Professional Documents
Culture Documents
2020
SIR TARGET
SR.NO PART NAME PART NO. SUPPLIER CAVITY REASON OF SUB. SUB FREQ. SUB DATE
DATE
12 BODY 4851AZ-049 DCD PUNE 2 MOVING SIDE INSERT CHANGE 4 6/26/2020 6/29/2020
14 BRACKET LATCH BEARING 1297MZ-057LB VALMI PRODUCTS 1 TOOL CORRECTION 2 6/30/2020 7/3/2020
29 Sleeve Breather 4851B-141B BSC Rubber Ind. 36 NEW DEVELOPMENT 1 7/11/2020 7/14/2020
31 Body Assy. 1296CZ-001A Opelauto electrotech Pvt.Ltd. 0 ECN & Tool Correction 4 7/16/2020 7/19/2020
Total 33 0
PENDING AD 0 3 -43894
PENDING AT 0 3 -43894
PENDING AD 0 3 -43895
PENDING AT 0 3 -43896
PENDING AD 0 3 -43897
PENDING AT 0 3 -43897
PENDING AT 3
PENDING AD
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
Completed SIR Count - Inspector wise
G.S
G.S
A.G
S.K
10/04/19 A.G
10/04/19 A.G
S.K
A.G
S.K
Page 12
DPCache_SIR Monitoring Sheet_2
SR.NO SIR TARGET DONE / PENDResp.
04/13/80 10/10/19 PENDING S.K
01/14/00 10/03/19 DONE S.K
01/13/00 10/05/19 DONE S.K
04/02/80 10/11/19 PENDING S.K
01/09/00 10/03/19 DONE A.G
01/09/00 10/03/19 DONE A.G
01/09/00 10/03/19 DONE S.K
01/03/00 10/03/19 DONE S.K
02/05/00 09/28/19 DONE S.K
08/22/01 09/30/19 DONE A.G
04/14/00 10/05/19 DONE A.G
04/24/00 10/04/19 DONE A.G
12/30/99 10/11/19 PENDING A.G
12/30/99 10/10/19 PENDING S.K
12/30/99 10/03/19 DONE A.G
12/30/99 10/03/19 DONE A.G
06/08/00 10/06/19 DONE S.K
12/30/99 10/13/19 PENDING A.G
08/27/00 10/07/19 DONE S.K
11/15/00 10/05/19 DONE S.K
06/28/00 10/05/19 DONE S.K
05/09/00 10/05/19 DONE S.K
02/28/00 10/07/19 DONE S.K
06/23/00 10/07/19 DONE S.K
12/30/99 10/12/19 PENDING S.K
12/30/99 10/12/19 PENDING S.K
05/09/00 10/12/19 DONE S.K
12/30/99 10/12/19 PENDING S.K
02/23/00 10/09/19 DONE S.K
12/30/99 10/10/19 PENDING A.G
12/30/99 10/10/19 PENDING A.G
12/30/99 10/10/19 PENDING A.G
Page 13
DPCache_SIR Monitoring Sheet_2
0
0
0
0
0
0
0
0
0
0
0
0
Page 14