Main Bar 10 mm 1 x 1 x 6.49 = --- 6.49 --- --- --- ---
Main Bar 10 mm 1 x 9 x 21.77 = --- 195.93 --- --- --- ---
Lap 10 mm 1 x 9 x 0.50 = --- 4.50 --- --- --- ---
C7-C20 --- --- --- --- --- ---
Main Bar 10 mm 1 x 13 x 16.79 = --- 218.27 --- --- --- ---
Lap 10 mm 1 x 13 x 0.50 = --- 6.50 --- --- --- ---
(C59-C53-C42-B102)-(C31-C20) --- --- --- --- --- ---
Main Bar 10 mm 1 x 23 x 24.19 = --- 556.37 --- --- --- ---
Lap 10 mm 1 x 23 x 0.50 = --- 11.50 --- --- --- ---
(C58-C52-C41-C30)-C31 --- --- --- --- --- ---
Main Bar 10 mm 1 x 1 x 18.54 = --- 18.54 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
Main Bar 10 mm 1 x 9 x 19.31 = --- 173.79 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 17 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Lap 10 mm 1 x 9 x 0.50 = --- 4.50 --- --- --- ---
Main Bar 10 mm 1 x 8 x 18.31 = --- 146.48 --- --- --- ---
Lap 10 mm 1 x 8 x 0.50 = --- 4.00 --- --- --- ---
C5-C6 --- --- --- --- --- ---
Main Bar 10 mm 1 x 28 x 21.77 = --- 609.56 --- --- --- ---
Lap 10 mm 1 x 28 x 0.50 = --- 14.00 --- --- --- ---
C29-B59 --- --- --- --- --- ---
Main Bar 10 mm 1 x 1 x 11.16 = --- 11.16 --- --- --- ---
C4-C5 --- --- --- --- --- ---
Main Bar 10 mm 1 x 19 x 21.77 = --- 413.63 --- --- --- ---
Lap 10 mm 1 x 19 x 0.50 = --- 9.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 14.34 = --- 14.34 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
C3-C4 --- --- --- --- --- ---
Main Bar 10 mm 1 x 10 x 21.77 = --- 217.70 --- --- --- ---
Lap 10 mm 1 x 22 x 0.50 = --- 11.00 --- --- --- ---
C3-C15-C39 --- --- --- --- --- ---
Main Bar 10 mm 1 x 1 x 14.34 = --- 14.34 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
C3-C2 --- --- --- --- --- ---
Main Bar 10 mm 1 x 33 x 21.77 = --- 718.41 --- --- --- ---
Lap 10 mm 1 x 33 x 0.50 = --- 16.50 --- --- --- ---
Main Bar 10 mm 1 x 1 x 14.44 = --- 14.44 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
C1-C2 --- --- --- --- --- ---
Main Bar 10 mm 1 x 22 x 21.77 = --- 478.94 --- --- --- ---
Lap 10 mm 1 x 22 x 0.50 = --- 11.00 --- --- --- ---
Main Bar B74-B56 10 mm 1 x 1 x 11.19 = --- 11.19 --- --- --- ---
Main Bar B74-B75 10 mm 1 x 1 x 7.99 = --- 7.99 --- --- --- ---
C1-C13 --- --- --- --- --- ---
Main Bar 10 mm 1 x 11 x 18.90 = --- 207.90 --- --- --- ---
Lap 10 mm 1 x 11 x 0.50 = --- 5.50 --- --- --- ---
C13-C12 --- --- --- --- --- ---
Main Bar 10 mm 1 x 34 x 18.90 = --- 642.60 --- --- --- ---
Lap 10 mm 1 x 34 x 0.50 = --- 17.00 --- --- --- ---
Long Direction Top Bar --- --- --- --- --- ---
(C9-C10-C18)-(C16-C23-C24) --- --- --- --- --- ---
Main Bar 10 mm 1 x 17 x 1.56 = --- 26.44 --- --- --- ---
10 mm 1 x 16 x 4.03 = --- 64.48 --- --- --- ---
B127-B123
10 mm 1 x 1 x 1.27 = --- 1.27 --- --- --- ---
(C10-C23) B123 10 mm 1 x 17 x 1.98 = --- 33.66 --- --- --- ---
C9 (B116) 10 mm 1 x 17 x 2.00 = --- 34.00 --- --- --- ---
(C20-C21-C22-C23-C24)-(C31-C32-C33-C34-C35) --- --- --- --- --- ---
Main Bar (C20-C24) 10 mm 1 x 5 x 26.86 = --- 134.30 --- --- --- ---
Lap 10 mm 1 x 10 x 0.50 = --- 5.00 --- --- --- ---
C22-C25-C24 10 mm 1 x 3 x 14.36 = --- 43.08 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
C20-C21(B98-B102-B104- 10 mm 1 x 4 x 10.92 = --- 43.68 --- --- --- ---
B108)
B126 10 mm 1 x 17 x 1.73 = --- 29.41 --- --- --- ---
B122 10 mm 1 x 17 x 1.63 = --- 27.71 --- --- --- ---
B119 10 mm 1 x 17 x 1.80 = --- 30.60 --- --- --- ---
B115 10 mm 1 x 17 x 1.98 = --- 33.66 --- --- --- ---
B112 10 mm 1 x 7 x 1.64 = --- 11.48 --- --- --- ---
B108 10 mm 1 x 6 x 1.64 = --- 9.84 --- --- --- ---
B104 10 mm 1 x 16 x 1.67 = --- 26.72 --- --- --- ---
B98 10 mm 1 x 16 x 1.12 = --- 17.92 --- --- --- ---
B102 10 mm 1 x 16 x 1.82 = --- 29.12 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 18 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B108-B112 10 mm 1 x 9 x 5.03 = --- 45.27 --- --- --- ---
C22 10 mm 1 x 1 x 1.10 = --- 1.10 --- --- --- ---
10 mm 1 x 1 x 1.33 = --- 1.33 --- --- --- ---
(C33-C34-C35)-(B112-B115-B119-B122-B126) --- --- --- --- --- ---
Main Bar 10 mm 1 x 8 x 13.78 = --- 110.24 --- --- --- ---
Lap 10 mm 1 x 8 x 0.50 = --- 4.00 --- --- --- ---
(B98-B102-B104-B108)-(C20-C21-B108) --- --- --- --- --- ---
Main Bar
10 mm 1 x 6 x 11.46 = --- 68.76 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 19 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B87 10 mm 1 x 8 x 3.85 = --- 30.80 --- --- --- ---
B95 10 mm 1 x 8 x 3.57 = --- 28.56 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 20 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B101 10 mm 1 x 8 x 2.87 = --- 22.96 --- --- --- ---
B107
10 mm 1 x 8 x 3.34 = --- 26.72 --- --- --- ---
B114 10 mm 1 x 15 x 3.18 = --- 47.70 --- --- --- ---
B118 10 mm 1 x 15 x 2.12 = --- 31.80 --- --- --- ---
B125
10 mm 1 x 5 x 2.30 = --- 11.50 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 21 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B94 10 mm 1 x 12 x 3.10 = --- 37.20 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 22 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B90 10 mm 1 x 12 x 2.50 = --- 30.00 --- --- --- ---
B84 10 mm 1 x 12 x 1.90 = --- 22.80 --- --- --- ---
B81 10 mm 1 x 12 x 2.80 = --- 33.60 --- --- --- ---
B71 10 mm 1 x 12 x 2.90 = --- 34.80 --- --- --- ---
B67 10 mm 1 x 12 x 1.55 = --- 18.60 --- --- --- ---
B124-B67 10 mm 1 x 5 x 30.00 = --- 150.00 --- --- --- ---
10 mm 1 x 5 x 25.19 = --- 125.95 --- --- --- ---
Lap 10 mm 1 x 22 x 0.50 = --- 11.00 --- --- --- ---
B124-B106 10 mm 1 x 2 x 18.95 = --- 37.90 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B124-B100 10 mm 1 x 1 x 26.21 = --- 26.21 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
Porha area --- --- --- --- --- ---
(B99-B93)TO(B66-B65) --- --- --- --- --- ---
10 mm 1 x 6 x 7.85 = --- 47.10 --- --- --- ---
B93 10 mm 1 x 11 x 2.44 = --- 26.84 --- --- --- ---
B99 10 mm 1 x 11 x 2.41 = --- 26.51 --- --- --- ---
10 mm 1 x 6 x 7.85 = --- 47.10 --- --- --- ---
(B99-B93)TO(B66-B60) --- --- --- --- --- ---
10 mm 1 x 12 x 7.85 = --- 94.20 --- --- --- ---
B93
10 mm 1 x 11 x 2.43 = --- 26.73 --- --- --- ---
B99 10 mm 1 x 11 x 2.43 = --- 26.73 --- --- --- ---
Short Direction Top Bar --- --- --- --- --- ---
(C11,C24,C35,C46,C57)-(C10,C23,C34,B45,B64)
--- --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 23 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
(C10-C23-C34-C45)-(C9-C19-C32-C44-C63-C45-C56) --- --- --- --- --- ---
B6,B19,B32,B45 10 mm 1 x 3 x 17.21 = --- 51.63 --- --- --- ---
Lap 10 mm 1 x 4 x 0.50 = --- 2.00 --- --- --- ---
B6,B19,B32,B45,B64 10 mm 1 x 4 x 21.81 = --- 87.24 --- --- --- ---
Lap 10 mm 1 x 6 x 0.50 = --- 3.00 --- --- --- ---
B45-B64 (C45-C56) 10 mm 1 x 2 x 7.31 = --- 14.62 --- --- --- ---
B6 10 mm 1 x 14 x 2.24 = --- 31.36 --- --- --- ---
B19 10 mm 1 x 14 x 2.65 = --- 37.10 --- --- --- ---
B32 10 mm 1 x 14 x 2.57 = --- 35.98 --- --- --- ---
B44-B63 (C45-C56) 10 mm 1 x 6 x 7.31 = --- 43.86 --- --- --- ---
10 mm 1 x 1 x 2.10 = --- 2.10 --- --- --- ---
B44 10 mm 1 x 5 x 2.65 = --- 13.25 --- --- --- ---
B63 10 mm 1 x 11 x 2.14 = --- 23.49 --- --- --- ---
B6.B19,B32,B44 10 mm 1 x 6 x 17.33 = --- 103.98 --- --- --- ---
Lap 10 mm 1 x 6 x 0.50 = --- 3.00 --- --- --- ---
B6, B19,B32,B44,B63 10 mm 1 x 1 x 21.81 = --- 21.81 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B44-B63 (C45-C56) 10 mm 1 x 1 x 6.49 = --- 6.49 --- --- --- ---
(C9,B63)-(C22,C33,B44,B63) --- --- --- --- --- ---
B19,B32,B44,B63 10 mm 1 x 4 x 16.67 = --- 66.68 --- --- --- ---
Lap 10 mm 1 x 4 x 0.50 = --- 2.00 --- --- --- ---
B19,B32,B44 10 mm 1 x 1 x 11.18 = --- 11.18 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
B32,B44,B63 10 mm 1 x 5 x 12.06 = --- 60.30 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
B32,B44 10 mm 1 x 3 x 7.42 = --- 22.26 --- --- --- ---
Near C22 B-116 10 mm 1 x 8 x 2.11 = --- 16.88 --- --- --- ---
Near C44 (B44) 10 mm 1 x 4 x 7.20 = --- 28.80 --- --- --- ---
Near C55 (B63) 10 mm 1 x 12 x 2.11 = --- 25.32 --- --- --- ---
(C22,C33,C44,C63)-(C8,C44,C55) --- --- --- --- --- ---
B18,B23,B31 10 mm 1 x 6 x 7.26 = --- 43.56 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
C33 Area 10 mm 1 x 1 x 1.80 = --- 1.80 --- --- --- ---
B44-B63 Near C44,C55 10 mm 1 x 6 x 7.21 = --- 43.26 --- --- --- ---
C44 10 mm 1 x 1 x 1.51 = --- 1.51 --- --- --- ---
(C8,C44,C55-C7,C17,B30,B41,B53,B61) --- --- --- --- --- ---
B43-B62 10 mm 1 x 6 x 7.21 = --- 43.26 --- --- --- ---
B31 Near C33 10 mm 1 x 11 x 1.83 = --- 20.13 --- --- --- ---
B23 10 mm 1 x 11 x 1.48 = --- 16.28 --- --- --- ---
B18 10 mm 1 x 1 x 1.40 = --- 1.40 --- --- --- ---
B5,B12,B18 10 mm 1 x 11 x 6.91 = --- 76.01 --- --- --- ---
B5,B12,B18,B23,B31 10 mm 1 x 2 x 12.51 = --- 25.02 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B5,B12,B18,B23,B31,B43 10 mm 1 x 3 x 17.29 = --- 51.87 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
B31-B43 10 mm 1 x 1 x 6.47 = --- 6.47 --- --- --- ---
B31-B43 10 mm 1 x 1 x 6.83 = --- 6.83 --- --- --- ---
B5,B18,B31,B43 10 mm 1 x 2 x 17.30 = --- 34.60 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B5,B18,B31,B43,B62 10 mm 1 x 3 x 21.81 = --- 65.43 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
B31,B43,B62 10 mm 1 x 5 x 12.00 = --- 60.00 --- --- --- ---
B31 10 mm 1 x 1 x 1.70 = --- 1.70 --- --- --- ---
B5-B18 10 mm 1 x 6 x 7.56 = --- 45.36 --- --- --- ---
B18 10 mm 1 x 1 x 1.80 = --- 1.80 --- --- --- ---
B5-B18 10 mm 1 x 2 x 7.56 = --- 15.12 --- --- --- ---
B31,B41,B53,B61 10 mm 1 x 3 x 12.00 = --- 36.00 --- --- --- ---
B5,B18,B31,B41,B53,B61 10 mm 1 x 3 x 21.82 = --- 65.46 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 24 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B18,B31,B41,B53,B61 10 mm 1 x 3 x 17.23 = --- 51.69 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
Col. 21 (B18) 10 mm 1 x 1 x 1.80 = --- 1.80 --- --- --- ---
B31,B41,B53,B61 Near C32 10 mm 1 x 1 x 11.13 = --- 11.13 --- --- --- ---
C43-B41 10 mm 1 x 15 x 1.68 = --- 25.20 --- --- --- ---
B53
10 mm 1 x 15 x 1.94 = --- 29.10 --- --- --- ---
B61 10 mm 1 x 15 x 1.76 = --- 26.40 --- --- --- ---
B17-B30 10 mm 1 x 5 x 7.32 = --- 36.60 --- --- --- ---
B30 10 mm 1 x 10 x 2.12 = --- 21.20 --- --- --- ---
B5,B17,B30 10 mm 1 x 1 x 12.11 = --- 12.11 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
B5,B17 10 mm 1 x 4 x 7.63 = --- 30.52 --- --- --- ---
B30,B41,B53,B61 10 mm 1 x 2 x 11.96 = --- 23.92 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
B17,B30,B41,B53,B61 (B17-C4 10 mm 1 x 6 x 16.60 = --- 99.60 --- --- --- ---
Lap 10 mm 1 x 6 x 0.50 = --- 3.00 --- --- --- ---
(C47,C36,C25,C12-C48,C37,C26,C13) --- --- --- --- --- ---
Main Bar 10 mm 1 x 18 x 18.92 = --- 340.56 --- --- --- ---
Lap 10 mm 1 x 18 x 0.50 = --- 9.00 --- --- --- ---
B55 10 mm 1 x 17 x 1.74 = --- 29.58 --- --- --- ---
B47 10 mm 1 x 17 x 1.84 = --- 31.20 --- --- --- ---
B35 10 mm 1 x 17 x 1.67 = --- 28.39 --- --- --- ---
B24 10 mm 1 x 17 x 2.12 = --- 35.96 --- --- --- ---
B21 10 mm 1 x 17 x 2.02 = --- 34.26 --- --- --- ---
(C48,C37,C26,C13-B56,B48,B36,C27,C14,C2,C1) --- --- --- --- --- ---
B-9 10 mm 1 x 17 x 1.51 = --- 25.67 --- --- --- ---
B56,B48,B36,B25,B22,B10 10 mm 1 x 6 x 18.92 = --- 113.52 --- --- --- ---
(C1)
Lap 10 mm 1 x 6 x 0.50 = --- 3.00 --- --- --- ---
B56,B48,B36,B25,B22 10 mm 1 x 2 x 15.46 = --- 30.92 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B56,B48,B36 10 mm 1 x 2 x 8.73 = --- 17.46 --- --- --- ---
B25,B22 10 mm 1 x 7 x 5.70 = --- 39.90 --- --- --- ---
B25 10 mm 1 x 1 x 1.30 = --- 1.30 --- --- --- ---
B10 Near C13 10 mm 1 x 5 x 1.66 = --- 8.30 --- --- --- ---
B56 10 mm 1 x 21 x 1.76 = --- 36.96 --- --- --- ---
B48 10 mm 1 x 21 x 1.82 = --- 38.22 --- --- --- ---
B36 10 mm 1 x 17 x 1.67 = --- 28.39 --- --- --- ---
B25 10 mm 1 x 9 x 1.82 = --- 16.38 --- --- --- ---
B22 10 mm 1 x 1 x 1.65 = --- 1.65 --- --- --- ---
B25,B22,B10,B1 10 mm 1 x 2 x 12.11 = --- 24.22 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B10,B1 10 mm 1 x 6 x 4.46 = --- 26.76 --- --- --- ---
B22,B10,B1 10 mm 1 x 8 x 8.56 = --- 68.48 --- --- --- ---
B22 10 mm 1 x 1 x 1.76 = --- 1.76 --- --- --- ---
B1 10 mm 1 x 1 x 1.56 = --- 1.56 --- --- --- ---
B36,B25,B22,B10,B1 10 mm 1 x 4 x 14.91 = --- 59.64 --- --- --- ---
Lap 10 mm 1 x 4 x 0.50 = --- 2.00 --- --- --- ---
B56,B48,B36,B25,B22,B10,B1 10 mm 1 x 2 x 21.21 = --- 42.42 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B56,B48,B36 10 mm 1 x 1 x 8.62 = --- 8.62 --- --- --- ---
(C27,C14,C2-C49,C38,C16)(B56,B48,B36,B11,B2) --- --- --- --- --- ---
Main Bar 10 mm 1 x 8 x 21.87 = --- 174.96 --- --- --- ---
Lap 10 mm 1 x 12 x 0.50 = --- 6.00 --- --- --- ---
C38,B26,B11,B2 10 mm 1 x 1 x 15.48 = --- 15.48 --- --- --- ---
Lap 10 mm 1 x 1 x 0.50 = --- 0.50 --- --- --- ---
B57,B49,B37,B26,B11 10 mm 1 x 3 x 18.66 = --- 55.98 --- --- --- ---
Lap 10 mm 1 x 3 x 0.50 = --- 1.50 --- --- --- ---
B26,B11 Near C16 10 mm 1 x 2 x 8.70 = --- 17.40 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 25 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B57,B49,B37 10 mm 1 x 4 x 8.74 = --- 34.96 --- --- --- ---
B26,B13,B11 Near C15 10 mm 1 x 9 x 8.70 = --- 78.30 --- --- --- ---
B26
10 mm 1 x 11 x 2.15 = --- 23.65 --- --- --- ---
B26 10 mm 1 x 1 x 1.20 = --- 1.20 --- --- --- ---
B13,B11
10 mm 1 x 2 x 4.07 = --- 8.14 --- --- --- ---
B13,B11,B2 (C15-C3) 10 mm 1 x 10 x 7.36 = --- 73.60 --- --- --- ---
B11 10 mm 1 x 1 x 1.58 = --- 1.58 --- --- --- ---
(C49-C38-C50-C39) --- --- --- --- --- ---
B2 10 mm 1 x 16 x 1.82 = --- 29.12 --- --- --- ---
B57
10 mm 1 x 11 x 1.76 = --- 19.36 --- --- --- ---
B49 10 mm 1 x 11 x 1.78 = --- 19.58 --- --- --- ---
B37 10 mm 1 x 11 x 1.68 = --- 18.48 --- --- --- ---
(C50,C39,C15,C3)-(B38,C28,C17,C4) --- --- --- --- --- ---
B58,B50,B38,B26 10 mm 1 x 4 x 12.00 = --- 48.00 --- --- --- ---
B58,B50,B38,B26,B13 10 mm 1 x 2 x 16.69 = --- 33.38 --- --- --- ---
Lap 10 mm 1 x 2 x 0.50 = --- 1.00 --- --- --- ---
B38,B26,B13 10 mm 1 x 6 x 9.73 = --- 58.38 --- --- --- ---
B38 10 mm 1 x 1 x 1.60 = --- 1.60 --- --- --- ---
(C50,C39-C51,C40) --- --- --- --- --- ---
B58 10 mm 1 x 11 x 1.64 = --- 18.04 --- --- --- ---
B50 10 mm 1 x 11 x 1.77 = --- 19.47 --- --- --- ---
(B38,C28,C17,C4-C51,C40,C27,C14,B3)-(C29,C18,C5)
--- --- --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 26 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
B40 10 mm 1 x 20 x 1.67 = --- 33.40 --- --- --- ---
B29 10 mm 1 x 6 x 2.10 = --- 12.60 --- --- --- ---
C31 10 mm 1 x 1 x 1.43 = --- 1.43 --- --- --- ---
B17,B30 10 mm 1 x 5 x 6.08 = --- 30.40 --- --- --- ---
B30 10 mm 1 x 7 x 2.10 = --- 14.70 --- --- --- ---
B17 10 mm 1 x 12 x 2.26 = --- 27.12 --- --- --- ---
B66,B65 TO B29 10 mm 1 x 5 x 19.36 = --- 96.80 --- --- --- ---
Lap 10 mm 1 x 7 x 0.50 = --- 3.50 --- --- --- ---
B66,B65 TO B17 10 mm 1 x 5 x 24.02 = --- 120.10 --- --- --- ---
Lap 10 mm 1 x 10 x 0.50 = --- 5.00 --- --- --- ---
Slab projction --- --- --- --- --- ---
C47,C48,C49,C50,C51,C52 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 25.65 = --- 102.60 --- --- --- ---
Lap 10 mm 1 x 8 x 0.50 = --- 4.00 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 25.65 = --- 128.25 --- --- --- ---
Lap 10 mm 1 x 8 x 0.50 = --- 4.00 --- --- --- ---
C53,C54,C55,C56,C57 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 23.09 = --- 92.36 --- --- --- ---
Lap 10 mm 1 x 8 x 0.50 = --- 4.00 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 23.09 = --- 115.45 --- --- --- ---
Lap 10 mm 1 x 8 x 0.50 = --- 4.00 --- --- --- ---
Lap 10 mm 1 x 9 x 0.50 = --- 4.50 --- --- --- ---
C47,C36,C25,C12 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 18.85 = --- 75.40 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 18.85 = --- 94.25 --- --- --- ---
Lap 10 mm 1 x 11 x 0.50 = --- 5.50 --- --- --- ---
C12,C13 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 7.00 = --- 28.00 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 7.00 = --- 35.00 --- --- --- ---
Lap 10 mm 1 x 5 x 0.50 = --- 2.50 --- --- --- ---
C13,C1 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 3.00 = --- 12.00 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 3.00 = --- 15.00 --- --- --- ---
Lap 10 mm 1 x 6 x 0.50 = --- 3.00 --- --- --- ---
C1,C2,C3,C4,C5,C6 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 19.60 = --- 78.40 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 19.60 = --- 98.00 --- --- --- ---
Lap 10 mm 1 x 5 x 0.50 = --- 2.50 --- --- --- ---
Main bar lap 10 mm 1 x 13 x 0.50 = --- 6.50 --- --- --- ---
C6,C19 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 6.15 = --- 24.60 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 6.15 = --- 30.75 --- --- --- ---
Lap 10 mm 1 x 11 x 0.50 = --- 5.50 --- --- --- ---
C19,C20,C7 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 7.40 = --- 29.60 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 7.40 = --- 37.00 --- --- --- ---
Lap 10 mm 1 x 20 x 0.50 = --- 10.00 --- --- --- ---
C21,C7 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 5.35 = --- 21.40 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 5.35 = --- 26.75 --- --- --- ---
C7,C8 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 8.20 = --- 32.80 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 8.20 = --- 41.00 --- --- --- ---
Lap 10 mm 1 x 21 x 0.50 = --- 10.50 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 27 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C8,C22 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 5.18 = --- 20.72 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 5.18 = --- 25.90 --- --- --- ---
Lap 10 mm 1 x 14 x 0.50 = --- 7.00 --- --- --- ---
C8,C9 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 2.20 = --- 8.80 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 2.20 = --- 11.00 --- --- --- ---
Lap 10 mm 1 x 18 x 0.50 = --- 9.00 --- --- --- ---
C9,B19 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 5.25 = --- 21.00 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 5.25 = --- 26.25 --- --- --- ---
Lap 10 mm 1 x 18 x 0.50 = --- 9.00 --- --- --- ---
C9,C10,C11 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 11.50 = --- 46.00 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 11.50 = --- 57.50 --- --- --- ---
Lap 10 mm 1 x 14 x 0.50 = --- 7.00 --- --- --- ---
C11,C24,C35,C46,C57 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 21.82 = --- 87.28 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 21.82 = --- 109.10 --- --- --- ---
Top Lap 10 mm 1 x 4 x 0.50 = --- 2.00 --- --- --- ---
Bottom Lap 10 mm 1 x 5 x 0.50 = --- 2.50 --- --- --- ---
C58,C52 & C59,C53 --- --- --- --- --- ---
Binder top bar 10 mm 2 x 4 x 7.40 = --- 59.20 --- --- --- ---
Binder bottom bar 10 mm 2 x 5 x 7.40 = --- 74.00 --- --- --- ---
Lap 10 mm 2 x 10 x 0.50 = --- 10.00 --- --- --- ---
C58,C59 --- --- --- --- --- ---
Binder top bar 10 mm 1 x 4 x 7.91 = --- 31.64 --- --- --- ---
Binder bottom bar 10 mm 1 x 5 x 7.91 = --- 39.55 --- --- --- ---
Lap 10 mm 1 x 10 x 0.50 = --- 5.00 --- --- --- ---
Column projection area --- --- --- --- --- ---
C1 10 mm 1 x 4 x 1.02 = --- 4.08 --- --- --- ---
C2 10 mm 1 x 2 x 1.16 = --- 2.32 --- --- --- ---
C3 10 mm 1 x 4 x 1.15 = --- 4.60 --- --- --- ---
C15 10 mm 1 x 3 x 1.02 = --- 3.06 --- --- --- ---
C4 10 mm 1 x 1 x 1.19 = --- 1.19 --- --- --- ---
C5 10 mm 1 x 1 x 1.00 = --- 1.00 --- --- --- ---
C6 10 mm 1 x 3 x 1.15 = --- 3.45 --- --- --- ---
C20 10 mm 1 x 2 x 1.12 = --- 2.24 --- --- --- ---
C7 10 mm 1 x 1 x 1.45 = --- 1.45 --- --- --- ---
C8 10 mm 1 x 1 x 1.45 = --- 1.45 --- --- --- ---
10 mm 1 x 1 x 1.50 = --- 1.50 --- --- --- ---
B12 10 mm 1 x 2 x 1.40 = --- 2.80 --- --- --- ---
C22 10 mm 1 x 1 x 1.30 = --- 1.30 --- --- --- ---
C9 10 mm 1 x 2 x 1.40 = --- 2.80 --- --- --- ---
C10 10 mm 1 x 1 x 1.30 = --- 1.30 --- --- --- ---
C11 10 mm 1 x 4 x 1.30 = --- 5.20 --- --- --- ---
C24 10 mm 1 x 1 x 1.39 = --- 1.39 --- --- --- ---
C46 10 mm 1 x 2 x 1.39 = --- 2.78 --- --- --- ---
C57 10 mm 1 x 2 x 1.39 = --- 2.78 --- --- --- ---
C56 10 mm 1 x 1 x 1.39 = --- 1.39 --- --- --- ---
C55 10 mm 1 x 1 x 1.39 = --- 1.39 --- --- --- ---
C54 10 mm 1 x 1 x 1.39 = --- 1.39 --- --- --- ---
C59 10 mm 1 x 2 x 1.40 = --- 2.80 --- --- --- ---
C58 10 mm 1 x 2 x 1.39 = --- 2.78 --- --- --- ---
B65 10 mm 1 x 3 x 1.39 = --- 4.17 --- --- --- ---
C51 10 mm 1 x 2 x 1.39 = --- 2.78 --- --- --- ---
C50 10 mm 1 x 2 x 1.39 = --- 2.78 --- --- --- ---
Lap 10 mm 1 x 5 x 0.50 = --- 2.50 --- --- --- ---
C49 10 mm 1 x 2 x 1.40 = --- 2.80 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 28 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C48 10 mm 1 x 2 x 1.40 = --- 2.79 --- --- --- ---
C47 10 mm 1 x 4 x 1.39 = --- 5.56 --- --- --- ---
C25 10 mm 1 x 2 x 1.39 = --- 2.78 --- --- --- ---
C12 10 mm 1 x 5 x 1.39 = --- 6.95 --- --- --- ---
C13 10 mm 1 x 2 x 1.39 = --- 2.78 --- --- --- ---
B77 10 mm 1 x 1 x 1.39 = --- 1.39 --- --- --- ---
Chair --- --- --- --- --- ---
S1 10 mm 1 x 4 x 1.09 = --- 4.36 --- --- --- ---
S2 10 mm 1 x 1 x 1.09 = --- 1.09 --- --- --- ---
S3 10 mm 1 x 1 x 1.09 = --- 1.09 --- --- --- ---
S4 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S5 10 mm 1 x 3 x 1.09 = --- 3.27 --- --- --- ---
S6 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S7 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S8 10 mm 1 x 7 x 1.09 = --- 7.63 --- --- --- ---
S9 10 mm 1 x 3 x 1.09 = --- 3.27 --- --- --- ---
S10 10 mm 1 x 9 x 1.09 = --- 9.81 --- --- --- ---
S11 10 mm 1 x 7 x 1.09 = --- 7.63 --- --- --- ---
S12 10 mm 1 x 3 x 1.09 = --- 3.27 --- --- --- ---
S13 & S14 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S15 10 mm 1 x 2 x 1.09 = --- 2.18 --- --- --- ---
S16 10 mm 1 x 3 x 1.09 = --- 3.27 --- --- --- ---
S17 10 mm 1 x 5 x 1.09 = --- 5.45 --- --- --- ---
S18 10 mm 1 x 3 x 1.09 = --- 3.27 --- --- --- ---
S19 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S20 10 mm 1 x 3 x 1.09 = --- 3.27 --- --- --- ---
S21 10 mm 1 x 11 x 1.09 = --- 11.99 --- --- --- ---
S22 10 mm 1 x 10 x 1.09 = --- 10.90 --- --- --- ---
S23 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S24 10 mm 1 x 11 x 1.09 = --- 11.99 --- --- --- ---
S25 10 mm 1 x 10 x 1.09 = --- 10.90 --- --- --- ---
S26 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S27 10 mm 1 x 9 x 1.09 = --- 9.81 --- --- --- ---
S28 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S29 10 mm 1 x 4 x 1.09 = --- 4.36 --- --- --- ---
S30 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S31 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S32 10 mm 1 x 2 x 1.09 = --- 2.18 --- --- --- ---
S33 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S34 10 mm 1 x 5 x 1.09 = --- 5.45 --- --- --- ---
S35 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S36 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S37 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
S38 10 mm 1 x 12 x 1.09 = --- 13.08 --- --- --- ---
S39 10 mm 1 x 3 x 1.09 = --- 3.27 --- --- --- ---
S40 10 mm 1 x 7 x 1.09 = --- 7.63 --- --- --- ---
S42 10 mm 1 x 14 x 1.09 = --- 15.26 --- --- --- ---
S43 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S44 10 mm 1 x 9 x 1.09 = --- 9.81 --- --- --- ---
S45 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S46 10 mm 1 x 11 x 1.09 = --- 11.99 --- --- --- ---
S47 10 mm 1 x 6 x 1.09 = --- 6.54 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 29 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
S53 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S54 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S55 10 mm 1 x 7 x 1.09 = --- 7.63 --- --- --- ---
S56 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S57 10 mm 1 x 10 x 1.09 = --- 10.90 --- --- --- ---
S58 10 mm 1 x 11 x 1.09 = --- 11.99 --- --- --- ---
S59 10 mm 1 x 8 x 1.09 = --- 8.72 --- --- --- ---
S60 10 mm 1 x 4 x 1.09 = --- 4.36 --- --- --- ---
S61 10 mm 1 x 9 x 1.09 = --- 9.81 --- --- --- ---
S62 10 mm 1 x 10 x 1.09 = --- 10.90 --- --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 30 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Bottom Binder
12 mm 1 x 19 x 1.20 = --- --- 22.80 --- --- ---
12 mm 1 x 5 x 1.50 = --- --- 7.50 --- --- ---
Down top binder 12 mm 1 x 11 x 1.20 = --- --- 13.20 --- --- ---
Up top binder 12 mm 1 x 5 x 1.50 = --- --- 7.50 --- --- ---
Top Main Bar
12 mm 1 x 10 x 1.60 = --- --- 16.00 --- --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 31 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C17
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C18 --- --- ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C19 --- --- ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C20 --- --- ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C21
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C22 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C23 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C24 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C25
Stiruups (master ring) 8 mm 1 x 3 x 1.47 = 4.41 --- --- --- --- ---
C26 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C27 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C28
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C29
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C30
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C31
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C32
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C33
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C34
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C35
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C36
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C37
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C38
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C39
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C40
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C41
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C42
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C43
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C44
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C45 --- ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C46 --- ---
measured by M/S Khatri Enterprises Checked by A.E Pag No- 32 Checked by Junior Engineer
Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = --- --- --- --- ---
C47 --- ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C48
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C49
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C50 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C51 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C52 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C53 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C54
Stiruups (master ring) 8 mm 1 x 3 x 1.47 = 4.41 --- --- --- --- ---
C55 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.47 = 4.41 --- --- --- --- ---
C56 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C57 ---
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C58
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
C59
Stiruups (master ring) 8 mm 1 x 3 x 1.74 = 5.22 --- --- --- --- ---
Total = 297.12 0.00 0.00 0.00 0.00 0.00
Weight per Meter in KG = 0.390 0.613 0.877 1.528 2.465 3.840
Weight = 115.88 0.00 0.00 0.00 0.00 0.00
115.88
C/O Page No.
measured by M/S Khatri Enterprises Checked by A.E Pag No- 33 Checked by Junior Engineer
Details of actual measurements Contents
Particulars Unit
or Area
No. Length Breadth Depth
Date of Measurement: 4/19/2023
Item No - 4.2 Centering and shuttering including strutting, propping etc. and removal of form
for:
Item No - 4.2.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Hospital Building. Shuttering work for Column from 2.4 m ht of Suspended Slab to Roof slab
C1 1 x 2 x( 0.350 + 0.450 )x 1.20 = 1.92 sqm
C2 1 x 2 x( 0.350 + 0.450 )x 1.20 = 1.92 sqm
C3 1 x 2 x( 0.350 + 0.450 )x 1.20 = 1.92 sqm
C4 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C5 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C6 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C7 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C8 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C9 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C10 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C11 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C12 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C13 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C14 1 x 2 x( 0.350 + 0.800 )x 1.20 = 2.76 sqm
C15 1 x 2 x( 0.350 + 0.450 )x 1.20 = 1.92 sqm
C16 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C17 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C18 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C19 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C20 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C21 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C22 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C23 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C24 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C25 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C26 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C27 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C28 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C29 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C30 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
C31 1 x 2 x( 0.350 + 0.600 )x 1.20 = 2.28 sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-36 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Bottom 1 X 1 X 2.200 X 0.230 X - = 0.51 Sqm
B9 (C12-C13)
Side 1 X 1 X 5.000 X 0.500 X - = 2.50 Sqm
1 X 1 X 5.000 X 0.450 X - = 2.25 Sqm
Bottom 1 X 1 X 5.000 X 0.230 X - = 1.15 Sqm
B10 (C13-C14)
Side 1 X 1 X 1.320 X 0.500 X - = 0.66 Sqm
1 X 1 X 3.440 X 0.450 X - = 1.55 Sqm
1 X 1 X 4.760 X 0.450 X - = 2.14 Sqm
Bottom 1 X 1 X 4.760 X 0.230 X - = 1.09 Sqm
B11 (C14-C15)
Side 1 X 2 X 4.870 X 0.450 X - = 4.38 Sqm
Bottom 1 X 1 X 4.870 X 0.230 X - = 1.12 Sqm
B12 (B109-B111)
Side 1 X 2 X 2.300 X 0.300 X - = 1.38 Sqm
Bottom 1 X 1 X 2.300 X 0.230 X - = 0.53 Sqm
B13 (C16-C17)
Side 1 X 1 X 1.500 X 0.500 X - = 0.75 Sqm
1 X 1 X 2.860 X 0.450 X - = 1.29 Sqm
1 X 1 X 4.360 X 0.450 X - = 1.96 Sqm
Bottom 1 X 1 X 4.360 X 0.230 X - = 1.00 Sqm
B14 (C17-C18)
Side 1 X 2 X 2.760 X 0.450 X - = 2.48 Sqm
Bottom 1 X 1 X 2.760 X 0.230 X - = 0.63 Sqm
B15 (C18-C19)
Side 1 X 2 X 3.990 X 0.450 X - = 3.59 Sqm
Bottom 1 X 1 X 3.990 X 0.230 X - = 0.92 Sqm
B16 (C19-C20)
Side 1 X 1 X 2.470 X 0.500 X - = 1.24 Sqm
1 X 1 X 2.470 X 0.450 X - = 1.11 Sqm
Bottom 1 X 1 X 2.470 X 0.230 X - = 0.57 Sqm
B17 (C20-C21)
Side 1 X 1 X 5.440 X 0.500 X - = 2.72 Sqm
1 X 1 X 1.150 X 0.450 X - = 0.52 Sqm
1 X 1 X 6.590 X 0.450 X - = 2.97 Sqm
Bottom 1 X 1 X 6.590 X 0.230 X - = 1.52 Sqm
B18 (C21-C22)
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-37 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Side 1 X 1 X 0.770 X 0.650 X - = 0.50 Sqm
1 X 1 X 5.160 X 0.600 X - = 3.10 Sqm
1 X 1 X 5.930 X 0.600 X - = 3.56 Sqm
Bottom 1 X 1 X 5.930 X 0.300 X - = 1.78 Sqm
B19 (C22-C23)
Side 1 X 1 X 2.380 X 0.500 X - = 1.19 Sqm
1 X 1 X 4.390 X 0.450 X - = 1.98 Sqm
1 X 1 X 6.770 X 0.450 X - = 3.05 Sqm
Bottom 1 X 1 X 6.770 X 0.230 X - = 1.56 Sqm
B20 (C23-C24)
Side 1 X 2 X 5.110 X 0.450 X - = 4.60 Sqm
Bottom 1 X 1 X 5.110 X 0.230 X - = 1.18 Sqm
B21 (B69-B73)
Side 1 X 2 X 5.120 X 0.450 X - = 4.61 Sqm
Bottom 1 X 1 X 5.120 X 0.230 X - = 1.18 Sqm
B22 (B73-B79)
Side 1 X 2 X 4.880 X 0.450 X - = 4.39 Sqm
Bottom 1 X 1 X 4.880 X 0.230 X - = 1.12 Sqm
B23 (B108-B112)
Side 1 X 2 X 3.300 X 0.300 X - = 1.98 Sqm
Bottom 1 X 1 X 3.300 X 0.230 X - = 0.76 Sqm
B24 (C25-C26)
Side 1 X 2 X 5.000 X 0.450 X - = 4.50 Sqm
Bottom 1 X 1 X 5.000 X 0.230 X - = 1.15 Sqm
B25 (C26-C27)
Side 1 X 2 X 4.780 X 0.450 X - = 4.30 Sqm
Bottom 1 X 1 X 4.780 X 0.230 X - = 1.10 Sqm
B26 (C27-C28)
Side 1 X 2 X 6.740 X 0.450 X - = 6.07 Sqm
Bottom 1 X 1 X 6.740 X 0.230 X - = 1.55 Sqm
B27 (C28-C29)
Side 1 X 2 X 2.760 X 0.450 X - = 2.48 Sqm
Bottom 1 X 1 X 2.760 X 0.230 X - = 0.63 Sqm
B28 (C29-C30)
Side 1 X 2 X 3.990 X 0.450 X - = 3.59 Sqm
Bottom 1 X 1 X 3.990 X 0.230 X - = 0.92 Sqm
B29 (C30-C31)
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-38 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Side 1 X 2 X 2.470 X 0.450 X - = 2.22 Sqm
Bottom 1 X 1 X 2.470 X 0.230 X - = 0.57 Sqm
B30 (C31-C32)
Side 1 X 2 X 6.590 X 0.450 X - = 5.93 Sqm
Bottom 1 X 1 X 6.590 X 0.230 X - = 1.52 Sqm
B31 (C32-C33)
Side 1 X 2 X 5.930 X 0.450 X - = 5.34 Sqm
Bottom 1 X 1 X 5.930 X 0.230 X - = 1.36 Sqm
B32 (C33-C34)
Side 1 X 2 X 6.775 X 0.450 X - = 6.10 Sqm
Bottom 1 X 1 X 6.775 X 0.300 X - = 2.03 Sqm
B33 (C34-C35)
Side 1 X 2 X 5.110 X 0.450 X - = 4.60 Sqm
Bottom 1 X 1 X 5.110 X 0.300 X - = 1.53 Sqm
B35 (C36-C37)
Side 1 X 2 X 5.000 X 0.450 X - = 4.50 Sqm
Bottom 1 X 1 X 5.000 X 0.230 X - = 1.15 Sqm
B36 (C37-C38)
Side 1 X 2 X 6.210 X 0.450 X - = 5.59 Sqm
Bottom 1 X 1 X 6.210 X 0.230 X - = 1.43 Sqm
B37 (C38-C39)
Side 1 X 2 X 3.380 X 0.450 X - = 3.04 Sqm
Bottom 1 X 1 X 3.380 X 0.230 X - = 0.78 Sqm
B38 (C39-C40)
Side 1 X 2 X 3.260 X 0.450 X - = 2.93 Sqm
Bottom 1 X 1 X 3.260 X 0.230 X - = 0.75 Sqm
B39 (C40-C41)
Side 1 X 2 X 5.420 X 0.450 X - = 4.88 Sqm
Bottom 1 X 1 X 5.420 X 0.230 X - = 1.25 Sqm
B40 (C41-C42)
Side 1 X 2 X 6.020 X 0.450 X - = 5.42 Sqm
Bottom 1 X 1 X 6.020 X 0.230 X - = 1.38 Sqm
B41 (C42-C43)
Side 1 X 2 X 4.270 X 0.450 X - = 3.84 Sqm
Bottom 1 X 1 X 4.270 X 0.230 X - = 0.98 Sqm
B43 (B106-C44)
Side 1 X 2 X 3.300 X 0.450 X - = 2.97 Sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-39 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Bottom 1 X 1 X 3.300 X 0.230 X - = 0.76 Sqm
B44 (C44-C45)
Side 1 X 2 X 6.670 X 0.450 X - = 6.00 Sqm
Bottom 1 X 1 X 6.670 X 0.230 X - = 1.53 Sqm
B45 (C45-C46)
Side 1 X 2 X 6.650 X 0.450 X - = 5.99 Sqm
Bottom 1 X 1 X 6.650 X 0.230 X - = 1.53 Sqm
B47 (B67-B71)
Side 1 X 2 X 5.000 X 0.450 X - = 4.50 Sqm
Bottom 1 X 1 X 5.000 X 0.230 X - = 1.15 Sqm
B48 (B71-B81)
Side 1 X 2 X 6.450 X 0.450 X - = 5.81 Sqm
Bottom 1 X 1 X 6.450 X 0.230 X - = 1.48 Sqm
B49 (B81-B84)
Side 1 X 2 X 3.500 X 0.450 X - = 3.15 Sqm
Bottom 1 X 1 X 3.500 X 0.230 X - = 0.81 Sqm
B50 (B84-B90)
Side 1 X 2 X 3.360 X 0.450 X - = 3.02 Sqm
Bottom 1 X 1 X 3.360 X 0.230 X - = 0.77 Sqm
B51 (B90-B94)
Side 1 X 2 X 5.540 X 0.450 X - = 4.99 Sqm
Bottom 1 X 1 X 5.540 X 0.230 X - = 1.27 Sqm
B52 (B94-B100)
Side 1 X 2 X 6.020 X 0.450 X - = 5.42 Sqm
Bottom 1 X 1 X 6.020 X 0.230 X - = 1.38 Sqm
B53 (B100-B106)
Side 1 X 2 X 4.570 X 0.450 X - = 4.11 Sqm
Bottom 1 X 1 X 4.570 X 0.230 X - = 1.05 Sqm
B55 (C47-C48)
Side 1 X 1 X 5.000 X 0.500 X - = 2.50 Sqm
1 X 1 X 5.000 X 0.450 X - = 2.25 Sqm
Bottom 1 X 1 X 5.000 X 0.230 X - = 1.15 Sqm
B56 (C48-C49)
Side 1 X 1 X 6.200 X 0.500 X - = 3.10 Sqm
1 X 1 X 6.200 X 0.450 X - = 2.79 Sqm
Bottom 1 X 1 X 6.200 X 0.230 X - = 1.43 Sqm
B57 (C49-C50)
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-40 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Side 1 X 1 X 3.380 X 0.500 X - = 1.69 Sqm
1 X 1 X 3.380 X 0.450 X - = 1.52 Sqm
Bottom 1 X 1 X 3..38 X 0.230 X - = 0.23 Sqm
B58 (C50-C51)
Side 1 X 1 X 3.240 X 0.500 X - = 1.62 Sqm
1 X 1 X 3.240 X 0.450 X - = 1.46 Sqm
Bottom 1 X 1 X 3.240 X 0.230 X - = 0.75 Sqm
B59 (C51-C52)
Side 1 X 1 X 5.420 X 0.500 X - = 2.71 Sqm
1 X 1 X 5.420 X 0.450 X - = 2.44 Sqm
Bottom 1 X 1 X 5.420 X 0.230 X - = 1.25 Sqm
B60 (C52-C53)
Side 1 X 2 X 6.020 X 0.450 X - = 5.42 Sqm
Bottom 1 X 1 X 6.020 X 0.230 X - = 1.38 Sqm
B61 (C53-C54)
Side 1 X 1 X 4.270 X 0.500 X - = 2.14 Sqm
1 X 1 X 4.270 X 0.450 X - = 1.92 Sqm
Bottom 1 X 1 X 4.270 X 0.230 X - = 0.98 Sqm
B62 (C54-C55)
Side 1 X 1 X 3.300 X 0.500 X - = 1.65 Sqm
1 X 1 X 3.300 X 0.450 X - = 1.49 Sqm
Bottom 1 X 1 X 3.300 X 0.230 X - = 0.76 Sqm
B63 (C55-C56)
Side 1 X 1 X 6.670 X 0.500 X - = 3.34 Sqm
1 X 1 X 6.670 X 0.450 X - = 3.00 Sqm
Bottom 1 X 1 X 6.670 X 0.230 X - = 1.53 Sqm
B64 (C56-C57)
Side 1 X 1 X 6.650 X 0.500 X - = 3.33 Sqm
1 X 1 X 6.650 X 0.450 X - = 2.99 Sqm
Bottom 1 X 1 X 6.650 X 0.230 X - = 1.53 Sqm
B65 (B93-B99)
Side 1 X 2 X 6.020 X 0.450 X - = 5.42 Sqm
Bottom 1 X 1 X 6.020 X 0.230 X - = 1.38 Sqm
B66 (C58-C59)
Side 1 X 1 X 6.020 X 0.500 X - = 3.01 Sqm
1 X 1 X 6.020 X 0.450 X - = 2.71 Sqm
Bottom 1 X 1 X 6.020 X 0.230 X - = 1.38 Sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-41 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Linear Direction
B67 (C47-C36)
Side 1 X 1 X 6.190 X 0.500 X - = 3.10 Sqm
1 X 1 X 6.190 X 0.450 X - = 2.79 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B68 (C36-C25)
Side 1 X 1 X 2.400 X 0.500 X - = 1.20 Sqm
1 X 1 X 2.400 X 0.450 X - = 1.08 Sqm
Bottom 1 X 1 X 2.400 X 0.230 X - = 0.55 Sqm
B69 (C25-C12)
Side 1 X 1 X 6.560 X 0.500 X - = 3.28 Sqm
1 X 1 X 6.560 X 0.450 X - = 2.95 Sqm
Bottom 1 X 1 X 6.560 X 0.230 X - = 1.51 Sqm
B71 (C48-C37),
Side 1 X 2 X 6.190 X 0.450 X - = 5.57 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B72 (C37-C26)
Side 1 X 2 X 2.400 X 0.450 X - = 2.16 Sqm
Bottom 1 X 1 X 2.400 X 0.230 X - = 0.55 Sqm
B73 (C26-C13)
Side 1 X 2 X 6.560 X 0.450 X - = 5.90 Sqm
Bottom 1 X 1 X 6.560 X 0.230 X - = 1.51 Sqm
B74 (B25-B22)
Side 1 X 2 X 3.535 X 0.300 X - = 2.12 Sqm
Bottom 1 X 1 X 3.535 X 0.230 X - = 0.81 Sqm
B75 (B10-C1)
Side 1 X 1 X 2.370 X 0.500 X - = 1.19 Sqm
1 X 1 X 2.370 X 0.450 X - = 1.07 Sqm
Bottom 1 X 1 X 2.370 X 0.230 X - = 0.55 Sqm
B76 (B22-B10)
Side 1 X 2 X 3.535 X 0.450 X - = 3.18 Sqm
Bottom 1 X 1 X 3.535 X 0.230 X - = 0.81 Sqm
B77 (B10-B1)
Side 1 X 2 X 2.590 X 0.450 X - = 2.33 Sqm
Bottom 1 X 1 X 2.590 X 0.230 X - = 0.60 Sqm
B78 (B36-C27)
Side 1 X 2 X 2.400 X 0.450 X - = 2.16 Sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-42 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Bottom 1 X 1 X 2.400 X 0.230 X - = 0.55 Sqm
B79 (C27-C14)
Side 1 X 2 X 6.470 X 0.450 X - = 5.82 Sqm
Bottom 1 X 1 X 6.470 X 0.230 X - = 1.49 Sqm
B80 (C14-C2)
Side 1 X 2 X 2.370 X 0.450 X - = 2.13 Sqm
Bottom 1 X 1 X 2.370 X 0.230 X - = 0.55 Sqm
B81 (C49-C38)
Side 1 X 2 X 6.190 X 0.450 X - = 5.57 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B82 (B26-C16)
Side 1 X 2 X 5.000 X 0.450 X - = 4.50 Sqm
Bottom 1 X 1 X 5.000 X 0.230 X - = 1.15 Sqm
B83 (C16-B11)
Side 1 X 2 X 1.180 X 0.450 X - = 1.06 Sqm
Bottom 1 X 1 X 1.180 X 0.230 X - = 0.27 Sqm
B84 (C50-C39)
Side 1 X 2 X 6.190 X 0.450 X - = 5.57 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B85 (B13-C15)
Side 1 X 1 X 1.550 X 0.500 X - = 0.78 Sqm
1 X 1 X 1.550 X 0.450 X - = 0.70 Sqm
Bottom 1 X 1 X 1.550 X 0.230 X - = 0.36 Sqm
B86 (B15-C3)
Side 1 X 1 X 2.735 X 0.500 X - = 1.37 Sqm
1 X 1 X 2.735 X 0.450 X - = 1.23 Sqm
Bottom 1 X 1 X 2.735 X 0.230 X - = 0.63 Sqm
B87 (B38-C28)
Side 1 X 2 X 2.400 X 0.450 X - = 2.16 Sqm
Bottom 1 X 1 X 2.400 X 0.230 X - = 0.55 Sqm
B88 (C17-C28)
Side 1 X 2 X 4.240 X 0.450 X - = 3.82 Sqm
Bottom 1 X 1 X 4.240 X 0.230 X - = 0.98 Sqm
B89 (C17-C4)
Side 1 X 1 X 4.670 X 0.500 X - = 2.34 Sqm
1 X 1 X 4.670 X 0.450 X - = 2.10 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-43 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
B90 (C51-C40)
Side 1 X 2 X 6.190 X 0.450 X - = 5.57 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B91 (C29-C18)
Side 1 X 2 X 4.240 X 0.450 X - = 3.82 Sqm
Bottom 1 X 1 X 4.240 X 0.230 X - = 0.98 Sqm
B92 (C18-C5)
Side 1 X 2 X 4.670 X 0.450 X - = 4.20 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
B93 (C58-C52) , B99 (C59-C53)
Side 2 X 1 X 6.800 X 0.500 X - = 6.80 Sqm
2 X 1 X 6.800 X 0.450 X - = 6.12 Sqm
Bottom 2 X 1 X 6.800 X 0.230 X - = 3.13 Sqm
B94(C52-C41)
Side 1 X 2 X 6.190 X 0.450 X - = 5.57 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B95 (C41-C30)
Side 1 X 2 X 2.400 X 0.450 X - = 2.16 Sqm
Bottom 1 X 1 X 2.400 X 0.230 X - = 0.55 Sqm
B96 (C30-C19)
Side 1 X 2 X 4.240 X 0.450 X - = 3.82 Sqm
Bottom 1 X 1 X 4.240 X 0.230 X - = 0.98 Sqm
B97 (C19-C6)
Side 1 X 1 X 4.670 X 0.500 X - = 2.34 Sqm
1 X 1 X 4.670 X 0.450 X - = 2.10 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
B98 (B31-B20)
Side 1 X 2 X 4.240 X 0.450 X - = 3.82 Sqm
Bottom 1 X 1 X 4.240 X 0.230 X - = 0.98 Sqm
B100(C53-C42)
Side 1 X 2 X 6.190 X 0.450 X - = 5.57 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B101 (C42-B30)
Side 1 X 2 X 2.400 X 0.450 X - = 2.16 Sqm
Bottom 1 X 1 X 2.400 X 0.230 X - = 0.55 Sqm
B102 (B30-B17)
Side 1 X 2 X 5.000 X 0.450 X - = 4.50 Sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-44 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Bottom 1 X 1 X 5.000 X 0.230 X - = 1.15 Sqm
B103 (B17-C7)
Side 1 X 1 X 4.670 X 0.500 X - = 2.34 Sqm
1 X 1 X 4.670 X 0.450 X - = 2.10 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
B104 (C32-C21)
Side 1 X 2 X 4.260 X 0.450 X - = 3.83 Sqm
Bottom 1 X 1 X 4.260 X 0.230 X - = 0.98 Sqm
B105 (B18-B5),
Side 1 X 2 X 5.040 X 0.450 X - = 4.54 Sqm
Bottom 1 X 1 X 5.040 X 0.230 X - = 1.16 Sqm
B 106(C54-C43)
Side 1 X 2 X 6.190 X 0.450 X - = 5.57 Sqm
Bottom 1 X 1 X 6.190 X 0.230 X - = 1.42 Sqm
B107 (B31-C43)
Side 1 X 2 X 2.400 X 0.450 X - = 2.16 Sqm
Bottom 1 X 1 X 2.400 X 0.230 X - = 0.55 Sqm
B108 (B31-B18)
Side 1 X 2 X 4.910 X 0.450 X - = 4.42 Sqm
Bottom 1 X 1 X 4.910 X 0.230 X - = 1.13 Sqm
B109 (C18-B5)
Side 1 X 2 X 5.047 X 0.450 X - = 4.54 Sqm
Bottom 1 X 1 X 5.047 X 0.230 X - = 1.16 Sqm
B110 (C55-C44), B117 (C56-C45)
Side 2 X 2 X 4.270 X 0.450 X - = 7.69 Sqm
Bottom 2 X 1 X 4.270 X 0.230 X - = 1.96 Sqm
B111 (B18-C8)
Side 1 X 1 X 4.670 X 0.500 X - = 2.34 Sqm
1 X 1 X 4.670 X 0.450 X - = 2.10 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
B112 (C33-C22)
Side 1 X 2 X 4.240 X 0.450 X - = 3.82 Sqm
Bottom 1 X 1 X 4.240 X 0.230 X - = 0.98 Sqm
B113 (B63-B44)
Side 1 X 2 X 5.010 X 0.450 X - = 4.51 Sqm
Bottom 1 X 1 X 5.010 X 0.230 X - = 1.15 Sqm
B114 (B44-B32)
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-45 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Side 1 X 2 X 4.350 X 0.450 X - = 3.92 Sqm
Bottom 1 X 1 X 4.350 X 0.230 X - = 1.00 Sqm
B115 (B32-B19)
Side 1 X 2 X 4.910 X 0.450 X - = 4.42 Sqm
Bottom 1 X 1 X 4.910 X 0.230 X - = 1.13 Sqm
B116 (B19-C9)
Side 1 X 1 X 4.670 X 0.500 X - = 2.34 Sqm
1 X 1 X 4.670 X 0.450 X - = 2.10 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
B118 (B45-C34)
Side 1 X 2 X 4.350 X 0.450 X - = 3.92 Sqm
Bottom 1 X 1 X 4.350 X 0.230 X - = 1.00 Sqm
B119 (C34-C23)
Side 1 X 2 X 4.240 X 0.450 X - = 3.82 Sqm
Bottom 1 X 1 X 4.240 X 0.230 X - = 0.98 Sqm
B120 (C23-C10)
Side 1 X 2 X 4.670 X 0.450 X - = 4.20 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
B121 (B64-B45)
Side 1 X 2 X 5.010 X 0.450 X - = 4.51 Sqm
Bottom 1 X 1 X 5.010 X 0.230 X - = 1.15 Sqm
B122 (B33-B20)
Side 1 X 2 X 4.910 X 0.450 X - = 4.42 Sqm
Bottom 1 X 1 X 4.910 X 0.230 X - = 1.13 Sqm
B123 (B20-B7)
Side 1 X 2 X 5.040 X 0.450 X - = 4.54 Sqm
Bottom 1 X 1 X 5.040 X 0.230 X - = 1.16 Sqm
B124 (C57-C46)
Side 1 X 1 X 4.270 X 0.500 X - = 2.14 Sqm
1 X 1 X 4.270 X 0.450 X - = 1.92 Sqm
Bottom 1 X 1 X 4.270 X 0.230 X - = 0.98 Sqm
B125 (C46-C35)
Side 1 X 1 X 0.550 X 0.500 X - = 0.28 Sqm
1 X 2 X 4.350 X 0.450 X - = 3.92 Sqm
Bottom 1 X 1 X 4.350 X 0.230 X - = 1.00 Sqm
B126 (C35-C24)
Side 1 X 1 X 4.240 X 0.500 X - = 2.12 Sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-46 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
1 X 1 X 4.240 X 0.450 X - = 1.91 Sqm
Bottom 1 X 1 X 4.240 X 0.230 X - = 0.98 Sqm
B127 (C24-C11)
Side 1 X 1 X 4.670 X 0.500 X - = 2.34 Sqm
1 X 1 X 4.670 X 0.450 X - = 2.10 Sqm
Bottom 1 X 1 X 4.670 X 0.230 X - = 1.07 Sqm
Total Quantity (Sqm) = 645.15 Sqm
C/O TCMB / P -
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-47 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Date of Measurement 4/24/2023
Centering and shuttering including strutting, propping etc. and removal of
Agreement No. 4.2 form for:
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-48 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
S33 1 X 1 X 3.535 X 3.15 X - = 11.14 Sqm
S34 1 X 1 X 2.385 X 3.30 X - = 7.87 Sqm
S35 1 X 1 X 5.120 X 2.40 X - = 12.29 Sqm
S36 1 X 1 X 4.900 X 2.40 X - = 11.76 Sqm
S37 1 X 1 X 6.740 X 2.40 X - = 16.18 Sqm
S38 1 X 1 X 7.340 X 2.40 X - = 17.62 Sqm
S39 1 X 1 X 6.020 X 2.40 X - = 14.45 Sqm
S40 1 X 1 X 4.510 X 2.40 X - = 10.82 Sqm
S42 1 X 1 X 7.460 X 4.35 X - = 32.45 Sqm
S43 1 X 1 X 4.250 X 4.35 X - = 18.49 Sqm
S44 1 X 1 X 5.230 X 4.35 X - = 22.75 Sqm
S45 1 X 1 X 5.000 X 3.35 X - = 16.75 Sqm
S46 1 X 1 X 6.450 X 3.35 X - = 21.61 Sqm
S47 1 X 1 X 3.520 X 3.35 X - = 11.79 Sqm
S48 1 X 1 X 3.360 X 3.35 X - = 11.26 Sqm
S49 1 X 1 X 5.540 X 3.35 X - = 18.56 Sqm
S50 1 X 1 X 6.020 X 3.35 X - = 20.17 Sqm
S51 1 X 1 X 4.510 X 3.35 X - = 15.11 Sqm
S52 1 X 1 X 5.010 X 3.30 X - = 16.53 Sqm
S53 1 X 1 X 5.010 X 3.30 X - = 16.53 Sqm
S54 1 X 1 X 5.010 X 3.30 X - = 16.53 Sqm
S55 1 X 1 X 5.010 X 3.30 X - = 16.53 Sqm
S56 1 X 1 X 5.010 X 3.27 X - = 16.38 Sqm
S57 1 X 1 X 5.000 X 3.35 X - = 16.75 Sqm
S58 1 X 1 X 6.450 X 3.35 X - = 21.61 Sqm
S59 1 X 1 X 3.500 X 3.35 X - = 11.73 Sqm
S60 1 X 1 X 3.360 X 3.35 X - = 11.26 Sqm
S61 1 X 1 X 5.540 X 3.35 X - = 18.56 Sqm
S62 1 X 1 X 6.020 X 3.35 X - = 20.17 Sqm
S63 1 X 1 X 4.590 X 3.35 X - = 15.38 Sqm
S64 1 X 1 X 6.020 X 3.47 X - = 20.89 Sqm
S65 1 X 1 X 6.020 X 3.47 X - = 20.89 Sqm
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-49 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Date of Measurement 4/24/2023
Agreement No. 4.2.8 Edges of slabs and breaks in floors and walls
4.2.8.1 Under 20 cm wide
Particular No. x No. x L x B x H = Quantity Unit
Hospital Building. Shuttering work for R.C.C Of Roof Slab
C11 -C57 1 X 1 X 21.83 X - X - = 21.83 mtr
C57-C53 1 X 1 X 22.20 X - X - = 22.20 mtr
C53-C59& C58-C52 1 X 2 X 6.80 X - X - = 13.60 mtr
C59-C58 1 X 1 X 7.90 X - X - = 7.90 mtr
C52-C47 1 X 1 X 24.80 X - X - = 24.80 mtr
C12-C47 1 X 1 X 18.87 X - X - = 18.87 mtr
C12-C13 1 X 1 X 6.85 X - X - = 6.85 mtr
C1-C13 &(C3-C15)
&(C4-C16) & (C6-C18) X X X X =
1 7 2.94 - - 20.58 mtr
(C7-C21) (C8-C22)- (C9-
C22)
C1-C12 1 X 1 X 10.36 X - X - = 10.36 mtr
1 X 1 X 5.23 X - X - = 5.23 mtr
1 X 1 X 5.23 X - X - = 5.23 mtr
1 X 1 X 9.15 X - X - = 9.15 mtr
1 X 1 X 5.20 X - X - = 5.20 mtr
1 X 1 X 5.25 X - X - = 5.25 mtr
1 X 1 X 6.70 X - X - = 6.70 mtr
1 X 1 X 5.28 X - X - = 5.28 mtr
1 X 1 X 5.25 X - X - = 5.25 mtr
1 X 1 X 5.25 X - X - = 5.25 mtr
1 X 1 X 2.20 X - X - = 2.20 mtr
1 X 1 X 11.53 X - X - = 11.53 mtr
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-50 Checked By Junior Engineer
RECORD ENTRY OF MEASUREMENT
Centering and shuttering including strutting, propping etc. and removal of form
Agreement No. 4.2 for:
4.2.7 Stairs (excluding Landing ) except Spiral-staircase
Particular No. x No. x L x B x H = Quantity unit
Hospital Stairs 1st Flight & 2nd Flight
Waist Slab Bottom 2 X 1 X 3.070 X 1.200 X - = 7.37 Sqm
Waist Slab Side 2 X 2 X 3.300 X - X 0.330 = 4.36 Sqm
Riser Shuttering 2 X 10 X 1.200 X - X 0.180 = 4.32 Sqm
Total Quantity (Sqm) = 16.05 Sqm
C/O TCMB / P -
Centering and shuttering including strutting, propping etc. and removal of form
Agreement No. 4.2
for:
4.2.3 Suspended Floors, roofs, landings, balonies acess
Particular No. x No. x L x B x H = Quantity unit
Hospital Stairs 1st Flight
Landing Slab Bottom 1 X 1 X 2.470 X 1.365 X - = 3.37 Sqm
Landing Slab Side 1 X 2 X 0.765 X - X 0.150 = 0.23 Sqm
Total Quantity (Sqm) = 3.60 Sqm
C/O TCMB / P -
Centering and shuttering including strutting, propping etc. and removal of form
Agreement No. 4.2
for:
Measured By M/S Khatri Enterprises Test Checked By A.E Page No-51 Checked By Junior Engineer
Date of Measurement: 4/25/2023
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and
Item No. - 4.4
binding all complete Upto plinth level.
Item No. 4.4.1 Thermo-Mechanically Treated bars of Gradee Fe-500D or more
Reinforcement of Septic Tank SO'S Bldg.
8MM 10MM 12MM 16MM 20MM 25MM
Long Wall Vertical Bar Outer
Side 12 mm 2 x 36 x 3.22 = --- --- 231.48 --- --- ---
Lap 12 mm 1 x 12 x 0.60 = --- --- 7.20 --- --- ---
Long Wall Vertical Bar Inner
Side 12 mm 2 x 34 x 3.22 = --- --- 218.62 --- --- ---
Lap 12 mm 1 x 12 x 0.60 = --- --- 7.20 --- --- ---
Short Wall Vertical Bar Outer
Side 12 mm 2 x 12 x 3.22 = --- --- 77.16 --- --- ---
Lap 12 mm 1 x 6 x 0.60 = --- --- 3.60 --- --- ---
Short Wall Vertical Bar Inner
Side 12 mm 2 x 12 x 3.22 = --- --- 77.16 --- --- ---
Lap 12 mm 1 x 6 x 0.60 = --- --- 3.60 --- --- ---
Middle Wall Vertical Bar
12 mm 2 x 14 x 2.07 = --- --- 57.82 --- --- ---
Lap 12 mm 1 x 6 x 0.60 = --- --- 3.60 --- --- ---
Long Direction
Raft Top Binder
10 mm 1 x 14 x 5.64 = --- 78.96 --- --- --- ---
Raft Bottom Binder mm 1 x 14 x = 78.96 --- --- --- ---
10 5.64 ---
Short Direction
Raft Top & Bottom Binder
10 mm 2 x 36 x 2.24 = --- 161.28 --- --- --- ---
Hounch Bar Long Side Wall mm 2 x 34 x = 115.60 --- --- --- ---
10 1.70 ---
Hounch Bar Short Side Wall mm 2 x 12 x = 40.80 --- --- --- ---
10 1.70 ---
Chair mm 1 x 10 x = 13.40 --- --- --- ---
10 1.34 ---
Only For Raft
Long Wall Binder Outer Side 10 mm 1 x 2 x 5.94 = --- 11.88 --- --- --- ---
Long Wall Binder Inner Side 10 mm 1 x 2 x 5.94 = --- 11.88 --- --- --- ---
Short Wall Binder Outer Side 10 mm 1 x 2 x 2.54 = --- 5.08 --- --- --- ---
Short Wall Binder Inner Side 10 mm 1 x 2 x 2.54 = --- 5.08 --- --- --- ---
Only For Wall
1st Lift Spacer U bar 10 mm 1 x 21 x 0.92 = --- 19.24 --- --- --- ---
Long Wall Binder Outer Side
10 mm 2 x 13 x 5.94 = --- 154.44 --- --- --- ---
Long Wall Binder Inner Side
10 mm 2 x 13 x 5.94 = --- 154.44 --- --- --- ---
Short Wall Binder Outer Side
10 mm 2 x 13 x 2.54 = --- 66.04 --- --- --- ---
Short Wall Binder Inner Side
10 mm 2 x 13 x 2.54 = --- 66.04 --- --- --- ---
Middle Wall Binder
10 mm 2 x 7 x 2.54 = --- 35.56 --- --- --- ---
Measured By M/S Khatri Enterprises Test Checked By A.E Page No 51 Checked By J.E
Date of Measurement: 4/27/2023
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and
Item No. - 4.4
binding all complete Upto plinth level.
Item No. 4.4.1 Thermo-Mechanically Treated bars of Gradee Fe-500D or more
Reinforcement of Septic Tank SO'S Bldg.
8MM 10MM 12MM 16MM 20MM 25MM
Top Slab
Top Long Bar 10 mm 1 x 10 x 5.54 = --- 55.40 --- --- --- ---
Top Long Bar 8 mm 1 x 5 x 4.05 = 20.25 --- --- --- --- ---
Bottom Long Bar 10 mm 1 x 10 x 5.54 = --- 55.40 --- --- --- ---
Bottom Long Bar 8 mm 1 x 5 x 4.05 = 20.25 --- --- --- --- ---
Top Short Bar 10 mm 1 x 30 x 2.15 = --- 64.50 --- --- --- ---
Top Short Bar 8 mm 1 x 9 x 1.35 = 12.15 --- --- --- --- ---
Bottom Short Bar 10 mm 1 x 26 x 2.15 = --- 55.90 --- --- --- ---
Bottom Short Bar 8 mm 1 x 9 x 1.35 = 12.15 --- --- --- --- ---
Chair 10 mm 1 x 14 x 1.10 = --- 15.40 --- --- --- ---
Buffle Wall Vertical Bar 12 mm 1 x 11 x 0.83 = --- --- 9.08 --- --- ---
Buffle Wall Binder 10 mm 1 x 4 x 2.54 = --- 10.16 --- --- --- ---
Measured By M/S Khatri Enterprises Test Checked By A.E Page No 52 Checked By J.E
Date of Measurement: 4/28/2023
Agreement No. 4.2 Centering and shuttering including strutting, propping etc. and removal of form for:
4.2.1 Foundation , footing, bases of columns, etc. for mass concrete.
Particular No. x No. x L x B x H = Quantity unit
Septic Tank R.C.C Shuttering in SO'S Bldg.
1 X 2 X 5.400 X - X 0.250 = 2.70 sqm
1 X 2 X 2.000 X - X 0.250 = 1.00 sqm
Total Quantity (Cum) = 3.70 sqm
C/O TCMB / P -
Providing and laying in position machine batched, machine mixed design M-25 grade
cement concrete for reinforced cement concrete work using cement content as per
approved design mix, including pupping of concrete to site of laying but excluding the
cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS : 9103 to accelerate, retard setting of concrete,
improve workability without impairing strength and durability as per direction of the
Agreement No. 4.8 engineer-in-charge.
(Note-1) Cement content considered in this item is @330 kg/cum.
Excess/less cement used as per design mix is payable/recoverable separately)
Providing and laying in position machine batched, machine mixed design M-25 grade
cement concrete for reinforced cement concrete work using cement content as per
approved design mix, including pupping of concrete to site of laying but excluding the
cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS : 9103 to accelerate, retard setting of concrete,
Agreement No. 4.8 improve workability without impairing strength and durability as per direction of the
engineer-in-charge.
(Note-1) Cement content considered in this item is @330 kg/cum.
Excess/less cement used as per design mix is payable/recoverable separately)
Providing and laying in position machine batched, machine mixed design M-25 grade
cement concrete for reinforced cement concrete work using cement content as per
approved design mix, including pupping of concrete to site of laying but excluding the
cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS : 9103 to accelerate, retard setting of concrete,
Agreement No. 4.8 improve workability without impairing strength and durability as per direction of the
engineer-in-charge.
(Note-1) Cement content considered in this item is @330 kg/cum.
Excess/less cement used as per design mix is payable/recoverable separately)
a) White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single
(a) hole basin mixer
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
GO'S Pedestral Basin
Ground Floor
Staff Room 1 X 1 X - X - X - = 1.00 nos
Male Toilet 1 X 1 X - X - X - = 1.00 nos
1st Floor
All Suits 1 X 6 X - X - X - = 6.00 nos
Bin Type Megazine Pedestral Basin
1 X 2 X - X - X - = 2.00 nos
14.4.1 Single half stall urinal with 5 litre P.V.C. automatic flushing cistern
Details of actual measurements Contents or
Particulars Area Unit
No. X No. X Length X Breath X Height =
Bin Type megazine Urinal
1 X 1 X - X - X - = 1.00 nos
Total Quantity (Nos) = 1.00 nos
C/O TCMB / P -
Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931 :
15.15
Agreement No.
15.15.1 15 mm nominal Bore
Details of actual measurements Contents or
Particulars Area Unit
No. X No. X Length X Breath X Height =
Bin Type Megazine Building bib cock
Bath Room 1 X 1 X - X - X - = 1.00 nos
Toilet 1 X 1 X - X - X - = 1.00 nos
Total Quantity (Nos) = 2.00 nos
C/O TCMB / P -
Providing and fixing C.P. brass stop cock (concealed) of standard design and of
15.16 approved make conforming to IS:8931.
Agreement No.
15 mm nominal Bore
15.16.1
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Details of actual measurements Contents or
Particulars Area Unit
No. X No. X Length X Breath X Height =
Bin Type Megazine Building concealed Stop cock
Bath Room 1 X 1 X - X - X - = 1.00 nos
Total Quantity (Nos) = 1.00 nos
C/O TCMB / P -
15.7 Providing and fixing uplasticised PVC connection pipe with brass unions :
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Guest Room-3 1 X 1 X 2.025 X 0.928 X - = 1.88 Sqm
Agreement No. 18.3 Providing and fixing glazing in aluminum door, window, ventilator shutters and
partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the
18.3.1 With float glass panes of 4.0 mm thickness
architectural drawings and the directions of engineer-in-charge . (Cost of aluminum
Particular No. snap
x No.beading shall
x be paid
L in basic
x item):
B x H = Quantity unit
Frosted Glass Measurement
SO'S Toilet glass
Louvars Area 15 X 6 X 0.510 X 0.100 X - = 4.59 Sqm
Bottom Fix 15 X 1 X 0.540 X 0.230 X - = 1.86 Sqm
Top Fix 15 X 1 X 0.300 X 0.180 X - = 0.81 Sqm
= 21.45 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
C/O TCMB / P -
Agreement No. 9.5 Providing and fixing M.S. fan clamp type I or II of 16 mm dia M.S. bar, bent to shape
with hooked ends in R.C.C. slabs or beams during laying, including painting the
Particular No. x No. portionxof loop,Lall as per
exposed x standard
B design x complete.
H = Quantity unit
Hospital Building Fan Clamp
1 X 42 X - X - X - = 42.00 nos
Total Quantity (Sqm) = 42.00 nos
C/O TCMB / P -
Date of Measurement 5/2/2023
Providing and fixing false ceiling at all height including providing and fixing of frame work made of special
sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive)
as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and
37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long
with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts
& bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm
running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80
mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a
direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long
G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm
and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with
Agreement No. 11.4 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter
channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a
flush finish of tapered and square edges of the board with recommended jointing compound , jointing tapes ,
finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer
suitable for board, all as per manufacturer's specification and also including the cost of making openings for light
fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per
drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with :
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Hand Wash 0.00
1 X 1 X 3.76 X 1.97 X - = 7.41 Sqm
Store Room 0.00
1 X 1 X 2.09 X 2.60 X - = 5.43 Sqm
Verndah 0.00
1 X 1 X 4.15 X 1.95 X - = 8.09 Sqm
Side Vertical 1 X 1 X 2.15 X 0.27 X - = 0.58 Sqm
Staff Room 0.00
1 X 1 X 4.16 X 2.81 X - = 11.69 Sqm
Dinning Area 0.00
Top Layer 1 X 1 X 3.41 X 2.66 X - = 9.07 Sqm
Bottom Layer 1 X 2 X 4.37 X 0.63 X - = 5.51 Sqm
1 X 2 X 2.36 X 0.63 X - = 2.97 Sqm
Vertical 1 X 2 X 3.41 X 0.15 X - = 1.02 Sqm
1 X 2 X 2.66 X 0.15 X - = 0.80 Sqm
1 X 2 X 3.11 X 0.10 X - = 0.62 Sqm
1 X 2 X 2.36 X 0.10 X - = 0.47 Sqm
Bottom Layer 1 X 1 X 12.94 X 0.63 X - = 8.15 Sqm
Vertical 1 X 1 X 11.68 X 0.10 X - = 1.17 Sqm
1 X 1 X 11.98 X 0.15 X - = 1.80 Sqm
Bottom Layer 1 X 1 X 12.91 X 0.63 X - = 8.13 Sqm
Vertical 1 X 1 X 11.68 X 0.10 X - = 1.17 Sqm
1 X 1 X 11.98 X 0.15 X - = 1.80 Sqm
Bottom Layer 1 X 1 X 12.31 X 0.63 X - = 7.76 Sqm
Vertical 1 X 1 X 11.68 X 0.10 X - = 1.17 Sqm
1 X 1 X 11.98 X 0.15 X - = 1.80 Sqm
Bottom Layer 1 X 2 X 6.66 X 0.63 X - = 8.39 Sqm
Vertical 1 X 2 X 6.96 X 0.15 X - = 2.09 Sqm
1 X 2 X 6.96 X 0.10 X - = 1.39 Sqm
Bottom Layer 1 X 1 X 8.79 X 1.36 X - = 11.95 Sqm
Top Layer 1 X 1 X 11.68 X 1.00 X - = 11.68 Sqm
1 X 1 X 10.95 X 1.00 X - = 10.95 Sqm
1 X 1 X 10.98 X 1.00 X - = 10.98 Sqm
1 X 2 X 5.81 X 1.00 X - = 11.62 Sqm
1 X 2 X 8.79 X 1.00 X - = 17.58 Sqm
1 X 1 X 6.89 X 1.00 X - = 6.89 Sqm
Panel-1 1 X 1 X 4.10 X 3.95 X - = 16.20 Sqm
Vertical 1 X 2 X 4.10 X 0.10 X - = 0.82 Sqm
1 X 2 X 3.95 X 0.10 X - = 0.79 Sqm
1 X 2 X 3.80 X 0.15 X - = 1.14 Sqm
1 X 2 X 3.65 X 0.10 X - = 0.73 Sqm
Panel-2 1 X 1 X 4.10 X 3.95 X - = 16.20 Sqm
Vertical 1 X 2 X 4.10 X 0.10 X - = 0.82 Sqm
1 X 2 X 3.95 X 0.10 X - = 0.79 Sqm
1 X 2 X 3.80 X 0.15 X - = 1.14 Sqm
1 X 2 X 3.65 X 0.15 X - = 1.10 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
1 X 1 X 3.20 X 0.10 X - = 0.32 Sqm
1 X 1 X 3.80 X 0.15 X - = 0.57 Sqm
1 X 1 X 5.40 X 0.15 X - = 0.81 Sqm
1 X 1 X 2.90 X 0.15 X - = 0.44 Sqm
1 X 1 X 5.56 X 0.15 X - = 0.83 Sqm
Panel-4 1 X 1 X 4.10 X 3.20 X - = 13.12 Sqm
1 X 0.50 X 4.10 X 2.50 X - = 5.13 Sqm
Vertical 1 X 1 X 4.10 X 0.10 X - = 0.41 Sqm
1 X 1 X 5.70 X 0.10 X - = 0.57 Sqm
1 X 1 X 3.20 X 0.10 X - = 0.32 Sqm
1 X 1 X 3.80 X 0.15 X - = 0.57 Sqm
1 X 1 X 5.40 X 0.15 X - = 0.81 Sqm
1 X 1 X 2.90 X 0.15 X - = 0.44 Sqm
1 X 1 X 5.56 X 0.15 X - = 0.83 Sqm
Suit-4 1 X 1 X 5.25 X 3.50 X - = 18.38 Sqm
1 X 1 X 3.35 X 3.55 X - = 11.89 Sqm
1 X 1 X 0.70 X 0.46 X - = 0.32 Sqm
1 X 1 X 1.86 X 0.25 X - = 0.47 Sqm
Cup board area 1 X 1 X 1.58 X 1.97 X - = 3.11 Sqm
1 X 1 X 1.69 X 0.10 X - = 0.17 Sqm
Suit-3 1 X 1 X 5.35 X 3.49 X - = 18.67 Sqm
1 X 1 X 3.15 X 3.52 X - = 11.09 Sqm
1 X 1 X 2.56 X 0.25 X - = 0.64 Sqm
1 X 1 X 1.69 X 0.15 X - = 0.25 Sqm
Cup board area 1 X 1 X 1.69 X 1.99 X - = 3.36 Sqm
Vip Suit-2 (Dinning Area)
Top Layer 1 X 1 X 6.71 X 4.32 X - = 28.99 Sqm
1 X 1 X 4.51 X 3.32 X - = 14.97 Sqm
Bottom Layer 1 X 2 X 6.71 X 0.70 X - = 9.39 Sqm
1 X 2 X 2.92 X 1.25 X - = 7.30 Sqm
Vertical 1 X 2 X 4.21 X 0.10 X - = 0.84 Sqm
1 X 2 X 2.92 X 0.10 X - = 0.58 Sqm
1 X 2 X 4.51 X 0.15 X - = 1.35 Sqm
1 X 2 X 3.32 X 0.15 X - = 1.00 Sqm
Window Side 1 X 1 X 1.20 X 0.15 X - = 0.18 Sqm
Door Side 1 X 1 X 1.74 X 0.18 X - = 0.31 Sqm
Bed Room
Top Layer 1 X 1 X 3.52 X 3.45 X - = 12.14 Sqm
Bottom Layer 1 X 2 X 4.55 X 0.65 X - = 5.92 Sqm
1 X 1 X 3.15 X 0.65 X - = 2.05 Sqm
1 X 1 X 3.15 X 0.68 X - = 2.14 Sqm
Vertical 1 X 2 X 3.22 X 0.10 X - = 0.64 Sqm
1 X 2 X 3.15 X 0.10 X - = 0.63 Sqm
1 X 2 X 3.52 X 0.15 X - = 1.06 Sqm
1 X 2 X 3.45 X 0.15 X - = 1.04 Sqm
Window Side 1 X 1 X 1.70 X 0.13 X - = 0.22 Sqm
Cup board area 1 X 1 X 1.89 X 1.58 X - = 2.99 Sqm
Vip Suit-1 (Dinning Area)
Top Layer 1 X 1 X 6.70 X 4.33 X - = 29.01 Sqm
1 X 1 X 4.38 X 3.33 X - = 14.59 Sqm
Bottom Layer 1 X 2 X 6.58 X 0.65 X - = 8.55 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
1 X 2 X 3.03 X 1.25 X - = 7.58 Sqm
Vertical 1 X 2 X 4.38 X 0.15 X - = 1.31 Sqm
1 X 2 X 3.33 X 0.15 X - = 1.00 Sqm
1 X 2 X 4.08 X 0.10 X - = 0.82 Sqm
1 X 2 X 3.03 X 0.10 X - = 0.61 Sqm
Window Side 1 X 1 X 1.12 X 0.12 X - = 0.13 Sqm
1 X 1 X 1.75 X 0.19 X - = 0.33 Sqm
Bed Room
Top Layer 1 X 1 X 4.67 X 4.45 X - = 20.78 Sqm
1 X 1 X 3.65 X 3.23 X - = 11.79 Sqm
Bottom Layer 1 X 2 X 4.67 X 0.70 X - = 6.54 Sqm
1 X 2 X 2.93 X 0.66 X - = 3.87 Sqm
Vertical 1 X 2 X 3.65 X 0.15 X - = 1.10 Sqm
1 X 2 X 3.23 X 0.15 X - = 0.97 Sqm
1 X 2 X 3.35 X 0.10 X - = 0.67 Sqm
1 X 2 X 3.23 X 0.10 X - = 0.65 Sqm
Window Side 1 X 1 X 1.70 X 0.17 X - = 0.29 Sqm
Cup board area 1 X 1 X 1.91 X 1.60 X - = 3.06 Sqm
Suit-1 1 X 1 X 5.39 X 3.10 X - = 16.71 Sqm
1 X 1 X 3.55 X 2.62 X - = 9.30 Sqm
Cup board area 1 X 1 X 1.78 X 1.63 X - = 2.90 Sqm
Window Side 1 X 1 X 1.70 X 0.10 X - = 0.17 Sqm
1 X 1 X 2.52 X 0.17 X - = 0.43 Sqm
Suit-2 1 X 1 X 5.33 X 2.51 X - = 13.38 Sqm
1 X 1 X 3.18 X 3.61 X - = 11.48 Sqm
Cup board area 1 X 1 X 1.93 X 1.56 X - = 3.01 Sqm
Window Side 1 X 1 X 1.70 X 0.13 X - = 0.22 Sqm
1 X 1 X 2.41 X 0.25 X - = 0.60 Sqm
1st Floor Corridor
Bottom Layer 1 X 1 X 2.78 X 1.25 X - = 3.48 Sqm
Vertical 1 X 1 X 1.25 X 0.11 X - = 0.14 Sqm
1 X 1 X 1.53 X 0.10 X - = 0.15 Sqm
Bottom Layer 1 X 1 X 6.61 X 1.25 X - = 8.26 Sqm
Vertical 1 X 1 X 5.36 X 0.10 X - = 0.54 Sqm
Bottom Layer 1 X 1 X 12.30 X 1.25 X - = 15.38 Sqm
Vertical 1 X 1 X 9.80 X 0.10 X - = 0.98 Sqm
Bottom Layer 1 X 1 X 6.63 X 1.25 X - = 8.29 Sqm
Vertical 1 X 1 X 5.38 X 0.10 X - = 0.54 Sqm
Bottom Layer 1 X 1 X 1.53 X 1.25 X - = 1.91 Sqm
Vertical 1 X 1 X 1.53 X 0.10 X - = 0.15 Sqm
1 X 1 X 1.25 X 0.11 X - = 0.14 Sqm
Top Layer 2 X 0.5 X 3.75 X 2.63 X - = 9.86 Sqm
2 X 1 X 5.67 X 1.68 X - = 19.05 Sqm
Vertical 1 X 2 X 5.67 X 0.15 X - = 1.70 Sqm
1 X 2 X 1.68 X 0.15 X - = 0.50 Sqm
Bottom Layer 1 X 1 X 1.70 X 1.25 X - = 2.13 Sqm
Vertical 1 X 2 X 1.70 X 0.10 X - = 0.34 Sqm
1 X 2 X( 4.15 + 1.85 )X 3.570 = 21.42 Sqm
2
Vertical 1 X 2 X 5.25 X 0.15 X - = 1.58 Sqm
1 X 2 X 1.85 X 0.15 X - = 0.56 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Side Vertical 1 X 2 X 9.05 X 0.08 X - = 1.45 Sqm
1 X 1 X 1.25 X 0.11 X - = 0.14 Sqm
Window Side 1 X 2 X 1.70 X 0.12 X - = 0.41 Sqm
1 X 1 X 2.04 X 0.22 X - = 0.45 Sqm
1 X 1 X 2.14 X 0.22 X - = 0.47 Sqm
Ground Floor Corridor
Bottom Layer 1 X 2 X 3.15 X 1.20 X - = 7.56 Sqm
Vertical 1 X 2 X 1.22 X 0.10 X - = 0.24 Sqm
1 X 2 X 1.93 X 0.10 X - = 0.39 Sqm
Bottom Layer 1 X 2 X 3.71 X 1.22 X - = 9.05 Sqm
Vertical 1 X 2 X 2.49 X 0.10 X - = 0.50 Sqm
Bottom Layer 1 X 1 X 11.09 X 1.22 X - = 13.53 Sqm
1 X 1 X 1.70 X 1.25 X - = 2.13 Sqm
Vertical 1 X 1 X 9.84 X 0.10 X - = 0.98 Sqm
1 X 2 X 1.70 X 0.10 X - = 0.34 Sqm
1 X 2 X 1.07 X 0.15 X - = 0.32 Sqm
1 X 2 X 1.93 X 0.15 X - = 0.58 Sqm
1 X 2 X 2.79 X 0.15 X - = 0.84 Sqm
1 X 1 X 10.44 X 0.15 X - = 1.57 Sqm
1 X 2 X 1.85 X 0.15 X - = 0.56 Sqm
Top Layer 1 X 1 X 2.79 X 3.12 X - = 8.70 Sqm
1 X 2 X( 3.12 + 1.88 )X 3.230 = 16.15 Sqm
2
Side Vertical 1 X 1 X 9.05 X 0.15 X - = 1.36 Sqm
1 X 1 X 1.25 X 0.13 X - = 0.16 Sqm
Door Side 1 X 1 X 2.01 X 0.30 X - = 0.60 Sqm
1 X 1 X 2.14 X 0.30 X - = 0.64 Sqm
Less Already Paid CMB No Vide Page No = -596.38 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Lobby Area Balcony With 3 X 6 X - X - X - = 18.00 nos
Staircase
Main Lobby Area 1st Floor 3 X 7 X - X - X - = 21.00 nos
Roof Area Lobby
L.H.S 3 X 9 X - X - X - = 27.00 nos
R.H.S 3 X 9 X - X - X - = 27.00 nos
Ramp Railling
L.H.S
3 X 11 X - X - X - = 33.00 nos
R.H.S 3 X 12 X - X - X - = 36.00 nos
C/O TCMB / P -
Providing and laying water proofing treatment on roofs of slabs by applying cement
Extra Item-18 slurry mixed with water proofing cement compound consisting of applying:
after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with
(a) water proofing cement compound @ 0.253 kg/sqm
laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of
(b) joints of fibre cloth should not be less than 10 cm
third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed
with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289
kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48
(c)
hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into
groove in parapet all around.
(d) fourth and final layer of cement concrete 1:2:4 (which will be paid for separately
Particular No. x No. x L x B x H = Quantity unit
SO'S mess Roof Treatment
1 X 1 X 6.68 X 3.89 X - = 25.99 Sqm
1 X 1 X 11.86 X 10.39 X - = 123.23 Sqm
1 X 1 X 12.40 X 0.99 X - = 12.28 Sqm
1 X 1 X 10.44 X 3.06 X - = 31.95 Sqm
1 X 1 X 10.76 X 1.02 X - = 10.98 Sqm
1 X 1 X 1.50 X 0.40 X - = 0.60 Sqm
1 X 1 X 0.60 X 0.43 X - = 0.26 Sqm
1 X 1 X 5.38 X 4.93 X - = 26.52 Sqm
1 X 1 X 6.19 X 1.26 X - = 7.80 Sqm
1 X 1 X 15.49 X 3.41 X - = 52.82 Sqm
1 X 1 X 4.20 X 3.44 X - = 14.45 Sqm
Total Quantity (Sqm) = 306.88 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
C/O TCMB / P -
Grading roof for water proofing treatment with
Agreement No. 19.3
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
19.3.1 nominal size
Agreement No. Providing and fixing aluminium handles, ISI marked, anodised (anodic coating not
8.16
less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or
8.16.1 125 mmwith necessary screws etc. complete
shade,
Particular No. x No. x L x B x H = Quantity unit
GO'S Mess Flush Door Handle
Dinning Room 2 X 2 X - X - X - = 4.00 Nos
Gym Room 1 X 2 X - X - X - = 2.00 Nos
Recreation Room 1 X 1 X - X - X - = 1.00 Nos
Wash Area 1 X 2 X - X - X - = 2.00 Nos
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Guest Room-2 1 X 2 X - X - X - = 2.00 Nos
1st Floor
Guest Room-1 1 X 2 X - X - X - = 2.00 Nos
Guest Room-2 1 X 2 X - X - X - = 2.00 Nos
Guest Room-3 1 X 2 X - X - X - = 2.00 Nos
Guest Room-5 1 X 2 X - X - X - = 2.00 Nos
Guest Room-6 1 X 2 X - X - X - = 2.00 Nos
Bin Type Megazine Building
all room door 1 X 4 X - X - X - = 4.00 Nos
Agreement No. Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not
8.14
less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or
8.14.3 200x10 mm
shade, with necessary screws etc. complete :
Particular No. x No. x L x B x H = Quantity unit
SO'S Mess Flush Tower Bolts
Ground Floor
Kitchen 1 X 1 X - X - X - = 1.00 Nos
Staff Room 1 X 1 X - X - X - = 1.00 Nos
Store Room 1 X 1 X - X - X - = 1.00 Nos
Guest Room-1 1 X 1 X - X - X - = 1.00 Nos
Guest Room-2 1 X 1 X - X - X - = 1.00 Nos
Guest Room-3 1 X 1 X - X - X - = 1.00 Nos
1st Floor
Guest Room-1 1 X 1 X - X - X - = 1.00 Nos
Guest Room-2 1 X 1 X - X - X - = 1.00 Nos
Guest Room-3 1 X 1 X - X - X - = 1.00 Nos
Guest Room-5 1 X 1 X - X - X - = 1.00 Nos
Guest Room-6 1 X 1 X - X - X - = 1.00 Nos
= 11.00 Nos
Total Quantity (Sqm)
C/O TCMB / P -
Agreement No. Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not
8.14
less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or
8.14.2 250x10 mm
shade, with necessary screws etc. complete :
Particular No. x No. x L x B x H = Quantity unit
GO'S Mess Flush Door Tower Bolt
1st Floor
Suit-1 1 X 1 X - X - X - = 1.00 Nos
Suit-2 1 X 1 X - X - X - = 1.00 Nos
Suit-3 1 X 1 X - X - X - = 1.00 Nos
Suit-4 1 X 1 X - X - X - = 1.00 Nos
Vip Suit-1 1 X 1 X - X - X - = 1.00 Nos
Vip Suit-2 1 X 1 X - X - X - = 1.00 Nos
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
GO'S Mess Grouting (600x600) mm
1st Floor
VIP Suit-1
Drawing Room Floor 1 x 1 x 6.690 x 4.320 x - = 28.90 Sqm
Area 1 x 1 x 0.150 x 1.750 x - = 0.26 Sqm
Deduction -1 x 1 x 0.600 x 0.150 x - = -0.09 Sqm
Bed Room Floor Area
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
-1 x 1 x 0.590 x 0.380 x - = -0.22 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Heavy Duty Cupboard Area
Floor Area 1 x 1 x 1.680 x 1.850 x - = 3.11 Sqm
1 x 1 x 1.020 x 0.150 x - = 0.15 Sqm
Door Sill
1 x 1 x 0.870 x 0.150 x - = 0.13 Sqm
Suit-4
Floor Area 1 x 1 x 2.510 x 5.000 x - = 12.55 Sqm
1 x 1 x 2.100 x 3.600 x - = 7.56 Sqm
1 x 1 x 0.900 x 3.620 x - = 3.26 Sqm
Deduction Column -1 x 1 x 0.590 x 0.280 x - = -0.17 Sqm
-1 x 1 x 0.430 x 0.440 x - = -0.19 Sqm
-1 x 1 x 0.440 x 0.170 x - = -0.07 Sqm
-1 x 1 x 0.300 x 0.190 x - = -0.06 Sqm
Heavy Duty Cupboard Area
Floor Area 1 x 1 x 1.700 x 1.950 x - = 3.32 Sqm
Door Sill 1 x 1 x 1.100 x 0.210 x - = 0.23 Sqm
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Deduct for not grouting the joints with white cement and matching pigment in the
E/S-22 items of fixing of vitrified tiles
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Grouting the joints of flooring tiles having joints of 3 mm width, using epoxygrout mix
of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg
Extra Item-23 of resin per kg), including filling/ grouting and finishing complete as per direction of
Engineer-in-charge.
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Cutting Hole of required dia and depth upto 150 mm in RCC slabs/ beams at all floor
and at all height by core cutting machine without disturbing the existing structure
including removing of debris etc. and sealing the gap in hole after installation of pipe
with non shrinkable grout of SIKA/CICO/PIDILITE or equivalant and backing of core
Extra Item-24 at botto with jute/san or ply shuttering and props to each hole i/c curing etc. complete
as per architectural drawing and as directed by Engineer-In-Charge.
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Extra For Cutting rebate in Flush Door Shutters ( Total area of the shutter to be
Agreement No. 8.7 measure)
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Agreement No. 12.15 French Spirit Polishing
12.15.1 Two or more coats on new work including a coat of wood filler
Particular No. x No. x L x B x H = Quantity unit
GO'S Mess Cupboard Shutter
= 12.00 Nos
Total Quantity (Nos)
C/O TCMB / P -
Measured By M/S Khatri Enterprises Checked By A.E Page No- Checked By J.E
Abstract of steel
Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10 Bedded Hospital
Including water supply , sanitary installation, IEI , fans, service connection , compound light, fire
1 Name of Work:- alarm & AC at 33rd Bn ITBP, Karchia Sonapur, Guwahati (Assam).
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete
4.4 Upto plinth level.
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete
4.5 above plinth level.
4.5.1 Thermo-Mechanically Treated bars
Qty B/F TCMB 1 29.70 0.00 159.15 0.00 22.08 0.00
Qty B/F TCMB 15 8,111.98 560.50 1,000.58 2,483.17 1,143.95 0.00
Qty B/F TCMB 28 0.00 28,558.92 472.00 0.00 0.00 0.00
Qty B/F TCMB 29 0.00 0.00 179.26 0.00 0.00 0.00
Qty B/F TCMB 31 297.12 0.00 0.00 0.00 0.00 0.00
Total 8438.80 29119.42 1810.99 2483.17 1166.03 0.00
Weight/mtr in Kg 0.390 0.613 0.877 1.528 2.465 3.840
Weight in Kg 3291.13 17850.20 1588.24 3794.28 2874.26 0.00 29398.11
Kg Kg Kg Kg Kg Kg Kg
Page no - 86
ABSTRACT OF COST
Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10 Bedded
1 Name of Work : - : Hospital Including water supply , sanitary installation, IEI , fans, service connection ,
compound light, fire alarm & AC at 33rd Bn ITBP, Karchia Sonapur, Guwahati (Assam).
2 Agreement No. : 02/CE/SE/EE/PD-II/2019-20
3 Agency Name : M/s Khatri Enterprises
4 Stp. Date of Start : 4/30/2019
Stp. Date of
5 : 4/29/2020
Completion
6 Time Allowed : 12 (Twelve) months
Actual Date of
7 : Work in Progress
Completion
8 Date of Abstract : 5/3/2023
9 Sl.No Of Bill : 16th R.A Bill
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
1.1 Carriage of earth by mechanical transport including loading, unloading and stacking
1.1.1 Earth Lead -2km
Agrt. Qnty - 8000.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/802
42673.62 cum
vide Page No. 41
Total 42673.62 cum
As per agreement qty. 8000.00 cum 151.94 151.94 cum 1,215,520.00
Qty upto Deviation Limit 8000.00 cum 151.94 151.94 cum 1,215,520.00
Qty beyond Deviation Limit 26673.62 cum 108.80 cum 2,902,089.86
Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means over areas exceeding
2.2 30cm in depth 1.5m in width as well as 10sqm on plan including disposal of excavated earth lead upto 50m
and lift upto 1.5m disposed earth to be levelled and neatly dressed
2.2.1 All kinds of soil
Agrt. Qnty - 12909.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/802
55786.23 cum
vide Page No. 41
Qty TCMB 34 38.98 cum
Total 55825.21 cum
As per agreement qty. 12909.00 cum 171.63 171.63 cum 2,215,571.67
Qty upto Deviation Limit 12909.00 cum 171.63 171.63 cum 2,215,571.67
Qty beyond Deviation Limit 29182.00 cum 172.85 cum 5,044,108.70
Qty beyond Sanction Limit 825.21 cum 120.00 cum 99,025.20
Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation
trenches or drains (not exceeding 1.5m in width or 10 sqm on plan ), including dressing of sides and
2.3: ramming of bottoms lift upto 1.5m, including getting out the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50m.
Page No- 87
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked
2.6
materials.
2.6.1 All kinds of soil
Agrt. Qnty - 275.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/802
789.70 cum
vide Page No. 41
Qty B/F TCMB 34 18.10 cum
Total 807.80 cum
As per agreement qty. 275.00 cum 70.52 70.52 cum 19,393.00
Qty upto Deviation Limit 82.50 cum 70.52 cum 5,817.90
Qty beyond Deviation Limit 450.30 cum 52.89 cum 23,816.37
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating
2.7
and dressing complete.
Agrt. Qnty - 403.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/802
89.03 cum
vide Page No. 42
Total 89.03 cum 1250.62 1250.62 cum 111,342.70
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
3.1 shuttering - All work upto plinth level:
3.1.1 1:2:4(1 cement :2coarse sand :4 graded stone aggregate 20mm nominal size)
Agrt. Qnty - 36.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/802
6.51 cum
vide Page No. 42
Total 6.51 cum 7470.25 7470.25 cum 48,631.33
3.1.3 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
3.2.1 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Agrt. Qnty - 6.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/802
5.06 cum
vide Page No. 42
Total 5.06 cum 8922.55 8922.55 cum 45,148.10
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone
3.3 aggregate 20mm nominal size) over 75mm thick bed of dry brick ballast 40mm nominal size, well rammed
and consolidated and grouted with fine sand , including finishing the top smooth.
Page No- 88
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
4.2 Centering and shuttering including strutting, propping etc. and removal of form for:
4.2.1 Foundation , footing, bases of columns, etc. for mass concrete.
Agrt. Qnty - 1533.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
1636.72 sqm
vide Page No. 42
Qty TCMB 35 1.56 sqm
Qty TCMB 53 3.70 sqm
Total 1641.98 sqm
As per agreement qty. 1533.00 sqm 264.30 264.30 sqm 405,171.90
Qty upto Deviation Limit 108.98 sqm 264.30 sqm 28,803.41
4.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Agrt. Qnty - 1146.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
205.10 sqm
vide Page No. 42
Qty TCMB 53 80.93 sqm
Total 286.03 sqm 515.92 515.92 Sqm 147,568.60
4.2.3 Suspended floors, roofs, landings, balconies and access platform
Agrt. Qnty - 3504.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
2951.83 sqm
vide Page No. 43
Qty B/F TCMB 48 913.46 sqm
Qty B/F TCMB 50 3.60 sqm
Qty B/F TCMB 55 10.22 sqm
Total 3879.11 sqm
As per agreement qty. 3504.00 sqm 575.47 575.47 sqm 2,016,446.88
Qty upto Deviation Limit 375.11 sqm 575.47 sqm 215,864.55
4.2.5 Lintels, beams,Plinth beams,girders,bressumers and cantilevers
Agrt. Qnty - 3352.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
3669.77 sqm
vide Page No. 43
Qty B/F TCMB 46 645.15 sqm
Qty B/F TCMB 50 2.23 sqm
Total 4317.15 sqm
As per agreement qty. 3352.00 sqm 467.27 467.27 sqm 1,566,289.04
Qty upto Deviation Limit 965.15 sqm 467.27 sqm 450,985.64
4.2.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Agrt. Qnty - 1356.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
1890.99 sqm
vide Page No. 43
Qty TCMB 33 134.70 sqm
Total 2025.69 sqm
As per agreement qty. 1356.00 sqm 637.54 637.54 sqm 864,504.24
Qty upto Deviation Limit 406.80 sqm 637.54 sqm 259,351.27
Qty beyond Deviation Limit 262.89 sqm 459.00 sqm 120,666.51
4.2.7 Stairs, (excluding landings) except spiralstaircases
Agrt. Qnty - 107.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
73.53 sqm
vide Page No. 43
Qty TCMB 50 16.05 sqm
Total 89.58 sqm 571.45 571.45 Sqm 51,190.49
Extra for shuttering in circular work (20% of respective centering and shuttering items) for Columns, Pillars,
4.2.7.1
Piers, Abutments, Posts and Struts.
Agrt. Qnty - 55.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
83.51 sqm
vide Page No. 43
Total 83.51 sqm
As per agreement qty. 55.00 sqm 127.51 127.51 sqm 7,013.05
Qty upto Deviation Limit 16.50 sqm 127.51 sqm 2,103.92
Page No- 89
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Qty beyond Deviation Limit 12.01 sqm 127.51 100.00 Sqm 1,201.00
Page No- 90
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
4.2.8 Edges of slabs and breaks in floors and walls
4.2.8.1 Under 20 cm wide
Agrt. Qnty - 346.00 Mtr.
Qty. B/F CMB No COM/ITBP/PD-II/802
464.29 mtr
vide Page No. 43
Qty TCMB 49 213.26 mtr
Total 677.55 mtr
As per agreement qty. 346.00 mtr 166.52 166.52 mtr 57,615.92
Qty upto Deviation Limit 103.80 mtr 166.52 mtr 17,284.78
Qty beyond Deviation Limit 227.75 mtr 124.89 mtr 28,443.70
4.2.9 Weather shade, Chajjas, corbels etc., including edges.
Agrt. Qnty - 28.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
206.95 sqm
vide Page No. 43
Total 206.95 sqm
As per agreement qty. 28.00 sqm 710.99 710.99 sqm 19,907.72
Qty upto Deviation Limit 8.40 sqm 710.99 sqm 5,972.32
Qty beyond Deviation Limit 170.55 sqm 533.24 sqm 90,944.08
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position
4.4
and binding all complete upto plinth level
4.4.1 Thermo-Mechanically Treated bars
Agrt. Qnty - 156339.00 Kg
Qty. B/F CMB No COM/ITBP/PD-II/802
77027.26 kg
vide Page No. 43
Qty TCMB 86 1417.96 kg
Total 78445.22 kg 77.13 77.13 kg 6,050,479.82
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position
4.5
and binding all complete above plinth level.
4.5.1 Thermo-Mechanically Treated bars
Agrt. Qnty - 133170.00 Kg
Qty. B/F CMB No COM/ITBP/PD-II/802
129758.19 kg
vide Page No. 44
Qty B/F TCMB 86 29398.11 kg
Total 159156.30 kg
As per agreement qty. 133170.00 kg 77.13 77.13 kg 10,271,402.10
Qty upto Deviation Limit 25986.30 kg 74.00 kg 1,922,986.20
4.7 Add for plaster drip course /groove in plaster surface or moulding to R.C.C projections
Page No- 91
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
4.8.2 All works above plinth level upto floor V level
Agrt. Qnty - 847.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/802
850.00 cum
vide Page No. 44
Qty B/F TCMB 61 245.66 cum
Qty B/F TCMB 61 2.79 cum
Total 1098.45 cum
As per agreement qty. 847.00 cum 9879.64 9879.64 Cum 8,368,055.08
Qty upto Deviation Limit 251.45 cum 8891.00 Cum 2,235,633.06
4.9 Add for using extra cement in the items of design mix over and above the specified cement content therein
Page No- 92
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Total 617.86 Cum 5404.26 5404.26 Cum 3,339,076.08
Page No- 93
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Providing and fixing 18mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut
for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved
7.1 shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1cement :4 Coarse sand) jointes
treated with whitw cement , mixed with matching pigment , epoxy touch ups, including rubbing , curing,
moulding and polishing to edges give high gloss finish etc. complete at all levels.
Page No- 94
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Extra for providing frosted glass panes 4 mm thick instead of ordinary float glass panes 4 mm thick in
8.3 doors, windows and clerestory window shutters.(Area of opening for glass panes excluding portion inside
rebate shall be measured
Agrt. Qnty -12.00 Sqm
Qty B/F TCMB 68 21.50 sqm
Total 21.50 sqm 101.32 101.32 sqm 2,178.38
Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of
8.4 block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with
vertical grains or cross bands and face veneers on both faces of shutters.
8.4.1 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws
Agrt. Qnty - 46.00Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
0.00 sqm
vide Page No. 46
Total 0.00 sqm 3391.69 3300.00 sqm -
Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of
8.5 block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with
vertical grains or cross bands and face veneers on both faces of shutters.
8.5.1 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws
Agrt. Qnty - 103.00Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
39.86 sqm 2125.47 2125.47 sqm 84,721.23
vide Page No. 46
Qty B/F TCMB 67 20.40 sqm 2125.47 2050.00 sqm 41,820.00
Total 60.26 sqm
8.7 Extra For Cutting rebate in Flush Door Shutters ( Total area of the shutter to be measure)
Agrt. Qnty - 110.00Sqm
Qty B/F TCMB 84 6.45 sqm
Total 6.45 sqm 174.08 174.08 sqm 1,122.82
Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade
8.13 AC 10 as per IS : 1868), transparent or dyed to required colour or shade, with nuts and screws etc.
complete :
8.13.2 250X16 mm
Agrt. Qnty - 23.00 nos
Qty. B/F CMB No COM/ITBP/PD-II/802
7.00 Nos
vide Page No. 46
Qty B/F TCMB 78 15.00 Nos
Total 22.00 Nos 257.82 257.82 nos 5,672.04
Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC
8.14 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc.
complete :
8.14.2 250X10 mm
Agrt. Qnty - 72.00 nos
Qty. B/F CMB No COM/ITBP/PD-II/802
7.00 Nos
vide Page No. 46
Qty B/F TCMB 77 6.00 Nos
` Total 13.00 Nos 120.05 120.05 nos 1,560.65
8.14.3 200x10 mm
Agrt. Qnty - 295.00 nos
Qty B/F TCMB 77 11.00 Nos
` Total 11.00 Nos 103.77 103.77 nos 1,141.47
Providing and fixing aluminium handles, ISI marked, anodised (anodic coating not less than grade AC 10
8.16
as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc. complete
8.16.1 125 mm
Agrt. Qnty - 541.00 each
Qty B/F TCMB 76 41.00 Nos
` Total 41.00 Nos 69.63 69.63 nos 2,854.83
Page No- 95
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Providing and fixing factory made P.V.C door frame of size 50X47 mm with a wall thickness of 5mm, made
out of extruded 5mm rigid P.V.C foam sheet, mitred at corners and joined with 2nos of 150 mm long
brackets of15X15 mm M.S square tube, the vertical door frame profiles to be reinforced with19X19mm M.S
8.18
square tube of 19 gauge, EPDM rubber gasket weather seal to be provided through out the frame. The
door frame to be fixed to the wall using M.S screw of 65/100 mm size complete as per manufacturer's
specification and direction of Engineer-in-charge
Agrt. Qnty - 244.00mtr
Qty. B/F CMB No COM/ITBP/PD-II/802
158.14 mtr
Providing
vide PageandNo. fixing factory
47 made P.V.C door shutter consisting of frame made out of M.S tubes of
19gauge thickness and size of 19X19 mm for styles 158.14and 15X15 mm for top &bottom rails
597.88 . M.S frame mtr
597.88 shall
Total mtr 94,548.74
have a coat of steel primers of approved make and manufacture M.S frame covered with 5mm thick heat
moulded PVC 'C' channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm
shall be tapered in 45degree angle on both side forming styles and 5mm thick , 95mm wide P.V.C sheet
out of which 75mm shall be flat and 20mm shall be trapered in degree on the inner side to form top and
8.19 bottom rail and 115mm wide PVC sheet out of which 75mm shall be flat and 20mm shall be tapered on
both side to form lock rail shall be provided both side of panel. 10mm (5mmX2) thick, 20mm wide cross
PVC sheet be provided as gap insert for top rail & bottom rail,paneking of 5mm thick both side PVC sheet
to be fitted in the M.s frame welded/sealed to the styles &rails with 7mm (5mm+2mm)thick X15mm wide
PVC sheet beading on inner side,and joined togrther with solvent cement adhesive .An additional 5mm
8.19.1 30mm thick pre laminated PVC door Shutters
thick PVC strip of 20mm width is to be stuck on the interior side of the 'C' channel using PVC solvent
Agrt. Qnty
adhesive - 3.00sqm
etc. complete as per direction of engineer -in- charge ,manufacturer's specification &drawing.
Qty. B/F CMB No COM/ITBP/PD-II/802
4.03 sqm
vide Page No. 47
Total 4.03 sqm
As per agreement qty. 3.00 sqm 3772.09 3772.09 sqm 11,316.27
Qty upto Deviation Limit 0.90 sqm 3772.09 2829.00 sqm 2,546.10
Qty byeond Deviation Limit 0.13 Sqm 2829.00 Sqm 367.77
8.19.2 30mm thick plain PVC door Shutters
Agrt. Qnty - 81.00Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
39.26 sqm
vide Page No. 47
Total 39.26 sqm
(A) 14.33 sqm 4405.20 4405.20 sqm 63,126.52
(B) 24.93 sqm 4405.20 4355.00 sqm 108,570.15
Providinf and fixing fly proof stainless steel grade 304 wire gauge, to window and clerestory Window using
8.21 wir Gauge with average width of aperture 1.4 mm in both direction with wire of dia 0.50 mm all complete
Page No- 96
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Total 1416.74 Kg 117.12 117.12 Kg 165,928.59
Page No- 97
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
9.8 Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc.,
including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the
same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary
accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the
floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for
payment purpose only weight of stainless steel members shall be considered excluding fixing accessories
such as nuts, bolts, fasteners etc.).
Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622( thickness to be specified
by the manufacturer), of approved make , in all colours , shades except burgundy , bottle green, black of
10.6 any size approved by Charge In charge, in skirting risers of steps and dados , over 12mm thick bed of
cement mortar 1:3( 1cement :3 coarse sand ) and jointing with grey cement slurry @ 3.3kg per sqm ,
including pointing in white cement mixed with pigment of matching shade complete.
Providing and laying Ceramic glazed floor tiles of size 300*300 mm (thickness to be specified by the
manufacture) of 1st quality conforming to IS :15622 of approved make in colours such as
10.7
white,ivory,grey,fume red brown, laid on 20mm thick cement mortar 1:4 (1 cement :4 coarse sand),
including pointing the joints with white cement and matching pigment etc, complete
Page No- 98
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Total 1024.45 sqm 1525.41 1475.50 sqm 1,511,575.98
Page No- 99
Rate
Item No. Description B/F Page No. Quantity Unit Amount
Agmnt in this bill
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacture ) with
water absorption less than 0.08% and conforming to IS:15622, of approved make , in all colours and
10.10
shades ,in skirting , riser of steps, over 12 mm bed of cement mortar 1:3 (1 cement :3 coarse sand ) ,
incuding grounting the joints with whitw cement and matching pigments etc. complete
Providing and fixing wall face unplasticised rigid P.V.C rain water pipes conforming to IS:13592 Type A
11.1 including jointing with seal ring conforming to IS 5382 leaving 10mm gap for thermal expansion (i) Single
socketed pipes
11.3.1 110 mm
Agrt. Qnty - 194.00 nos
Qty. B/F CMB No COM/ITBP/PD-II/802
49.00 nos
vide Page No. 49
Total 49.00 nos 247.19 247.19 Nos 12,112.31
12.15.1 Two or more coats on new works including a coat of wood filler
Agrt. Qnty - 173.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
96.26 sqm
vide Page No. 51
Qty B/F TCMB 85 18.37 sqm
Total 114.63 sqm 285.83 250.00 Nos 28,657.50
Providing and supplying white cement based putty of average thickness 1 mm , of approved brand and
12.16 manufacturer, over the plastered wqll surface to prepare the surface even and smooth completed.
Agrt. Qnty - 4204.00.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/802
6609.83 sqm
vide Page No. 51
Total 6609.83 sqm
As per agreement qty. 4204.00 sqm 119.00 115.00 sqm 483,460.00
Qty upto Deviation Limit 1261.20 sqm 119.00 115.00 sqm 145,038.00
Qty beyond Deviation Limit 1144.63 sqm 95.00 sqm 108,739.85
Providing and laying 60 mm thick factory made cement concrete interlocking paver block M-30 Grade
made by blockmaking machine with strong vibratory compaction, of approved size design & shape, laid in
13.3 required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints
with line sand etc. all complete as per direction of Engineer-in-charge
14.4.1 Single half stall urinal with 5 litre P.V.C. automatic flushing cistern
Agrt. Qnty - 5.00 nos
Qty B/F TCMB 65 1.00 each
Total 1.00 each 4761.55 4200.00 each 4,200.00
14.5.1 White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap
Agrt. Qnty - 4.00 nos
Qty. B/F CMB No COM/ITBP/PD-II/802
4.00 each
vide Page No. 51
Total 4.00 each 2753.47 2500.00 each 10,000.00
Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of
14.6 approved quality and make, including painting of fittings and brackets, cutting and making good the walls
wherever required:-
(a) White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer
Agrt. Qnty -38.00 nos
Qty. B/F CMB No COM/ITBP/PD-II/802
7.00 each
vide Page No. 51
Qty B/F TCMB 64 3.00 each
Total 10.00 each 4066.57 4066.57 each 40,665.70
Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the
14.7 reception of pipes and fittings.
Agrt. Qnty -6.00 each
Qty B/F TCMB 64 10.00 each
Total 10.00 each
As per agreement qty. 6.00 each 1328.97 1328.97 each 7,973.82
Qty upto Deviation Limit 2.00 each 1328.97 1328.97 each 2,657.94
Qty beyond Deviation Limit 2.00 each 996.73 each 1,993.46
Providing and fixing Stainless Steel A ISi 304 (18/8) kitchen sink as per IS: 13983 with C.I. brackets and
14.8 stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls
wherever required :
14.32.1 Total bracket length 580mm of approved shape and design( for single 110mm dia pipe)
Inside size 90 X 80 cm and 45 cm deep including C.I cover with frame (light duty) 455X 610 mm internal
16.5.1 dimensions, total weight cover and frame to be not less than 38 kg (weight of cover 23kg and weight of
frame 15kg):
16.5.1.1 With common burnt clay F.P.S (non modular) bricks of class designation 7.5
17.2.1.1 Initial test (Test Load 2.5 times the Safe capacity)
Providing and Fixing Brass 200 mm Mortice Latch and lock with 6 Levers with pair of handles (best make
EIS/8
of approved quality) for flush door with necessary cutting and making good etc complete.
Providing and laying Polycarbonate fiber sheet including all neccesary item as per as direction by engineer
EIS/11
in charge
Half brick masonry with commom brunt clay F.P.S( non modular) bricks of class designation 7.5 in
E/S/12
foundations and plinth in:
a 20 mm nominal bore
laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth
(b) should not be less than 10 cm
third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing
cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4
(c) hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall
and tucked into groove in parapet all around.
(d) fourth and final layer of cement concrete 1:2:4 (which will be paid for separately
Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix of 0.70 kg of organic
E/S-19 coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg), including filling/ grouting
and finishing complete asper direction of Engineer-in-charge.
Deduct for not grouting the joints with white cement and matching pigment in the items of fixing of vitrified
E/S-22 tiles
514713.00
TOTAL RECOVERY: : (-) -514,713.00
Net payable amount 5,681,455.00
Say 5,681,455.00
Certify that:-
1. The work has been done as per CPWD specification and agreement
2. No Govt. T&P has been issued to the contractor
3. No Labour complaint has been received so far.
4. Water has been arranged by the contractor at his own source.
5. Contractor has engaged technical staff.
6. F.N.Labour report has been submitted by the contractor
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
RECOVERIES:
1 Security Deposit @ 2.5% on "Gross value " : 154904.00
Now to be recovered : 154904.00
Withheld for not achieving milestone 1st @0.50% of bidded val 116419379
Net payable amount 5,681,455.00
Say 5,681,455.00
5681455.00
Executive Engineer
Project Division, CPWD
Guwahati-21
4.2.1 Foundation , footing, bases of columns, etc. for mass concrete. 1641.98 sqm
As per agreement qty. 1533.00 sqm 264.30 264.30 405,171.90 432,585.10 -27413.20
Qty upto Deviation Limit 108.98 sqm 0.00 264.30 28,803.41 - 28803.41
4.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string
286.03 sqm 515.92 515.92 147,568.60 105,815.19 41753.41
courses etc.
4.2.3 Suspended floors, roofs, landings, balconies and access platform 3879.11 sqm
As per agreement qty. 3504.00 sqm 575.47 575.47 2,016,446.88 1,698,689.61 317757.27
Qty upto Deviation Limit 375.11 sqm 0.00 575.47 215,864.55 - 215864.55
4.2.5 Lintels, beams,Plinth beams,girders,bressumers and cantilevers 4317.15 sqm
As per agreement qty. 3352.00 sqm 467.27 467.27 1,566,289.04 1,714,773.43 -148484.39
Qty upto Deviation Limit 965.15 sqm 0.00 467.27 450,985.64 - 450985.64
4.2.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Total 2025.69 sqm
As per agreement qty. 1356.00 sqm 637.54 637.54 864,504.24 864,504.24 0.00
Qty upto Deviation Limit 406.80 sqm 0.00 637.54 259,351.27 259,351.27 0.00
Qty beyond Deviation Limit 262.89 sqm 0.00 459.00 120,666.51 58,839.21 61827.30
4.2.7 Stairs, (excluding landings) except spiralstaircases 89.58 sqm 571.45 571.45 51,190.49 42,018.72 9171.77
4.2.7.1 Extra for shuttering in circular work (20% of respective centering and shuttering
items) for Columns, Pillars, Piers, Abutments, Posts and Struts.
Total 83.51 sqm
As per agreement qty. 55.00 sqm 127.51 127.51 7,013.05 7,013.05 0.00
Qty upto Deviation Limit 16.50 sqm 0.00 127.51 2,103.92 2,103.92 0.00
Qty beyond Deviation Limit 12.01 sqm 127.51 100.00 1,201.00 1,201.00 0.00
4.2.8 Edges of slabs and breaks in floors and walls
4.2.8.1 Under 20 cm wide
Total 677.55 mtr
As per agreement qty. 346.00 mtr 166.52 166.52 57,615.92 57,615.92 0.00
Qty upto Deviation Limit 103.80 mtr 0.00 166.52 17,284.78 17,284.78 0.00
Qty Beyond Deviation Limit 227.75 mtr 0.00 124.89 28,443.70 1,809.66 26634.04
4.2.9 Weather shade, Chajjas, corbels etc., including edges.
Total 206.95 sqm
As per agreement qty. 28.00 sqm 710.99 710.99 19,907.72 19,907.72 0.00
Qty upto Deviation Limit 8.40 sqm 0.00 710.99 5,972.32 5,972.32 0.00
Qty beyond Deviation Limit 170.55 sqm 533.24 90,944.08 90,944.08 0.00
4.4 Steel reinforcement for RCC work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level
4.4.1 Thermo-Mechanically Treated bars 78445.22 kg 77.13 77.13 6,050,479.82 5,941,112.56 109367.26
4.5 Steel reinforcement for RCC work including straightening, cutting, bending,
placing in position and binding all complete above plinth level.
4.5.1 Thermo-Mechanically Treated bars 159156.30 kg
Total 159156.30 kg
As per agreement qty. 133170.00 kg 77.13 77.13 10,271,402.10 9,385,952.79 885449.31
Qty upto Deviation Limit 25986.30 kg 74.00 1,922,986.20 581,148.84 1341837.36
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
4.7 Add for plaster drip course /groove in plaster surface or moulding to R.C.C
134.64 metre 46.54 46.54 6,266.15 6,266.15 0.00
projections
4.8 Providing and laying in position machine batched, machine mixed design M-25
grade cement concrete for reinforced cement concrete work using cement
content as per approved design mix, including pupping of concrete to site of
laying but excluding the cost of centering, shuttering, finishing and reinforcement,
including admixtures in recommended proportions as per IS : 9103 to accelerate,
retard setting of concrete, improve workability without impairing strength and
durability as per direction of the engineer-in-charge.
(Note-1) Cement content
considered in this item is @330 kg/cum. Excess/less cement used as per design
4.8.1 mix is payable/recoverable
All work upto plinth level separately) 733.95 cum 8784.58 8784.58 6,447,442.49 6,340,622.00 106820.49
4.8.2 All works above plinth level upto floor V level 1098.45 cum -
As per agreement qty. 847.00 cum 9879.64 9879.64 8,368,055.08 8,397,694.00 -29638.92
Qty upto Deviation Limit 251.45 cum 0.00 8891.00 2,235,633.06 - 2235633.06
4.9 Add for using extra cement in the items of design mix over and above the
431.77 Quintal 916.76 916.76 395,829.47 327,503.34 68326.13
specified cement content therein
5.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in:
5.1.1 Cement mortar 1:4(1 cement : 4 coarse sand) 18.85 cum 6773.03 6773.03 127,671.62 127,671.62 0.00
5.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) 53.39 cum 6475.07 6475.07 345,703.99 345,703.99 0.00
5.2 Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in superstructure above plinth level up to floor V level in all
shapes and sizes in :
5.2.1 Cement mortar 1:6 (1 cement : 6 coarse sand) 309.62 cum 7607.75 7607.75 2,355,511.56 2,355,511.56 0.00
5.3 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in superstructure above plinth level up to floor V level.
5.3.1 Cement mortar 1:4 (1 cement :4 coarse sand) 1277.26 sqm 932.36 932.36 1,190,866.13 1,190,866.13 0.00
5.4 Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every
1264.14 sqm 77.47 77.47 97,932.93 97,932.93 0.00
third course of half brick masonry
6.1 Random rubble masonry with hard stone in foundation and plinth including
leveling up with cement concrete 1:6:12(1cement :6 coarse sand :12 graded
stone aggregate 20mm mominal size )upto plinth level with:
6.1.1 Cement mortar 1:6 (1cement:6 coarse sand) 617.86 Cum 5404.26 5404.26 3,339,076.08 3,339,076.08 0.00
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
7.1 Providing and fixing 18mm thick gang saw cut, mirror polished, premoulded and
prepolished, machine cut for kitchen platforms, vanity counters, window sills,
facias and similar locations of required size, approved shade, colour and texture
laid over 20mm thick base cement mortar 1:4 (1cement :4 Coarse sand) jointes
treated with whitw cement , mixed with matching pigment , epoxy touch ups,
including rubbing , curing, moulding and polishing to edges give high gloss finish
etc. complete at all levels.
7.1.2 Granite of any colour and shade
7.1.2.2 area of slab over .50sqm
Total 94.13 sqm
As per agreement qty. 33.00 sqm 4242.49 3818.00 125,994.00 125,994.00 0.00
Qty upto Deviation Limit 9.90 sqm 0.00 3818.00 37,798.20 37,798.20 0.00
Qty beyond Deviation Limit 51.23 sqm 0.00 3051.00 156,302.73 156,302.73 0.00
7.2 Providing edge moulding to 18mm thick marble stone counters,vanities etc.,
including machine polishing to edge to give high gloss finish etc. complete as per
design approved by Engineer-in-charge.
8.21.1 With 12 mm Mild Steel U Beading 50.39 sqm 1490.00 1400.00 70,546.00 67,572.99 2973.01
9.5 Providing and fixing M.S. fan clamp type I or II of 16 mm dia M.S. bar, bent to
shape with hooked ends in R.C.C. slabs or beams during laying, including 80.00 Nos 152.83 152.83 12,226.40 5,807.54 6418.86
painting the exposed portion of loop, all as per standard design complete.
9.6 Providing and fixing circular/ Hexagonal cast iron or M.S. sheet box for ceiling fan
clamp, of internal dia 140 mm, 73 mm height, top lid of 1.5 mm thick M.S. sheet
with its top surface hacked for proper bonding, top lid shall be screwed into the
46.00 each 177.29 177.29 8,155.34 8,155.34 0.00
cast iron/ M.S. sheet box by means of 3.3 mm dia round headed screws, one
lock at the corners. Clamp shall be made of 12 mm dia M.S. bar bent to shape as
per standard drawing.
9.7 Steel Work welded in built up sections/ framed work , including cutting, hosting
fixing in position and applying a priming coat approved strrl primer using
structural steel etc. as required
9.7.1 In grating, frames, guard bar , laddar, railings, brackets gates and similar work 1416.74 Kg 117.12 117.12 165,928.59 165,928.59 0.00
9.8 Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes,
channels, plates etc., including welding, grinding, buffing, polishing and making
curvature (wherever required) and fitting the same with necessary stainless steel
nuts and bolts complete, i/c fixing the railing with necessary accessories &
stainless steel dash fasteners , stainless steel bolts etc., of required size, on the 1215.97 kg 643.74 608.00 739,309.76 705,262.60 34047.16
top of the floor or the side of waist slab with suitable arrangement as per
approval of Engineer-in-charge, (for payment purpose only weight of stainless
steel members shall be considered excluding fixing accessories such as nuts,
bolts, fasteners etc.).
10.4 Kota stone slab flooring over 20 mm (average) thick base laid over and jointed
with grey cement slurry mixed with pigment to match the shade of the slab,
including rubbing and polishing complete with base ofm cement mortar 1 : 4 (1
cement : 4 coarse sand) :
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
10.4.1 25 mm thick 195.33 sqm 1578.14 1500.00 292,995.00 292,995.00 0.00
10.5 Kota stone slabs 20 mm thick in riser of steps, skirting, dado, and pillars laid on
12 mm (average ) thick cement mortar 1:3 (1cement : 3 coarse sand) and jointed
41.03 sqm 1687.30 1600.00 65,648.00 65,648.00 0.00
with grey cement slurry mixed pigment to match the shade of the slabs, including
rubbing and polishing complete.
10.6 Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS:
15622( thickness to be specified by the manufacturer), of approved make , in all
colours , shades except burgundy , bottle green, black of any size approved by
Charge In charge, in skirting risers of steps and dados , over 12mm thick bed of 514.07 sqm 1014.94 964.00 495,563.48 495,563.48 0.00
cement mortar 1:3( 1cement :3 coarse sand ) and jointing with grey cement slurry
@ 3.3kg per sqm , including pointing in white cement mixed with pigment of
matching shade complete.
10.7 Providing and laying Ceramic glazed floor tiles of size 300*300 mm (thickness to
be specified by the manufacture) of 1st quality conforming to IS :15622 of
approved make in colours such as white,ivory,grey,fume red brown, laid on 101.20 sqm 938.01 890.00 90,068.00 86,020.00 4048.00
20mm thick cement mortar 1:4 (1 cement :4 coarse sand), including pointing the
joints with white cement and matching pigment etc, complete
10.8 Providing and laying rectified glazed ceramicfloor tiles of size 300*300 mm
(thickness to be specified by the manufacture) of 1st quality conforming to
IS :15622 of approved make in colours such as white,ivory,grey,fume red brown, 29.75 sqm 1227.86 1165.00 34,658.75 9,865.80 24792.95
laid on 20mm thick cement mortar 1:4 (1 cement :4 coarse sand), including
pointing the joints with white cement and matching pigment etc, complete
10.9 Providing and laying vitrified floor tiles in different sizes (thickness to be specified
by the manufacture ) with water absorption less than 0.08% and conforming to
IS:15622, of approved make , in all colours and shades , laid on 20mm thick
cementt mortar 1:4 (1 cement :4 coarse sand ) , incuding grounting the joints with
whitw cement and matching pigments etc. complete
10.9.1 Size of tile 600X600mm 1024.45 sqm 1525.41 1475.50 1,511,575.98 1,328,711.65 182864.33
10.10 Providing and laying vitrified floor tiles in different sizes (thickness to be specified
by the manufacture ) with water absorption less than 0.08% and conforming to
IS:15622, of approved make , in all colours and shades ,in skirting , riser of
steps, over 12 mm bed of cement mortar 1:3 (1 cement :3 coarse sand ) ,
incuding grounting the joints with whitw cement and matching pigments etc.
10.10.1 complete
Size of tile 600X600mm 61.42 sqm 1546.94 1470.00 90,287.40 82,917.00 7370.40
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
11.1 Providing and fixing wall face unplasticised rigid P.V.C rain water pipes
conforming to IS:13592 Type A including jointing with seal ring conforming to IS
5382 leaving 10mm gap for thermal expansion (i) Single socketed pipes
11.1.1 110mm diameter 357.72 mtr
As per agreement qty. 244.00 mtr 322.07 322.07 78,585.08 100,357.01 -21771.93
Qty upto Deviation Limit 73.20 mtr 0.00 322.07 23,575.52 - 23575.52
Qty Beyond Deviation Limit 40.52 mtr 0.00 242.00 9,805.84 - 9805.84
11.2.2 Bend 87.5
11.2.2.1 110 mm bend 25.00 nos 154.12 154.12 3,853.00 2,003.56 1849.44
11.2.3 Shoe (plain)
11.2.3.1 110 mm shoe 7.00 nos 133.54 133.54 934.78 934.78 0.00
11.3 Providing and fixing unplasticised -PVC pipe clips of approved design to
Unplasticised -PVC rain water pipes by means of 50x50x50 mm hard wood
plugs, screwed with M.S screws of required length, including cutting brick work
and fixing in cement mortar 1:4(1cement:4 coarse sand) and making good the
wall etc. complete.
12.10.1 Water thinnable cement primer 900.02 sqm 50.35 50.35 45,316.01 45,316.01 0.00
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives
12.12 of required shade
New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including
12.12.1 priming coat of exterior primer applied @ 2.20 kg/10 sqm) 492.15 sqm 131.91 120.00 59,058.00 59,058.00 0.00
12.15 French spirit polishing :
12.15.1 Two or more coats on new works including a coat of wood filler 114.63 sqm 285.83 250.00 28,657.50 19,252.00 9405.50
Providing and supplying white cement based putty of average thickness 1 mm ,
12.16 of approved brand and manufacturer, over the plastered wqll surface to prepare 6609.83 sqm
the surface even and smooth completed.
As per agreement qty. 4204.00 sqm 119.00 115.00 483,460.00 399,380.00 84080.00
Qty upto Deviation Limit 1261.20 sqm 119.00 115.00 145,038.00 113,508.00 31530.00
Qty beyond Deviation Limit 1144.63 sqm 0.00 95.00 108,739.85 97,293.55 11446.30
Providing and laying 60mm thick faciory made cement concrete interlocking
paver block of M -30 grade made by block making machine with strong vibratory
13.3 compaction, of approved s;ze, design & shape, laid in required colour and pattern 103.27 sqm
over and including 50mm thick compacted bed of coarse sand, filling the joints
with line sand etc. all complete as per the direction of Engineer-in-charge
As per agreement qty. 35.24 sqm 839.01 839.01 29,566.71 29,566.71 0.00
Qty upto Deviation Limit 68.03 sqm 839.01 750.00 51,022.50 51,022.50 0.00
Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100
mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern,
14.1 including flush pipe, with manually controlled device (handle lever) conforming to
IS : 7231, with all fittings and fixtures complete, including cutting and making
good the walls and floors wherever required:
White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral
14.1.1 1.00 each 8431.57 6323.68 6,323.68 - 6323.68
type foot rest
Providing and fixing white vitreous china flat back half stall urinal of size
580x380x350 mm with white PVC automatic flushing cistern, with fittings,
standard size C.P. brass flush pipe, spreaders with unions and clamps (all in
14.4
C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating and
other couplings in C.P. brass, including painting of fittings and cutting and making
good the walls and floors wherever required :
14.4.1 Single half stall urinal with 5 litre P.V.C. automatic flushing cistern 1.00 each 4761.55 4200.00 4,200.00 - 4200.00
14.4.2 Range of two half stall urinals with 5 litre P.V.C. automatic flushing cistern. 2.00 each 12697.09 10000.00 20,000.00 20,000.00 0.00
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps,
14.5 32 mm C.P. brass waste of standard pattern, including painting of fittings and
brackets, cutting and making good the walls wherever require:
White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P.
14.5.1 4.00 each 2753.47 2500.00 10,000.00 10,000.00 0.00
brass pillar tap
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single
14.6 hole basin mixer of approved quality and make, including painting of fittings and
brackets, cutting and making good the walls wherever required:-
(a) White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass
single hole basin mixer
Total 10.00 each 4066.57 4066.57 40,665.70 28,465.99 12199.71
Providing and fixing white vitreous china pedestal for wash basin completely
14.7
recessed at the back for the reception of pipes and fittings.
Total 10.00 each
As per agreement qty. 6.00 each 1328.97 1328.97 7,973.82 - 7973.82
Qty upto Deviation Limit 2.00 each 1328.97 1328.97 2,657.94 - 2657.94
Qty beyond Deviation Limit 2.00 each 0.00 996.73 1,993.46 - 1993.46
Providing and fixing Stainless Steel A ISi 304 (18/8) kitchen sink as per IS: 13983
14.8 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings
and brackets, cutting and making good the walls wherever required :
14.8.1 Kitchen sink with drain board
14.8.1.1 510X1040 mm bowl depth 200 mm 1.00 nos 5140.58 5000.00 5,000.00 5,000.00 0.00
Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C.
14.12
waste fittings complete
14.12.2 Flexible Pipe
14.12.2.2 40mm dia
Total 16.00 nos
As per agreement qty. 6.00 nos 103.02 103.02 618.12 - 618.12
Qty upto Deviation Limit 2.00 nos 103.02 103.02 206.04 - 206.04
Qty beyond Deviation Limit 8.00 nos 0.00 77.27 618.12 - 618.12
Providing and fixing mirror of superior glass (of approved quality) and of required
14.15 shape and size with plastic moulded frame of approved make and shade with 6
mm thick hard board backing
14.15.2 Oval shape 600x450 mm (outer dimensions) 14.00 nos 1103.11 1103.11 15,443.54 - 15443.54
14.17 Providing and fixing toilet paper holder
14.17.1 C.P Brass 11.00 nos 525.12 500.00 5,500.00 - 5500.00
14.18 Providing and fixing soil, waste and vent pipes:
14.18.1 100mm dia
14.18.1.1 Centrifugally cast (spun) iron socket & spigot (s&s) pipe as per IS: 3989 71.21 Mtr 1255.93 1255.93 89,434.78 89,434.78 0.00
Providing and fixing bend of required degree withaccess door, insertion rubber
14.20
washer 3mm thick, bolts and nuts complete.
14.20.1 100 mm dia
14.20.1.1 Sand cast iron S&S as per IS :3989 1.00 Nos 530.64 530.64 530.64 530.64 0.00
14.21 Providing and fixing plain bend of required degree.
14.21.1 100 mm dia
14.21.1.1 Sand cast iron S&S as per IS :3989
Total 43.00 Nos
As per agreement qty. 25.00 Nos 456.44 456.44 11,411.00 11,411.00 0.00
Qty upto Deviation Limit 7.00 Nos 0.00 456.44 3,195.08 3,195.08 0.00
Qty upto Deviation Limit 11.00 Nos 0.00 342.33 3,765.63 3,765.63 0.00
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
Providing lesd caulke joints to sand cast iron/ centrifugally cast (spun) iron pipes
14.25
and fittings of diameter:
14.25.1 100 mm dia
Total 209.00 Nos
As per agreement qty. 180.00 Nos 422.37 422.37 76,026.60 76,026.60 0.00
Qty upto Deviation Limit 29.00 Nos 0.00 422.37 12,248.73 12,248.73 0.00
Providing and fixing trap of self cleansing design with screwed down or hinged
14.25 grating with or without vent arm complete ,including cost of cutting and making
good the walls and floors
14.25.1 100mm inlet and 100mm outlet
14.25.1.1 Sand cast iron S&S as per IS :3989
Total 31.00 Nos
As per agreement qty. 15.00 Nos 1409.65 1409.65 21,144.75 21,144.75 0.00
Qty upto Deviation Limit 4.00 Nos 1409.65 1409.65 5,638.60 5,638.60 0.00
Qty beyond Deviation Limit 12.00 Nos 0.00 1057.24 12,686.85 12,686.85 0.00
Providing and fixing M.S. holder-bat clamps of approved design to Sand Cast
iron/cast iron (spun) pipes comprising of M.S flat brackets made of 50x5mm flat
of specifiedshape, projecting 75mm outside the wall surface and fixed on wall
with 4nos, 6mm dia expansion hold fastners, including drilling necessary holes in
14.32 brick wall/cc/RCC surface and the cost of bolts etc.The pipes shall be fixed to the
already fixed brackets with the help of 30mmx1.6mm galvanised M.S flats of
specified shape and of total length 420mm and shall be fixed with M.S nuts, bolts
&washers of size 25x6 mm, one bolts on each side of the pipe.
Total bracket length 580mm of approved shape and design( for single 110mm
14.32.1 48.00 nos 244.47 244.47 11,734.56 11,734.56 0.00
dia pipe)
15.1.3 40 mm dia Nominal bore 53.45 mtr 537.11 450.00 24,052.50 18,052.74 5999.76
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c making
15.2 good the walls etc. concealed pipe, including painting with anti
corrosivebitumastic paint cutting chases and making good the wall:
15.2.1 15mm dia nominal bore
Total 307.82 mtr
As per agreement qty. 110.00 mtr 389.32 389.32 42,825.20 42,825.20 0.00
Qty upto Deviation Limit 33.00 mtr 0.00 389.32 12,847.56 12,847.56 0.00
Qty beyond Deviation Limit 164.82 mtr 0.00 291.99 48,125.79 48,125.79 0.00
15.7 Providing and fixing uplasticised PVC connection pipe with brass unions :
15.7.1 45 cm length
15.7.1.1 15 mm nominal bore
Total 30.00 each 92.39 92.39 2,771.70 - 2771.70
15.8 Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet :
15.8.1 100 mm dimeter 8.00 nos 97.64 97.64 781.12 - 781.12
Providing and fixing G.I. Union in G.I. pipe including cutting and threading the
15.13 pipe and making long screws etc. complete (New work) :
15.13.1 25 mm nominal bore 5.00 nos 280.44 280.44 1,402.20 1,402.20 0.00
15.13.3 40 mm nominal bore 3.00 nos 407.11 407.11 1,221.33 1,221.33 0.00
Providing and placing on terrace (at all floor level )polythylene water storage
tank, Isi: 12701 marked, with cover and suitable locking arrangement and making
15.14
necessary holes for inlet, outlet and overflow pipes but without fittings and the
base support for tank
Circular Tank 3,500.00 ltr. 9.88 9.88 34,580.00 34,580.00 0.00
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
Providing and fixing C.P. brass bib cock of approved quality conforming to
15.15
IS:8931 :
15.15.1 15 mm nominal bore 2.00 Each 506.52 506.52 1,013.04 - 1013.04
Providing and fixing C.P. brass stop cock (concealed) of standard design and of
15.16
approved make conforming to IS:8931.
15.16.1 15 mm nominal bore 1.00 nos 756.71 756.71 756.71 - 756.71
Providing and fixing C.P. brass angle valve for basin mixer and geyser points of
15..17
approved quality conforming to IS:8931 a) 15 mm nominal bore
15.17.1 15 mm nominal bore 40.00 nos 648.24 600.00 24,000.00 - 24000.00
Providing, laying and jointing glazed stoneware pipes class SP-1 with stiff
16.1 mixture of cement mortar in the proportion of 1:1 (1 cement :1 fine sand )
including testing of joints etc. complete:
16.1.1 150mm diameter 79.95 mtr 445.67 445.67 35,631.32 35,631.32 0.00
Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand : 10
16.2 graded stone aggregate 40 mm nominal size ) all round S.W. pipes including bed
concrete as per standerd design:
16.2.1 150mm diameter S.W pipe 78.95 mtr 1038.17 1038.17 81,963.52 81,963.52 0.00
Construction brick masonary manhole in cement mortar 1:4 (1cement:4 coarse
sand) with R.C.C top slab with 1:2:4 mix (1 cement :2 coarse sand :4 graded
stone aggregate 20 mm nominal size )foundation concrete 1:4:8 mix (1
cewment :4 coarse Graded sand :8graded stone aggregate 40 mm nominal size),
16.5 inside plastering 12 mm thick with cement mortar 1:3 (1cement :3 coarse sand)
finished with floating coat neat cement and making channels in cement concrete
1:2:4 ( 1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size )
finished with a floating coat of neat cement complete as per standard design :
Inside size 90 X 80 cm and 45 cm deep including C.I cover with frame (light duty)
16.5.1 455X 610 mm internal dimensions, total weight cover and frame to be not less
than 38 kg (weight of cover 23kg and weight of frame 15kg):
16.5.1.1 With common burnt clay F.P.S (non modular) bricks of class designation 7.5 12.00 Each 11765.69 11000.00 132,000.00 132,000.00 0.00
16.6 Extra for depth for manholes :
16.6.1 Size 90x80 cm
16.6.1.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 5.04 mtr 7792.60 7792.60 39,274.70 39,274.70 0.00
17.1 Boring, providing and installation bored cast-in-situ reinforced cement concrete
piles of grade M-25 of specified diameter and length below the pile cap, to carry
a safe working load not less than specified, excluding the cost of steel
reinforcement but including the cost of boring with bentonite solution and
temporary casing of appropriate length for setting out and removal of same and
the length of the pile to be embedded in the pile cap etc. By percussion drilling
using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and
mechanical WinchMachine all complete, including removal of excavated earth
with all its lifts and leads (length of pile for payment shall be measured up to
bottom of pile cap)
17.1.1 450 mm dia piles 224.45 Mtr 2039.21 2039.21 457,700.68 457,700.68 0.00
17.2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including
installation of loading platform by entledge/Anchor piles method and preparation
of pile head or construction of test cap and dismantling of test cap after test etc.
complete as per specification & the direction of Engineer incharge.
17.2.1 Single pile upto 50 tonne Safe capacity
17.2.1.1 Initial test (Test Load 2.5 times the Safe capacity) 1.00 per test 52548.16 52548.16 52,548.16 52,548.16 0.00
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
18.1 Providing and fixing aluminum work for doors, windows, ventilator and partitions
with extruded built up standard tubular sections/ appropriate Z sections and other
sections of approved make conforming to IS:733 and IS:1285, fixing with dash
fastner of required dia and size, including neceesary filling up the gaps at
junctions, i.e. at top , bottom and sides with required EPDM rubber / neoprene
gasket etc. Alumnium section shall be smooth rust free, straight, mitred and
jointed mechanically wherever required including cleat angle,Aluminium snap
beading for glazing/ paneling C.P Brass / stainless steel screws, all completed.
as per architectural drawing and the direction of Engineer-in-charge. (Glazing,
paneling and dash fastner to be paid for separtely) :
18.1.1 For Fixed portion
18.1.1.1 powder coated aluinium (minimum thickness of polyester powder coating
76.54 Kg 523.96 500.00 38,270.00 38,270.00 0.00
50micron)
18.1.1.2 Polyester powder coated aluinium (minimum thickness of polyester powder
843.74 Kg 533.91 500.00 421,870.00 421,870.00 0.00
coating 50micron)
18.1.2 For Shutter of doors, windows, & Ventilatiors Including , Providingand fixing
hinges/Pivots and making provision for fixing of fittings Wherever required
including the cost of EPDM rubber / Neoprene gasket required (Fittting Shall be
Paid For Separtely)
18.1.2.1 Powder Coated aluminum (minimum thickness Of polyster powder coating
335.46 Kg 606.27 580.00 194,566.80 194,566.80 0.00
50micron)
18.1.2.2 Polyster Powder Coated aluminum (minimum thickness Of polyster powder
185.83 Kg 616.49 580.00 107,781.40 107,781.40 0.00
coating 50micron)
18.3 Providing and fixing glazing in aluminum door, window, ventilator shutters and
partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the
architectural drawings and the directions of engineer-in-charge . (Cost of
aluminum snap beading shall be paid in basic item):
18.3.1 With float glass panes of 4.0 mm thickness 158.46 sqm 1010.44 1010.44 160,114.32 138,440.38 21673.94
18.3.2 With float glass panes of 5.56 mm thickness 24.14 sqm 1368.08 1368.08 33,025.45 33,025.45 0.00
19.3 Grading roof for water proofing treatment with
19.3.1 Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20
19.46 cum 7609.04 7609.04 148,071.92 148,071.92 0.00
mm nomonal size)
15.34 cum 7609.04 6087.23 93,378.11 - 93378.11
Total 34.80 0.00
20.1 Providing and fixing on wall face unplasticised Rigid PVC SWR pipes conforming
to IS : 13592 Type B including jointing with seal ring conforming to IS : 5382
32.05 mtr 483.80 483.80 15,505.79 15,505.79 0.00
leaving 10 mm gap for thermal expansion.(i) Single socketed pipes. 110 mm
diameter.
20.3 Providing and fixing on wall face unplasticised - PVC moulded fittings/
accessories for unplasticised Rigid PVC SWR pipes conforming to IS : 14735
10.00 nos 177.10 177.10 1,771.00 1,771.00 0.00
Type B including jointing with seal ring conforming to IS : 5382 leaving 10 mm
gap for thermal expansion. Bend 87.5° with out door 110 mm diameter
20.4 Providing and fixing on wall face unplasticised - PVC moulded fittings/
accessories for unplasticised Rigid PVC SWR pipes conforming to IS : 14735
Type B including jointing with seal ring conforming to IS : 5382 leaving 10 mm
gap for thermal expansion. Single tee with out door 110 x 110 x110 mm diameter
Total 6.00 Nos
As per agreement qty. 3.00 Nos 253.10 253.10 759.30 759.30 0.00
Qty upto Deviation Limit 1.00 nos 253.10 253.10 253.10 253.10 0.00
Qty beyond Deviation limit 2.00 nos 253.10 190.00 380.00 380.00 0.00
20.7 Providing and fixing on P- trap ( without lip ring) of PVC moulded fittings/
accessories for unplasticised Rigid PVC SWR pipes conforming to IS : 14735
Type B including jointing with seal ring conforming to IS : 5382 leaving 10 mm 14.00 nos 811.10 811.10 11,355.40 11,355.40 0.00
gap for thermal expansion with Jali( round ) at top including cost of cutting and
making good the wall and floors. 110 mm inlet and 110 mm outlet
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
20.8 Providing and fixing (Health faucet) ( ABS Body )as per direction of Engineer-in
Charge with 1 M Flexible tube in chromre plated with wall hook of approved 11.00 nos 1004.80 1004.80 11,052.80 - 11052.80
make and modle as per direction of Engineer-in Charg
Total 81,015,136.48 74,123,467.75 6891668.73
Less beyond deviation amount 9,025,232.84 8,568,683.01 456549.83
Total 71,989,903.64 65,554,784.74 6435118.90
Contractor enhancement. @11.20% (below) -8,062,869.21 -7,342,135.89 -720733.32
Total 63,927,034.43 58,212,648.85 5714385.58
Add beyond deviation amount 9,025,232.84 8,568,683.01 456549.83
Total 72,952,267.27 66,781,331.86 6170935.41
EIS/1 Deduct for Carriage/disposal of earth excavated as per (agreement Item No.
1.1.1) by mechanical transport, beyond 1 km to 2km and beyond initial 50 mtrs
lead i/c loading unloading and disposed earth to be levelled as per direction of
Engineer-in-charge.
All kinds of soil 16000.00 cum 42.00 42.00 -672,000.00 -672,000.00 0.00
EIS/2 Extra for additional height in centering, shuttering where ever required with
adequate bracing, propping etc., including cost of de-shuttering and decentering
at all levels, over a height of 3.5 m, for every additional height of 1 metre or part
thereof (Plan area to be measured).
Suspended floors, roofs, landing, beams and balconies (Plan area to be 2168.55 sqm 227.65 171.00
370,822.05 520,126.72 -149304.67
measured)
EIS/3 Providing and supplying Desktop Dell or equivalent for official purpose as per
requirement of Client ITBP including configuration Desktop Dell 5400 I5
1.00 No. 104057.00 94900.00 94,900.00 94,900.00 0.00
11gen/8gb/1tb/256 Gb Ssd UPS CYBERPOWER 600VA(BU600E) Brother
2520d Printer
Providing and fixing Stainless Steel tower bolts, to required colour or shade, with
EIS/4 5.00 No. 17998.25 13498.69 67,493.45 67,493.45 0.00
necessary screws etc. complete :
EIS/5 Dismantling of R.C.C Slab as per as directed by Engineer-in-Charge 0.08 cum 1698.45 1273.84 101.91 101.91 0.00
EIS/6 Dismantling of Brickwork with plaster as per as directed by Engineer-in-Charge 2.53 sqm 1698.45 1273.84 3,222.82 3,222.82 0.00
EIS/7 Providing and fixing door beelding directed by Engineer -in-Charge 84.98 mtr 220.80 165.60 14,072.69 14,072.69 0.00
EIS/8 Providing and Fixing Brass 200 mm Mortice Latch and lock with 6 Levers with
pair of handles (best make of approved quality) for flush door with necessary 6.00 Nos 2807.90 2105.93 12,635.58 12,635.58 0.00
cutting and making good etc complete.
EIS/9 Providing and laying vitrified floor tiles in different sizes (thickness to be specified
by the manufacture ) with water absorption less than 0.08% and conforming to
IS:15622, of approved make , in all colours and shades , laid on 20mm thick
cementt mortar 1:4 (1 cement :4 coarse sand ) , incuding grounting the joints with
whitw cement and matching pigments etc. complete
size of tile 400X400mm 47.41 sqm 1075.05 806.29 38,226.21 38,226.21 0.00
EIS/10 Providing and laying vitrified floor tiles in different sizes (thickness to be specified
by the manufacture ) with water absorption less than 0.08% and conforming to
IS:15622, of approved make , in all colours and shades ,in skirting , riser of
steps, over 12 mm bed of cement mortar 1:3 (1 cement :3 coarse sand ) ,
incuding grounting the joints with whitw cement and matching pigments etc.
complete
size of tile 400X400mm 8.84 sqm 1110.35 832.76 7,361.60 7,361.60 0.00
EIS/11 Providing and laying Polycarbonate fiber sheet including all neccesary item as
70.95 sqm 1500.00 1125.00 79,818.75 79,818.75 0.00
per as direction by engineer in charge
EIS/12 Half brick masonry with commom brunt clay F.P.S( non modular) bricks of class
designation 7.5 in foundations and plinth in:
a Cement mortar 1:3 ( 1 cement: 3 coarse sand) 49.22 sqm 1031.60 773.70 38,081.51 38,081.51 0.00
E/S/13 Providing and fixing gun metal gate valve with C.I. wheel of approved quality
(screwed end) :
a 20 mm nominal bore 8.00 each 456.92 342.69 2,741.52 2,741.52 0.00
E/S/14 Providing and fixing G.I. Union in G.I. pipe including cutting and threading the
pipe and making long screws etc. complete (New work) :
20 mm nominal bore 10.00 each 302.37 226.78 2,267.78 2,267.78 0.00
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
E/S/15 Providing and fixing dormitory cupboard of size 2.7x1.97 sqm (consisting 3
units)with required number of 19mm block board and 6mm ply wood for inner,
outer partitions and shelves as per the approved drawings made out with backing
of 6mm ply wood both of approved brand and manufacture, in cluding 1mm thick
textured laminations in all exposed surfaces and inner surface with 0.80mm plain
laminates of approved quality, shade and with superior quality heat proff 28.94 sqm 20920.00 15690.00 454,068.60 454,068.60 0.00
adhesive of fevicol or equivalent as per direction of Engineer-in-charge(M
easurment shall be taken for the over all fontal area and the cost includes the
cost of all materials ,labour transportation and any other incidental charges but
excluding the cost of cupboard door shutter which will be paid separately at
aggrement item no and also locking arrangment to be paid separately.
E/S/16 Providing and Fixing Towel Rack with CP brass screws with concealed fittings
arrangement of approved quality and colour as per directed by Engineer-in -site
600 mm long Towel Rack 6.00 each 3825.00 2868.75 17,212.50 17,212.50 0.00
E/S/17 Providing And fixing Auminium Louvers Including all necessary fitting (screw,
5.67 sqm 1675.00 1256.25 7,122.94 7,122.94 0.00
rubber etc) as per as directed by Engineer-in-charge
E/S/18 Providing and laying water proofing treatment on roofs of slabs by applying
cement slurry mixed with water proofing cement compound consisting of
applying:
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed
with water proofing cement compound @ 0.253 kg/sqm
(b) laying second layer of Fibre glass cloth when the first layer is still green.
Overlaps of joints of fibre cloth should not be less than 10 cm
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm
mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand
@ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water
curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall
and tucked into groove in parapet all around.
(d) fourth and final layer of cement concrete 1:2:4 (which will be paid for separately 306.88 sqm 495.00 370.00 113,545.60 - 113545.60
E/S/22 Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout
mix of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and
0.20 kg of resin per kg), including filling/ grouting and finishing complete asper
direction of Engineer-in-charge.
(a) Size of Tile 600 x 600 mm. 225.83 sqm 254.00 190.50 43,020.62 - 43020.62
E/S/23 Grouting the joints of flooring tiles having joints of 3 mm width, using epoxygrout
mix of 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and
0.20 kg of resin per kg), including filling/ grouting and finishing complete as per
direction of Engineer-in-charge.
(a) Size of Tile 300 x 300 mm. 53.59 sqm 254.00 190.50 10,208.90 - 10208.90
E/S/24 Cutting Hole of required dia and depth upto 150 mm in RCC slabs/ beams at all
floor and at all height by core cutting machine without disturbing the existing
structure including removing of debris etc. and sealing the gap in hole after
installation of pipe with non shrinkable grout of SIKA/CICO/PIDILITE or 26.00 nos 575.75 431.81 11,227.13 - 11227.13
equivalant and backing of core at botto with jute/san or ply shuttering and props
to each hole i/c curing etc. complete as per architectural drawing and as directed
by Engineer-In-Charge.
E/S/22 Deduct for not grouting the joints with white cement and matching pigment in the
279.42 sqm -12.40 -12.40 -3,464.81 - -3464.81
items of fixing of vitrified tiles
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
PROVISIONAL RATE STATEMENT: 13th R/A Bill
16th R.A Bill
1 Name of Work: Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10
Bedded Hospital Including water supply , sanitary installation, IEI , fans, service
connection , compound light, fire alarm & AC at 33rd Bn ITBP, Karchia Sonapur,
Guwahati (Assam).
Deviation yet to be
2.6.1 All kinds of soil 450.30 70.52 52.89 cum
sanctioned
Columns, Pillars, Piers, Abutments, Posts and Deviation yet to be
4.2.6 262.89 637.54 459.00 cum
Struts sanctioned
Extra for shuttering in circular work (20% of
respective centering and shuttering items) for
4.2.7.1 Columns, Pillars, Piers, Abutments, Posts and 12.01 127.51 100.00 Sqm do
Struts.
7.1.2.2 area of slab over .50sqm 33.00 4242.49 3818.00 Sqm Joints filling & minor
rectification
9.90 4242.49 3818.00 Sqm
Providing and fixing false ceiling at all height Joints grouting not done
including providing and fixing of frame work made due to spacer epoxy
10.10.1 Size of tile 600X600mm 61.42 1,546.94 1,470.00 sqm
of special sections, power pressed from M.S. grouting
sheets and galvanized with zinc coating of 120
gms/sqm (both side inclusive) as per IS : 277 and
Providing and fixing wall face unplasticised rigid
consisting of angle cleats of size 25 mm wide x 1.6
P.V.C rain water pipes conforming to IS:13592
mm thick with flanges of 27 mm and 37mm, at
Type A including jointing with seal ring conforming
1200 mm centre to centre, one flange fixed to the
11.1 to IS 5382 leaving 10mm gap for thermal
ceiling with dash fastener 12.5 mm dia x 50mm
expansion (i) Single socketed pipes
long with 6mm dia bolts, other flange of cleat fixed
to the angle hangers of 25x10x0.50 mm of
required length with nuts & bolts of required size
110mm diameter Deviation Item Not to be
11.1.1 and other end of angle hanger fixed with 40.52 322.07 242.00 Sqm
intermediate G.I. channels 45x15x0.9 mm running Sanctioned Yet
at the spacing of 1200 mm centre to centre, to
which the ceiling section 0.5 mm thick bottom
wedge of 80 mm with tapered flanges of 26 mm
each having lips of 10.5 mm, at 450 mm centre to
centre, shall be fixed in a direction perpendicular to
G.I. intermediate channel with connecting clips
made out of 2.64 mm dia x 230 mm long G.I. wire
11.4 at every junction, including fixing perimeter
channels 0.5 mm thick 27 mm high having flanges
of 20 mm and 30 mm long, the perimeter of ceiling
fixed to wall/partition with the help of rawl plugs at
450 mm centre, with 25mm long dry wall screws @
230 mm interval, including fixing of gypsum board
to ceiling section and perimeter channel with the
help of dry wall screws of size 3.5 x 25 mm at 230
12.5 mmincluding
mm c/c, thick tapered edge
jointing andgypsum
finishing moisture
to a flush Proper Line level and minor
11.4.1 resistant board and square edges of the board
313.87 1,306.35 1,110.00 sqm rectification
finish of tapered
with recommended jointing compound , jointing
Finishing walls with Premium Acrylic Smooth
tapes , finishing with jointing compound in 3 layers
12.12 exterior paint with Silicone additives of required
covering upto 150 mm on both sides of joint and
shade
two coats of primer suitable for board, all as per
New work (Twospecification
manufacturer's or more coats andapplied @ 1.43 the
also including
12.12.1 ltr/10
cost ofsqm over openings
making and including priming
for light coatgrills,
fittings, of 492.15 131.91 120.00 sqm Minor Rectification
exterior primer applied @ 2.20 kg/10
diffusers, cutouts made with frame of perimetersqm)
12.15 channels
French suitably
spirit fixed,: all complete as per
polishing
drawings, specification and direction of the
Engineer in Charge but excluding the cost of
Two or more coats on new works including a coat Final Polishing
12.15.1 painting with : 114.63 285.83 250.00 sqm
of wood filler
Rate
Sl. No. Description Qty Provisional Per Remarks
Full
Rate
Single half stall urinal with 5 litre P.V.C. automatic minor rectification
14.4.1 flushing cistern
1.00 4,761.55 4,200.00 Each
Range of two half stall urinals with 5 litre P.V.C. Minor Rectification
14.4.2 automatic flushing cistern.
2.00 12,697.09 10,000.00 Nos
White Vitreous China Wash basin size 630x450 Pillar cock yet to be fixed
14.5.1 mm with a single 15 mm C.P. brass pillar tap
4.00 2,753.47 2,500.00 Nos
Providing and fixing white vitreous china pedestal Deviation Quantity yet to
14.7 for wash basin completely recessed at the back for 2.00 1,328.97 996.73 be sanctioned
the reception of pipes and fittings.
14.8.1.1 510X1040 mm bowl depth 200 mm 1.00 5,140.58 5,000.00 Nos Proper Fixing
15.1.3 40 mm dia Nominal bore 53.45 537.11 450.00 mtr minor Rectification
With common burnt clay F.P.S (non modular) Due to providing of Non
16.5.1.1 bricks of class designation 7.5
12.00 11765.69 11000.00 Nos
approval Manhole cover
Rate
Sl. No. Description Qty Provisional Per Remarks
Full
Rate
Providing and fixing aluminum work for doors,
windows, ventilator and partitions with extruded
built up standard tubular sections/ appropriate Z
sections and other sections of approved make
conforming to IS:733 and IS:1285, fixing with dash
fastner of required dia and size, including
neceesary filling up the gaps at junctions, i.e. at
top , bottom and sides with required EPDM
rubber / neoprene gasket etc. Alumnium section
shall be smooth rust free, straight, mitred and
18.1
jointed mechanically wherever required including
cleat angle,Aluminium snap beading for glazing/
paneling C.P Brass / stainless steel screws, all
completed. as per architectural drawing and the
direction of Engineer-in-charge. (Glazing, paneling
and dash fastner to be paid for separtely) :
(a) Size of Tile 600 x 600 mm. 225.83 254.00 190.50 sqm do
(a) Size of Tile 300 x 300 mm. 53.59 254.00 190.50 sqm do
Cutting Hole of required dia and depth upto 150
mm in RCC slabs/ beams at all floor and at all
height by core cutting machine without disturbing
the existing structure including removing of debris
etc. and sealing the gap in hole after installation of
E/S-21 pipe with non shrinkable grout of 26.00 575.75 431.81 nos do
SIKA/CICO/PIDILITE or equivalant and backing of
core at botto with jute/san or ply shuttering and
props to each hole i/c curing etc. complete as per
architectural drawing and as directed by Engineer-
In-Charge.
Sl. No. Description of item Qty Unit Co. off (In Qtl) Cement Reqd.
733.95 cum
95.73 cum 3.67 (Qtl/cum) 351.33 Qntl
43.75 cum 3.30 (Qtl/cum) 144.38 Qntl
4.8.1 All work upto plinth level
405.22 cum 3.60 (Qtl/cum) 1,458.79 Qntl
177.09 cum Quantity executed by R.M.C
12.16 cum 3.60 (Qtl/cum) 43.78 Qntl
All works above plinth level upto floor V level
4.8.2 1,098.45 cum
5.2.1 Cement mortar 1:6 (1 cement : 6 coarse sand) 309.62 cum 0.63 (Qtl/cum) 193.51 Qntl
Half brick masonry with common burnt clay
F.P.S. (non modular) bricks of class designation
5.3 7.5 in superstructure above plinth level up to floor
V level.
5.3.1 Cement mortar 1:4 (1 cement :4 coarse sand) 1,277.26 sqm 0.1064 (Qtl/sqm) 135.90 Qntl
6.1.1 Cement mortar 1:6 (1cement:6 coarse sand) 617.86 Cum 0.825 (Qtl/cum) 509.73 Qntl
Providing and fixing 18mm thick gang saw cut, mirror
polished, premoulded and prepolished, machine cut
for kitchen platforms, vanity counters, window sills,
facias and similar locations of required size, approved
shade, colour and texture laid over 20mm thick base
cement mortar 1:4 (1cement :4 Coarse sand) jointes
7.1 treated with whitw cement , mixed with matching
pigment , epoxy touch ups, including rubbing , curing,
moulding and polishing to edges give high gloss finish
etc. complete at all levels.
10.9.1 Size of tile 600X600mm 1,024.45 sqm 0.1242 (Qtl/sqm) 127.24 Qntl
Providing and laying vitrified floor tiles in different
sizes (thickness to be specified by the
manufacture ) with water absorption less than
0.08% and conforming to IS:15622, of approved
10.10 make , in all colours and shades ,in skirting , riser
of steps, over 12 mm bed of cement mortar 1:3
(1 cement :3 coarse sand ) , incuding grounting
the joints with whitw cement and matching
pigments etc. complete
10.10.1 Size of tile 600X600mm 61.42 sqm 0.1242 (Qtl/sqm) 7.63 Qntl
12.3 12 mm cement plaster of mix:
12.3.1 1:6 (1 cement: 6 coarse sand) 2197.37 sqm 0.0360 (Qtl/sqm) 79.11 Qntl
15 mm cement plaster on the rough side of
12.4
single or half brick wall of mix :
12.4.1 1:6 (1 cement: 6 coarse sand) 2570.33 sqm 0.0430 (Qtl/sqm) 110.52 Qntl
12mm cement plaster finished with a floating
12.5
coat of neat cement of mix :
12.5.1 1:4 (1cement : 4 coarse sand) 132.79 sqm 0.0767 (Qtl/sqm) 10.18 Qntl
12.6 6 mm cement plaster of mix :
12.6.1 1:3 (1 cement : 3 fine sand) 3297.50 sqm 0.0367 (Qtl/sqm) 121.02 Qntl
12.7 Neat cement punning 67.35 sqm 0.0220 (Qtl/sqm) 1.48 Qntl
17.1.1 450 mm dia piles 35.68 cum 4.0000 (Qtl/cum) 142.72 Qntl
19.3 Grading roof for water proofing treatment with
(a) Cement mortar 1:3 ( 1 cement: 3 coarse sand) 49.22 sqm 14.2800 (Qtl/100 sqm) 7.03 Qntl
6690.44 Qtl
Variation (+2%) 133.81 Qtl
6824.25 Qtl
13648.00 Bags
Variation (-2%) 133.81 Qtl
13514.19 Bags
13640.00 Bags
Qty brought at site = 13820.00 Bags
Actual Consumption = 13710.00 Bags
Balance = 110.00 Bags
250 bag of cement returned to the contractor as the expiry date of cement has been reached.
Exterior Paint
Qty brought at site = 180.00 Ltr
Actual Consumption = 100.00 Ltr
Balance = 80.00 Ltr
Exterior Primer
Qty brought at site = 140.00 Ltr
Actual Consumption = 120.00 Ltr
Balance = 20.00 Ltr
12.10.1 Water thinnable cement primer 900.02 sqm 0.070 (Ltr/Sqm) 63.00 Ltr
241.00 Bags
Assistant Engineer
SPSD-II, Project Division
CPWD, (Assam)
Dia Wise Steel Consumption Statement
Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10 Bedded Hospital Including water supply ,
Name of Work : sanitary installation, IEI , fans, service connection , compound light, fire alarm & AC at 33rd Bn ITBP, Karchia Sonapur,
Guwahati (Assam).
4th R/A 1537.64 0.00 15.45 527.39 2410.80 924.00 0.00 5415.28 Kgs
5th R/A 6454.00 12311.78 1343.75 8246.58 7421.62 2021.44 0.00 37799.17 Kgs
6th R/A 736.31 939.07 762.42 117.48 26.57 0.00 0.00 2581.85 Kgs
7th R/A 1509.75 19102.55 1265.50 2602.54 9723.40 1347.65 0.00 35551.39 Kgs
8th R/A 1116.24 1381.59 1040.89 173.58 133.11 119.81 0.00 3965.22 Kgs
9th R/A 162.98 1045.04 0.00 376.50 0.00 0.00 0.00 1584.52 Kgs
11th R/A 0.00 96.39 0.00 0.00 0.00 0.00 0.00 96.39 Kgs
12th R.A Bill 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Kgs
13th R.A Bill 5041.90 15804.22 2524.26 6732.66 4418.07 165.89 0.00 34687.00 Kgs
14th R.A Bill 9.22 0.00 0.00 0.00 0.00 0.00 0.00 9.22 Kgs
15th R.A Bill 2720.39 0.00 514.68 2693.34 1824.74 315.00 0.00 8068.15 Kgs
In This Bill 3291.13 17850.20 1588.24 3794.28 2874.26 0.00 0.00 29398.11 Kgs
Total (B) = 22579.56 68530.84 9055.19 25264.35 28832.57 4893.79 0.00 159156.30 Kgs
TOTAL (A+B) 35628.31 82070.64 21703.51 46266.85 43715.84 8216.37 0.00 237601.52 Kgs
Add 3% Wastage 1068.85 2462.12 651.11 1388.01 1311.48 246.49 0.00 7128.06 Kgs
GRAND TOTAL 36697.16 84532.76 22354.62 47654.86 45027.32 8462.86 0.00 244729.58 Kgs
Variation (+2%) 733.94 1690.66 447.09 953.10 900.55 169.26 0.00 4894.59 Kgs
TOTAL 37431.10 86223.42 22801.71 48607.96 45927.87 8632.12 0.00 249624.17 Kgs
Variation (-2%) -748.62 -1724.47 -456.03 -972.16 -918.56 -172.64 0.00 4992.48 Kgs
TOTAL 35948.54 82808.29 21898.59 46682.70 44108.76 8290.22 0.00 249722.06 Kgs
36.700 84.530 22.350 47.650 45.030 8.460 0.000 244.730 MT
Brought at site (In M.T) 37.568 88.096 35.300 48.020 47.004 9.930 0.000 265.918 MT
Junior Engineer Assistant Engineer
SPSD-II, CPWD SPSD-II, CPWD
FORNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 17.03.2023 TO 31-03.2023
2 Name of the Work: Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10 Bedded Hospital Including
water supply , sanitary installation, IEI , fans, service connection , compound light, fire alarm & AC at 33rd Bn
ITBP, Karchia Sonapur, Guwahati (Assam).
3 Agrement No.
02/CE/SE/EE/PD-II/2019-20
4. Stipulated Date of Start:- 4/30/2019
5. Stipulated Date of Completion:- 4/29/2020
(A) Number of Workers employed (B) Wages Paid C) Working (D) (E) No. of F) The G)Remar
Hours Amount female accident ks
Sl. No. Category Male Famale Total Daily Rate of Total Amount of workers who that (if any)
Wages Paid dg. the overtime have been occurred
period wages allowed to drg.
I II III IV V I II
paid drg. Maternity Thesaid
8:00AM to
12:00Noon &
1 Unskilled 300 0 300 Rs.477.00 Rs.143,100.00
1:00PM to
5:00PM
Signature of the Asstt. Engineer/ Jr. Engineer/ CPWD Signature of the Contractor
FORNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 01.04.2023 TO 15.04.2023
2 Name of the Work: Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10 Bedded Hospital Including
water supply , sanitary installation, IEI , fans, service connection , compound light, fire alarm & AC at 33rd Bn
ITBP, Karchia Sonapur, Guwahati (Assam).
3 Agrement No.
02/CE/SE/EE/PD-II/2019-20
4. Stipulated Date of Start:- 4/30/2019
5. Stipulated Date of Completion:- 4/29/2020
(A) Number of Workers employed (B) Wages Paid C) Working (D) (E) No. of F) The G)Remar
Hours Amount female accident ks
Sl. No. Category Male Famale Total Daily Rate of Total Amount of workers who that (if any)
Wages Paid dg. the overtime have been occurred
I II III IV V I period
II wages allowed to drg.
8:00AM to paid drg. Maternity Thesaid
12:00Noon &
1 Unskilled 285 0 285 Rs.494.00 Rs.140,790.00
1:00PM to
5:00PM
2 Semi-Skilled 145 0 145 Rs.577.00 Rs.83,665.00 "
3 Skilled 130 0 130 Rs.695.00 Rs.90,350.00 "
4 Highly Skilled 55 0 55 Rs.816.00 Rs.44,880.00 "
TOTAL: Rs.359,685.00
Signature of the Asstt. Engineer/ Jr. Engineer/ CPWD Signature of the Contractor
FORNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 16.04.2023 TO 30.04.2023
2 Name of the Work: Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10 Bedded Hospital Including
water supply , sanitary installation, IEI , fans, service connection , compound light, fire alarm & AC at 33rd Bn
ITBP, Karchia Sonapur, Guwahati (Assam).
3 Agrement No.
02/CE/SE/EE/PD-II/2019-20
4. Stipulated Date of Start:- 4/30/2019
5. Stipulated Date of Completion:- 4/29/2020
(A) Number of Workers employed (B) Wages Paid C) Working (D) (E) No. of F) The G)Remar
Hours Amount female accident ks
Sl. No. Category Male Famale Total Daily Rate of Total Amount of workers who that (if any)
Wages Paid dg. the overtime have been occurred
I II III IV V I II
period 8:00AM to wages allowed to drg.
12:00Noon &
1 Unskilled 295 0 295 Rs.494.00 Rs.145,730.00
1:00PM to
2 Semi-Skilled 145 0 145 Rs.577.00 Rs.83,665.00 5:00PM
"
3 Skilled 125 0 125 Rs.695.00 Rs.86,875.00 "
4 Highly Skilled 65 0 65 Rs.816.00 Rs.53,040.00 "
TOTAL: Rs.369,310.00
Signature of the Asstt. Engineer/ Jr. Engineer/ CPWD Signature of the Contractor
FORNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 01.05.2023 TO 15.05.2023
2 Name of the Work: Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10 Bedded Hospital Including
water supply , sanitary installation, IEI , fans, service connection , compound light, fire alarm & AC at 33rd Bn
ITBP, Karchia Sonapur, Guwahati (Assam).
3 Agrement No.
02/CE/SE/EE/PD-II/2019-20
4. Stipulated Date of Start:- 4/30/2019
5. Stipulated Date of Completion:- 4/29/2020
(A) Number of Workers employed (B) Wages Paid C) Working (D) (E) No. of F) The G)Remar
Hours Amount female accident ks
Sl. No. Category Male Famale Total Daily Rate of Total Amount of workers who that (if any)
Wages Paid dg. the overtime have been occurred
I II III IV V I period
II wages allowed to drg.
paid drg. Maternity Thesaid
8:00AM to
12:00Noon &
1 Unskilled 210 0 210 Rs.494.00 Rs.103,740.00
1:00PM to
5:00PM
2 Semi-Skilled 120 0 120 Rs.577.00 Rs.69,240.00 "
3 Skilled 110 0 110 Rs.695.00 Rs.76,450.00 "
4 Highly Skilled 45 0 45 Rs.816.00 Rs.36,720.00 "
TOTAL: Rs.286,150.00
Signature of the Asstt. Engineer/ Jr. Engineer/ CPWD Signature of the Contractor
RECOVERY STATEMENT
1) Name of work Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type Megazine and 10
Bedded Hospital Including water supply , sanitary installation, IEI , fans, service
connection , compound light, fire alarm & AC at 33rd Bn ITBP, Karchia Sonapur,
Guwahati (Assam).
Assistant Engineer
Sonapur Project Sub-Division -II
CPWD, Guwahati-15
TEST CHECK STATEMENT
1 Name of Work :-
Construction of SO's Mess (G+1), GO's Mess (G+1), Bin Type
Megazine and 10 Bedded Hospital Including water supply , sanitary
installation, IEI , fans, service connection , compound light, fire alarm
& AC at 33rd Bn ITBP, Karchia Sonapur, Guwahati (Assam).
Ref. of
SL Amount of AE Test Amount of EE Test
Description of Items MB & Quantity Remarks
No. Check Check
page
Total ₹ 40,354,419.00
Total 54.78
Certified that :
1. The work has been done as per CPWD specification and agreement
2. No Govt. T&P has been issued to the contractor
3. No Labour complaint has been received so far.
4. Water has been arranged by the contractor at his own source.
5. Contractor has engaged technical staff.
6. F.N.Labour report has been submitted by the contractor
N.B.-- When there are two or more entries in column 6 relating to each Sub-head of estimate they should in case of work the accounts of which are kept by sub-
heads be totalled and the recorded in II.
column 7 for posting
Certificate the work abstract.
& Signature
1. The measurement on which are based the entires in column 1 to 6 of account I were recorded by Shri Nilanjal Bora. on …………….and are recorded at
Computer
2. CertifiedMeasurement
that in additionBook No.quite
to and -----------------------
a part from the. quantities of work actually executed as shown in column 4 of the account I some work has actually been
done in connection with several items and the value of such work after deducting there from proportionate amount of required advance if any ultimately
** This
Thiscertificate
signature must be signed
is necessary by when
only Sub Divisional
the officerOfficer or Divisional
who prepares the Officer.
bill is not the officer who authorizes the payment. In case a case the two signature are
essential.
III Memorandum of Payments
Rs. P.
1. Total value of work actually measured, as per Acct. 1, col. 5 entry (A) 73664954.62
2. Total up-to-date, advance payment for work not yet measured, as per details give 0.00
below : Rs. P. )
a) Total as per Previous bill 67468786.44
b) Since previous bill………………………….as per page………..………..of ) 6196168.18
M. B. No……………………………………… (D)
3. Total 'up-to-date secured advance on security of materials as per annexure form
(26-A) Col. 8 Entry (C)
*This figure should be tested to see that it agree with the total of item 7 & 8.
If the net amount be paid is less than Rs.10 and it cannot be included in cheque the payment should be made in cash this entry being alteered suitable and the
alteration attested by dated initials.
@ Here specify the net amount payable vide item 8 (C)
= The Payee's acknowledgement should be for the amount paid as per item 8 (i.e.a+b+c)
* Payment should be attested by some known person when payee's acknowledgement is given by a mark seal or thumb impression.
Remarks
This space is reserved for any remarks which the Disbursing Officer of the Divisional Officer may wish to recorded in respect of the execution of the work check
of measurements or the state of contractor's amount.
Checked
Some Results
12 mm dia 35.30 tonne 35 tonnes 2 No. 2 No. 2 No.
awaited
Some Results
16mm dia 48.02 tonne 35 tonnes 2 No. 2 No. 2 No.
awaited
Some Results
20mm dia 47.00 tonne 35 tonnes 2 No. 2 No. 2 No.
awaited
Some Results
25mm dia 9.93 tonne 45 tonnes 1 Nos. 1 Nos. 1 No.
awaited
Some Results
3 Cement Test 13820.00 Bags 1000 Bags 14 Nos. 14 Nos. 14 Nos.
Awaited
Some Results
4 Cube Test of RCC M-25 1832.40 Cum 50 Cum 37 Nos. 91 Nos. 92 Nos.
Awaited
5 Slump Test M-25 1832.40 Cum 20 Cum 92 Nos. 166 Nos. 167 Nos. Satisfactory
8 Brick test 300000.00 Nos. 50000 Nos. 6 Nos. 6 Nos. 6 Nos. Satisfactory
6 Coarse Sand
i) Bulking Test 950.00 Cum 20 Cum 68 Nos. 68 Nos. 70 Nos. Satisfactory
ii) Silt Content Test. 950.00 Cum 20 Cum 68 Nos. 68 Nos. 70 Nos. Satisfactory
iii) Particle Size Distribution. 950.00 Cum 40 Cum 34 Nos. 34 Nos. 35 Nos. Satisfactory
7 Stone Aggregate
40 mm stone aggregate 302.00 Cum 40 cum 8 Nos. 8 Nos 8 Nos. Satisfactory
(a) Particle Size Distribution 1100.00 Cum 40 cum 28 Nos. 31 Nos. 35 Nos. Satisfactory
(b) Deleterious Material 1100.00 Cum 40 cum 28 Nos. 31 Nos, 35 Nos. Satisfactory
8 Aluminium Test
i) Fixed Portion 920.28 Kg Per Lot Kg 2 Nos. 2 Nos. 2 Nos. Report Awaited
ii) Shutter 521.29 Kg Per Lot Kg 2 Nos. 2 Nos, 2 Nos. Report Awaited
9 Flush Door 35mm Thick
i) End immersion Test 29 Nos 26 shutters 1 Nos. 2 Nos. 2 Nos. Satisfactory
ii) Knife Test 29 Nos 26 shutters 1 Nos. 2 Nos, 2 Nos. Satisfactory
iii) Adhesion Test 29 Nos 26 shutters 1 Nos. 2 Nos, 2 Nos. Satisfactory
10 Granite Test
Some Report
i) Moisture 510.00 sqm 100 sqm 5 Nos. 6 Nos, 6 Nos.
Awaited
Some Report
ii) Specific Gracity 510.00 sqm 100 sqm 5 Nos. 6 Nos, 6 Nos.
Awaited
11 Wood Frame
i) Second class Teak wood 0.91 cum 1 cum 1 Nos. 1 Nos. 1 Nos. Satisfactory
ii) Sal wood 0.96 cum 1 cum 1 Nos. 1 Nos. 1 Nos. Satisfactory
12 Tiles work
i) Ceramic Floor Tiles 2000 Nos 3000 Nos 1 Nos. 1 Nos. 1 Nos. Report Awaited
ii) Ceramic Wall Tiles 3810 Nos 3000 Nos 2 Nos. 2 Nos. 2 Nos. Report Awaited
iii) Vitrified Tiles 3016 nos 3000 Nos 2 Nos. 2 Nos. 2 Nos. Report Awaited
EIS-I/11 Providing and laying Polycarbonate fiber sheet including all neccesary item as per as
direction by engineer in charge
441405.44
Total
66210.82
Add for contractor’s profit and over-heads @ 15%
507616.26
Total
5076.16
Add 1% Labour Cess
512692.42
Total Cost for one nos Polycarbonate sheet 70.95Sqm
7226.11
Total cost for 1.00 sqm
Say 7226.00
Item No. EIS-I/19 D.O.E. : Dec,2022
Providing and fixing Fastner of Stainless Steel Work With Chromium Plate and Fittings Directed By
EIS-I/19 Engineer -in- Charge
MATERIALS:
NS Chromium Plate nos 10.00 40.00 400.00
NS Nuts and Bolts nos 30.00 20.00 600.00
9999 Labour for drilling holes and making good etc L.S 26.00 2.07 53.82
Total Cost for 1.00 Nos 1053.82
Add for water charge @ 1 % 10.54
Total 1064.36
Add for 18% GST applicable on work contract by 226.39
reversible method (multiplying fqactor 0.2127)
Total 1290.75
Add for contractor’s profit and over-heads @ 15% 193.61
Total 1484.36
Add 1% Labour Cess 14.84
Total Cost for 10.00 nos fastner 1499.20
Total Cost for 1.00 nos fastner 149.92
Say 150.00
Item No. EIS-I/21 D.O.E. : Sept.2021
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed
with water proofing cement compound consisting of applying:
EIS-I/21
after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water
proofing cement compound @ 0.253 kg/sqm
(a)
fourth and final layer of cement concrete 1:2:4 (which will be paid for separately
(b)
MATERIAL
Cement 10x(1.289+0.488) = 17.77 kg Sealing
fillets @ 10% = 1.77 kg Total = 19.54kg = 0.020
tonne
367 Portland Cement (OPC-43 grade) tonne 0.02 5700 114
2209 Carriage of Cemen tonne 0.02 92.24 1.84
Bonding material 1.6 kgx30x2 = 96 kg Bitumen
(blown/residual type) 10x(0.253+0.67) = 9.23 kg
Wastage @ 5% = 0.46 kg Total = 9.69 kg
8501 Polymer modified cementation coating kilogram 9.69 140.00 1356.60
LABOUR
155 Mason (average) day 2.00 552.50 1105.00
114 Belder day 1.00 505.00 505.00
101 Bhisti day 0.25 505.00 126.25
9999 Sundries,brusher etc L.S 23.40 2.07 48.44
Total Cost for 10.00 sqm 3257.13
Add for water charge @ 1 % 32.57
Total 3289.70
Add for 18% GST applicable on work contract by
699.72
reversible method (multiplying fqactor 0.2127)
Total 3989.42
Add for contractor’s profit and over-heads @ 15% 598.41
Total 4587.83
Add 1% Labour Cess 45.88
Total Cost for 10.00 sqm 4633.71
Total Cost for 1.00 sqm 463.37
Say 463.00
Item No. EIS-I/18 D.O.E. : Feb,2023
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed
EIS-I/20 with water proofing cement compound consisting of applying:
after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water
(a) proofing cement compound @ 0.253 kg/sqm
laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre
cloth should not be less than 10 cm
(b)
third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water
proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be
allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be
(c) taken upto 30 cm on parapet wall and tucked into groove in parapet all around.
fourth and final layer of cement concrete 1:2:4 (which will be paid for separately
(d)
MATERIAL
Cement 10x(1.289+0.488) = 17.77 kg Sealing
fillets @ 10% = 1.77 kg Total = 19.54kg = 0.020
tonne
367 Portland Cement (OPC-43 grade) tonne 0.02 5700 114
2209 Carriage of Cemen tonne 0.02 92.24 1.84
Bonding material 1.6 kgx30x2 = 96 kg Bitumen
(blown/residual type) 10x(0.253+0.67) = 9.23 kg
Wastage @ 5% = 0.46 kg Total = 9.69 kg
8501 Polymer modified cementation coating kilogram 9.69 140.00 1356.60
Fibre Glass cloth = 10.00 sqm Wastage @ 10 % -
1.00 sqm Total = 11.00 sqm
8502 Fiber Glass Cloth Sqm 11.00 44.00 484.00
LABOUR
155 Mason (average) day 2.00 614.00 1228.00
114 Belder day 1.00 557.00 557.00
101 Bhisti day 0.25 557.00 139.25
9999 Sundries,brusher etc L.S 23.40 2.07 48.44
Total Cost for 10.00 sqm 3929.13
Add for water charge @ 1 % 39.29
Total 3968.42
Add for 18% GST applicable on work contract by
844.08
reversible method (multiplying fqactor 0.2127)
Total 4812.50
Add for contractor’s profit and over-heads @ 15% 721.88
Total 5534.38
Add 1% Labour Cess 55.34
Total Cost for 10.00 sqm 5589.72
Total Cost for 1.00 sqm 558.97
Say 559.00
Item No. EIS-I/20 D.O.E. : Dec,2022
Based On DSR 2018 Item No 9.33.1 (N.S)
Providing and fixing Haindrail SS Coupler directed By Engieer-In-Charge
EIS-I/20
MATERIALS:
NS Hand rail Coupler nos 10.00 64.00 640.00
9999 Labour for drilling holes and making good etc L.S 26.00 2.07 53.82
Total Cost for 10.00 Nos 693.82
Add for water charge @ 1 % 6.94
Total 700.76
Add for 18% GST applicable on work contract by
149.05
reversible method (multiplying fqactor 0.2127)
Total 849.81
Add for contractor’s profit and over-heads @ 15% 127.47
Total 977.28
Add 1% Labour Cess 9.77
Total Cost for 10.00 nos 987.05
Total Cost for 1.00 nos 98.71
Say 99.00
Item No. EIS-I/23 D.O.E. : feb,2023
Based On DSR 2018 Item No 11.48.2
Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix of 0.70 kg
of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg), including
Item No. EIS-I/23 filling/ grouting and finishing complete asper direction of Engineer-in-charge.