You are on page 1of 7

AL QOOZ CONTRACTING LLC

HAZARD IDENTIFICATION AND RISK ASSESMENT DATE


page 1
PAGE

TASK/JOB/OPERATION: MOBILIZATION WORK


PROJECT : PROPOSED FACTORY AND FACILITIES ON PLOT NO:KHIA5-14A_B
CREW/SUBCONTRACTORS:

DATE: 15/09/2021 Date next Review : 15/03/2021


Recommended PPE: Hard hat,Safety shoes,Safety Harness overalls,Dust mask,Goggles,Gloves
EQUIPMENT REQUIRED: ,skid steer loader(bobcat)

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk
Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Residual Risk


level Control METHOD

L S R L S R
Heavy object fall on to
feet of Injury to feet,injury to safety shoe compulsory on site,safety helmet
head,injury t compulsory on site,coverall to be worn by
workers/personnel,over
body,fatality,severe workers,fire extinguisher in place,emergency number
1 General site operation head lifting with Yes 3 4 High R 3 2 Low
injury,loss of in place,trained first aiders at site,TBT conducted for
equipment,workers asset,illness/cough/long all activity,safety induction conducted all staff &
clothing snagging worker disease labors
part etc,fire

Adequate personal fitness,adequate site dress,well


fire inadequate earthing
Working in hot,humid Disease,heat rest area should be provide with A/C .adequate
2 without ptw without Yes 3 5 High R 4 2 MED
environment stress,headlines isotonic solution should be available,proper
flashback arrestor housekeeping,well HSE INDUCTION TRAINING

All the gangways shall be marked and sign boards


obstruction to th gang
3 Storage of materials To the equipment Yes 3 5 High R shall be kept prior to identify and area shall be 3 2 Low
way/material handling
marked for different material kept in its locaction

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC COENGR Engineering Consultant
5-Frequent 5-Catastrophic Low 1-6
AL QOOZ CONTRACTING LLC
HAZARD IDENTIFICATION AND RISK ASSESMENT DATE
page 7
PAGE

Health and Safety


1 In case of Near Miss , Accident or Emergencies call - HSE
2 Tis standard Risk Assement may be resvied to suit the site condition
All persons will familiarize themselves and conform to project HSE rules and requrements and wear basic PPE (Hard Had , High - viz vest and steel Toe Safety Shoes ) at all time - use additional PPE required by the job
3
4 Only trained and certified operators shall operate and mobile construction machinery .proof of competence be available will be available with the operator at all times for ste verification
5 Use of mobile phone during working hours is prohibited ,except for emergency reporting only .
6 No eating ,smoking and sleeping at the construction worksiteb .use the facilities provided on site
7 Do not use defective PPE ,tools ,machinery ,or equipment - get them replaced before you start
8 Report all near misses and accidentimmediately to HSE incharge and your work leader
9 Work leaders are accountable for the behavior of their opertavies
10 Conduct a Tool Box Talk Risk Assement Review or issuse safety instruction before the start of the days work
11 Copy of this Risk Asssement available on site

Environmental
1 All Wate Material will removed daily from the work area and transferred to the designated waste skip

2 All Hazardous waste shall be immediately removed as per UAE regulation and dispatched slip maintained

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC COENGR Engineering Consultant
5-Frequent 5-Catastrophic Low 1-6
AL QOOZ CONTRACTING LLC
DATE
HAZARD IDENTIFICATION AND RISK ASSESMENT page 6
PAGE

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk

Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Control Residual Risk


level METHOD

L S R L S R

Smoking is strictly prohibited except to the designated


smoking area not areas,ensure that the fir extinguisher are always
14 Smoking fire No 3 4 MED R 5 1 LOW
designated,fire available and in good condition.proper housekeeping
must be observed at all times

store the flammable liquid always from the heat,spark


and flames.avoid contacting and breathing the
materials.use only in a well ventilated area wash
thoroughly after handiling,always keep cotainer close do
no cut weld on or near this container,wear appropriate
PPEs such as safety glasses resistant gloves(rubber) and
A.C and insulation by using the
respirator mask,use local exhaust ventilation or other
15 flammable liquid foster 81-10 Fire NO 4 4 HIGH R 4 1 LOW
engineering control to minimize exposure,ensure all
and fibre glass
power tools should be 110V and connected to step
down tranformer,ensure the cable is in good condition,
there is no signs of cracks and cuts,Housekeeping should
be done regularly,provide portable fire
extinguisher(DCP,ABC) where using the flammable
liquids and the storage areas

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC COENGR Engineering Consultant
5-Frequent 5-Catastrophic Low 1-6
AL QOOZ CONTRACTING LLC
DATE
HAZARD IDENTIFICATION AND RISK ASSESMENT page 5
PAGE

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Hazard
Risk Rating/Risk

ences
Sl no

Mitigation action to be taken/Hazard/risk Control Residual Risk


level METHOD

L S R L S R
Injuries to the back are
biggest single case of
Incorrect lifting of
time,fingered cut due to
loads,sharp edges,hit sharp edges,burns due to Any lifting task must only be carried out by persons physically
articles,dropped capable to do so.Those who have previous back injury
handiling of hot
age,physique& general level of fitness should be considered.safety
articles placing the articles,foot injuries due to
officer must access of capability of any individual required,Rigging
object while fingers dropped articles,strain of
12 Use of lifting equipment No 3 5 High R team shall use a control the swinging and to tagling properly erecting 5 1 Low
underneath,swinging of wrist/fingers cutting & the load location,Adequate safety warning boards and warning
materials while lifted fractures any part of
signs,adequate working proper way,operator have been EHS 3rd
by crane/hoists,chance bodies,loss of life/property party approved,ensure proper lighting provided for the work
loss/money loss,workers
of touching to area,ensure proper emergency exits/procedure are available on site
fell down and possible of
opreating cabin
minor/major acident or
injuries

Ensure all electrical connection are free from damage,ensure all


electrical connection is connected with industrial socket,ensure
proper acess provided for the work area,ensure adequate/safe
working plaftform are available on site,lone working not
Inadequate or poor Workers get electrical allowed,well operator/experienced,adequqate/well
lightings,electrical shock due to unavailable belts,Hooks,sings for cranes,Adequate EHS approved 3rd party
shock due to poor or of competent electrician
certificate for all lifting equipment,well signal man,well
on site machinery or supervision,proper checking & maintanence,SWL properly,adequate
13 Electrical loose No 5 3 H R
equipment warning signs,worker must be using proper PPEs in the night
connection/damage accident,damage of shift,Tool box talks must be conducted for the workers befor starting
cable,poor supervision property,fire hazard and the work,safety officer & first aider should be available at
fire emergency situation /burn site,competent electrician ,security & emergency vehicle should be
available at site for night shift,Ensure safety inducted all the
employees,do not work without EHS-NOC for night work,adequate
fire cylinder provided & fire marshall ensure safety inducted all the
employees,do not work without es-noc for night work

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC COENGR Engineering Consultant
5-Frequent 5-Catastrophic Low 1-6
AL QOOZ CONTRACTING LLC
HAZARD IDENTIFICATION AND RISK ASSESMENT DATE
page 4
PAGE

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk
Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Residual Risk


level Control METHOD

L S R L S R
Housekeeping in the area at grinding operations to be
maintained to a high level,Grinding in the presence of
any type of flammable material the use of fire
Fire,eletrical shock
Fire,Electrical shock blankets with a fire extinguisher is compulsory,RCCB
10 Hot work,grinding etc circuit without safety
cutting injury
No 3 5 High R and 110v step down transformer shoul be used for
3 2 Low
guard flying object electricals connections.Only trained personnel
allowed to operate a grinder,make sure all
cables/cords are in good condition

Trained and authorized welder and gas cutters only


allowed to work,electrical connection taaken through
RCCb for electrical welding.,ensure the eathing for
welding and proper return path Ensure the flash back
fire inadequate arrestors and regulators for gas cylinder,Place the
earthing without ptw fire,electrical shock,shot cylinder in a shaded area and distiguish the empty
11 Welding & gas cutting No 4 4 High R 4 2 MED
without flashback circuit and full cylinder,Use gas cylinder trolley for carrying
arrestor the cylinder from one place to another place,keep the
cylinder always in upright position,ensure proper fire
control measures,ensure all cables/cords are in good
condition,ensure that there is no presence of
flammable/combustible materials in the working area

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC COENGR Engineering Consultant
5-Frequent 5-Catastrophic Low 1-6
AL QOOZ CONTRACTING LLC
HAZARD IDENTIFICATION AND RISK ASSESMENT DATE
page 3
PAGE

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk
Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Residual Risk


level Control METHOD

L S R L S R
Eletrical shock,property
Fire spark from the loss,deadth,time loss,fire The generator will be in a combustible,flammable or
exhaust pipe of accident/injury to the inflammable free/ventilated place.suitable fire
7 Generator operation generator,short personals/damage to the No 3 5 High R extinguisher shall be provided,never overloaded,drip 3 2 Low
circuit,overloaded,heat, equipments,injury to the tray should be provided for prevent oil
oil spillage personals/damage to the spillage,Adequte warning signs
equipment

Regular maintanence,Provide spill kit,collection tray


exhaust fumes,oil or disel
8 Generator operation Eniviroment No 4 4 High secondary storage and training ,adequate personal 4 2 MED
spillage noise pollution
protective equipment should be used

All workers should be wear correct personel


proctective equipment,should be provided adequqate
minor & major cut safety guards & stop button,should be provided
injuries,Fractures of any adequate industrial socket for electrical
grinders,electric part of body,damage of connections/joints,fire extingusiher and fir watch
9 Steel cutting/grinding No 3 5 High R 5 1 Low
shock,fire burns properties,Burn/fire,da shoul be provided for steel cutting/grinding works,hot
mage materials ,Time works permit should be recieved from project
loss incharge,training shoul be conducted for safe use of
working,adequate warning signs/working
area,adequate housekeeping at site,tool box meeting

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC COENGR Engineering Consultant
5-Frequent 5-Catastrophic Low 1-6
AL QOOZ CONTRACTING LLC
HAZARD IDENTIFICATION AND RISK ASSESMENT DATE
page 2
PAGE

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk
Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Residual Risk


level Control METHOD

L S R L S R

Proper house keeping,rubbish removed


Potential for
properly,food waste removed
4 Build up of waste materials contamination of Disease and ill health Yes 3 5 High R 3 1 L
properly,remove rubbish properly,adequate
environment
watse skip available on sites

All workers worn PPEs strictly,coducted all


workers &staff HSE induction
Injury to the training,Conducted all workers tool box
person falling
5 fencing work personals,muscular yes 3 5 HIGH R meeting,adequate supervision,work at 3 2 L
down,manual handiling
pains height:min 1.8mtrs & above all workers must
be wear safety harness,safe working
platform

Safety shoe,safety helmet are compulsory


Employee & others
Direct concrete exposure to skin concrete burns to skin and coverall to worn by workers,All marking
6 resulting in injury or yes 5 3 HIGH R 3 2 L
and eyes and eyes area must be barricaded/warning signs,HSE
fatality
induction training conducted

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC COENGR Engineering Consultant
5-Frequent 5-Catastrophic Low 1-6