You are on page 1of 2

CENTRAL ELECTRICITY AUTHORITY

G O & D WING
OPERATION PERFORMANCE MONITORING DIVISION

RECOMMISSIONNING OF THERMAL/NUCLEAR UNITS AS ON: 18-07-2020

Date of Maintanance
Unit
Station Capacity (MW)
No
DD/MM/YYYY HH:24MM

1 2 3 4

GH TPS (LEH.MOH.) 3 250.00 11/07/2020 07:48

ROPAR TPS 4 210.00 08/07/2020 11:30


GOINDWAL SAHIB TPP 1 270.00 18/07/2020 11:14

KOTA TPS 5 210.00 17/07/2020 05:11


DADRI (NCTPP) 1 210.00 30/05/2020 19:50

RIHAND STPS 1 500.00 15/07/2020 00:00


DAMODARAM SANJEEVAIAH TPS 2 800.00 17/07/2020 07:00

SGPL TPP 2 660.00 14/07/2020 20:40

METTUR TPS 4 210.00 11/07/2020 03:17


NORTH CHENNAI TPS 3 210.00 18/07/2020 10:35

TUTICORIN TPS 1 210.00 12/07/2020 11:50


NEYVELI TPS(Z) 1 250.00 10/07/2020 23:00
DARLIPALI STPS 1 800.00 10/06/2020 13:15
LAKWA REPLACEMENT POWER
2 9.96 18/07/2020 10:54
PROJECT
LAKWA REPLACEMENT POWER
3 9.96 18/07/2020 19:43
PROJECT
LAKWA REPLACEMENT POWER
3 18/07/2020 08:50
PROJECT
LAKWA REPLACEMENT POWER
5 9.96 18/07/2020 10:45
PROJECT
Total 4,819.90
ORITY

NG DIVISION

Sub-Report - 14

Sync Date
remarks
DD/MM/YYYY HH:24MM

5 6

18/07/2020 07:57 RSD/LOW SCHEDULE

18/07/2020 12:02 RSD/LOW SCHEDULE


18/07/2020 13:27 GRID MISCELLANEOUS

18/07/2020 18:12 WATER WALL TUBE LEAKAGE


18/07/2020 20:39 CONSERVATION OF MAIN FUEL/RSD

18/07/2020 22:30 AIR PREHEATERS PROBLEM


18/07/2020 10:58 RESERVE SHUT DOWN / STANDBY UNIT
GEN. TRANSORMER PROTECTION RELAY
18/07/2020 07:55
OPERATION PROBLEM
18/07/2020 00:23 RESERVE SHUT DOWN / STANDBY UNIT
18/07/2020 13:51 FURNACE FIRE OUT /FLAME FAILURE

18/07/2020 16:23 RESERVE SHUT DOWN / STANDBY UNIT


18/07/2020 02:53 ELECTRICAL MISCELLANEOUS PROBLEMS
18/07/2020 19:44 WATER WALL TUBE LEAKAGE

18/07/2020 23:59 Fuel Shortage

18/07/2020 23:59 Fuel Shortage

18/07/2020 13:20 Fuel Shortage

18/07/2020 16:33 Fuel Shortage