You are on page 1of 9

Ras Abu Aboud Stadium-

Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

Author Dastgeer - Garcia Assigned To Bhikesh Rajyagor

Author's Email raahbkbim2@gmail.com Assigned Email csc6.raa@gmail.com

Author's Company HBK Contracting Co. W.L.L. Assigned Company Louis Berger

Author's Phone # <not set> Assignee Phone # <not set>

Responsible Louis Berger Resp. Company


Company Phone #

Date Created 18 Aug 2020 3:20 AM Scheduled For 19 Aug 2020 9:10 AM

Name IRM Status New

Description Types
Material Receiving Inspection of Balustrade MTW. As per Attached IRM: Architectural/Interior
Delivery Not/Dossier Reference No. ET-QD-HBK-20-43

Locations Location Detail


Stadium Steel Yard

Attached Checklists

Custom Properties on ID SC-C06-CAG-HBK-IRM-AR-01610


01 Revision 0
03 Priority High
04 Method of Statement ref: SC-C06-CAG-HBK-MST-AR-00162
05 Inspection Test Plan (ITP) ref: SC-C06-CAG-HBK-ITP-AR-00097
06 Inspection Test Plan Item/s 1.5
09 Material Submittal Ref. SC-C06-CAG-HBK-MAS-AR-00578/00575
11 Delivery/Packing List As Attached
13 * We confirm that the work to be inspected has been coordinated with all related sub-
contractor and direct contractor
20 Status Level L3 No Objection

Signatures for ID SC-C06-CAG-HBK-IRM-AR-01610

14 HBK Site Engineer: Dastgeer - Garcia 18 Aug 2020 3:25 AM15 HBK QA/QC Engineer: Dastgeer - Garcia 18 Aug 2020 3:25 A

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 1 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

16 Project Director- Rohit Kakroo: Dastgeer - Garcia 18 Aug 2020


17 CSC
3:25
Inspector/Sr.
AM Engineer: CSC3 Architectural RAA 19 Aug

18 CSC Sr. Engineer: Kumar Seri Kiran 19 Aug 2020 3:03 PM 19 CSC Lead Engineer/Director:

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 2 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

2020-08-19 05:21:19 2020-08-19 05:21:17 2020-08-19 05:21:15

2020-08-19 05:21:12 2020-08-19 05:21:09 2020-08-19 05:21:08

2020-08-19 05:21:06 2020-08-19 05:21:04 2020-08-19 05:21:01

2020-08-19 05:21:00 2020-08-19 05:20:58 2020-08-19 05:20:55

2020-08-19 05:20:52 2020-08-19 05:20:50 2020-08-19 05:20:48

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 3 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

2020-08-19 05:20:45 2020-08-19 05:20:43 MRR_Form_DN-CG-20-86___12.08.2020.pdf

ET-QD-HBK-20-43.pdf (1 / 49) ET-QD-HBK-20-43.pdf (2 / 49) ET-QD-HBK-20-43.pdf (3 / 49)

ET-QD-HBK-20-43.pdf (4 / 49) ET-QD-HBK-20-43.pdf (5 / 49) ET-QD-HBK-20-43.pdf (6 / 49)

ET-QD-HBK-20-43.pdf (7 / 49) ET-QD-HBK-20-43.pdf (8 / 49) ET-QD-HBK-20-43.pdf (9 / 49)

ET-QD-HBK-20-43.pdf (10 / 49) ET-QD-HBK-20-43.pdf (11 / 49) ET-QD-HBK-20-43.pdf (12 / 49)

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 4 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

ET-QD-HBK-20-43.pdf (13 / 49) ET-QD-HBK-20-43.pdf (14 / 49) ET-QD-HBK-20-43.pdf (15 / 49)

ET-QD-HBK-20-43.pdf (16 / 49) ET-QD-HBK-20-43.pdf (17 / 49) ET-QD-HBK-20-43.pdf (18 / 49)

ET-QD-HBK-20-43.pdf (19 / 49) ET-QD-HBK-20-43.pdf (20 / 49) ET-QD-HBK-20-43.pdf (21 / 49)

ET-QD-HBK-20-43.pdf (22 / 49) ET-QD-HBK-20-43.pdf (23 / 49) ET-QD-HBK-20-43.pdf (24 / 49)

ET-QD-HBK-20-43.pdf (25 / 49) ET-QD-HBK-20-43.pdf (26 / 49) ET-QD-HBK-20-43.pdf (27 / 49)

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 5 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

ET-QD-HBK-20-43.pdf (28 / 49) ET-QD-HBK-20-43.pdf (29 / 49) ET-QD-HBK-20-43.pdf (30 / 49)

ET-QD-HBK-20-43.pdf (31 / 49) ET-QD-HBK-20-43.pdf (32 / 49) ET-QD-HBK-20-43.pdf (33 / 49)

ET-QD-HBK-20-43.pdf (34 / 49) ET-QD-HBK-20-43.pdf (35 / 49) ET-QD-HBK-20-43.pdf (36 / 49)

ET-QD-HBK-20-43.pdf (37 / 49) ET-QD-HBK-20-43.pdf (38 / 49) ET-QD-HBK-20-43.pdf (39 / 49)

ET-QD-HBK-20-43.pdf (40 / 49) ET-QD-HBK-20-43.pdf (41 / 49) ET-QD-HBK-20-43.pdf (42 / 49)

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 6 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

ET-QD-HBK-20-43.pdf (43 / 49) ET-QD-HBK-20-43.pdf (44 / 49) ET-QD-HBK-20-43.pdf (45 / 49)

ET-QD-HBK-20-43.pdf (46 / 49) ET-QD-HBK-20-43.pdf (47 / 49) ET-QD-HBK-20-43.pdf (48 / 49)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-
ET-QD-HBK-20-43.pdf (49 / 49)
00055_Rev_2.pdf (1 / 26) 00055_Rev_2.pdf (2 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (3 / 26) 00055_Rev_2.pdf (4 / 26) 00055_Rev_2.pdf (5 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (6 / 26) 00055_Rev_2.pdf (7 / 26) 00055_Rev_2.pdf (8 / 26)

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 7 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (9 / 26) 00055_Rev_2.pdf (10 / 26) 00055_Rev_2.pdf (11 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (12 / 26) 00055_Rev_2.pdf (13 / 26) 00055_Rev_2.pdf (14 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (15 / 26) 00055_Rev_2.pdf (16 / 26) 00055_Rev_2.pdf (17 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (18 / 26) 00055_Rev_2.pdf (19 / 26) 00055_Rev_2.pdf (20 / 26)

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (21 / 26) 00055_Rev_2.pdf (22 / 26) 00055_Rev_2.pdf (23 / 26)

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 8 of 9


Ras Abu Aboud Stadium-
Task Report
TDO-17-TTC-0044
ID SC-C06-CAG-HBK-IRM-AR-01610

Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST- Approved_WPS_SC-C06-CAG-HBK-PRC-ST-


00055_Rev_2.pdf (24 / 26) 00055_Rev_2.pdf (25 / 26) 00055_Rev_2.pdf (26 / 26)

SC-C06-CAG-HBK-MAS-AR-
MRR_Form_DN-CG-20-89___17.08.2020.pdf MRR_Form_DN-CG-20-88___16.08.2020.pdf
00578_Rev_0_Reply_1.pdf

Issues for ID SC-C06-CAG-HBK-IRM-AR-01610


Issue ID Description Type Status Company Date Due Date
Created
006083 Approved and Accepted External Open Louis Berger 19 Aug 2020 null
Snaglist

Report run on 19 Aug 2020 9:09 PM by Dastgeer - Garcia (raahbkbim2@gmail.com) Page 9 of 9