AL QOOZ CONTRACTING LLC

HAZARD IDENTIFICATION AND RISK ASSESMENT DATE


page 5
PAGE

Legal compliance
harm/consequ
Risks Who

Control E/I/R
/Activities
Job steps

might be
/potential
identified

Hazards

Remarks
Risk Rating/Risk

Hazard

ences
Sl no

Mitigation action to be taken/Hazard/risk Residual Risk


level Control METHOD

L S R L S R

Tool box talks to be given before


commencing the activity,proper access shall
be provide at required location,,all personnel
to HSE induction training from safety
department before entering the site,to
ensure proper use of PPE during entire
work,Heat stress awareness campaign/tool
box talk should be carried out prior to start
the work,Fire extinguisher to be available at
Fall of vehicles,without site,each employee to be instructed on his
Personal injury property
proper responsibility every day,excavation area to
5 Use of vehicles damage,loss of No 3 4 High R 3 3 Med
documents,Inadequate be cordoned off and wrning signs shall be
life,deadth
maintanance displayed,EHS approved third party
certificate operator license & registration
card available for heavy equipment like
jcb,shovel crane etc.as per the EHS
requirements,people not to work inside of
excavation when heavy equipments is in
operations,No leaks in roller & compactor &
it should be inspected prior to start,all
personnel to be attended REYAMI HSE
induction training from safety

1-Improbable 1-Negligible Likelihood X


Review by Main -Contractor Approved by Consultant
Severity

2-Remote 2-Minor Severity E -Eliminate


Control
Likely

Risk

3-Occassional 3-Reportable High 15-25 I- Isolate


COENGR Engineering
4-Probable 4-serious Medium 7-12 R-Reduce Al Qooz Contracting LLC
Consultancy
5-Frequent 5-Catastrophic Low 1-6