You are on page 1of 3

CENTRAL ELECTRICITY AUTHORITY Sub-Report-11

G O & D WING
OPERATION PERFORMANCE MONITORING DIVISION

DAILY MAINTENANCE REPORT (THERMAL AND NUCLEAR UNITS) FOR 500 AND ABOVE 09-12-2020
Date& Time of Expected/sync
Planned Forced Forced Others Maintenance Date of Return Reasons/Present Status
State/System Power Station Unit No. Maintenance (MW) Maintenance Maintenance Maintenance (MW)
(Major) (MW) (Minor) (MW) DD/MM/YYYY DD/MM/YYYY
HH24:MM HH24:MM
1 2 3 4 5 6 7 8 9 10
Haryana INDIRA GANDHI 1 0.00 0.00 500.00 0.00 09/12/2020 16:54 RSD/LOW SCHEDULE
STPP
Haryana INDIRA GANDHI 2 500.00 0.00 0.00 0.00 07/11/2020 23:59 SCHEDULED ANNUAL
STPP MAINTENANCE
Haryana INDIRA GANDHI 3 0.00 500.00 0.00 0.00 14/11/2020 00:00 RESERVE SHUT DOWN /
STPP STANDBY UNIT
Haryana RAJIV GANDHI TPS 1 0.00 600.00 0.00 0.00 02/10/2020 02:27 RSD/LOW SCHEDULE
Haryana RAJIV GANDHI TPS 2 0.00 600.00 0.00 0.00 18/09/2020 15:01 RSD/LOW SCHEDULE
Haryana MAHATMA GANDHI 1 0.00 0.00 0.00 0.00 24/10/2020 03:12 09/12/2020 11:43 RSD/LOW SCHEDULE
TPS
Punjab TALWANDI SABO 1 0.00 0.00 660.00 0.00 05/12/2020 20:01 RESERVE SHUT DOWN /
TPP STANDBY UNIT
Punjab TALWANDI SABO 2 0.00 660.00 0.00 0.00 11/10/2020 01:02 COAL SHORTAGE
TPP
Rajasthan KALISINDH TPS 1 0.00 0.00 600.00 0.00 09/12/2020 18:53 DRUM LEVEL LOW
Uttar Pradesh RIHAND STPS 2 0.00 500.00 0.00 0.00 18/11/2020 05:53 C&I PROBLEM
Uttar Pradesh ANPARA TPS 7 0.00 500.00 0.00 0.00 13/11/2019 14:13 HYDROGEN PRESSURE
PROBLEM
Uttar Pradesh LALITPUR TPS 3 0.00 660.00 0.00 0.00 16/11/2020 00:45 RESERVE SHUT DOWN /
STANDBY UNIT
Uttar Pradesh PRAYAGRAJ TPP 2 0.00 0.00 660.00 0.00 07/12/2020 21:50 WATER WALL TUBE LEAKAGE
Chhatisgarh KORBA STPS 6 500.00 0.00 0.00 0.00 25/11/2020 00:15 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
Chhatisgarh LARA TPP 1 0.00 0.00 800.00 0.00 08/12/2020 14:24 WATER WALL TUBE LEAKAGE
Chhatisgarh SIPAT STPS 5 500.00 0.00 0.00 0.00 17/11/2020 01:37 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
Chhatisgarh MARWA TPS 2 0.00 0.00 500.00 0.00 07/12/2020 04:13 09/12/2020 17:44 ASH HANDLING SYSTEM
PROBLEM
Chhatisgarh AKALTARA TPS 3 0.00 0.00 600.00 0.00 02/12/2020 05:27 P.A. FANS PROBLEM
Chhatisgarh AKALTARA TPS 4 0.00 600.00 0.00 0.00 15/11/2020 00:10 RSD/LOW SCHEDULE
Chhatisgarh TAMNAR TPP 4 0.00 600.00 0.00 0.00 26/09/2020 00:00 COAL SHORTAGE

https://npp.gov.in 2020/12/11 16:00:47 PAGE 1


DAILY MAINTENANCE REPORT (THERMAL AND NUCLEAR UNITS) FOR 500 AND ABOVE 09-12-2020
Date& Time of Expected/sync
Planned Forced Forced Others Maintenance Date of Return Reasons/Present Status
State/System Power Station Unit No. Maintenance (MW) Maintenance Maintenance Maintenance (MW)
(Major) (MW) (Minor) (MW) DD/MM/YYYY DD/MM/YYYY
HH24:MM HH24:MM
1 2 3 4 5 6 7 8 9 10
Gujarat MUNDRA UMTPP 2 0.00 0.00 800.00 0.00 25/11/2020 16:57 HRH LINE LEAKAGE
Madhya Pradesh VINDHYACHAL STPS 8 500.00 0.00 0.00 0.00 26/11/2020 00:12 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
Madhya Pradesh SHREE SINGAJI TPP 3 0.00 660.00 0.00 0.00 05/08/2020 23:56 TURBINE VIBRATIONS HIGH
Madhya Pradesh SHREE SINGAJI TPP 4 660.00 0.00 0.00 0.00 22/09/2020 07:49 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
Madhya Pradesh MAHAN TPP 2 0.00 600.00 0.00 0.00 24/09/2020 00:35 COAL SHORTAGE
Madhya Pradesh SASAN UMTPP 1 0.00 0.00 660.00 0.00 08/12/2020 19:30 ECONOMISER TUBE LEAKAGE
Maharashtra KORADI TPS 10 0.00 660.00 0.00 0.00 09/11/2020 01:28 BOILER MISC. PROBLEM
Andhra Pradesh SIMHADRI 2 0.00 500.00 0.00 0.00 11/10/2020 15:03 CONSERVATION OF MAIN
FUEL/RSD
Andhra Pradesh SIMHADRI 3 0.00 500.00 0.00 0.00 19/09/2020 00:13 CONSERVATION OF MAIN
FUEL/RSD
Andhra Pradesh DAMODARAM 1 0.00 800.00 0.00 0.00 13/11/2020 13:52 BOILER MISC. PROBLEM
SANJEEVAIAH TPS
Andhra Pradesh RAYALASEEMA TPS 6 0.00 600.00 0.00 0.00 07/11/2020 01:55 BOILER MISC. PROBLEM
Andhra Pradesh VIZAG TPP 1 0.00 520.00 0.00 0.00 18/07/2020 14:15 RSD/LOW SCHEDULE
Andhra Pradesh VIZAG TPP 2 0.00 520.00 0.00 0.00 18/07/2020 23:59 RSD/LOW SCHEDULE
Karnataka KUDGI STPP 1 0.00 800.00 0.00 0.00 08/09/2020 09:32 CONSERVATION OF MAIN
FUEL/RSD
Karnataka KUDGI STPP 2 0.00 800.00 0.00 0.00 27/03/2020 09:36 CONSERVATION OF MAIN
FUEL/RSD
Karnataka KUDGI STPP 3 0.00 0.00 0.00 0.00 09/09/2020 23:21 09/12/2020 08:36 CONSERVATION OF MAIN
FUEL/RSD
Karnataka BELLARY TPS 3 0.00 700.00 0.00 0.00 12/10/2020 13:49 RESERVE SHUT DOWN /
STANDBY UNIT
Karnataka YERMARUS TPP 1 0.00 0.00 800.00 0.00 03/12/2020 05:32 WATER WALL TUBE LEAKAGE
Karnataka YERMARUS TPP 2 0.00 0.00 800.00 0.00 05/12/2020 02:00 BOILER MISC. PROBLEM
Tamil Nadu TUTICORIN (JV) TPP 1 500.00 0.00 0.00 0.00 03/12/2020 00:00 CAPITAL MAINTENANCE
Tamil Nadu VALLUR TPP 1 500.00 0.00 0.00 0.00 27/11/2020 00:00 CAPITAL MAINTENANCE
Tamil Nadu VALLUR TPP 2 0.00 0.00 500.00 0.00 07/12/2020 06:08 WATER WALL TUBE LEAKAGE

https://npp.gov.in 2020/12/11 16:00:47 PAGE 2


DAILY MAINTENANCE REPORT (THERMAL AND NUCLEAR UNITS) FOR 500 AND ABOVE 09-12-2020
Date& Time of Expected/sync
Planned Forced Forced Others Maintenance Date of Return Reasons/Present Status
State/System Power Station Unit No. Maintenance (MW) Maintenance Maintenance Maintenance (MW)
(Major) (MW) (Minor) (MW) DD/MM/YYYY DD/MM/YYYY
HH24:MM HH24:MM
1 2 3 4 5 6 7 8 9 10
Tamil Nadu NORTH CHENNAI 4 0.00 600.00 0.00 0.00 11/11/2020 19:23 DRUM LEVEL HIGH/ low
TPS
Tamil Nadu NORTH CHENNAI 5 0.00 0.00 0.00 600.00 04/12/2020 00:50 Low system demand/ costly
TPS fuel
Tamil Nadu ITPCL TPP 2 0.00 600.00 0.00 0.00 19/08/2020 23:59 RSD/LOW SCHEDULE
Tamil Nadu MUTHIARA TPP 2 0.00 600.00 0.00 0.00 13/11/2020 20:00 RSD/LOW SCHEDULE
Bihar KAHALGAON TPS 5 500.00 0.00 0.00 0.00 07/11/2020 12:46 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
Bihar KAHALGAON TPS 6 0.00 0.00 500.00 0.00 07/12/2020 15:37 ELECTRICAL MISCELLANEOUS
PROBLEMS
Odisha TALCHER STPS 6 500.00 0.00 0.00 0.00 04/11/2020 02:21 BOILER OVERHAUL/ ANNUAL
MAINTENANCE
Odisha DERANG TPP 2 0.00 600.00 0.00 0.00 29/04/2020 01:15 I.D. FANS PROBLEM
Odisha STERLITE TPP 1 0.00 600.00 0.00 0.00 23/11/2018 00:22 TURBINE VIBRATIONS HIGH
West Bengal DURGAPUR STEEL 2 500.00 0.00 0.00 0.00 14/11/2020 23:58 CAPITAL MAINTENANCE
TPS
West Bengal FARAKKA STPS 5 0.00 0.00 500.00 0.00 05/12/2020 17:22 ELECTRICAL MISCELLANEOUS
PROBLEMS
Total 5,160.00 15,880.00 8,880.00 600.00