You are on page 1of 1

TMS Reports

USFD Testing (AT Welds) Overdue (Main Lines Only) As on 14/02/2023


Kota Division/West Central Railway
In the jurisdiction of : ADEN/SGZ

Location Welding Last Testing Overdue Defect


Sr.No. Section Line (LR/RR) Testing Criteria
km m Date Date Since Class
1 NAD-KTT UP LR 723 848.5 05/04/2007 22/12/2019 36 month 22/12/2022 GW
2 NAD-KTT UP LR 750 986.9 26/12/2019 36 month 26/12/2022 GW
OBS(W)
3 NAD-KTT UP LR 768 729.49 22/06/2018 19/06/2020 18 month 04/02/2023
(JP)
4 NAD-KTT UP RR 723 340.7 13/07/2022 20/07/2022 1st Periodic Testing 12/02/2023 GW
5 NAD-KTT UP RR 723 347.25 13/07/2022 20/07/2022 1st Periodic Testing 12/02/2023 GW
6 NAD-KTT UP RR 723 353.4 13/07/2022 20/07/2022 1st Periodic Testing 12/02/2023 GW
7 NAD-KTT UP RR 745 994.2 25/11/2015 23/12/2019 36 month 23/12/2022 GW
8 NAD-KTT UP RR 750 989.25 26/12/2019 36 month 26/12/2022 GW
9 NAD-KTT UP RR 751 962 30/12/2019 36 month 30/12/2022 GW
OBS(W)
10 NAD-KTT UP RR 769 171.5 17/06/2020 18 month 04/02/2023
(JP)
11 NAD-KTT UP RR 789 287.2 03/06/2022 07/07/2022 1st Periodic Testing 03/01/2023 GW
12 NAD-KTT UP RR 789 295.7 03/06/2022 07/07/2022 1st Periodic Testing 03/01/2023 GW

You might also like