CENTRAL ELECTRICITY AUTHORITY

G O & D WING
OPERATION PERFORMANCE MONITORING DIVISION

RECOMMISSIONNING OF THERMAL/NUCLEAR UNITS AS ON: 09-12-2020 Sub-Report - 14

Date of Maintanance Sync Date


Unit No
Station Capacity (MW) remarks
DD/MM/YYYY HH:24MM DD/MM/YYYY HH:24MM

1 2 3 4 5 6

PANIPAT TPS 7 250.00 21/10/2020 02:53 09/12/2020 06:54 RSD/LOW SCHEDULE

MAHATMA GANDHI TPS 1 660.00 24/10/2020 03:12 09/12/2020 11:43 RSD/LOW SCHEDULE

KALISINDH TPS 1 600.00 09/12/2020 04:13 09/12/2020 18:46 AIR PREHEATERS PROBLEM

KOTA TPS 3 210.00 08/12/2020 08:34 09/12/2020 18:48 BOILER MISC. PROBLEM

UNCHAHAR TPS 3 210.00 09/12/2020 01:10 09/12/2020 22:03 WATER WALL TUBE LEAKAGE

MARWA TPS 2 500.00 07/12/2020 04:13 09/12/2020 17:44 ASH HANDLING SYSTEM PROBLEM

PARAS TPS 4 250.00 08/12/2020 01:00 09/12/2020 15:30 WATER WALL TUBE LEAKAGE

KUDGI STPP 3 800.00 09/09/2020 23:21 09/12/2020 08:36 CONSERVATION OF MAIN FUEL/RSD

TUTICORIN TPS 5 210.00 08/12/2020 23:30 09/12/2020 16:51 RSD/LOW SCHEDULE


SOUTHERN REPL. TPS 1 67.50 08/12/2020 20:14 09/12/2020 16:34 RESERVE SHUT DOWN / STANDBY UNIT

SOUTHERN REPL. TPS 2 67.50 05/12/2020 21:12 09/12/2020 15:23 RESERVE SHUT DOWN / STANDBY UNIT

LAKWA GT 7 20.00 09/12/2020 00:00 09/12/2020 11:26 Fuel Shortage


LAKWA REPLACEMENT POWER
2 9.96 09/12/2020 08:51 09/12/2020 20:07 MISC. SHORT DURATION MAINTENANCE
PROJECT
NAMRUP CCPP 2 21.00 09/12/2020 12:58 09/12/2020 19:33 Fuel Shortage

AGARTALA GT 2 21.00 09/12/2020 06:01 09/12/2020 14:19 GT-MISCELLANEOUS PROBLEMS

AGARTALA GT 3 21.00 09/12/2020 07:26 09/12/2020 16:34 GT-MISCELLANEOUS PROBLEMS

Total 3,917.97

https://npp.gov.in 11/12/2020 16:03:10 PAGE 1