You are on page 1of 2

004 30.06.

2022
INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD IN RJ-ON-90/1 BLOCK PROJECT
OWNER: VEDANTA LTD. CAIRN OIL & GAS
EPC CONTRACTOR: HALLIBURTON EPC SUB-CONTRACTOR : OSWAL INFRASTRUCTURE LIMITED
PIPE LOG BOOK

Alignment SheetNo. : S340HAL-SRX-Y-DWG-0044-01 Rev. C1


Line Description: MS/FG/WI FG Type of Welding: SMAW Doc NO.: S340HAL-RX-Y-IR-0031. Rev. B 2
Welpad From: GSV To: RGT-MPT TIE-IN
Material Specification & Dia.: API 5L GRX52 PSL2/ Dia 4'' Electrodes / Size: 3.2/4.0 Report No.: S340HAL/GSV/PL/S-001

Date : 05.06.2022

PART : A

CUMM. CUMM. ACTUAL STRINGING BENDING JOINT No WELDING RADIOGRAPHY ACCEPTAN UT JOINT COATING
COATING CUM
S.No. CHAINAGE CHAINAGE PIPE No HEAT No THK LENGTH WPS NO. CE
No. LENGTH
(FROM) (TO) Mtrs. TYPE WELDER R/RT/RS SHEET
RPT. NO. DATE RPT. NO. DATE KM. NO. RPT. NO. DATE RPT. NO. DATE RPT. NO. DATE RPT. NO. DATE
(O/S/R/L) NO. NO.

1 103.00 114.86 28 3125290 34 7.92 11.63 11.63 001 05.06.2022 NA NA NA 00 1007

2 114.86 126.38 18 3125290 36 7.92 11.52 11.52 001 05.06.2022 NA NA NA 00 M010 PLW-01 001 05.06.2022 1007 003 18.06.2022 ACC NA NA 001 20.06.2022

3 126.38 137.89 09 3125290 33 7.92 11.51 11.51 001 05.06.2022 NA NA NA 00 M011 PLW-01 001 05.06.2022 1007 003 18.06.2022 ACC NA NA 002 27.06.2022

11.54 11.54 020 07.07.2022


4 137.89 149.43 05 3125290 32 7.92 001 05.06.2022 NA NA NA 00 M012 PLW-02 018 04.07.2022 1007 ACC 010 09.07.2022
022 08.07.2022
5 149.43 160.25 205 3125290 40 7.92 10.82 10.82 001 05.06.2022 NA NA NA 00 M013 PLW-01 001 05.06.2022 1007 003 18.06.2022 ACC NA NA 001 20.06.2022

6 160.25 171.7 16 3125290 37 7.92 11.45 11.45 002 07.06.2022 NA NA NA 00 M014 PLW-01 002 07.06.2022 1007 004 18.06.2022 ACC NA NA 001 20.06.2022

11.5 11.5 020 07.07.2022


7 171.7 183.2 203 3125290 39 7.92 002 07.06.2022 NA NA NA 00 M015 PLW-02 019 05.07.2022 1007 ACC 010 09.07.2022
022 08.07.2022
8 183.2 194.69 26 3125290 31 7.92 11.49 11.49 002 07.06.2022 NA NA NA 00 M016 PLW-01 002 07.06.2022 1007 006 22.06.2022 ACC NA NA 002 27.06.2022

11.49 11.49 020 07.07.2022


9 194.69 206.18 202 3125290 38 7.92 002 07.06.2022 NA NA NA 00 M017 PLW-02 019 05.07.2022 1007 ACC 010 09.07.2022
022 08.07.2022
10 206.18 217.73 04 3125290 35 7.92 11.55 11.55 002 07.06.2022 NA NA NA 00 M018 PLW-01 002 07.06.2022 1007 005 19.06.2022 ACC NA NA 002 27.06.2022

11 217.73 229.01 106 3125290 107 7.92 11.52 11.52 002 07.06.2022 NA NA NA 00 M019 PLW-02 020 08.07.2022 1007 023 08.07.2022 ACC 010 09.07.2022

12 480.00 491.51 64 3125290 106 7.92 11.51 11.51 006 12.06.2022 NA NA NA 00 M020 PLW-01 006 12.06.2022 1007 021 07.07.2022 ACC 008 05.07.2022

13 491.51 503.02 125 3125290 105 7.92 11.52 11.52 005 11.06.2022 NA NA NA 00 M021 PLW-01 006 12.06.2022 1007 005 19.06.2022 ACC NA NA 002 27.06.2022

14 456.96 468.48 119 3125290 108 7.92 11.52 11.52 005 11.06.2022 NA NA NA 00 M022 PLW-02 005 11.06.2022 1007 002 22.06.2022 ACC NA NA 002 27.06.2022

15 514.89 525.75 126 3125290 110 7.92 7.61 7.61 006 13.06.2022 NA NA NA 00 M023 PLW-01 006 12.06.2022 1007 007 28.06.2022 ACC NA NA 003 28.06.2022

16 M024 1007

17 M025 1007

18 217.73 229.01 101 3125290 113 7.92 11.28 11.28 002 07.06.2022 NA NA NA 00 M026 1007
002 22.06.2022
19 229.01 240.52 08 3125290 112 7.92 11.51 11.51 002 07.06.2022 NA NA NA 00 M027 PLW-01 002 07.06.2022 1007 ACC NA NA 002 27.06.2022
024 11.07.2022
20 240.52 251.99 70 3125290 20 7.92 11.47 11.47 002 07.06.2022 NA NA NA 00 M028 PLW-01 002 07.06.2022 1007 007 28.06.2022 ACC NA NA 003 28.06.2022

21 251.99 263.21 54 3125290 119 7.92 11.22 11.22 003 08.06.2022 NA NA NA 00 M029 PLW-01 003 08.06.2022 1007 007 28.06.2022 ACC NA NA 003 28.06.2022

22 263.21 273.71 92 3125290 114 7.92 10.5 10.5 003 08.06.2022 NA NA NA 00 M030 PLW-01 021 11.07.2022 1007 025 13.07.2022 ACC 010 13.07.2022

23 273.71 285.22 132 3125290 115 7.92 11.51 11.51 003 08.06.2022 NA NA NA 00 M031 PLW-01 003 08.06.2022 1007 008 29.06.2022 ACC NA NA 004 30.06.2022

24 285.22 296.73 89 3125290 116 7.92 11.51 11.51 003 08.06.2022 NA NA NA 00 M032 PLW-01 003 08.06.2022 1007 008 29.06.2022 ACC NA NA 004 30.06.2022

25 296.73 308.29 101 3125290 111 7.92 11.56 11.56 003 08.06.2022 NA NA NA 00 M033 PLW-01 021 11.07.2022 1007 025 13.07.2022 ACC 010 13.07.2022

26 308.29 319.75 123 3125290 118 7.92 11.46 11.46 003 08.06.2022 NA NA NA 00 M034 PLW-01 003 08.06.2022 1007 008 29.06.2022 ACC NA NA 004 30.06.2022

27 319.75 331.24 131 3125290 117 7.92 11.49 11.49 003 08.06.2022 NA NA NA 00 M035 PLW-01 003 08.06.2022 1007 008 29.06.2022 ACC NA NA 004 30.06.2022

28 331.24 342.73 23 3125290 24 7.92 11.49 11.49 003 08.06.2022 NA NA NA 00 M036 PLW-01 021 11.07.2022 1007 025 13.07.2022 ACC 010 13.07.2022

29 342.73 353.21 50 3125290 21 7.92 10.48 10.48 003 08.06.2022 NA NA NA 00 M037 PLW-01 003 08.06.2022 1007 009 29.06.2022 ACC NA NA 004 30.06.2022

30 353.21 364.72 107 3125290 25 7.92 11.51 11.51 003 08.06.2022 NA NA NA 00 M038 PLW-01 003 08.06.2022 1007 009 29.06.2022 ACC NA NA 004 30.06.2022

31 364.72 376.43 22 3125290 23 7.92 11.71 11.71 003 08.06.2022 NA NA NA 00 M039 PLW-02 021 11.07.2022 1007 029 14.07.2022 ACC 011 14.07.2022

32 376.43 387.68 141 3125290 30 7.92 11.25 11.25 003 08.06.2022 NA NA NA 00 M040 PLW-01 003 08.06.2022 1007 009 29.06.2022 ACC NA NA 004 30.06.2022

33 387.68 399.2 81 3125290 29 7.92 11.52 11.52 003 08.06.2022 NA NA NA 00 M041 PLW-02 022 12.07.2022 1007 029 14.07.2022 ACC 011 14.07.2022

34 399.2 410.72 19 3125290 22 7.92 11.52 11.52 003 08.06.2022 NA NA NA 00 M042 PLW-01 003 08.06.2022 1007 009 29.06.2022 ACC NA NA 004 30.06.2022

35 410.72 422.22 116 3125290 28 7.92 11.5 11.5 004 09.06.2022 NA NA NA 00 M043 PLW-02 022 12.07.2022 1007 029 14.07.2022 ACC 011 14.07.2022

36 422.22 433.74 25 3125290 27 7.92 11.52 11.52 004 09.06.2022 NA NA NA 00 M044 PLW-01 004 09.06.2022 1007 010 30.06.2022 ACC NA NA 004 30.06.2022

37 433.74 445.44 24 3125290 26 7.92 11.7 11.7 004 09.06.2022 NA NA NA 00 M045 PLW-01 004 09.06.2022 1007 010 30.06.2022 ACC NA NA 004 30.06.2022

38 503.02 514.89 76 3125290 82 7.92 11.87 11.87 007 13.06.2022 NA NA NA 00 M046 PLW-02 022 12.07.2022 1007 028 14.07.2022 ACC 011 14.07.2022

39 514.89 525.75 51 3125290 90 7.92 10.86 10.86 007 13.06.2022 NA NA NA 00 M047 PLW-01 007 13.06.2022 1007 010 30.06.2022 ACC NA NA 004 30.06.2022

40 525.75 537.47 59 3125290 86 7.92 11.72 11.72 007 13.06.2022 NA NA NA 00 M048 PLW-01 007 13.06.2022 1007 011 30.06.2022 ACC 005 01.07.2022

41 537.47 549.33 74 3125290 84 7.92 11.86 11.86 007 13.06.2022 NA NA NA 00 M049 PLW-02 022 12.07.2022 1007 028 14.07.2022 ACC 011 14.07.2022

42 549.33 560.85 72 3125290 87 7.92 11.52 11.52 007 13.06.2022 NA NA NA 00 M050 PLW-01 007 13.06.2022 1007 011 30.06.2022 ACC 005 01.07.2022

43 560.85 572.37 60 3125290 88 7.92 11.52 11.52 007 13.06.2022 NA NA NA 00 M051 PLW-01 007 13.06.2022 1007 012 01.07.2022 ACC 005 01.07.2022

44 572.37 583.88 86 3125290 81 7.92 11.51 11.51 007 13.06.2022 NA NA NA 00 M052 PLW-02 023 13.07.2022 1007 028 14.07.2022 ACC 011 14.07.2022

45 583.88 595.62 58 3125290 89 7.92 11.74 11.74 007 13.06.2022 NA NA NA 00 M053 PLW-01 007 13.06.2022 1007 012 01.07.2022 ACC 005 01.07.2022

46 595.62 607.19 69 3125290 83 7.92 11.57 11.57 007 13.06.2022 NA NA NA 00 M054 PLW-01 007 13.06.2022 1007 012 01.07.2022 ACC 005 01.07.2022

47 607.19 618.71 13 3125290 85 7.92 11.52 11.52 007 13.06.2022 NA NA NA 00 M055 PLW-02 023 13.07.2022 1007 027 14.07.2022 ACC 011 14.07.2022 1/2

48 618.71 630.20 52 3125290 64 7.92 11.49 11.49 008 15.06.2022 NA NA NA 00 M056 PLW-01 008 15.06.2022 1007 013 01.07.20222 ACC 005 01.07.2022 1/2

49 630.20 641.71 38 3125290 62 7.92 11.51 11.51 008 15.06.2022 NA NA NA 00 M057 PLW-01 008 15.06.2022 1007 013 01.07.20222 ACC 005 01.07.2022 1/2

50 641.71 653.22 45 3125290 61 7.92 11.51 11.51 008 15.06.2022 NA NA NA 00 M058 PLW-01 023 13.07.2022 1007 027 14.07.2022 ACC 011 14.07.2022 1/2

51 653.22 664.89 96 3125290 68 7.92 11.67 11.67 008 15.06.2022 NA NA NA 00 M059 PLW-01 008 15.06.2022 1007 013 01.07.20222 ACC 005 01.07.2022 1/2
014 02.07.2022
52 664.89 676.21 90 3125290 69 7.92 11.32 11.32 008 15.06.2022 NA NA NA 00 M060 PLW-01 008 15.06.2022 1007 ACC 009 06.07.2022 1/2
019 05.07.2022
53 676.21 687.72 49 3125290 63 7.92 11.51 11.51 008 15.06.2022 NA NA NA 00 M061 PLW-01 023 13.07.2022 1007 027 14.07.2022 ACC 011 14.07.2022 1/2
014 02.07.2022
54 687.72 699.23 17 3125290 67 7.92 11.51 11.51 008 15.06.2022 NA NA NA 00 M062 PLW-01 008 15.06.2022 1007 ACC 006 02.07.2022 1/2
026 13.07.2022
55 699.23 709.77 02 3125290 70 7.92 10.54 10.54 008 15.06.2022 NA NA NA 00 M063 PLW-01 008 15.06.2022 1007 014 02.07.2022 ACC 006 02.07.2022 1/2

56 709.77 721.31 137 3125290 65 7.92 11.54 11.54 008 15.06.2022 NA NA NA 00 M064 1007 1/2

57 721.31 733.14 27 3125290 66 7.92 11.83 11.83 008 15.06.2022 NA NA NA 00 M065 PLW-01 008 15.06.2022 1007 015 02.07.2022 ACC 006 02.07.2022 1/2

58 733.14 744.81 34 3125290 11 7.92 11.67 11.67 008 15.06.2022 NA NA NA 00 M066 PLW-02 024 14.07.2022 1007 1/2

59 744.81 756.35 61 3125290 15 7.92 11.54 11.54 008 15.06.2022 NA NA NA 00 M067 PLW-01 008 15.06.2022 1007 015 02.07.2022 ACC 006 02.07.2022 1/2

03 3125290 50 7.92 11.87 11.87 018 14.07.2022 NA NA NA 00 M067A PLW-02 024 14.07.2022 1007

60 756.35 767.85 78 3125290 19 7.92 11.5 11.5 008 15.06.2022 NA NA NA 00 M068 1007 2/2

61 767.85 779.36 10 3125290 20 7.92 11.51 11.51 008 15.06.2022 NA NA NA 00 M069 PLW-01 008 15.06.2022 1007 015 02.07.2022 ACC 006 02.07.2022 2/2

62 779.36 790.84 44 3125290 16 7.92 11.48 11.48 008 15.06.2022 NA NA NA 00 M070 PLW-02 025 15.07.2022 1007 033 16.07.2022 ACC 2/2

63 790.84 802.34 43 3125290 17 7.92 11.5 11.5 008 15.06.2022 NA NA NA 00 M071 PLW-01 008 15.06.2022 1007 016 02.07.2022 ACC 006 02.07.2022 2/2

64 802.34 813.87 46 3125290 14 7.92 11.53 11.53 008 15.06.2022 NA NA NA 00 M072 PLW-02 026 16.07.2022 1007 036 17.07.2022 ACC 2/2
016 02.07.20220
65 813.87 825.39 77 3125290 18 7.92 11.52 11.52 008 15.06.2022 NA NA NA 00 M073 PLW-01 008 15.06.2022 1007 ACC 009 06.07.2022 2/2
019 5.07.2022
66 825.39 836.90 57 3125290 12 7.92 11.51 11.51 009 17.06.2022 NA NA NA 00 M074 PLW-02 025 15.07.2022 1007 033 16.07.2022 ACC

67 836.90 848.42 62 3125290 13 7.92 11.52 11.52 009 17.06.2022 NA NA NA 00 M075 PLW-02 009 17.06.2022 1007 017 03.07.2022 ACC 007 04.07.2022

68 848.42 860.01 82 3125290 127 7.92 11.59 11.59 010 18.06.2022 NA NA NA 00 M076 PLW-02 010 18.06.2022 1007 017 03.07.2022 ACC 007 04.07.2022

69 860.01 871.52 136 3125290 128 7.92 11.51 11.51 010 18.06.2022 NA NA NA 00 M077 PLW-02 010 18.06.2022 1007 017 03.07.2022 ACC 007 04.07.2022

70 871.52 886.06 06 3125290 126 7.92 11.54 11.54 010 18.06.2022 NA NA NA 00 M078 PLW-02 010 18.06.2022 1007 018 03.07.2022 ACC 007 04.07.2022
014 03.07.2022
71 886.06 894.68 21 3125290 121 7.92 11.62 11.62 010 18.06.2022 NA NA NA 00 M079 PLW-02 010 18.06.2022 1007 ACC 007 04.07.2022
026 13.07.2022
72 894.68 905.91 91 3125290 125 7.92 11.23 11.23 010 18.06.2022 NA NA NA 00 M080 PLW-02 010 18.06.2022 1007 018 03.07.2022 ACC 007 04.07.2022

73 905.91 917.42 20 3125290 124 7.92 11.51 11.51 010 18.06.2022 NA NA NA 00 M081 1007

74 917.42 928.91 127 3125290 123 7.92 11.49 11.49 010 18.06.2022 NA NA NA 00 M082 PLW-02 010 18.06.2022 1007 033 16.07.2022 ACC

75 928.91 940.19 100 3125290 130 7.92 11.28 11.28 010 18.06.2022 NA NA NA 00 M083 PLW-02 010 18.06.2022 1007 030 16.07.2022 ACC

76 940.19 951.70 139 3125290 122 7.92 11.51 11.51 011 20.06.2022 NA NA NA 00 M084 PLW-02 011 20.06.2022 1007 030 16.07.2022 ACC

77 951.70 963.55 55 3125290 129 7.92 11.85 11.85 011 20.06.2022 NA NA NA 01 M001 PLW-02 011 20.06.2022 1007 036 17.07.2022 ACC

78 963.55 975.09 31 3125290 96 7.92 11.54 11.54 011 20.06.2022 NA NA NA 01 M002 PLW-02 011 20.06.2022 1007 036 17.07.2022 ACC

79 975.09 986.60 36 3125290 53 7.92 11.51 11.51 011 20.06.2022 NA NA NA 01 M003 PLW-02 011 20.06.2022 1007 030 16.07.2022 ACC

80 986.60 998.12 85 3125290 54 7.92 11.52 11.52 011 20.06.2022 NA NA NA 01 M004 PLW-02 011 20.06.2022 1007 032 16.07.2022 ACC

81 998.12 1009.65 07 3125290 51 7.92 11.53 11.53 011 20.06.2022 NA NA NA 01 M005 PLW-02 011 20.06.2022 1007 032 16.07.2022 ACC

82 1009.65 1021.17 71 3125290 55 7.92 11.52 11.52 012 22.06.2022 NA NA NA 01 M006 PLW-02 012 22.06.2022 1007 032 16.07.2022 ACC

83 1021.17 1032.76 129 3125290 57 7.92 11.59 11.59 012 22.06.2022 NA NA NA 01 M007 PLW-02 012 22.06.2022 1007 031 16.07.2022 ACC

84 1032.76 1044.62 30 3125290 52 7.92 11.86 11.86 012 22.06.2022 NA NA NA 01 M008 PLW-02 012 22.06.2022 1007 034 17.07.2022 ACC

85 1044.62 1056.17 33 3125290 56 7.92 11.52 11.52 012 22.06.2022 NA NA NA 01 M009 PLW-02 012 22.06.2022 1007 034 17.07.2022 ACC

86 1056.17 1067.70 32 3125290 59 7.92 11.56 11.56 012 22.06.2022 NA NA NA 01 M010 PLW-02 012 22.06.2022 1007 034 17.07.2022 ACC

87 1067.70 1079.14 35 3125290 58 7.92 11.44 11.44 013 23.06.2022 NA NA NA 01 M011 PLW-02 013 23.06.2022 1007 035 17.07.2022 ACC

88 1079.14 1090.63 42 3125290 60 7.92 11.49 11.49 013 23.06.2022 NA NA NA 01 M012 PLW-02 013 23.06.2022 1007 035 17.07.2022 ACC

89 1090.63 1102.43 103 3125290 139 7.92 11.8 11.8 013 23.06.2022 NA NA NA 01 M013 PLW-02 013 23.06.2022 1007 035 17.07.2022 ACC

90 1102.43 1114.19 104 3125290 138 7.92 11.76 11.76 013 23.06.2022 NA NA NA 01 M014 PLW-02 013 23.06.2022 1007

91 1114.19 1125.71 113 3125290 132 7.92 11.52 11.52 013 23.06.2022 NA NA NA 01 M015 PLW-02 013 23.06.2022 1007

92 1125.71 1136.88 118 3125290 137 7.92 11.17 11.17 013 23.06.2022 NA NA NA 01 M016 PLW-02 013 23.06.2022 1007

93 1136.88 1148.38 110 3125290 08 7.92 11.5 11.5 013 23.06.2022 NA NA NA 01 M017 1007

94 1148.38 1159.89 109 3125290 07 7.92 11.51 11.51 013 23.06.2022 NA NA NA 01 M018 PLW-02 013 23.06.2022 1007

95 1159.89 1171.52 48 3125290 04 7.92 11.63 11.63 013 23.06.2022 NA NA NA 01 M019 PLW-02 013 23.06.2022 1007

96 1171.52 1183.04 88 3125290 06 7.92 11.52 11.52 013 23.06.2022 NA NA NA 01 M020 PLW-02 013 23.06.2022 1007

97 1183.04 1194.56 108 3125290 05 7.92 11.52 11.52 014 24.06.2022 NA NA NA 01 M021 PLW-01 014 24.06.2022 1007

98 1194.56 1206.08 84 3125290 09 7.92 11.52 11.52 014 24.06.2022 NA NA NA 01 M022 PLW-01 014 24.06.2022 1007

99 1206.08 1217.57 130 3125290 03 7.92 11.49 11.49 014 24.06.2022 NA NA NA 01 M023 PLW-01 014 24.06.2022 1007

100 1217.57 1229.20 68 3125290 01 7.92 11.63 11.63 014 24.06.2022 NA NA NA 01 M024 PLW-01 014 24.06.2022 1007

101 1229.20 1240.76 11 3125290 74 7.92 11.56 11.56 014 24.06.2022 NA NA NA 01 M025 PLW-01 014 24.06.2022 1007

102 1240.76 1252.20 133 3125290 73 7.92 11.44 11.44 014 24.06.2022 NA NA NA 01 M026 PLW-01 014 24.06.2022 1007

103 1252.20 1263.71 105 3125290 75 7.92 11.51 11.51 014 24.06.2022 NA NA NA 01 M027 PLW-01 014 24.06.2022 1007

104 1263.71 1275.21 138 3125290 79 7.92 11.5 11.5 015 25.06.2022 NA NA NA 01 M028 PLW-02 015 25.06.2022 1007

105 1275.21 1287.01 12 3125290 80 7.92 11.8 11.8 015 25.06.2022 NA NA NA 01 M029 PLW-02 015 25.06.2022 1007

106 1287.01 1298.52 102 3125290 71 7.92 11.51 11.51 015 25.06.2022 NA NA NA 01 M030 1007

107 1298.52 1310.04 83 3125290 72 7.92 11.52 11.52 015 25.06.2022 NA NA NA 01 M031 PLW-02 015 25.06.2022 1007

108 1310.04 1321.54 140 3125290 78 7.92 11.5 11.5 015 25.06.2022 NA NA NA 01 M032 PLW-02 015 25.06.2022 1007

109 1321.54 1333.05 97 3125290 76 7.92 11.51 11.51 015 25.06.2022 NA NA NA 01 M033 PLW-02 015 25.06.2022 1007

110 1333.05 1344.93 53 3125290 77 7.92 11.88 11.88 015 25.06.2022 NA NA NA 01 M034 PLW-02 015 25.06.2022 1007

111 1344.93 1355.09 94 3125290 93 7.92 10.16 10.16 015 25.06.2022 NA NA NA 01 M035 PLW-02 015 25.06.2022 1007

112 1355.09 1366.61 47 3125290 94 7.92 11.52 11.52 015 25.06.2022 NA NA NA 01 M036 PLW-02 015 25.06.2022 1007

113 1366.61 1378.52 98 3125290 02 7.92 11.91 11.91 015 25.06.2022 NA NA NA 01 M037 PLW-02 015 25.06.2022 1007

114 1378.52 1390.03 37 3125290 10 7.92 11.51 11.51 015 25.06.2022 NA NA NA 01 M038 PLW-02 015 25.06.2022 1007

115 1390.03 1401.53 87 3125290 131 7.92 11.5 11.5 016 26.06.2022 NA NA NA 01 M039 1007

116 1401.53 1413.05 111 3125290 136 7.92 11.52 11.52 016 26.06.2022 NA NA NA 01 M040 PLW-02 016 26.06.2022 1007

117 1413.05 1424.66 112 3125290 135 7.92 11.61 11.61 016 26.06.2022 NA NA NA 01 M041 PLW-02 016 26.06.2022 1007

118 1424.66 1435.80 41 3125290 97 7.92 11.14 11.14 016 26.06.2022 NA NA NA 01 M042 PLW-02 016 26.06.2022 1007

119 1435.80 1447.31 135 3125290 99 7.92 11.51 11.51 016 26.06.2022 NA NA NA 01 M043 PLW-02 016 26.06.2022 1007

120 1447.31 1458.76 121 3125290 100 7.92 11.45 11.45 016 26.06.2022 NA NA NA 01 M044 PLW-02 016 26.06.2022 1007

121 1458.76 1470.29 56 3125290 91 7.92 11.53 11.53 016 26.06.2022 NA NA NA 01 M045 1007

122 1470.29 1481.14 01 3125290 95 7.92 10.85 10.85 016 26.06.2022 NA NA NA 01 M046 PLW-01 016 26.06.2022 1007

123 1481.14 1492.10 79 3125290 92 7.92 10.96 10.96 016 26.06.2022 NA NA NA 01 M047 1007

124 1492.10 1503.37 124 3125290 140 7.92 11.27 11.27 016 26.06.2022 NA NA NA 01 M048 PLW-01 016 26.06.2022 1007

125 1503.37 1514.89 80 3125290 133 7.92 11.52 11.52 017 27.06.2022 NA NA NA 01 M049 PLW-01 017 27.06.2022 1007

126 1514.89 1526.21 63 3125290 98 7.92 11.32 11.32 017 27.06.2022 NA NA NA 01 M050 PLW-01 017 27.06.2022 1007

127 1526.21 1537.70 99 3125290 46 7.92 11.49 11.49 017 27.06.2022 NA NA NA 01 M051 PLW-01 017 27.06.2022 1007

128 1537.70 1549.54 75 3125290 45 7.92 11.84 11.84 017 27.06.2022 NA NA NA 01 M052 PLW-01 017 27.06.2022 1007

LEGEND :

"O" :-OVERBEAD "S" :-SAG CH. :- CHAINAGE "R" :- RIGHT "L" :- LEFT

REMARKS : The pipe section from Ch. to Ch. - Joints from KM J to KM J have been cleared for lowering.

OSWAL / HOSI CIL

Sign: Sign:

Name: Name:

Date: Date:
011 02.07.2022
INTEGRATED FIELD PLAN EXECUTION SERVICES IN SATELLITE FIELD IN RJ-ON-90/1 BLOCK PROJECT
OWNER: VEDANTA LTD. CAIRN OIL & GAS
EPC CONTRACTOR: HALLIBURTON EPC SUB-CONTRACTOR : OSWAL INFRASTRUCTURE LIMITED
PIPE LOG BOOK

Alignment SheetNo. : S340HAL-SRX-Y-DWG-0044-01 Rev. C1


Line Description: MS/FG/WI FG Type of Welding: SMAW Doc NO.: S340HAL-RX-Y-IR-0031. Rev. B 2
Welpad From: GSV To: RGT-MPT TIE-IN
Material Specification & Dia.: API 5L GRX52 PSL2/ Dia 3'' Electrodes / Size: 3.2/4.0 Report No.: S340HAL/GSV/PL/S-001

Date : 05.06.2022

PART : A

CUMM. CUMM. ACTUAL STRINGING BENDING JOINT No WELDING RADIOGRAPHY ACCEPTAN UT JOINT COATING
COATING CUM
S.No. CHAINAGE CHAINAGE PIPE No HEAT No THK LENGTH WPS NO. CE
No. LENGTH
(FROM) (TO) Mtrs. TYPE WELDER R/RT/RS
RPT. NO. DATE RPT. NO. DATE KM. NO. RPT. NO. DATE RPT. NO. DATE RPT. NO. DATE RPT. NO. DATE SH. NO.
(O/S/R/L) NO.

1 390.8 402.48 104 3125290 45 7.92 11.68 11.68 004 12.06.2022 NA NA NA 00 1007

2 402.48 413.93 31 3125290 46 7.92 11.68 11.68 005 12.06.2022 NA NA NA 00 M010 PLW-01 004 12.06.2022 1007 002 22.06.2022 ACC NA NA 002 27.06.2022
021 07.07.2022
3 413.93 424.82 02 3125290 44 7.92 11.5 11.5 004 12.06.2022 NA NA NA 00 M011 PLW-01 015 04.07.2022 1007 ACC NA NA 009 09.07.2022
023 08.07.2022
4 424.82 436.69 110 3125290 41 7.92 10.84 10.84 004 12.06.2022 NA NA NA 00 M012 PLW-01 004 12.06.2022 1007 002 22.06.2022 ACC NA NA 002 27.06.2022
021 07.07.2022
5 436.69 448.51 58 3125290 47 7.92 11.87 11.87 004 12.06.2022 NA NA NA 00 M013 PLW-01 015 04.07.2022 1007 ACC NA NA 009 09.07.2022
023 08.07.2022
6 448.51 460.29 96 3125290 49 7.92 11.82 11.82 004 12.06.2022 NA NA NA 00 M014 PLW-01 004 12.06.2022 1007 001 19.06.2022 ACC NA NA 001 20.06.2022

021 07.07.2022
7 460.29 471.90 127 3125290 48 7.92 11.78 11.78 004 12.06.2022 NA NA NA 00 M015 PLW-02 016 05.07.2022 1007 ACC NA NA 009 09.07.2022
023 08.07.2022
8 471.90 483.53 106 3125290 43 7.92 11.61 11.61 004 12.06.2022 NA NA NA 00 M016 PLW-01 004 12.06.2022 1007 001 19.06.2022 ACC NA NA 001 20.06.2022
020 07.07.2022
9 483.53 494.87 77 3125290 50 7.92 11.63 11.63 004 12.06.2022 NA NA NA 00 M017 PLW-02 016 05.07.2022 1007 ACC NA NA 009 09.07.2022
023 08.07.2022

10 494.87 506.72 93 3125290 42 7.92 11.34 11.34 004 12.06.2022 NA NA NA 00 M018 PLW-01 004 12.06.2022 1007 001 19.06.2022 ACC NA NA 001 20.06.2022

11 356.05 367.79 84 3125290 103 7.92 11.85 11.85 004 12.06.2022 NA NA NA 00 M019 PLW-01 017 08.07.2022 1007 022 08.07.2022 ACC NA NA 009 09.07.2022
003 28.06.2022
12 367.79 379.14 49 3125290 106 7.92 11.74 11.74 004 12.06.2022 NA NA NA 00 M020 PLW-01 004 12.06.2022 1007 ACC NA NA 007 05.07.2022
024 11.07.2022
003 28.06.2022
13 332.71 344.41 101 M006600B 107 6.4 11.35 11.35 003 11.06.2022 NA NA NA 00 M021 PLW-01 004 12.06.2022 1007 ACC NA NA 007 05.07.2022
024 11.07.2022

14 344.41 356.05 82 M006600B 109 6.4 11.7 11.7 003 11.06.2022 NA NA NA 00 M022 PLW-01 003 08.06.2022 1007 003 28.06.2022 ACC NA NA 007 05.07.2022 2/2
003 28.06.2022
15 379.14 390.8 72 3125290 108 7.92 11.64 11.64 004 12.06.2022 NA NA NA 00 M023 PLW-01 004 12.06.2022 1007 ACC NA NA 007 05.07.2022
024 11.07.2022
16 390.8 402.48 104 3125290 45 7.92 6.14 6.14 004 12.06.2022 NA NA NA 00 M024 1007

17 M025 1007

18 M026 1007

19 184.26 195.53 53 M006600B 98 6.4 11.27 11.27 003 11.06.2022 NA NA NA 00 M027 PLW-01 003 11.06.2022 1007 004 28.06.2022 ACC NA NA 003 28.06.2022

20 195.53 206.88 34 M006600B 100 6.4 11.35 11.35 003 11.06.2022 NA NA NA 00 M028 PLW-01 003 11.06.2022 1007 004 28.06.2022 ACC NA NA 003 28.06.2022
032 13.07.2022
21 206.88 217.88 125 M006600B 99 6.4 10.7 10.7 003 11.06.2022 NA NA NA 00 M029 PLW-01 018 11.07.2022 1007 ACC 013 13.07.2022
035 14.07.2022
22 217.88 229.48 114 M006600B 91 6.4 11.9 11.9 003 11.06.2022 NA NA NA 00 M030 PLW-01 003 11.06.2022 1007 004 28.06.2022 ACC NA NA 003 28.06.2022

23 229.48 240.82 33 M006600B 97 6.4 11.34 11.34 003 11.06.2022 NA NA NA 00 M031 PLW-01 003 11.06.2022 1007 005 29.06.2022 ACC NA NA 004 30.06.2022

24 240.82 252.28 119 M006600B 92 6.4 11.46 11.46 003 11.06.2022 NA NA NA 00 M032 PLW-02 018 11.07.2022 1007 032 13.07.2022 ACC 013 13.07.2022

25 252.28 263.97 62 M006600B 96 6.4 11.69 11.69 003 11.06.2022 NA NA NA 00 M033 PLW-01 003 08.06.2022 1007 005 29.06.2022 ACC NA NA 004 30.06.2022 1/2

26 263.97 275.82 105 M006600B 95 6.4 11.85 11.85 003 11.06.2022 NA NA NA 00 M034 PLW-01 003 08.06.2022 1007 005 29.06.2022 ACC NA NA 004 30.06.2022 1/2

27 275.82 287.17 121 M006600B 94 6.4 11.35 11.35 003 11.06.2022 NA NA NA 00 M035 PLW-02 018 11.07.2022 1007 032 13.07.2022 ACC 013 13.07.2022
020 07.06.2022
28 287.17 298.53 80 M006600B 111 6.4 11.36 11.36 003 11.06.2022 NA NA NA 00 M036 PLW-01 003 08.06.2022 1007 ACC NA NA 010 10.07.2022 1/2
022 08.07.2022
29 298.53 309.68 116 M006600B 117 6.4 11.15 11.15 003 11.06.2022 NA NA NA 00 M037 PLW-01 003 08.06.2022 1007 005 29.06.2022 ACC NA NA 004 30.06.2022 1/2

30 309.68 321.38 30 M006600B 115 6.4 11.7 11.7 003 11.06.2022 NA NA NA 00 M038 PLW-02 018 11.07.2022 1007 032 13.07.2022 ACC 013 13.07.2022
020 07.06.2022
31 321.38 332.71 55 M006600B 116 6.4 11.33 11.33 003 11.06.2022 NA NA NA 00 M039 PLW-01 003 08.06.2022 1007 ACC NA NA 010 10.07.2022 2/2
022 08.07.2022

32 126.29 138.05 22 M006600B 119 6.4 11.76 11.76 002 10.06.2022 NA NA NA 00 M040 PLW-01 003 11.06.2022 1007 006 29.06.2022 ACC NA NA 004 30.06.2022 2/2

33 138.05 149.71 168 M006600B 118 6.4 11.66 11.66 002 10.06.2022 NA NA NA 00 M041 PLW-01 002 10.06.2022 1007 022 08.07.2022 ACC NA NA 010 10.07.2022

34 149.71 161.13 46 M006600B 120 6.4 11.42 11.42 002 10.06.2022 NA NA NA 00 M042 PLW-01 019 12.07.2022 1007 033 13.07.2022 ACC 013 13.07.2022

35 161.13 172.59 37 M006600B 114 6.4 11.46 11.46 002 10.06.2022 NA NA NA 00 M043 PLW-01 002 10.06.2022 1007 008 30.06.2022 ACC NA NA 004 30.06.2022

36 103.23 114.86 69 M006600B 112 6.4 11.45 11.45 001 09.06.2022 NA NA NA 00 M044 PLW-01 002 10.06.2022 1007 008 30.06.2022 ACC NA NA 004 30.06.2022

37 114.86 126.38 24 M006600B 113 6.4 11.61 11.61 001 09.06.2022 NA NA NA 00 M045 PLW-01 001 09.06.2022 1007 008 30.06.2022 ACC NA NA 004 30.06.2022
033 13.07.2022
506.72 518.57 31 M006600B 62 6.4 11.85 11.85 005 16.06.2022 NA NA NA 00 M046 PLW-01 019 12.07.2022 1007 ACC 014 14.07.2022
035 14.07.2022
38 518.57 529.97 36 M006600B 69 6.4 11.4 11.4 005 16.06.2022 NA NA NA 00 M047 PLW-01 005 16.06.2022 1007 007 30.06.2022 ACC NA NA 004 30.06.2022

39 529.97 541.66 108 M006600B 63 6.4 11.69 11.69 005 16.06.2022 NA NA NA 00 M048 PLW-01 005 16.06.2022 1007 007 30.06.2022 ACC 005 01.07.2022

40 541.66 553.41 40 M006600B 70 6.4 11.75 11.75 005 16.06.2022 NA NA NA 00 M049 PLW-01 0019 12.07.2022 1007 033 13.07.2022 ACC 013 13.07.2022

41 553.41 565.31 79 M006600B 64 6.4 11.9 11.9 005 16.06.2022 NA NA NA 00 M050 PLW-01 005 16.06.2022 1007 007 30.06.2022 ACC 005 01.07.2022

42 565.31 578.98 71 M006600B 61 6.4 10.67 10.67 005 16.06.2022 NA NA NA 00 M051 PLW-01 005 16.06.2022 1007 009 01.07.2022 ACC 005 01.07.2022

43 578.98 587.64 99 M006600B 68 6.4 11.66 11.66 005 16.06.2022 NA NA NA 00 M052 PLW-02 020 13.07.2022 1007 035 14.07.2022 ACC 014 14.07.2022

44 587.64 599.22 54 M006600B 67 6.4 11.58 11.58 005 16.06.2022 NA NA NA 00 M053 PLW-01 005 16.06.2022 1007 009 01.07.2022 ACC 005 01.07.2022

45 599.22 610.97 89 M006600B 66 6.4 11.75 11.75 005 16.06.2022 NA NA NA 00 M054 PLW-02 020 13.07.2022 1007 035 14.07.2022 ACC 014 14.07.2022

46 610.97 622.67 29 M006600B 65 6.4 11.7 11.7 005 16.06.2022 NA NA NA 00 M055 PLW-01 005 16.06.2022 1007 009 01.07.2022 ACC 005 01.07.2022

47 622.67 634.34 91 M006600B 03 6.4 11.67 11.67 006 17.06.2022 NA NA NA 00 M056 PLW-01 020 13.07.2022 1007 034 14.07.2022 ACC 014 14.07.2022 1/2

48 634.34 645.7 92 M006600B 04 6.4 11.36 11.36 006 17.06.2022 NA NA NA 00 M057 PLW-01 006 17.06.2022 1007 009 01.07.2022 ACC 005 01.07.2022 1/2

49 645.7 656.77 35 M006600B 01 6.4 11.07 11.07 006 17.06.2022 NA NA NA 00 M058 PLW-01 006 17.06.2022 1007 010 01.07.2022 ACC 005 01.07.2022 1/2

50 656.77 668.32 18 M006600B 02 6.4 11.55 11.55 006 17.06.2022 NA NA NA 00 M059 PLW-01 020 13.07.2022 1007 034 14.07.2022 ACC 014 14.07.2022 1/2
012 02.07.2022
51 668.32 679.83 123 M006600B 05 6.4 11.51 11.51 006 17.06.2022 NA NA NA 00 M060 PLW-01 006 17.06.2022 1007 ACC 008 06.07.2022 1/2
019 06.07.2022
52 679.83 691.51 61 M006600B 06 6.4 11.68 11.68 006 17.06.2022 NA NA NA 00 M061 PLW-01 006 17.06.2022 1007 012 02.07.2022 ACC 006 02.07.2022 1/2

53 691.51 703.21 16 M006600B 10 6.4 11.7 11.7 006 17.06.2022 NA NA NA 00 M062 PLW-01 020 13.07.2022 1007 034 14.07.2022 ACC 014 14.07.2022 1/2

54 703.21 714.43 15 M006600B 07 6.4 11.22 11.22 006 17.06.2022 NA NA NA 00 M063 PLW-01 006 17.06.2022 1007 012 02.07.2022 ACC 006 02.07.2022 1/2

55 714.43 726.12 28 M006600B 09 6.4 11.69 11.69 006 17.06.2022 NA NA NA 00 M064 1007 1/2

56 726.12 737.36 76 M006600B 58 6.4 11.24 11.24 006 17.06.2022 NA NA NA 00 M065 PLW-01 006 17.06.2022 1007 012 02.07.2022 ACC 006 02.07.2022 1/2

57 737.36 748.99 12 M006600B 08 6.4 11.63 11.63 006 17.06.2022 NA NA NA 00 M066 PLW-01 021 14.07.2022 1007 037 15.07.2022 ACC 1/2
011 02.07.2022
58 748.99 760.33 43 M006600B 57 6.4 11.34 11.34 006 17.06.2022 NA NA NA 00 M067 PLW-01 006 17.06.2022 1007 ACC 008 06.07.2022 1/2
019 06.07.2022

60 M006600B 59 6.4 11.67 11.67 015 14.07.2022 NA NA NA 00 M067A PLW-01 021 14.07.2022 1007 037 15.07.2022 ACC

59 760.33 771.74 107 M006600B 54 6.4 11.41 11.41 006 17.06.2022 NA NA NA 00 M068 1007 1/2
011 02.07.2022
60 771.74 783.41 68 M006600B 56 6.4 11.67 11.67 006 17.06.2022 NA NA NA 00 M069 PLW-02 006 17.06.2022 1007 ACC 008 06.07.2022 1/2
019 06.07.2022
61 783.41 794.74 51 M006600B 52 6.4 11.33 11.33 006 17.06.2022 NA NA NA 00 M070 PLW-01 022 15.07.2022 1007 040 16.07.2022 ACC 2/2
011 02.07.2022
62 794.74 806.39 100 M006600B 55 6.4 11.65 11.65 006 17.06.2022 NA NA NA 00 M071 PLW-02 006 17.06.2022 1007 ACC 008 06.07.2022 2/2
019 06.07.2022
63 806.39 817.73 161 M006600B 21 6.4 11.34 11.34 006 17.06.2022 NA NA NA 00 M072 PLW-02 023 16.07.2022 1007 041 17.07.2022 ACC 2/2

64 817.73 829.42 47 M006600B 22 6.4 11.69 11.69 006 17.06.2022 NA NA NA 00 M073 PLW-02 006 17.06.2022 1007 013 03.07.2022 ACC 007 05.07.2022 2/2
012A 05.07.2022
65 829.42 840.75 19 M006600B 23 6.4 11.33 11.33 007 18.06.2022 NA NA NA 00 M074 PLW-01 007 18.06.2022 1007 ACC 008 06.07.2022
018 06.07.2022
014 03.07.2022
66 840.75 852.61 67 M006600B 30 6.4 11.86 11.86 007 18.06.2022 NA NA NA 00 M075 PLW-01 007 18.06.2022 1007 ACC 007 05.07.2022
017 05.07.2022
014 03.07.2022
67 852.61 863.93 111 M006600B 24 6.4 11.32 11.32 007 18.06.2022 NA NA NA 00 M076 PLW-01 007 18.06.2022 1007 ACC 007 05.07.2022
017 05.07.2022
014 03.07.2022
68 863.93 875.28 63 M006600B 29 6.4 11.35 11.35 007 18.06.2022 NA NA NA 00 M077 PLW-01 007 18.06.2022 1007 ACC 007 05.07.2022
017 05.07.2022
014 03.07.2022
69 875.28 886.81 39 M006600B 27 6.4 11.53 11.53 007 18.06.2022 NA NA NA 00 M078 PLW-01 007 18.06.2022 1007 ACC 007 05.07.2022
017 05.07.2022
70 886.81 879.42 133 M006600B 25 6.4 10.61 10.61 007 18.06.2022 NA NA NA 00 M079 PLW-02 023 16.07.2022 1007 041 17.07.2022 ACC

71 879.42 908.99 124 M006600B 26 6.4 11.57 11.57 007 18.06.2022 NA NA NA 00 M080 PLW-01 007 18.06.2022 1007 041 17.07.2022 ACC

72 908.99 920.66 94 M006600B 28 6.4 11.67 11.67 007 18.06.2022 NA NA NA 00 M081 PLW-01 007 18.06.2022 1007 041 17.07.2022 ACC

73 920.66 932.16 20 M006600B 39 6.4 11.5 11.5 007 18.06.2022 NA NA NA 00 M082 PLW-01 007 18.06.2022 1007 016 05.07.2022 ACC 007 05.07.2022
016 05.07.2022
74 932.16 943.51 11 M006600B 33 6.4 11.35 11.35 008 20.06.2022 NA NA NA 00 M083 PLW-01 008 20.06.2022 1007 ACC
025 11.07.2022
75 943.51 955.29 122 M006600B 35 6.4 11.78 11.78 008 20.06.2022 NA NA NA 00 M084 PLW-01 008 20.06.2022 1007 042 17.07.2022 ACC

76 955.29 966.64 06 M006600B 40 6.4 11.35 11.35 008 20.06.2022 NA NA NA 01 M001 PLW-01 008 20.06.2022 1007 018 06.07.2022 ACC

77 966.64 978.00 05 M006600B 38 6.4 11.36 11.36 008 20.06.2022 NA NA NA 01 M002 PLW-01 008 20.06.2022 1007 042 17.07.2022 ACC

78 978.00 989.68 90 M006600B 34 6.4 11.68 11.68 008 20.06.2022 NA NA NA 01 M003 PLW-01 008 20.06.2022 1007 025 11.07.2022 ACC

79 989.68 1000.98 04 M006600B 37 6.4 11.3 11.3 008 20.06.2022 NA NA NA 01 M004 PLW-01 008 20.06.2022 1007 025 11.07.2022 ACC

80 1000.98 1012.46 07 M006600B 36 6.4 11.48 11.48 009 22.06.2022 NA NA NA 01 M005 PLW-01 009 22.06.2022 1007 025 11.07.2022 ACC

81 1012.46 1024.14 103 M006600B 31 6.4 11.68 11.68 009 22.06.2022 NA NA NA 01 M006 PLW-01 009 22.06.2022 1007 026 11.07.2022 ACC

82 1024.14 1035.49 09 M006600B 32 6.4 11.35 11.35 009 22.06.2022 NA NA NA 01 M007 PLW-01 009 22.06.2022 1007 026 11.07.2022 ACC

83 1035.49 1047.04 17 M006600B 124 6.4 11.55 11.55 009 22.06.2022 NA NA NA 01 M008 PLW-01 009 22.06.2022 1007 026 11.07.2022 ACC

84 1047.04 1058.28 08 M006600B 125 6.4 11.24 11.24 009 22.06.2022 NA NA NA 01 M009 PLW-01 009 22.06.2022 1007 026 11.07.2022 ACC

85 1058.28 1070.02 113 M006600B 130 6.4 11.74 11.74 010 23.06.2022 NA NA NA 01 M010 PLW-01 010 23.06.2022 1007 027 11.07.2022 ACC

86 1070.02 1081.67 117 M006600B 121 6.4 11.65 11.65 010 23.06.2022 NA NA NA 01 M011 PLW-01 010 23.06.2022 1007 027 11.07.2022 ACC

87 1081.67 1093.47 56 M006600B 126 6.4 11.8 11.8 010 23.06.2022 NA NA NA 01 M012 PLW-01 010 23.06.2022 1007 027 11.07.2022 ACC

88 1093.47 1104.81 169 M006600B 127 6.4 11.34 11.34 010 23.06.2022 NA NA NA 01 M013 PLW-01 010 23.06.2022 1007 027 11.07.2022 ACC

89 1104.81 1115.45 86 M006600B 129 6.4 10.64 10.64 010 23.06.2022 NA NA NA 01 M014 PLW-01 010 23.06.2022 1007 028 11.07.2022 ACC

90 1115.45 1127.17 126 M006600B 123 6.4 11.72 11.72 010 23.06.2022 NA NA NA 01 M015 1007

91 1127.17 1138.86 44 M006600B 128 6.4 11.69 11.69 010 23.06.2022 NA NA NA 01 M016 PLW-01 010 23.06.2022 1007 037 15.07.2022 ACC

92 1138.86 1150.81 102 M006600B 122 6.4 11.95 11.95 010 23.06.2022 NA NA NA 01 M017 PLW-01 010 23.06.2022 1007 037 15.07.2022 ACC

93 1150.81 1162.49 97 M006600B 15 6.4 11.68 11.68 010 23.06.2022 NA NA NA 01 M018 PLW-01 010 23.06.2022 1007 038 15.07.2022 ACC

94 1162.49 1174.33 164 M006600B 14 6.4 11.84 11.84 011 24.06.2022 NA NA NA 01 M019 PLW-01 011 24.06.2022 1007

95 1174.33 1185.98 163 M006600B 13 6.4 11.65 11.65 011 24.06.2022 NA NA NA 01 M020 PLW-01 011 24.06.2022 1007 038 15.07.2022 ACC

96 1185.98 1197.68 98 M006600B 11 6.4 11.7 11.7 011 24.06.2022 NA NA NA 01 M021 PLW-01 011 24.06.2022 1007 038 15.07.2022 ACC

97 1197.68 1209.02 88 M006600B 20 6.4 11.34 11.34 011 24.06.2022 NA NA NA 01 M022 PLW-01 011 24.06.2022 1007 036 15.07.2022 ACC

98 1209.02 1220.01 57 M006600B 12 6.4 11.88 11.88 011 24.06.2022 NA NA NA 01 M023 PLW-01 011 24.06.2022 1007 036 15.07.2022 ACC

99 1220.01 1232.49 26 M006600B 19 6.4 11.59 11.59 011 24.06.2022 NA NA NA 01 M024 PLW-01 011 24.06.2022 1007 029 12.07.2022 ACC

100 1232.49 1243.75 81 M006600B 16 6.4 11.26 11.26 011 24.06.2022 NA NA NA 01 M025 PLW-01 011 24.06.2022 1007 029 12.07.2022 ACC

101 1243.75 1254.82 48 M006600B 18 6.4 11.07 11.07 012 25.06.2022 NA NA NA 01 M026 PLW-01 012 25.06.2022 1007 029 12.07.2022 ACC

102 1254.82 1266.15 165 M006600B 17 6.4 11.33 11.33 012 25.06.2022 NA NA NA 01 M027 PLW-01 012 25.06.2022 1007 029 12.07.2022 ACC

103 1266.15 1277.82 42 M006600B 87 6.4 11.67 11.67 012 25.06.2022 NA NA NA 01 M028 1007

104 1277.82 1289.33 115 M006600B 88 6.4 11.51 11.51 012 25.06.2022 NA NA NA 01 M029 PLW-01 012 25.06.2022 1007 031 12.07.2022 ACC

105 1289.33 1301.24 109 M006600B 86 6.4 11.91 11.91 012 25.06.2022 NA NA NA 01 M030 PLW-01 012 25.06.2022 1007 031 12.07.2022 ACC

106 1301.24 1312.90 38 M006600B 81 6.4 11.66 11.66 012 25.06.2022 NA NA NA 01 M031 PLW-01 012 25.06.2022 1007 031 12.07.2022 ACC
031 12.07.2022
107 1312.90 1324.78 32 M006600B 90 6.4 11.88 11.88 012 25.06.2022 NA NA NA 01 M032 PLW-01 012 25.06.2022 1007 ACC
033 13.07.2022

108 1324.78 1336.59 27 M006600B 82 6.4 11.81 11.81 012 25.06.2022 NA NA NA 01 M033 PLW-01 012 25.06.2022 1007 030 12.07.2022 ACC

109 1336.59 1347.17 134 M006600B 84 6.4 10.58 10.58 012 25.06.2022 NA NA NA 01 M034 PLW-01 012 25.06.2022 1007 030 12.07.2022 ACC

110 1347.17 1358.50 10 M006600B 83 6.4 11.33 11.33 012 25.06.2022 NA NA NA 01 M035 PLW-01 012 25.06.2022 1007 030 12.07.2022 ACC

111 1358.50 1370.28 64 M006600B 85 6.4 11.78 11.78 012 25.06.2022 NA NA NA 01 M036 PLW-01 012 25.06.2022 1007 030 12.07.2022 ACC

112 1370.28 1381.60 41 M006600B 89 6.4 11.32 11.32 013 26.06.2022 NA NA NA 01 M037 1007

113 1381.60 1392.00 120 M006600B 140 6.4 10.4 10.4 013 26.06.2022 NA NA NA 01 M038 PLW-01 013 26.06.2022 1007 036 15.07.2022 ACC

114 1392.00 1403.70 59 M006600B 133 6.4 11.7 11.7 013 26.06.2022 NA NA NA 01 M039 PLW-01 013 26.06.2022 1007 036 15.07.2022 ACC

115 1403.70 1414.95 118 M006600B 139 6.4 11.25 11.25 013 26.06.2022 NA NA NA 01 M040 PLW-01 013 26.06.2022 1007 039 15.07.2022 ACC

116 1414.95 1425.33 132 M006600B 132 6.4 10.38 10.38 013 26.06.2022 NA NA NA 01 M041 PLW-01 013 26.06.2022 1007 040 16.07.2022 ACC

117 1425.33 1435.93 162 M006600B 136 6.4 10.6 10.6 013 26.06.2022 NA NA NA 01 M042 PLW-01 013 26.06.2022 1007 040 16.07.2022 ACC

118 1435.93 1447.68 45 M006600B 134 6.4 11.75 11.75 013 26.06.2022 NA NA NA 01 M043 1007

119 1447.68 1458.84 166 M006600B 135 6.4 11.16 11.16 013 26.06.2022 NA NA NA 01 M044 PLW-01 013 26.06.2022 1007 040 16.07.2022 ACC

120 1458.84 1469.53 65 M006600B 137 6.4 10.69 10.69 014 27.06.2022 NA NA NA 01 M045 1007

121 1469.53 1481.19 83 M006600B 75 6.4 11.66 11.66 014 27.06.2022 NA NA NA 01 M046 PLW-01 014 27.06.2022 1007

122 1481.19 1492.85 167 M006600B 131 6.4 11.66 11.66 014 27.06.2022 NA NA NA 01 M047 PLW-01 014 27.06.2022 1007

123 1492.85 1504.53 23 M006600B 74 6.4 11.68 11.68 014 27.06.2022 NA NA NA 01 M048 PLW-01 014 27.06.2022 1007

124 1504.53 1516.42 112 M006600B 76 6.4 11.89 11.89 014 27.06.2022 NA NA NA 01 M049 PLW-01 014 27.06.2022 1007

125 1516.42 1528.27 70 M006600B 73 6.4 11.85 11.85 014 27.06.2022 NA NA NA 01 M050 PLW-01 014 27.06.2022 1007

REMARKS : The pipe section from Ch. to Ch. - Joints from KM J to KM J have been cleared for lowering.

OSWAL / HOSI CIL

Sign: Sign: