You are on page 1of 4

CENTRAL ELECTRICITY AUTHORITY

G O & D WING
OPERATION PERFORMANCE MONITORING DIVISION

THERMAL/NUCLEAR UNITS WENT OUT OF GRID ON: 04-07-2020

Date of Maintanance
Unit
Station Capacity (MW)
No
DD/MM/YYYY HH:24MM

1 2 3 4

GH TPS (LEH.MOH.) 1 210.00 04/07/2020 19:09


GH TPS (LEH.MOH.) 3 250.00 04/07/2020 23:44

ROPAR TPS 5 210.00 04/07/2020 22:46


ROPAR TPS 6 210.00 04/07/2020 23:10

CHHABRA TPP 5 660.00 04/07/2020 15:13


HARDUAGANJ TPS 8 250.00 04/07/2020 09:15
OBRA TPS 11 200.00 04/07/2020 02:21

DSPM TPS 2 250.00 04/07/2020 06:05


OP JINDAL TPS 1 250.00 04/07/2020 10:21

AKRIMOTA LIG TPS 2 125.00 04/07/2020 22:57

MUNDRA TPS-I & II 3 330.00 04/07/2020 06:01


SASAN UMTPP 4 660.00 04/07/2020 04:25
CHANDRAPUR(MAHARASHTRA)
3 210.00 04/07/2020 14:48
STPS
CHANDRAPUR(MAHARASHTRA)
9 500.00 04/07/2020 13:31
STPS
PAINAMPURAM TPP 1 660.00 04/07/2020 19:32

TUTICORIN TPS 3 210.00 04/07/2020 09:03


MUTHIARA TPP 2 600.00 04/07/2020 08:59
BARAUNI TPS 8 250.00 04/07/2020 12:00

SAGARDIGHI TPS 3 500.00 04/07/2020 02:38


LAKWA REPLACEMENT POWER
6 9.96 04/07/2020 04:35
PROJECT
MONARCHAK CCPP 2 35.60 04/07/2020 00:00
Total 6580.57
https://npp.gov.in 08/07/2020 17:05:08
Y AUTHORITY
NG
ONITORING DIVISION

Sub-Report - 15

Expected/Sync Date of return


remarks
DD/MM/YYYY HH:24MM

5 6

RSD/LOW SCHEDULE
RSD/LOW SCHEDULE

RSD/LOW SCHEDULE
RSD/LOW SCHEDULE

ELECTRICAL MISCELLANEOUS PROBLEMS


FURNACE FIRE OUT /FLAME FAILURE
05/07/2020 FUEL SUPPLY & OTHER MISC. PROBLEMS

FURNACE FIRE OUT /FLAME FAILURE


AIR PREHEATERS PROBLEM

P.A. FANS PROBLEM

BOILER AUX. MISC. PROMLEMS


05/07/2020 VARIOUS STEAM LEAKAGES
FURNACE DRAFT ABNORMAL

BOILER MISC. PROBLEM


04/07/2020 BOILER MISC. PROBLEM

07/07/2020 RESERVE SHUT DOWN / STANDBY UNIT


WATER WALL TUBE LEAKAGE
WATER WALL TUBE LEAKAGE

BOILER FEED PUMP/MOTOR PROBLEM

MINOR MAINTENANCE WORKS

E.S.V. CLOSURE