TMS Reports

USFD Testing (AT Welds) Due (Main Lines Only)


for the Period Between 14/02/2023 And 11/03/2023
Kota Division/West Central Railway
In the jurisdiction of : ADEN/SGZ
De
Location fec
Welding Last Testing
Sr.No. Section Line (LR/RR) Testing Criteria Due Upto t
km m Date Date
Cla
1 NAD-KTT UP LR 706 747.24 08/02/2023 Initial Testing 10/03/2023 ss
2 NAD-KTT UP LR 706 759.04 07/02/2023 Initial Testing 09/03/2023
3 NAD-KTT UP LR 706 766.38 08/02/2023 Initial Testing 10/03/2023
4 NAD-KTT UP LR 706 775.5 09/02/2023 Initial Testing 11/03/2023
G
5 NAD-KTT UP LR 709 107.5 23/07/2022 04/08/2022 1st Periodic Testing 22/02/2023
W
G
6 NAD-KTT UP LR 709 115.27 23/07/2022 04/08/2022 1st Periodic Testing 22/02/2023
W
G
7 NAD-KTT UP LR 780 187.25 28/07/2022 05/08/2022 1st Periodic Testing 27/02/2023
W
G
8 NAD-KTT UP LR 780 200.25 28/07/2022 05/08/2022 1st Periodic Testing 27/02/2023
W
9 NAD-KTT UP RR 699 105.15 01/02/2023 Initial Testing 03/03/2023
10 NAD-KTT UP RR 699 113 01/02/2023 Initial Testing 03/03/2023
11 NAD-KTT UP RR 706 642 05/02/2023 Initial Testing 07/03/2023
12 NAD-KTT UP RR 706 650.25 06/02/2023 Initial Testing 08/03/2023
13 NAD-KTT UP RR 706 657.59 05/02/2023 Initial Testing 07/03/2023
14 NAD-KTT UP RR 706 667.9 07/02/2023 Initial Testing 09/03/2023
G
15 NAD-KTT UP RR 780 187.25 28/07/2022 05/08/2022 1st Periodic Testing 27/02/2023
W
G
16 NAD-KTT UP RR 780 200.25 28/07/2022 05/08/2022 1st Periodic Testing 27/02/2023
W