EAST COAST RAILWAY

Olo PrincipalChief Engineer,


Railsadan, Samantavihar,
C.S.Pur, Bhubaneswar

No: W7/63 1/EST/RATE/PI-V/2349 Dated: 28.03.2023

To.
Sr DEN(Co-ord),
East Coast Railway,
KUR/SBP/WAT
Sub: Unit Price ofP.Way materials for the year 2023-24.
Ref.: Railway Board's letter No. 2006/CE-I/MPW/1dated 08.07.2022.
The unit price of various P. way materials, as vetted by Accounts vide
letter No. ECoR/Accts/BBS/Fin-IV/Unit Price-P.Way-2023-24/ENGG/Ol
/1404 dated 24.03.2023 is sent herewith for preparation of detailed estimates
of Track Renewal works sanctioned in Pink Book 2023-24 / to be sanction in
LAW Book 2023-24.

The above rates are only approximate and should be adopted for
preparation of estimates only and not for any other purpose. In other cases,
actual prices should be taken intoconsideration.

This has the approval of CTE/ECoR/BBS.


Encl: Vetted rates.

(P.K.Panigrahy)23/2
Dy. Chief Engineer/Track
CE
Pr.

RDtecolp3t.*
RAILHA BHUAAN EAST COAST RAILWAY

No.ECoR/Accts/BBS/Fin-IV/Unit Price-PWay-2023-24/ENGG/01/1404
PFA'sOffice/BBS
Dt:24-03-2023

The CTEBBS
Glued Joints and Points
Sub: Vetting of Unit Price of Rails, Sleepers, Fishplates, SEJs,
Track Renewal Works
& Crossings etc for adoption in Detailed Estimates for
included in Pink Book & LAW Book-2023-24.
Ref: (1) Your office Note dt.27-02-2023.
(2)Your office letter No.W7/63 1/EST/RATE/Pt-[V/153 1dt.28-02-2023.(F/222)
(2) Railway Board's letter No:2006/CE-II/MPW/1 dt.08-07-2022 (F/201)

The Unit rates of all P-Way materials for preparation of Detailed Estimates for Track
Renewal Works included in Pink Book & LAW Book 2023-24 are examined with reference to
the rates communicated by Railway Board vide letter dt.08-07-2022(ref-2) as well as with those
rates available from Latest Purchase Orders/Sale Release Orders issued by this Railway.
The rates of P.Way materials are vetted subject to these rates are only approximate and
should be adopted for preparation of track renewal estimates for the Works included in Pink
Book & LAW Book'2023-24 only and not for any other purpose. In other cases, actual prices
should be taken into consideration.

Dy.FA&CAO/Finance

r
Approximate Cost of P.Way materials for adoption in Track Renewal
Estimates Sanctioned in Pink Book /LAW Book 2023-24
(Based on Rly. Board's letter no. 2006/CE-I/MPWI1 dated 08.07.2022)

(() RAILS
(a) New Rails (Prices are in per MT ex works excluding Taxes and Freight)
SI. New Rails, all 90 UTS Unit Price Remarks
No.
13M/26MI260M MT 67500 As per Rly. Bd's letter under ref.
(60Kg/52Kg) above.

(b) New Rails (Prices are in per MT ex works including Taxes and Freight)
SI. New Rails, all 90 UTS Unit Price Remarks
No.
() 13M/26MI260M MT 79650 As per Rly. Bd's letter under ref.
(6OKg/52Kg) above.

(c) Second Hand (SH) Rails (65% of new cost)


(Prices are in per MT ex works excluding Taxes and Freight)
SI. SH Rails Unit Price Remarks
No.
() 13M/26M/260M MT 43875 As per Rly. Bd's letter under ref.
(60Kg/52Kg) above.

Jese/est
Dy. Chief Engineer (TR
East Coest Raitway
atyrt Bhubaneswar

Vetted
For FACAO/E.Co.Rly/BBS

Vested Knje+to obcenats


.E/A wt/ea,&/bh- W/ht Prea
For FA& CAOrECo.Rly/BRS

P.Way Rate - 2023-24 Page 1


(e U/S RAIL
Rail section Book rate Remarks
per metre
(in )
60 KG 2546.30 AVERAGE of (1) Sr. DMM/KUR's SRO No 239782|
dated 08.08.2022 (2) Sr. DMM/KUR's SRO No 247897
dated 07.10.2022 (3) Sr. DMM/KUR's SRO No 248755
dated 18.10.2022 (4) Sr. DMM/KUR's SRO No 256238
dated 09.01.2023 (5) Sr. DMM/KUR's SRO No 256993
dated 16.01.2023 (6) Sr. DMM/KUR's SRO No 257583
dated 20.01.2023 (7) Sr. DMM/SBP's SRO No 232027
dated 23.06.2022 (8) Sr. DMM/SBP's SRO No 232898|
dated 28.06.2022 (9) Sr. DMM/SBP's SRO No 233875
ldated 05.07.2022 (10) Sr. DMM/SBP's SRO No 235944|
dated 18.07.2022 (11) Sr. DMM/SBP's SRO No 235981
dated 18.07.2022 (12) Sr. DMM/SBP's SRO No 248946
dated 19.10.2022 (13) Sr. DMM/SBP's SRO No 257388
dated 19.01.2023 (14) Sr. DMM/SBP's SRO No 257713
dated 23.01.2023 (15) Sr. DMMWAT's SRO No 237463
dated 27.07.2022 (16) Sr. DMM/WAT's SRO No 250110
dated 04.11.2022

52 KG 2123.34 |AVERAGE of (1) Sr. DMM/KUR's SRO No 250585|


dated 10.11.2022 (2) Sr. DMM/KUR's SRO No 257351
dated 19.01.2023 (3) Sr. DMM/SBP's SRO No 256912
dated 16.01.2023 (4) Sr. DMM/SBP's SRO No 257795
dated 23.01.2023 (5) Sr. DMM/SBP's SRO No 257814|
dated 23.01.2023 (6) Sr. DMM/SBP's SRO No 258681
dated 31.01.2023 (7) Sr. DMM/SBP's SRO No 260579
dated 16.02.2023 (8) Sr. DMMWAT's SRO No 252435
dated 05.12.2022 (9) Sr. DMM/WAT's SRO No 257586
dated 20.01.2023 (10) Sr. DMM/WAT's SRO No 259692
dated 08.02.2023

90 R 1869.50 |AVERAGE of (1) Sr. DMM/KUR's SRO No 245079


dated 08.09.2022 (2) Sr. DMM/SBP's SRO No 243590
dated 30.08.2022 (3) Sr. DMM/SBP's SRO No 255773|
dated 05.01.2023 (4) Sr. DMM/SBP's SRO No 257835
|dated 23.01.2023 (5) Sr. DMM/MAT's SRO No 246220
dated 20.09.2022 (6) Sr. DMMWAT's SRO 252429
dated 05.12.2022 (7) Sr. DMM/WAT's SRO 256689
dated 13.01.2023

Dy. Chief Engineer (TR.)


Vetted tto
East Goast Railway For FA&COECo.Rly /BBS
yayqt Bhubaneswar

P.Way Rate - 2023-24 Page2


219

(Ii) FISH PLATE:


(A) Cost of new Fish Plate :
SI. Description Rate per RemarkS
No. pair (in )
() 1m long 60Kg fish plates with Bolts 8579/ |As per 'a' below.
and Nuts
(ii 1m long 52Kg fish plates with Bolts 6092/ |As per 'b' below.
and Nuts
(ii) 60Kgfish plates with Bolts and Nuts 4267/ |As per 'c' below.
(iv) 52Kgfish plates with Bolts and Nuts 3380/ |Asper 'd' below.

(a) 1m long 60 kg fish plates with Bolts and Nuts


SI. Description Rate Unit Qty Total Rate Reference
No
1 1metre long 8106.60 pair 8106.60 |As per vetted rate of
60Kg fish plate 2021-22.
2 Fish Bolts, nuts 78.68 no 6 472.08 As per vetted rate of
& spring 2020-21.
washers
Total cost for 1 set = 8578.68
Say 8579/

(b) 1m long 52Kg fish plates with Bolts and Nuts


SI. Description Rate Unit Qty Total Rate Reference
No
1 |1mlong 52Kg 5638.04 pair 1 5638.04 |As per vetted rate of
|fish plate |2018-19.
2 Fish Bolts, nuts 75.70 no 454.20 JAs per vetted rate of
|& spring 2020-21.
washers
Total cost for 1 set = 6092.24
Say 6092/

Dy. Chief Engineer (TR.)

East Cost Railway


Yety Bhubaneswar Vettd

For FA &CAO/E,Go.Rly/BBS

P.Way Rate - 2023-24 Page 3


(

(c) 60Kg fish plates with Bolts and Nuts


SI. Description Rate Unit Qty Total Rate Reference
No
1 60Kg fish plate 3952.72 pair 1 3952.72As per vetted rate of
2015-16.
2 Fish Bolts, nuts 78.68 4 314.72 As per vetted rate of
|& spring 2020-21.
washers
Total cost for 1set = 4267.44
Say 42671

(d) 52Kgfish plates with Bolts and Nuts


SI. Description Rate Unit Qty Total Rate Reference
No
1 |52Kgfish plate 3076.86 pair 1 3076.86 |As per vetted rate of
2015-16.
2 Fish Bolts, nuts 75.70 no 4 302.80 As per vetted rate of
|&spring |2020-21.
washers
Total cost for 1 set = 3379.66
Say 3380/

(B) (a) SHCost of Fish Plates for Secondary Renewal:


(i) 60KgSH fish plates with New Bolts and Nuts 2884/- 65% cost of new FP +
R 2569.27+314.72= 2883.99/-, Say 2884/-) new cost of bolts &
nuts
(ii) 52KgSH fish plates with New Bolts and Nuts 2303/ -Do
(R 1999.96 + 302.80 =2302.76/- Say 2303/-)

(b) SH Cost of Fish Plate for released materials:


(i) 60Kg SH fish plates 2569/- 65% cost of new Fish
Plate.
(ii ) 52Kg SH fish plates 2000/ -Do

(C) UIS Cost of Fish Plates for released materials:


(i) 60KgU/S fish plates with Bolts and Nuts (in ) 935 Enclosed based on

(iü) 52Kg U/S fish plates with Bolts and Nuts (in ) 771 rate analysis at
JAnnexure-IX.
( ii ) 90R U/S fish plates with Bolts and Nuts (in ) 709

Dy. Chief Engineer (TR.)


East Coest Railway
yayat Bhubaneswar
For FA &

P.Way Rate - 2023-24 Page4


(I) SLEEPERS
(a) (i)Cost of new sleepers:
SI. Description Rate per sleeper
No. (Price in)
() Approximate cost of PSC Mono-Block Main Line Sleeper (RT 2884.61
8527 & RT-8746) as on April, 2022 exclusive of fittings iz.
ERC-V, GEN Liner, GRSP etc.) (EX-works basic rate)|
exclusive of Taxes, transportation and freight on input
material. (As per Rly. Bd's letter under ref. above)
(ü) Approximate cost of PSC Mono-Block Main Line Sleeper (RT 3403.84
8527 & RT-8746) as on April, 2022 exclusive of fittings viz.
ERC-V, GEN Liner, GRSP etc.) (Ex-works basic rate)
inclusive of GST, exclusive of transportation and freight on
input material. (As per Rly. Bd's letter under ref. above)
(ii) Approximate cost of PSC Mono-Block Main Line Sleeper (RT 3998
8527 & RT-8746) as on April, 2022 {Inclusive of fittings viz.
ERC-MK-V - 4nos, Metal Liner - 4nos, G.R. Sole Plate - 2nos
|i.e. 594/-, details at ll (b) ()} / b
(i.e. 3403.84/- + 594/- =3997.84/-, Say 3998/-)

(a) (ii) SHcost of sleepers for secondary renewal.


() Cost of SH PSC Mono-Block Sleeper for secondary renewal 2668
{Inclusive of cost of fittings viz. ERC-MK-V - 4ncs (SH), GFN
|66 Liner - 4nos (new), G,R. sole plate - 2nos (new), details at
I() (ü)} (i.e. 3403.84 x65% i.e. 2212.50 + 455.48 i.e.
cost of fittings = 2667.98, Say? 2668/-)
(ii) SH cost of Sleepers for release material (65% of new sleeper 2599
cost i.e. 3997.84/- x 65% = 2598.70/-, Say 2599/-)

Dy.Chief Engineer (TR.)


East Coest Railway
qey Bhubaneswar
Vetted kheeb b

For FA &CAOBE.Co.Rly/BBS

P.Way Rate - 2023-24 Page 5


(b) (i) Cost of fittings for one Concrete sleeper
SI. Description Rate Unit Qty Total Rate Reference
No.
(i) Elastic Rail 98.94 Each 4 395.76As per P.0. No.
Clip MK-V TP235007D00004
dated 03.02.2023
(i) Metal Liner 25.96 Each 4 103.84 As per P.O. No.
(60Kg) PCE/ECoR/2022-23/W
(T-8748) 7/629/Tender/ 2021-22
|/08/00018/3544 dated
|21.07.2022
(ii)Grooved 47.20 Each 94.40 As per P.O. No.
Rubber Sole PCE/ECoR/2022-23/
Plate W-7/629rTender/2021
(T-8747) |22/07/00010/3650
dated 05.07.2022
Total cost for one sleeper with fittings = 594.00
Say Rs. 594/

(b) (ii) Cost of fittings for one SH Concrete sleeper.


SI. Description Rate Unit Qty Total Rate Reference
|No.
() Elastic Rail 64.31 Each 4 257.24 As per P.0. No.
Clip MK-V (SH TP235007D00004
i.e. 98.94 x dated 03.02.2023
0.65 = 64.31/-)
(ii) Metal Liner 25.96 Each 4 103.84 As per P.O. No.
(60Kg) PCE/ECoR/2022-23N
(T-8748) 7/629/Tender/ 2021-22
|/08/00018/3544 dated
21.07.2022

(iii) Grooved 47.20 Each 2 94.40 As per P.O. No.


Rubber Sole PCE/ECoR/2022-23/
Plate |W-7/629/Tender/2021
(T-8747) 22/07/00010/3650
dated 05.07.2022
Total cost for one sleeper with fittings = 455.48
Say Rs. 455/

Dy. Chief Engineer (TR-)


East Coæst Raitway
yyatBhubaneswar Vettpd
CAOIEGo.Rly!BBS
For FA &

P.Way Rate - 2023-24 Page 6


(c) Other Sleeper &Fittings Remarks
SI. Description Rate
No. PCE/ECoR/2022-23/W-7/629/Tender/
(i) Wider PSC 3899.90/-As per P.O. No.
2021-22/13/00025/4973 dated 26.09.2022
Sleepers for per No
Curves
(T-8979 to
T-8982) PCE/ECoRI2022-23/W-7/629/Tender
(ii) Metal Liner 25.96/- per As per P.O. No.
(60Kg) T-8748 No l2021-22/08/00018/3544 dated 21.07.2022
PCEIECOR/22-23/W-7/629/P/ER/RC/
(ii) Metal Liner 20.72/- per As per P.0. No.
No 21-22/06/00021/5064 dated 29.09.2022
(60Kg) T-3740
PCE/ECoRI22-23/W-7/629/21-22/CP/
(iv) Composite 28.67/- per As per P.O. No.
SCR/RC/CGRSP T-6618/00013/3372 dated 11.07.2022
GRSP (for No
PSC Sleeper T
6618) PCE/ECoR/22-23/W-7/629/Tender/
(v) GFN-66 Liner 11.47/- per As per P.. No.
No 2021-22/09/00001/2745 dated 24.05.2022
(T-8751) for
Wider PSC
|Sleeper (60 Kg
Rail)
(vi) Combination 84.76/- per As per vetted rate of 2019-20.
Metal Liner Set
(60kg rail &
|52kg rail)
T-3741 & 3742

(d) CST/9 Sleeper with fittings (BG)


1549/- per As per vetted rate of 2020-21.
UIS cost
Set

(e) Steel Channel Sleeper


4318.33/- Sr.DMM/KUR's SRO No 253352 dated 13.12.2022
U/S cost
per No,

() Elastic Rail Clip 60 Kg


34.46/- per Sr.DMM/WAT's SRONo 258676 dated 01.02.2023
U/S cost
No.

Dy. Chief Engineer (TR.)


East Couat Railway
ayaT Bhubaneswar

For FA &C¤OCQBWBBS

P.Way Rate - 2023-24 Page 7


219)
(g) Metal Liner 60 Kg
UIS cost 8.08/- perSr.DMMWAT's SRO No 256748 dated 13.01.2023
No.

(h) Wooden Sleeper


230.20/-As per vetted rate of 2020-21.
U/S cost
each

(i) PSC Sleeper


537.27/- perlSr.DMM/WAT's SRO No 256277 dated 09.01.2023
U/S cost
No.

(i) SEJ (60Kg)


41429.90/-As per vetted rate of 2021-22.
U/S cost
Per Set

(k) SEJ(52Kg)
34639.94/- |As per vetted rate of 2021-22.
U/S cost
Per Set

() Fish Plate (60Kg)


UI` cost 944.65/- per|As per vetted rate of 2021-22.
Pair

(m) Fish Plate (52Kg)


UIS cost |729.26/- perAs per vetted rate of 2021-22.
Pair

(n)Fish Plate (90R)


U/S cost 657.26/- per|As per vetted rate of 2021-22.
Pair

Dy. Chief Engineer (TR.)


East Coest Railway
etye Bhubaneswar

Vetted

ForFA& CAbTCo,Rly/GBs- o9-1ey t wsy et/ lyoy

P.Way Rate - 2023-24


Page 8
(2)

(o) Glued Joint


12163.24/- JAs per vetted rate of 2022-23.
60Kg UIS cost
each
9558.88/-As per vetted rate of 2021-22.
52Kg U/S cost each

(IV) IMPROVED SWITCH EXPANTION JOINT (SEJ)


Description Rate Remarks
Switch expantion joint inclusive of 60Kg 468008
90 UTS Rail, fittings 6 nos. PSC Enclosed based on rate analysis
sleepers, Sales Tax, etc per set. 52Kg 435070 at Annexure-l.

Switch expantion joint inclusive of 60Kg 504212


110UTS Rail, fittings 6 nos. PSC Enclosed based on rate analysis
sleepers,Sales Tax, etc per set. 52Kg 466447 lat AnnexXure-l.

(V) GLUED JOINT


60Kg 45063
90 UTS Rail
Enclosed based on rate analysis
52Kg 42167 Jat Annexure-lll.
60Kg 49589
110 UTSRail Enclosed based on rate analysis
52Kg 46089 at Annexure-IV.

Dy. Chief Engineer (TR.)


East Coeat RaiBway
gayat Bhubaneswar

Vetteg
For FA&CAO

P.Way Rate - 2023-24


Page 9
(VI) POINTS AND CROSSINGS
a) New Cost with Rail 90 UTS
SI. Item Layout Curved CMS PSC Total
No. switches* Crossing Layout
(per set) with all
fittings
set)**
1 60Kg 1 in 8 1/2 PSC 416383 1 218772.00 470020. 1105175

52Kg 1in 8 1/2 PSC 364410 216036.76 4Z0020. 1050467


3 60Kg 1in 12 PSC 480968 1256060.00| 678791 1415819
4 |52Kg 1in 12. PSC 441291 4241367.82678791 1361450

* As per Annexure-V ** As per Annexure-VIl&VIlI


(b) New Cost with Rail 110 UTS
SI. ltem Layout Curved CMS PSC Total
No. switches* Crossing Layout
(per set) with all
fittings
(per*a
set)**
1 60Kg 1 in 8 1/2 PSC 457692 218772.00 470020 1146484
2 52Kg 1in 8 1/2 PSC 399918 216036.76 470020 1085974
3 60Kg 1in 12 PSC 523670 256060.00| 678791 1458521
4 |52Kg 1 in 12 PSC 478075 241367.82678791 1398234

* As per Annexure-VI As per Annexure-VIl & VII

Rate reference of CMS Crossing


1 60Kg 1in 8 1/2|As per P.O. No. TP235021200005 dated 03.02.2023
2 52Kg 1in 81/2|As per vetted rate of 2020-21.
3 60Kg 1 in 12 As per P.0. No. TP225001200001 dated 10.01.2023
|52Kg 1in 12 |As per vetted rate of 2021-22.

Dy. Chief Engineer (TR.)

East Gotat Railway


qetya Bhubaneswar Vetted
For FA 8& CAO/EGe.RlylBBS

P.Way Rate - 2023-24 Page 10


2 10

(i) Second Hand Materials: INDIA


Switch &Crossings (BG) 65% of the cost of new material
New Materials:
(iii) Thick Web Switches |1in 12 TWS 60 Kg - 7,41,312/- per set (all inclusive)
(Based on Rly. Board's 1 in 8.5 TWS 60Kg - 6,64,540/- per set (all inclusive)
|letter no. 2006/CE-I/MPW/1 Note - However, these rates are indicative only and may
dated 08.07.2022) / l |vary between ZRs, as pertheir individual contracts.
(iv) Weldable CMS Crossings |1 in 12 WCMSC - 2,39,82 1/-perset (excludingGST)
(Based on Rly. Board's 1in 8.5 WCMSC -* 2,00,471/- per set (excluding GST)
letter no. 2006/CE-l/MPW/1|1
i n 12 WCMSC 2,82,989/- per set (including GST
dated 08.07.2022) @18%)
|1 in 8.5 WCMSC - 2,36,556/- per set (including GST
@18%)
Note - However, these rates are indicative only and may
vary between ZRs, as per their individual contracts.
(v) Derailing Switch (T-6068) 106200/- per set As per vetted rate of 2020-21.
60Kg 1 in 8.5
(vi) PSCSleepers for 60 Kg 1in 132750/- per set As per vetted rate of 2022-23.
8.5 Derailing Switch
(vii) GFN-66 liner for use with 13.34/- per No As per vetted rate of 2022-23.
ERC-MK-I||(T-3706)
(vii) GRSP for 52Kg 1 in 8.5 6592/- per set As per vetted rate of 2020-21.
Derailing Switch (T-5836)
(ix) GRSP for 60Kg PSCR 38.81/- per No As per vetted rate of 2022-23.
|Sleeper (T-6618)
(x) Combination GFN Liner use 35.39/- per set As per vetted rate of 2020-21.
with Concrete SIleeper
(T-3707 &T-3708)
(xi) Joggled Fish Plate T-5849 * 7575.60/- per set As per vetted rate of 2020-21.
(2 Nos), Bolts and Nuts T
11513 (4 Nos), Single Coil
Spring Washer T-10773 (4
|Nos), Special Washer
(50mmX50mm) and 10mm
thick (8 Nos)

Dy. Ch)of Engineer (TR.)


East Coest Railway
yatgt Bhubaneswar

For FA &CAOTE.Co.Rly/ BBS

P.Way Rate - 2023-24


otyy/y Page 11
Annexure-l
Rate Analysis For Improved Switch Expantion Joint (SEJ) 60Kg &52Kg
with 90 UTS Rail and fittings
Improved SEJ for
60 Kg 52Kg
(a) Cost of fabrication and fittings Remarks

KUR 198240 197650


For 60 kg - As per vetted rate of 2022-23
(KUR)
SBP 197060
For 60 kg - As per vetted rate of 2022-23
197650
(SBP &WAT)
For 52 kg -As per vetted rate of 2020-21
WAT 197060
|(KUR, SBP &WAT)
197650

Average 197453.33 197650.00


(b) Rail 60 Kg (52m) 52Kg (52m)
Qty (MT) 3.12 2.704
Rate / MT 79650 79650 |As per Rly. Bd's letter under ref. above.
Unit MT MT
Amount 248508.00 215373.60
(c) Sleeper
Qty (No
Rate / each 3235.56 3235.56 |As per vetted rate of 2022-23.
Unit each each
Amount 19413.36 19413.36
(d) GR Sole Plate (T-4159)
Qty (No) 12 12
Rate /each 219.45 219.45 |As per vetted rate of 2020-21.
Unit each each
Amount 2633.40 2633.40
Total cost
for 1set
468008 435070
(a+b+c
+d+e+f)

ngatam
Dy. Chief Engineer (TR.)

East Coest RaiBway


qatya Bhubaneswar
Annexure-ll
Rate Analysis For Improved Switch Expantion Joint (SEJ) 60Kg &52Kg
with 110 UTS Rail and fittings
Improved SEJ for
60 Kg 52Kg
(a) Cost of fabrication and fittings Remarks

KUR 198240 197650


For 60 kg - As per vetted rate of 2022-23
(KUR)
|For 60 kg - As per vetted rate of 2022-23
SBP 197060 197650
(SBP & WAT)
For 52 kg - As per vetted rate of 2020-21
197060 197650
(KUR,SBP &WAT)
WAT

Average 197453.33 197650.00


(b) Rail 60 Kg (52m) 52Kg (52m)
Qty (MT) 3.12 2.704
Rate / MT 91253.80 * 91253.80 *As per vetted rate of 2019-20.
Unit MT MT incloling GsT@18%
Amount 284711.86 246750.28
(c) Sleeper
Qty (No) 6 6
Rate / each 3235.56 3235.56 As per vetted rate of 2022-23.
Unit each each
Amount 19413.36 19413.36
(d) GR Sole Plate (T-4159)
Qty (No) 12 12
Rate /each 219.45 219.45 |As per vetted rate of 2020-21.
Unit each each
Amount 2633.40 2633.40
Total cost
for 1set
504212 466447
(a+b+c
+d+e+f)

Dy. Chief Engineer (TR.)


East Goest Railway
qayet Bhubaneswar

P.Way Rate - 2023-24 SEJ-60-52 Page 2


Annexure-ll|
Rate Analysis For Glued Joint 60Kg &52Kg with 90 UTS Rail
Glued Joint for
60 Kg (T-2572) 52Kg (T-671)
(a) Cost of fabrication and fittings Remarks
KUR 13999.52 15245.60
|For 60 kg - As per vetted rate of
SBP 13999.52 15245.60 |2020-21 (KUR, SBP &WAT)
For 52 kg -As per vetted rate of
WAT 13999.52 15245.60
2020-21 (KUR, SBP&WAT) A t
Average Cost 13999.52 15245.60
(b) Rail 60 Kg (6.5 m) 52Kg(6.5 m)
Qty(MT) 0.39 0.338
Rate / MT 79650 79650 |As per Rly. Bd's letter under ref.
above.
Unit MT MT
Amount 31063.50 26921.70
Total cost for 45063 42167
1 joint (a+b)

Annexure-IV
Rate Analysis For Glued Joint 60Kg &52Kg with 110 UTS Rail
Glued Joint for
60 Kg (T-2572) 52Kg (T-671)
(a) Cost of fabrication and fittings Remarks
KUR 13999.52 15245.60 For 60 kg - As per vetted rate of
SBP 13999.52 15245.60 2020-21 (KUR, SBP & WAT)
For 52 kg - As per vetted rate of
WAT 13999.52 15245.60 2020-21 (KUR, SBP &WAT)^
Average Cost 13999.52 15245.60
(b)| Rail 60 Kg (6.5 m) 52Kg (6.5 m)
Qty(MT) 0.39 0.338
Rate / MT 91253.80 91253.80 As per vetted rate of 2019-20.
Unit MT MT
Amount 35588.98 30843.78
Total cost for
49589 46089
1 joint (a+b)

Dy. Chief Engineer (TR.)


East Cost Railway
yedyat Bhubaneswar
Annexure-V
Rate Analysis For Over Riding Curve Switch 60Kg & 52Kg with 90 UTS Rail
(a) Switch (1 in 12) Switch (1 in 8 1/2)
60 Kg 52Kg 60 Kg 52Kg
Cost of manufacture and supply of curved switches. Remarks
KUR 187856.00 132828.67 120680.96 60kg 1 in 12 - As per vetted
rate of 2020-21 (KUR, SBP &
|WAT).
52kg 1 in 12 - As per vetted
SBP 187856.00 132828.67120680.96 rate of 2020-21 (WAT).
60kg 1 in 8.5 - As per vetted|
rate of 2020-21 (KUR, SBP &
WAT 187856.00 188800.00 132828.67 120680.96 WA).
52kg 1 in 8.5 - As per vetted
rate of 2020-21 (KUR, SBP &
|WAT).
Average 187856.00| 188800.00 132828.67 120680.96
Cost

(b)| Rail 60 Kg 52Kg 60 Kg 52Kg


(61m) (61m) (59m) (59m)
Qty (MT) 3.68 3.17 3.56 3.06
Rate / MT 79650 79650 79650 79650 As per Rly. Bd's letter under ref.
above.
Unit MT MT MT MT
Amount 293112.00 252490.5 233554.00 243729.00
Total
cost for
480968 441291 416383 364410
1set
(a+b)

Dy. Chief Engineer (TR.)


Cast Coest Railway
ataBhubaneswar

P.Way Rate - 2023-24 Switch Analysis Page 1


Annexure-VI
Rate Analysis For Curved Switch 60Kg &52Kg with 110 UTS Rail

(a) Switch (1 in 12) Switch (1 in 8 1/2)


60 Kg 52Kg 60 Kg 52Kg
Cost of manufacture and supply of curved switches. Remarks
KUR 187856.00 132828.67 120680.96 60kg 1 in 12 - As per vetted
rate of 2020-21 (KUR, SBP &
|WAT).
52kg 1 in 12 - As per vetted
SBP 187856.00 132828.67 120680.96rate of 2020-21 (WAT).
60kg 1 in 8.5 - As per vetted
rate of 2020-21 (KUR, SBP &
WAT 187856.00 188800.00 132828.67 120680.96 WAT).
52kg 1 in 8.5 - As per vetted
rate of 2020-21 (KUR, SBP &
WAT), 1
Average 187856.00 188800.00 132828.67 120680.96
Cost

(b) Rail 60 Kg 52Kg 60 Kg 52Kg


(61m) (61m) (59m) (59m)
Qty (MT) 3.68 3.17 3.56 3.06
Rate / MT 91253.80 91253.80 91253.80 91253.80|As per vetted rate of 2019-20.
Unit MT MT MT MT
Amount 335813.98 289274.55| 324863.53 279236.63
Total
cost for 478075 457692 399918
523670
1set
(a+b)

Dy. Chief Engineer (TR.)


East Coest Railway
yaigat Bhubaneswar

P Way Rate - 2023-24 Switch Analysis Page 2


20)
Annexure-VIl

1in 8 1/2 PSC Layout with all fittings (per set) (60Kg/52Kg)
Total Rate Reference
SI. Description Rate Unit Qty
No
PSC 413076.12Set 1 413076.12|As per P.0. No. PCE/ECoRI
1 Special 2022-23/W-7/629//Tender/
Sleepers for 60
Kg 1 in 8.5 |2021-22/12/00030/5341 dated
14.10.2022
Turnouts (T
l4865) 10025.12|As per vetted rate of 2022-23.
2 Grooved Rubber 10025.12 Set 1
Sole Plate for
Turnout (T-4865)
98.94 Each 356 35222.64|As per P.O. No.
3 Elastic Rail Clip
|TP235007DOg904 dated
MK-V
03.02.2023

4GFN-66 Liner for 17.15 Each 356 6105.40|As per vetted rate of 2022-23.
ERC-MK-v
5 Plate screw 44.37 Each 126 5590.62 As per vetted rate of 2022-23.
(T-3912)
Total cost for 1 set Turnout sleeper with fittings = 470019.90

Annexure-VIll

1in 12 PSC Layout with all fittings (per set) (60Kg/52Kg)


SI. Description Rate Unit Qty Total Rate Reference
No
1Special PSCI 591895.08 Set 1 591895.08|As per P.O. No. PCE/ECoR/
Sleepers for 60 2022-23/W-7/629//Tender/
Kg 1 in 12 2021-22/12/00027/5336 dated
|Turnouts (T 14.10.2022
4218)
2 Grooved Rubber 17785.60 Set 17785.6o|As per vetted rate of 2021-22.
Sole Plate for
Turnout P.0. No.
3 Elastic Rail Clip 98.94 Each 512 50657.28|As per
MK-V TP235007D00004 dated
03.02.2023

GFN-66 Liner for 17.15 Each 512 8780.80As per vetted rate of 2022-23.
ERC-MK-V
5 Plate screW 44.37 Each 218 9672.66|As per vetted rate of 2022-23.
(T-3912)
Total cost for 1set Turnout sleeperwith fittings = 678791.42

Dy. Chicf Engineer (TR.)

East Coast Railway


geyAT Bhubaneswar
P.Way Rate - 2023-24 PSC T-Out sleeper
Annexure-|X

Rate Analysis of Unserviceable Fish plate & Bolt for 60Kg, 52Kg & 90R rails

For Fish Plate Wt. Per Fish Bolt Wt. Total Wt. UIS Weight
Rails Pair (in kg) (4 Nos) in kg (in kg) (95% of Col. 4)

1 2 3 4 5
35.20 1.05 x 4 nos. 39.40 37.43
60 kg
28.71 0.94 'x 4nos. 32.47 30.85
52 kg
90 R 26.11 0.94 x 4n0s. 29.87 28.38
Note: Weight workout as per track manual Vol-l (1994).

For Weight of Fish Rate (in) Unit Cost Per Pair Rate reference
Rails Plate with Bolt Per per Kg (in )
Pair (in kg)
2 3 4 5 6
1
60 kg 37.43 24.98 Pair 935.00

30.85 24.98 Pair 770.55 As per vetted


52 kg
Yrate of 2022-23.
90 R 28.38 24.98 Pair 708.84

Dy. Chief Engineer (TR.)

East Coast Railway


ycyat Bhubaneswar

P.Way Rate -2023-24


202

DETAILS ANALYLIS OF SLEEPER FITTINGS FOR TURN OUT ON PSC


LAYOUT

I.1 in 12for 60kg (RT-4218)


G.R.Sole ERC GEN Plate RDSO
plate liner Screw Drg. No.
A. Switch Portion (Sleeper 80 34 34 218 T-4219
No. 1to 27)
B. Crossing Portion (Sleeper 68 130 130 T-4220
No. 65 to 83)
C. Lead Portion (Sleeper No. 148 296 296 T-4218
|28to 64)
D. Approach sleeper (13 nos) 26 52 52 T-4218

Total Quantity in Nos. 322 512 512 218

II. 1in 8 1/2 for 6Okg (RT-4965)


G.R.Sole ERC GFN Plate RDSO
plate liner Screw Drg. No.
A. Switch Portion (Sleeper 68 66 66 126 T-4966
No. 1 to 22)
B. Crossing Portion (Sleeper 50 94 94 T-4967
No. 41 to 54)
C. Lead Portion (Sleeper No. 72 144 144 T-4965
|23 to 40)
D. Approach sleeper (13 nos) 26 52 52 T-4965

Total Quantity in Nos. 216 356 356 126

Dy. Chief Engineer (TR.)


East Coast Raitway
ayaBhubaneswar
ATNT HThT (GOVERNMENT OF INDIA)
t HaleT (MINISTRY OF RAILWAYS)
trd as (RAILWAY BOARD)
No.2006/CE-II/MPW/I New Delhi, Date &.07.2022
The Principal Chief Engineers
All Indian Railways

The General Managers


CLW, DLW, ICE, W&AP, DMW &N.F. Railway (Const.), Guwahati.
TheChief Administrative Officer (Const.), All Indian Railways
The General Manager, Railway Electrification, Allahabad
The Chief Engineer, Metro Railway, Kolkata, Mumbai & Chennai
Sub: Price of rails, sleepers and fittings etc. for preparation of estimates for Track
Renewalworks 2023-24.

The following approximate prices F.O.R. works for various items of permanent way
materials are advised for the preparation of estimates:
(a) Rails (Primary) Price in Rupees
13M/26M/260M(60kg/52kg) Rs. 67500/- Per MT (ex works, excluding Taxes and
Freight etc)
(b) Rails (Second Hand) 65% of the cost of new material.
(c) Sleepers
Approximate cost of PSC Rs. 2834.61/- per sleeper (ex-works basic Rate) exclusive
Mono-Block Main Line Sleeper of Taxes, transportation and freight on input material.
(RT-8527 & RT-8746) as on
April'2022 exclusive of fittings
viz. ERC-V,GFN Liner, GRSP
etc.
(d) Thick Web Switches 1in 12 TWS 60kg-Rs. 7,41,312/- (all inclusive)
lin 8.5 TWS 60 kg-Rs. 6,64,540/- (all inclusive)
However these rates are indicative only, and may vary
between ZRs, as per their individual contracts.
(e) Weldable CMS Crossings lin 12 WCMSC- Rs.2,39,821/- (excluding GST)
Iin 8.5 WCMSC- Rs.2,00,47 1/- (excluding GST)
However these rates are indicative only, and may vary
between ZRs, as per their individual contracts.
The above rates are only approximate and should be adopted for preparation of
estimates only and not for any other purpose. In other cases, actual prices should be taken into
consideration.

Please acknowledge receipt of this letter.

(Pradep Naan &lal


Director Civil Engg. (P)
Railway Board